Text
~8 REQy v
C<
0~c UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 June 23, 1993 Docket No. 50-220 Hr. B. Ralph Sylvia Executive Vice President, Nuclear Niagara Hohawk Power Corporation 301 Plainfield Road
- Syracuse, New York 13212
Dear Hr. Sylvia:
SUBJECT:
NINE HILE POINT NUCLEAR STATION UNIT NO.
1
RESPONSE
TO NRC BULLETIN 93-02, "DEBRIS PLUGGING OF EHERGENCY CORE COOLING SUCTION STRAINERS" (TAC NO. H86586)
This letter acknowledges receipt of Niagara Mohawk Power Corporation's (NHPC's) response dated June 10, 1993, to NRC Bulletin 93-02 (Bulletin).
The Bulletin was issued Hay 11, 1993, to all nuclear power reactor licensees.
It requested licensees to identify fibrous material in the primary containment, take any necessary compensatory
- measures, and remove any such material.
NHPC's response stated that:
(1) no fibrous filter material, such as described in the Bulletin, was identified as being used or stored in the Nine Hile Point 1 containment during normal operation; (2) if fibrous materials were to be used, even on a temporary basis, its use would need to be reviewed in accordance with the temporary modification or other plant change procedure and that currently no temporary modifications exist on drywell cooling or ventilation systems; and (3) the drywell is thoroughly inspected for cleanliness prior to startup following each refueling outage and that these walkdowns would have identified any poor housekeeping or abnormal drywell configurations.
Based on NHPC's response, we consider NHPC's actions to be complete.
Please retain any records of NHPC's actions in response to this Bulletin, as subsequent inspection activities may be conducted in regards to this issue.
Should you have any questions, please contact me at (301) 504-1409 or the Lead Project Hanager for this issue, John B. Hickman at (301) 504-3017.
Sincerely, cc:
See next page Donald S.
Brinkman, Senior Project Hanager Project Directorate I-1 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation 9306280304 930623 PDR ADQCK 05000220 8
0
',:"~""36c g:
I
Mr. B. Ralph Sylvia Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station Unit No.
1 CC:
Hark J. Wetterhahn, Esquire Winston 5 Strawn 1400 L Street, NW Washington, DC 20005-3502 Supervisor Town of Scriba Route 8, Box 382
- Oswego, New York 13126 Mr. Neil S.
Cams Vice President - Nuclear Generation Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station Post Office Box 32
- Lycoming, New York 13093 Resident Inspector U.S. Nuclear Regulatory Commission Post Office Box 126
- Lycoming, New York 13093 Gary D. Wilson, Esquire Niagara Mohawk Power Corporation 300 Erie Boulevard West
- Syracuse, New York 13202 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406 Hs.
Donna Ross New York State Energy Office 2 Empire State Plaza 16th Floor
- Albany, New York 12223 Hr. Kim Dahlberg Unit 1 Station Superintendent Nine Mile Point Nuclear Station Post Office Box 32
- Lycoming, New York 13093 Hr. David K. Greene Manager Licensing Niagara Mohawk Power Corporation 301 Plainfield Road
- Syracuse, New York 13212 Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, New York 10271 Mr. Paul D.
Eddy State of New York Department of Public Service Power Division, System Operations 3 Empire State Plaza
- Albany, New York 12223
1 P
Docket No. 50-220 Hr. B. Ralph Sylvia Executive Vice President, Nuclear Niagara Mohawk Power Corporation 301 Plainfield Road
- Syracuse, New York 13212
Dear Hr. Sylvia:
June 23, 1993 Distribution:
Docket File NRC 5, Local PDRs PDI-1 Reading SVarga JCalvo RACapra
CCowgill, RI
- JHickman, 13Dl
SUBJECT:
NINE MILE POINT'NUCLEAR STATION UNIT NO.
1
RESPONSE
TO NRC BULLETIN 93-02, "DEBRIS PLUGGING OF EMERGENCY CORE COOLING SUCTION STRAINERS" (TAC NO. H86586)
This letter acknowledges receipt of Niagara.Mohawk Power Corporation's (NMPC's) response dated June 10, 1993, to NRC Bulletin 93-02 (Bulletin).
The Bulletin was issued Hay 11, 1993, to all nuclear power reactor licensees.
It requested licensees to identify fibrous material in the primary containment, take any necessary compensatory
- measures, and remove any such material.
NMPC's response stated that:
(1) no fibrous filter material, such as described in the Bulletin, was identified as being used or stored in the Nine Mile Point 1 containment during normal operation; (2) if fibrous materials were to be used, even on a temporary basis, its use would need to be reviewed in accordance with the temporary modification or other plant. change procedure and that currently no temporary modifications exist on drywell cooling or ventilation systems; and (3) the drywell is thoroughly inspected for.
cleanliness prior to startup following each refueling outage and that these walkdowns would have identified any poor housekeeping or abnormal drywell configurations.
Based on NMPC's response, we consider NMPC's actions to: be complete.
Please retain any records of NMPC's actions in response to this Bulletin, as subsequent inspection activities may be conducted in regards to this issue.
Should you have any questions, please contact me at (301) 504-1409 or the Lead Project Manager for this issue, John B. Hickman at (301) 504-3017.
cc:
See next age Sincerely, Original signed by:
Donald S.
Brinkman, Senior Project Manager Project Directorate I-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation LA:PDI-1 PH'PDI-1 D:PDI-1 CVo an
'Brinkma mm RACa ra +
93
( /2.5/93 4/ P9 93 OFFICIAL RECORD COPY FILENAME: NH186586. LTR