ML17058B784
| ML17058B784 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 06/01/1993 |
| From: | Briggs L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| NUDOCS 9306080073 | |
| Download: ML17058B784 (8) | |
Text
t REGULMZ INFORMATION DZSTRZBUTIOtISTEM (RIDE)
ACCESSION NBR:9306080073 DOC.DATE: 93/06/Ol NOTARIZED: NO DOCKET g FACIL:50-220 Nine Mile Point Nuclear Station, Unit '1, Niagara Powe 05000220 50-410 Nine Mile Point Nuclear Station, Unit 2, Niagara Moha 05000410 AUTH.NAME AUTHOR AFFILIATION BRIGGS,L.E.
Region 1 (Post 820201)
RECIP.NAME RECIPIENT AFFILIATION Region 1 (Post 820201)
SUBJECT:
Notification of significant licensee meeting 93-71 w/util on 930609 to discuss facility svc water audit team findings.
DISTRIBUTION CODE:
IE45D COPIES RECEIVED:LTR
)
ENCL Q SIZE:
TITLE: Summary of Significant Meeting with Licensee (Part 50)
NOTES:
RECIPIENT ID CODE/NAME BRINKMAN,D.
INTERNAL: AEOD/DOA DEDRO NRR/PMAS/ILRB OGC/ROED RES/DSIR/EIB EXTERNAL: NRC PDR COPIES LTTR ENCL 1
1 1
1 1
RECIPIENT ID CODE/NAME MENNING,J AEOD/DSP/TPAB NRR/DRIL/RPEB NUDOCS-ABSTRACT EG FCCE 02 GN F LE 01 NSIC COPIES LTTR ENCL 1
YOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! COYTACT THE DOCUMEYT COYTROL DESK.
ROOM P 1-37 (EXT. 504-2065) TO ELIMINATEYOUR NAhkE FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DOY'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 14 ENCL
~1
U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF SIGNIFICANTMEETING No. 93-71 Licensee:
Facility:
Docket No.:
Time and Date:
Niagara Mohawk Power Corporation Nine Mile Point Units 1 & 2 50-220 and 50-410 9:00 a.m.; June 9, 1993 Location:
U.S. Nuclear Regulatory Commission, Region I Division of Reactor Safety Conference Room
Purpose:
NRC Attendees:
Discuss Facility Service Water Audit Team Findings W. Hodges, Director, Division of Reactor Safety (DRS)
G. Imbro, Deputy Director, (DRS)
J. Durr, Chief, Engineering Branch, DRS C. Cowgill, Chief, Reactor Projects Branch No. 1, Division of Reactor Projects (DRP)
L. Briggs, Chief, Reactor Projects Section No. 1A, DRP P. K. Eapen, Chief, Systems Section, DRS L. Prividy, Team Leader, Engineering Branch, DRS P. Drysdale, Senior Reactor Engineer, DRS S. Stewart, Reactor Engineer, DRS J. Menning, Project Manager, NRR D. Brinkman, Project Manager, NRR Licensee Attendees:
C. Terry, Vice President - Nuclear Engineering K. Dahlberg, Unit 1 Plant Manager M. McCormick, Unit 2 Plant Manager NOTE:
This meeting is open to the public for observation.
Attendance by NRC personnel at this meeting should be made known by close of business on June 7, 1993, via telephone call to Larry Briggs, Region I, at FTS 8-215-337-5128.
Handicapped persons requiring assistance to attend or participate in the meeting shall make their requests known to Larry Briggs, USNRC, Region I, 475 Allendale Rd., King of Prussia, PA 19406, (215) 337-5128, no later than two business days prior to the meeting.
9306080073 930601 PDR ADQCK 05000220 P
PDR 0 t'1~00 t
Prepared by:
. Briggs, ef Reactor Projects Section No. 1A
~Di ~ri i~in (Via K-Mail):
J. Taylor, Executive Director for Operations (EDO)
J. Sniezek, Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research (DEDR)
H. Thompson, Deputy Executive Director for Nuclear Material Safety, Safeguards and Operations Support (DEDS)
B. Grimes, Director, Division of Reactor Inspection and Safeguards, NRR J. Lieberman, Director, Office of Enforcement S. Lewis, Office of the General Counsel (OGC)
T. Murley, Director, Office of Nuclear Reactor Regulation W. Russell, Associate Director for Inspection and Technical Assessment, NRR J. Partlow, Associate Director for Projects, NRR S. Varga, Director, Division of Reactor Projects - I/II,NRR J. Calvo, Assistant Director for Region I Reactors, NRR R. Capra, Director, Project Directorate I-l, NRR J. Menning, Project Manager, NRR D. Brinkman, Project Manager, NRR S. Bajwa, RPEB/NRR
¹ Green, Jr., Policy Development and Technical Support Branch V. McCree, Regional Coordinator, OEDO NRC Resident Inspector Region I Branch Chiefs Region I Section Chiefs K. Abraham, Public Affairs Officer, RI D. Screnci, Field Public Affairs Officer, RI M. Miller, State Liaison Officer, RI T. Darden, State Agreements Officer, RI K. Smith, Regional Attorney, RI D. Holody, Enforcement Officer, RI B. Letts, Office of Investigations, Region I Field Office J. Lanning, DRP, RI P. Jefferson, DRMA, RI Public Document Room (PDR)
Local Public Document Room (LPDR)
B. Ralph Sylvia, Executive Vice President - Nuclear P. Eddy, New York State Public Service Department State of New York Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DRSS Division Secretary, RI DRMA Division Secretary, RI Projects Branch No. 1, Secretary, RI Region I Receptionist OFFIChQ RECORD COPY
e
RI:DRP LBriggs 06///93 OFFICIALRECORD COPY a:NNIPMTG93.71
I C ~
f ky