ML17058B444
| ML17058B444 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 04/28/1993 |
| From: | Durr J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Sylvia B NIAGARA MOHAWK POWER CORP. |
| Shared Package | |
| ML17058B445 | List: |
| References | |
| NUDOCS 9305050280 | |
| Download: ML17058B444 (8) | |
See also: IR 05000410/1993004
Text
ACCELERATED DOCUMEN'I DISTRIBUTION SYSTEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
DOCKET
05000410
I
ACCESSION NBR:9305050280
DOC.DATE: 93/04/28
NOTARIZED: NO
ACIL:50-410 Nine Mile Point Nuclear Station, Unit 2, Niagara
Moha
AUTH.NAME
AUTHOR AFFILIATION
DURR,J.P.
,
Region
1 (Post
820201)
RECIP.NAME
..
"RECIPIENT AFFILIATION
SYLVIA,B.R.
Niagara
Mohawk Power .Corp.
'g ~
C
SUBJECT'.
Forwards Safety Insp Rept 50-410/93-04
on 930322-26.
Engineering
& technical support staff effectively addressed
monitoring transient operation of primary components
&
piping.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:"
4""
'lid
I i i Ig ~
~)v, -
g(fPq " '
"
(g~-
'"
~
gl)('- Q'f~,'
c~"'['s
RECIPIENT
COPIES
RECIPIENT
COPIES
ID CODE/NAME
LTTR ENCL
ID CODE/NAME
LTTR ENCL
PD1-1
1
1
MENNING,J
1
1
INTERNAL: ACRS
AEOD/DSP/TPAB
DEDRO
NRR/DRCH/HHFB
NRR/DRSS/PEPB
AEOD/DEIB
AEOD/TTC
NRR/DORS/OEAB
NRR/DRIL/RPEB
NRR/PMAS/ILPBl
NUDOCS-ABSTRACT
OGC/HDS1
MORISSEAU,D
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
EXTERNAL: EG&G/BRYCEgJ.H.
1
1
1
1
NRC PDR
I
1
1
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CON1 ROL DFDK,
ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIDUT!ON
LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
23
ENCL
23
<<.
"APR 2 8 tgg3 '
Docket No. 50-410
'<<g <<
Mr. B. Ralph Sylvia
Executive Vice President - Nuclear
Niagara Mohawk Power Corporation
301 Plainfield Road
Syracuse, New York 13212
Dear Mr. Sylvia
'<<<<p <<.<<g<<<<<<<<
~I'wt~ p<<, <<<<<<)
~ 't <<
~
SUBJECT:
NRC INSPECTION REPORT NO. 50-410/9344
This letter refers to the safety inspection of engineering and technical support activity related
to the Niagara Mohawk Power Corporation {NMPC) Nine Mile Point Station Unit No. 2
(NMPU2) conducted by Mr. A. Lohmeier of this office during the period
March 22-26, 1993, in Lycoming, New York. At the conclusion of the inspection, his
findings were discussed with Mr. McCormick, Jr., and members of the NMPU2 engineering
and licensing staff.
The scope of this inspection included review of your engineering and technical support
effectiveness in monitoring transient operation of primary components and piping.
As the
plant increases in age, it is important to have identified those component and piping
transients approaching the numbers of cycles for which they have been designed.
Effective
performance in these areas by your engineering and technical support personnel is important
to the safe operation of the plant and protection of public health and safety.
Based on the results of this inspection, your engineering and technical support staff
effectively addressed
these areas, properly recording and evaluating the effect of plant
operating cycles on the remaining life of primary components.
Your engineering staff has
identified the fact that the number of start up and shutdown cycles to date has been at a rate
greater than that anticipated for the design of the components
and piping under fatigue
loading.
An action plan is under consideration to ameliorate the potential problem of
primary components
and piping operating beyond the design basis for fatigue strength before
the 40-year anticipated plant lifetime. Your support of these considerations willbe helpful.
OFFICIALRECORD COPY
A:NM9304.AL
9305050280
930428
ADOCK 050004l0
G
l<<
I
<<
<<<<<<wa
Your cooperation in this matter is greatly appreciated.
<<
".; Sincerely,
Jacque P. Durr, Chief
Engineering. Branch
Division of Reactor Safety
$J
~
<<
~
Enclosure:
NRC Inspection Report No. 50-410/93-04
cc w/encl:
C. Terry, Vice President - Nuclear Engineering
J. Perry, Vice President - Quality Assurance
Vice President - Nuclear Generation
K. Dahlberg, Unit 1 Plant Manager
M. McCormick, Unit 2 Plant Manager
D. Greene, Manager, Licensing
J. Warden, New York Consumer Protection Branch
G. Wilson, Senior Attorney
M. Wetterhahn, Winston and Strawn
Director, Energy & Water Division, Department of Public Service, State of New York
C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law
K. Abraham, PAO (2) AllInspection Reports
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New York, SLO Designee
OFFICIALRECORD COPY
A:NM9304.AL
APR 28 ]993
r ~ I
~
bcc w/encl:
Region I Docket Room (with concurrences)
C. Cowgill, DRP
J. Yerokun, DRP
L. Nicholson, DRP
S. Greenlee, DRP
W. Schmidt, SRI - ¹ne Mile
V. McCree, OEDO
R. Capra, NRR
J. Menning, NRR
D. Brinkman,
NRR'RS/EB
SALP Coordinator
D. Holody, EO
J. Strosnider, NRR
K. Wichman, NRR
R. Parkhill, NRR
R. Kirkwood, RES
RI:DRS
Lo m ier
04)i/93
RI:DRS
Gr~a
mlrfi93
RI:DRS
OFFICIALRECORD COPY
A:NM9304.AL