Forwards Safety Insp Rept 50-410/92-27 on 920914-18. Unresolved Items Noted Re Adequacy of Procedure.Continuing Concern Raised Re Adequacy & Use of Procedures at Facility
ML17058B039
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 11/12/1992
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Sylvia B
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17058B040 List:
References
RTR-NUREG-1455 NUDOCS 9211180250
Download: ML17058B039 (6)


See also: IR 05000410/1992027

Text

Docket No. 50-410

Mr. B. Ralph Sylvia

Executive Vice President - Nuclear

Niagara Mohawk Power Corporation

301 Plainfield Road

Syracuse, New York 13212

Dear Mr. Sylvia:

SUBJECT:

INSPECTION REPORT NO. 50-410/92-27

\\

This letter refers to the safety inspection led by Mr. J. H. Williams of this office from

September

14 - 18, 1992, at Nine Mile Point, Unit 2, of activities authorized by NRC

License No. NPF-69 and to the discussions of our findings with members of your staff at the

conclusion of the inspection.

Areas examined during this inspection are described in the

NRC Region I Inspection Report which is enclosed with this letter.

Within these areas, the

inspection consisted of selective review of procedures

and representative

records, interviews

with personnel,

and observations by the inspectors.

The follow-up was necessary

(and will

continue) because it addressed

your resolution of safety significant findings and conclusions

noted by the NRC Incident Investigation Team for the loss of power incident on

August 13, 1991

~

Overall, your corrective actions in response to the IIT report were appropriate,

and you met

your commitments.

This inspection verified certain actions as described in your letter of

May 11, 1992, to Mr. Hodges that you have taken in response to the findings and

conclusions of NUREG-1455, "Transformer Failure and Common-Mode Loss of Instrument

Power at Nine Mile Point, Unit 2, on August 13, 1991."

We continue to have concerns over

the adequacy and use of procedures at Nine Mile Point, Unit 2.

Based upon this inspection,

procedure adequacy is an unresolved item.

The use of procedures during the

August 13, 1991, transformer failure event is also unresolved.

We will follow up on these

issues in the future.

iBOO'.

OFFICIAL RECORD COPY

G:HWNM9227

9211180250

921112

PDR

ADQCK 05000410

Q

PDR

1

(6

No reply to this letter is required.

Your cooperation with us in this matter is appreciated.

= Sincerely,

Lee H: Bettenhausen,

Chief

Operations Branch

Division of Reactor Safety

Enclosure: .NRC Region I Inspection Report No. 50-410/92-27

cc w/encl:

J. Firlit, Vice President - Nuclear Support

C. Terry, Vice President - Nuclear Engineering

J. Perry,,Vice President - Quality Assurance

Vice President - Nuclear Generation

K. Dahlberg, Unit I Plant Manager

M. McCormick, Unit 2 Plant Manager

D. Greene, Manager, Licensing

J. Warden, New York Consumer Protection Branch

G. Wilson, Senior Attorney

M. Wetterhahn, Winston and Strawn

Director, Power Division, Department of Public Service, State of New York

C. Donaldson, Esquire, Assistant Attorney General; New York Department of Law

K. Abraham, (2)

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New York, SLO Designee

OFFICIALRECORD COPY

G:HWNM9227

Mr. B. Ralph Sylvia

3

bcc w/encl:

Region I Docket Room (with concurrences)

L. Bettenhausen,

DRS

C. Cowgill, DRP

R. Conte, DRS

E. McCabe, DRSS

J. Yerokun, DRP

L. Nicholson, DRP

S. Greenlee, DRP

W. Schmidt, SRI - Nine Mile

V. McCree, OEDO

R. Capra, NRR

J. Menning, NRR

D. Brinkman, NRR

DRS/EB SALP Coordinator

D. Holody, EO

Walter H. Baunack, DRS

William A, Maier, DRS

DRS File {1)

RI:DRS

Wi 'ams/ajk/dmg

CC3

11

/92

RI:DRS

~

Bett nhausen

11/~/92

G:HWNM9227

RI:DRS

Choo g

11/g/92

OFFICIALRECORD COPY