ML17058B037
| ML17058B037 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 11/09/1992 |
| From: | Hehl C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Sylvia B NIAGARA MOHAWK POWER CORP. |
| References | |
| NUDOCS 9211170131 | |
| Download: ML17058B037 (10) | |
Text
HOV Oe
$992 Docket Nos.
50-220 50-410 Mr. B. Ralph Sylvia Executive Vice President - Nuclear Niagara Mohawk Power Corporation 301 Plainfield Road Syracuse, New York 13212
Dear Mr. Sylvia:
Subject:
INADEQUATEUNIT ONE CONTROL ROOM STAFFING This is to confirm the results of the telephone conference call of October 30, 1992, held between you, other members of your staff, and members of the NRC's Region I and headquarters staff.
The focus of the discussion was your investigation into the circumstances surrounding a senior shift supervisor (SSS) leaving the Unit 1 control room for about 5 minutes on the afternoon of October 9, 1992.
The absence of the SSS resulted in the control room staff being without an actively licensed senior reactor operator for that period, and thus less than that required by Technical Specification.
Your staff reviewed the conclusions reached in your investigation with the NRC. You informed us that you have removed the SSS from licensed duties and that you are considering terminating the license of the SSS. Ifthe termination of license is your final decision, you shall notify the NRC in accordance with 10 CFR 50.74.
Also at our request, you agreed to provide the NRC a copy of your investigation. Ifyou seek to withhold this report from public disclosure, please provide the basis for your request in an affidavit pursuant to 10 CFR 2.790.
Ifour understanding is incorrect, please let me know as soon as possible.
Sincerely, Charles W. Hehl, Director Division of Reactor Projects ioOU4~
OFFICIALRECORD COPY a:ALLEG.LTR 92fif70i3f 92ii09 PDR ADOCK 05000220 P
Mr. B. Ralph Sylvia cc w/encl:
J. Firlit, Vice President - Nuclear Support C. Terry, Vice President - Nuclear Engineering J. Perry, Vice President - Quality Assurance, Vice President - Nuclear Generation K. Dahlberg, Unit 1 Plant Manager M. McCormick, Unit 2 Plant Manager-D. Greene, Manager, Licensing J. Warden, New York Consumer Protection Branch G. Wilson, Senior Attorney M. Wetterhahn, Winston and Strawn Director, Power Division, Department of Public Service, State of New York C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law K. Abraham, PAO (2) AllInspection Reports Public Document Room (PDR)
. Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector State of New York, SLO Designee J. Goldberg, OGC
Mr. B. Ralph Sylvia.
bcc w/encl:
Region I Docket Room (with concurrences)
C. Cowgill, DRP J:, Yerokun, DRP L. Nicholson, DRP S. Greenlee, DRP
. W. Schmidt, SRI - Nine Mile V. McCree,'OEDO R. Capra, NRR J. Menning, NRR D. Brinkman, NRR DRS/EB SALP Coordinator D. Holody, EO 3
RI:DRP~
JYerokun RI:DRP~
RI:DRS~
LNicholson LBettenhausen RI:RC KSmith 11/ /92 11/ /92 11/ /92 11/ /92 RI:DRP
'Cowgill 11/./92 11/
92
- SEE PREVIOUS CONC NCE
Mr. B. Ralph Sylvia bcc w/encl:
Region I Docket Room (with concurrences)
C. Cowgill, DRP J. Yerokun, DRP L. Nicholson, DRP S. Greenlee, DRP W. Schmidt, SRI - Nine Mile
'. McCree, OEDO R. Capra, NRR J. Menning, NRR D. Brinkman, NRR DRS/EB SALP Coordinator D. Holody, EO RI:DRP~
JYerokun 11/ /92 11/ /92
+:DRP*
RI:DRS LNicholson LBettenhaus 11/
92
~
~
- RC Smith 11/ /92 RI:DRP CCowgill 11/ /92 RI:DRP WHehl 11/ /92
- SEE PREVIOUS CONCURRENCE
Mr. B. Ralph Sylvia bcc w/encl:
Region I Docket Room (with concurrences)
C. Cowgill, DRP J. Yerokun, DRP L. Nicholson, DRP S. Greenlee, DRP W. Schmidt, SRI - Nine Mile V. McCree, OEDO R. Capra, NRR J. Menning, NRR D. Brinkman, NRR DRS/EB SALP Coordinator D. Holody, EO
j l