Forwards Exam Rept 50-410/92-06(OL) Administered During Wks of 920511 & 18
ML17058A980
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 07/07/1992
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Sylvia B
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17058A981 List:
References
NUDOCS 9207140142
Download: ML17058A980 (6)


See also: IR 05000410/1992006

Text

Docket Nos.

50-410

Jgj."

7 1992

Mr. B. Ralph Sylvia

Executive Vice President - Nuclear

Niagara Mohawk Power Corporation

Nine Mile Point

Post Office Box 63, Lake Road

Lycoming, New York

13093

Dear Mr. Sylvia:

SUBJECT:

EXAMINATIONREPORT NO. 50-410/92-06 (OL)

During the weeks of May 11 and 18, 1992, the NRC administered initial examinations to

employees of your company who had applied for licenses to operate the Nine Mile Point

Station, Unit 2.

A requalification retake examination-was

also administered

to a reactor

operator.

At the conclusion of the examinations,

the preliminary findings were discussed

with those members of your staff identified in the enclosed report.

The test results indicate that the reactor operator passed

his requalification retake examination

and twelve of the fourteen candidates

passed all portions of the initial examination.

Two

reactor operator candidates

failed the written portion of the exam.

We had some-difficulty in preparing an operationally oriented examination.

This was because

the reference material provided for examination preparation was incomplete, lacked detail,

and did not have well-developed learning objectives in a number of cases.

A number of

procedura1 deficiencies were noted also.

During the process of application review, it became clear that eligibilityrequirements for

reactor and senior reactor operator candidates

were not clearly defined in facility procedures

used to evaluate candidate eligibility.

We have discussed

these issues with your staff at the exit meeting and in a telephone

conversation on July 1, 1992.

It was agreed during the telephone call that a meeting with

your staff would be scheduled for late August or September

to continue discussions

on these

issues.

Section 2 of the enclosed report provides the details.

ln accordance with 10 CFR 2.790 of the Commission's regulations,

a copy of this letter and

its enclosure will be placed in the NRC Public Document Room.

9207,1401 42 920?07

PDR

ADOCN 05000410

PDR

Mr. B. Ralph Sylvia

Should you have any question regarding this information, please contact Richard Conte at

(215) 337-5210.

Sincerely,

Lee H. Bettenhausen,

Chief

Operations Branch

Division of Reactor Safety

Enclosure:

Examination Report No. 50-410/92-06 w/Attachments

1-5

Attachments:

1.

RO, SRO, and LSRO Examinations and Answer Keys

2.

Facility Comments on Written Examination

3.

NRC Resolution of Facility Comments

4.

Simulator Facility Report

5.

Exit Attendees

cc w/encl.; w/o Attachments:

J. Firlit, Vice President

- Nuclear Support

C. Terry, Vice President

- Nuclear Engineering

J. Perry, Vice President - Quality Assurance

Vice President - Nuclear Generation

K. Dahlberg, Unit

1 Plant Manager

M. McCormick, Unit 2 Plant Manager

D. Greene, Manager, Licensing

J. Warden, New York Consumer Protection Branch

G. Wilson, Senior Attorney

M. Wetterhahn, Winston and Strawn

Director, Power Division, Department of Public Service, State of New York

C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law

NRC Resident Inspector

State of New York, SLO Designee

Mr. B. Ralph Sylvia

cc w/encl. and Attachments

1 -5:

R. G. Smith, Manager - Training

F. White, Training Supervisor, Unit 2

R. Sanaker,

General Supervisor - Operations Training (NMP1)

R. Slade, General Supervisor - Operations Training {NMP2)

Public Document Room (PDR)

Local Public Document Room (LPDR)

'uclear

Safety Information Center (NSIC)

bcc w/encl.; w/o Attachments

1-5:

Region I Docket Room (with concurrences)

W. Lanning, DRS

A: Burritt, DRS

R. Gallo, Chief, OLB, NRR

D. Brinkman, NRR

R. Capra, NRR

J. Menning, NRR

R. Lobel, EDO

L. Bettenhausen,

DRS

J. Joyner, DRSS

C. Cowgill, DRP

R. Conte, DRS

J. Yerokun, DRP

L. Nicholson, DRP

S. Greenlee,

DRP

OL Facility File

R. Miller, Examiner, Sonalyst

M. Daniels, Examiner, Sonalyst

DRS Files (2)

bcc w/encl. and Attachments

1-5:

Master Exam File

RI:DRS

Williams/ajk

06/'92

77

RI:DRS

RI:DRS

Conte

Bettenhausen

~5

06/ /92

OF/j792

1 7/py

0 PICIAL RECORD COPY - G:HWNM2926