Docket Nos. 50-220/50-410
Nia
oh wk P
gara M
a
ower Corporation
ATT¹ Mr. B. Ralph Sylvia
Executive Vice President - Nuclear
301 Plainfield Road
Syracuse, New York 13212
AUG 26 t99l
Dear Mr. Sylvia:
Subject:
NRC Region I Combined Inspection Report Nos. 50-220/91-12 and 50-410/91-12
This refers to the results of the resident safety inspection conducted by Messrs. W. Schmidt,
R. Laura, and R. Temps from June 23 to July 27, 1991, at Nine Mile Point Units
1 and 2,
Scriba, New York. The inspection findings were discussed with members of your staff at the
conclusion of the inspection.
This inspection was directed toward areas important to public health and safety as identified in
the enclosed
inspection
report.
Within these
areas,
the inspection
consisted of selective
examinations
of procedures
and
representative
records,
interviews
with personnel,
and
observation of activities in progress.
Overall, performance in the areas
reviewed was generally good.
However, our inspectors
identified instances of inadequate control of temporary modifications at both units, as described
in section 7.3 of the enclosed inspection report.
Temporary blowers were installed to cool two
fire panels in the reactor building at Unit 1 and mechanical flushing water jumpers were installed
on the service water radiation monitors at Unit 2. In both instances,
the alterations were made
without adherence
to the temporary modification program.
The safety significance of these
issues was minor.
Nonetheless,
we are concerned
about the failure of your staff to properly
implement these alterations to plant equipment,
as well as apparent weaknesses
in addressing
past problems in this area.
This issue is considered
an unresolved item, pending further NRC
review of the NMPC temporary modification process.
However, this matter is brought to your
attention for your information and consideration of actions
as you deem appropriate.
No
response
is requested or required at this time,
9109040011
910826
ADOCK 05000220
G
OFFlCIALRECORD COPY
a: CIR91-12.NMP
0
Niagara Mohawk Power Corporation
Your cooperation with us is appreciated.
Sincerely,
Original SigQed By.
Donald R. Haverkamp
Donald R. Haverkamp, Acting Chief
Projects Branch No.
1
Division of Reactor Projects
Enclosure:
NRC Region I Combined Inspection Report No. 50-220/91-12 and,50-410/91-12
cc w/encl:
J. I:irlit,Vice President, Nuclear Generation
C. Terry, Vice President, Nuclear Engineering
J. Perry,'ice President,
Quality Assurance
S. Wilczek, Vice President, Nuclear Support
K. Dahlberg, Manager, Unit 1
M. McCormick, Manager, Unit 2
J. Warden, New York Consumer Protection Branch
M. Wetterhahn, Jr., Esquire
G. Wilson, Senior Attorney
Director, Power Division, Department of Public Works, State of New York
C. Donaldson, Esquire, Department of Law, State of New York
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
SLO Designee,
State of New York
OFFICIALRECORD COPY
a: CIR91-12.NMP
Niagara Mohawk Power Corporation
AUG ib 1991
bcc w/encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
C. Cowgill, DRP
D. Haverkamp, DRP
R. Summers, DRP
K. Abraham, PAO (2)
W. Bateman, EDO
R. Capra, NRR
D. Brinkman, NRR
W. Cook, SRI - FitzPatrick
bcc w/Report Cover Sheet and Executive Summary only:
W. Hehl, DRP
J. Wiggins, DRP
W. Hodges, DRS
W. Lanning, DRS
J. Durr, DRS
L. Bettenhausen,
M. Knapp, DRSS
R. Cooper, DRSS
J. Joyner, DRSS
RI'P
WSchmidt/mjd
A@91
RI: RP
RSummers
8'/1
MRI:D
DHaverkamp
+/91
OFFICIALRECORD COPY
a: CIR91-12.NMP
0