ML17058A908
| ML17058A908 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 08/13/1991 |
| From: | Durr J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Sylvia B NIAGARA MOHAWK POWER CORP. |
| Shared Package | |
| ML17058A909 | List: |
| References | |
| NUDOCS 9108260079 | |
| Download: ML17058A908 (6) | |
See also: IR 05000220/1991014
Text
'
Docket Nos.
50-220
50-410
AUG 7.3 891
Niagara Mohawk Power Corporation
ATTN: Mr. B. Ralph Sylvia
Executive Vice President
Nuclear Operation
301 Plainfield Road
Syracuse, New York 13212
Gentlemen:
Subject:
Inspection Report Nos. 50-220/91-14 & 50-410/91-14
This letter refers to the unannounced
inspection conducted by Mr. H. J. Kaplan and Ms. C.
D. Beardslee of this office on July 8-12, 1991 at Nine Mile Point Units
1 & 2.
H. J. Kaplan
discussed
the findings of the inspection with members of your staff at the conclusion of the
mspection.
The processing of Problem Reports, the Erosion/Corrosion Program and Water Chemistry
Control were examined during this inspection and focused on issues important to the
assurance of operability and safety.
The conversion of Problem Reports to Deviation/Event
Reports,
a system whose effectiveness will increase the safety of the plant, was reviewed.
The Erosion/Corrosion Program, which is intended to prevent material failure, personal
injury and loss of electric generation,
was reviewed.
Water Chemistry Control was inspected
by reviewing Quality Assurance Surveillance reports.
The details of the inspection are
contained in the enclosed inspection report.
C
Within the scope of this inspection, no violations or deviations were observed.
9108~60079
910813
P DR
ADOCJ( 05000220
6
a>C~gr,"
~+V%'U
OFFICIALRECORD COPY
~go/
I i
'
Niagara Mohawk Power Corporation
No reply is required to this letter.
Your cooperation with us in this matter is appreciated.
Sincerely,
Jacque P. Durr, Chief
Engineering Branch
Division of Reactor Safety
Enclosure:
NRC Inspection Report No. 50-220/91-14 and 50-410/91-14
CC:
J. Firlit, Vice President - Nuclear Generation
C. Terry, Vice President - Nuclear Engineering
J. Perry, Vice President - Quality Assurance
S. Wilczek, Jr., Vice President - Nuclear Support
K. Dahlberg, Unit 1 Plant Manager
M. McCormick, Unit 2 Plant Manager
D. Greene, Manager, Licensing
J. Warden, New York Consumer Protection Branch
G. Wilson, Senior Attorney
Director, Power Division, Department of Public Service, State of New York
State of New York, Department of Law
K. Abraham, PAO (2)
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New York, SLO Designee
bcc w/encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
R. Fuhrmeister, ORA
C. Cowgill, DRP
D. Vito, DRP
D. Haverkamp, DRP
M. Conner, DRP (SALP Reports Only)
S. Black, EDO
D. Brinkman, NRR
OFFICIAL RECORD COPY
0'
'
Niagara Mohawk Power Corporation
bcc w/encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
R. Furhmeister, ORA
C. Cowgill, DRP
D. Vito, DRP
D. Haverkamp, DRP
M. Conner, DRP (SALP Reports Only)
K. Brockman, EDO
D. Brinkman, NRR
R. Capra, NRR
RI:DRS
Beard slee
CM-
08/~1
RI:DRS
Kaplan
+J1(
08/%91,
C/A
RI:DRS
G~ray
08/Q/91
RWI:DR
Durr
R
Ho
s
08t&1
0 / /9
OFFICIALRECORD COPY
F:CL91014
~
'