ML17058A796

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-220/91-09 & 50-410/91-09 on 910331-0511.Util Professionally Executed Repair of Unisolable Sample Line Leak on Unit 2 Recirculation Loop
ML17058A796
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 06/06/1991
From: Cowgill C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Sylvia B
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17058A797 List:
References
NUDOCS 9106140202
Download: ML17058A796 (6)


See also: IR 05000220/1991009

Text

Docket Nos. 50-220

50-410

JUg P6 199~

Niagara Mohawk Power Corporation

A%I'N: Mr. B. Ralph Sylvia

Executive Vice President - Nuclear

301 Plainfield Road

Syracuse, New York 13212

Gentlemen:

Subject:

Combined NRC Region I Inspection Nos. 50-220/91-09 and 50-410/91-09

This letter transmits the results of the routine resident safety inspection conducted by Messrs.

W. Cook, R. Laura, and R. Temps from March 31 to May 11, 1991, at Nine Mile Point Units

1 and 2, Scriba, New York. A summary of the inspection findings was presented

to members

of your staff at the conclusion of the inspection.

Areas examined during the inspection are described in the NRC Region I inspection report,

which is enclosed with this letter.

Within these areas,

the inspection consisted of observation

of activities, interviews with personnel,

and document reviews.

Overall performance during this irispection period was good at both units. Ofparticular note was

the professionally executed repair of the unisolable sample line leak on the Unit 2 recirculation

loop.

Your cooperation with us is appreciated.

Sincerely,

(eJ

Curt s J.

o

ill, Chief

Projects Br

c

No.

1

Division of Reactor Projects

Enclosure:

NRC Region I Combined Inspection Report Nos. 50-220/91-09 and 50-410/91-09

OFFICIALRECORD COPY

a: CIR91-09. NMP

9106i40$ 02 910606

PDR

ADOCK 0 000220

l.i

pBR

Niagara Mohawk Power Corporation

JUN 0b 1991

cc w/encls:

J. Firlit, Vice President,

Nuclear Generation

C. Terry, Vice President, Nuclear Engineering

J. Perry, Vice President, Quality Assurance

S. Wilczek, Vice President, Nuclear Support

K. Dahlberg, Unit 1 Plant Manager

M. McCormick, Unit 2 Plant Manager

D. Greene, Manager, Licensing

J. Warden, New York Consumer Protection Branch

G. Wilson, Senior Attorney

Director, Power Division, Department of Public Works, State of New York

State of New York, Department of Law

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New York, SLO Designee

OFFICIALRECORD COPY

a: CIR91-09.NMP

Niagara Mohawk Power Corporation

JUN 06 1991

bcc w/encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

C.,Cowgill, DRP

D. Vito, DRP

D. Haverkamp," DRP

W. Cook, SRI - Nine Mile

K. Abraham, PAO (2)

K. Brockman, EDO

R. Capra, NRR

D. Brinkman, NRR

I

bcc w/Letter and Executive Summary only:

W. Hehl, DRP

J

~ Wiggins, DRP

W. Hodges, DRS

W. Lanning, DRS

J. Durr, DRS

L. Bettenhausen,

DRS

M. Knapp, DRSS

R. Cooper, DRSS

J. Joyner, DRSS

KAfRP

WCook/mjd

4/6/91

DHaverkamp

6 /~/91

RI:DRP ~

CCowgill

+/g/91

OFFICIALRECORD COPY

a: CIR91-09. NMP