ML17058A717

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-220/91-06 & 50-410/91-06 on 910216-0330.Non-cited Violation Noted
ML17058A717
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 04/18/1991
From: Linville J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Sylvia B
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17058A718 List:
References
NUDOCS 9104300045
Download: ML17058A717 (6)


See also: IR 05000220/1991006

Text

Docket Nos. 50-220

50-410

P,PR l.8.1991

Niagara Mohawk Power Corporation

ATTN: Mr. B. Ralph Sylvia

Executive Vice President - Nuclear

301 Plainfield Road

Syracuse, New York 13212

Dear Mr', Sylvia:

Subject;

NRC Region I Combined Inspection Report Nos. 50-220/91-06 and 50-410/91-06

This letter transmits the results of the routine resident safety inspection conducted by Messrs.

W. Cook, R. Laura, and R. Temps from February

16 to March 30, 1991, at Nine Mile Point

Units

1 and 2, Scriba, New York.

A summary of the inspection findings was presented

to

members of your staff at the conclusion of the inspection.

Areas examined during the inspection are described in the NRC Region I inspection report,

which is enclosed with this letter.

Within these areas,

the inspection consisted of observation

of activities, interviews with personnel,

and document reviews.

Overall, performance at both units continued to show improvement during the inspection period.

Your cooperation with us is appreciated.

Sincerely,

)~<~a)~s

~,

Ql fjt/if}t~>

James C. Linville, Chief

Reactor Projects Branch No.

1

Division of Reactor Projects

Enclosure:

NRC Region I Combined Inspection Report Nos. 50-220/91-06 and 50-410/91-06

OFFICIALRECORD COPY

a: CIR91-06.NMP

9104300045

910418

PDR

ADOCK 05000220

8

PDR

yi') ~

(

Niagara Mohawk Power Corporation

cc w/encl:

J. Firlit, Vice President - Nuclear Generation

C. Terry, Vice President - Nuclear Engineering

J. Perry, Vice President - Quality Assurance

S. Wilczek, Jr., Vice President - Nuclear Support

K. Dahlberg, Unit 1 Plant Manager

M. McCormick, Unit 2 Plant Manager

D. Greene, Manager, Quality Assurance Operations - Unit 1

C. Beckham, Manager, Quality Assurance Operations - Unit 2

.R. Tessie., Manager, Operations - Unit

1

M. Colomb, Manager, Operations

Unit 2

K: Thomas, Supervisor - Site Licensing

J. Warden, New York Consumer Protection Branch

M. Wetterhahn, Jr., Esquire

G. Wilson, Senior Attorney

Director, Power Division, Department of Public Service, State

State of New York, Department of Law

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New York, SLO Designee

of New York

OFFICIALRECORD COPY

a: CIR91-06.NMP

m 7 ~

~

Niagara Mohawk Power Corporation

APR 18 t99l

bcc w/encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

J. Linville, DRP

D. Vito, DRP

D. Haverkamp, DRP

T. Vegel, DRP

K. Brockman, EDO

R. Capra, NRR

D. Brinkman, NRR

bcc w/Letter and Executive Summary Only:

W. Hehl, DRP

J. Wiggins, DRP

W. Hodges, DRS

W. Lanning, DRS

J. Durr, DRS

L. Bettenhausen,

DRS

M. Knapp, DRSS

R. Cooper, DRSS

J. Joyner, DRSS

RI:DRP

gf

ooldmj d

4/9/91

RI:DRP

HaverLtmp

4A791

RI:IRS

CAnderson

4/$ 91

~/'/jPI.

OFFICIALRECORD COPY

a: CIR91-06.NMP

l

lr

..3

~