ML17058A549
| ML17058A549 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 03/26/1986 |
| From: | Mangan C NIAGARA MOHAWK POWER CORP. |
| To: | Thompson H Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML17055B424 | List: |
| References | |
| (NMP2L-0671), (NMP2L-671), NUDOCS 8604030106 | |
| Download: ML17058A549 (96) | |
Text
t~"
r~i
,r 1e'EGULATORY%FORMATION DISTRIBUTION SYLM (RIDE)
ACCESSION NBR: 8604030106 DOC. DATE: 86/03/26 NOTARIZED: YES DOCKET 0 FACIL: 50-410 Nine Nile Point Nuclear Station>
Unit 21 Niagara Noha 05000410 AUTH. NANE AUTHOR AFFILIATION MANGANIC. V.
Niagara Mohawk P ower Corp.
\\
RECIP, NAME RECIPIENT AFFILIATION THOMPSON>H.. Office oF Nuclear Reactor Regulationi Director (post 851125
SUBJECT:
Forwards Amend 25 to FSAR for Nine Nile Point Unit 2. Section 6A withheld (ref 10CFR2. 790)i per util 830125 request S.
NRC 83092'1 a p proval.
+//
I"I. L NRR/DHFT/MTB g7 RGN1 BNL(ANDTS ONLY) LPDR 03 NSIC 05 COPIES LTTR ENCL 1 1 '1 1 1 1 1 1 1 0 1 1 1 1 0 I 1 1 1 3 3 g gg-Pg<<QQQ 'te g. HA2$ h>9 March 1986 0 Nine Mile Point Unit 2 FSAR INSERTION INSTRUCTIONS VOLUME 13 Remove T 5.2-1 (5 and 5a of 8) 6-xix/xixa 6.1-5/- T 6.1-3 (1 of 1) Insert T 5.2-1 (5 and 5a of 8) 6-xix/xixa 6.1-5/- T 6.1-3 (1 of 1) Amendment 25 2453-1217718-HC2 FII-10 March 1986 Nine Mile Point Unit 2 FSAR Remove 6.2-24c/24d 6.2-51/5la 6.2-68a/68b 6.2-83/83a 6.2-85/85a 6.2-87/87a T 6.2-56 (6 of 24) T 6.2-56 (8 of 24) T 6.2-56 (17 of 24) T 6.2-56 (17a of 24) T 6.2-56 (22 of 24) T 6.2-56 (23 of 24) T 6.2-60 (1 of 1) T 6.2-62 (1 of 1) F 6.2-80 F 6.2-82 INSERTION INSTRUCTIONS VOLUME 14 Insert 6.2-24c/24d 6.2-51/51a 6.2-68a/68b 6.2-83/83a 6.2-85/85a 6.2-87/87a T 6.2-56 (6 of 24) T 6.2"56 (8 of 24) T 6.2"56 (17 of 24) T 6.2-56 (17a of 24) T 6.2-56 (22 of 24) T 6.2-56 (23 of 24) T 6.2"60 (1 of 1) T 6.2-62 (1 of 1) F 6.2-80 F 6.2-82 Amendment 25 2453-1217718-HC2 FII-11 March 1986 Nine Mile Point Unit 2 FSAR Remove INSERTION INSTRUCTIONS VOLUME 15 Insert 6.3-8ab/8b F 6.3-2 6.3-8ab/8b F 6.3-2 6.5-1/2 6.5-3/4 7.3-7/7a 6.5-1/2 6.5-2a/2b 6.5-3/4 6.5-4a/4b 7.3-7/7a Amendment 25 2453-1217718-HC2 FII-12 March 1986 -l Nine Mile Point Unit 2 FSAR INSERTION INSTRUCTIONS VOLE'K 16 'emove Insert 8.2-21/22 8.3-7b/8 8.3-19/20 8.3-20a/20b 8.3-23/24 8.3-24a/24b 8.3-25/25a 8.3-51/51a 8.2-21/22 8.3-7b/8 8.3-19/20 8.3-20a/20b 8.3-23/24 8.3-24a/24b 8.3-25/25a 8.3-51/5la Amendment 25 2453-1217718-HC2 FII-13 March 1986 Nine Mile Point Unit 2 FSAR INSERTION INSTRUCTIONS VOLUME 17 Remove Insert T 8.3-9 (1 of 1) T 8.3-9 (1 of 1) Amendment 25 2453"1217718-HC2 FII-14 March 1986 V 4 Nine Mile Point Unit 2 FSAR INSERTION INSTRUCTIONS VOL@K 18 Remove Insert 9.2-3/4 9.2-4a/4b 9.2-5/5a 9.2-7/7a 9.2-7b/8 9.2-17/18 9.2-19/20 9.2-27/28 T 9 '-1 (1 and 2 of 2) 9.2-3/4 9.2-4a/4b 9.2-5/5a 9.2-7/7a 9.2-7b/8 9.2-17/18 9.2-18a/18b 9.2-19/20 9.2-27/28 9.2-28a/28b T 9.2-1 (1 and 2 of 2) Amendment 25 2453-1217718-HC2 FII-15 March 1986 Nine Mile Point Unit 2 FSAR INSERTION INSTRUCTIONS VOLUME 19 Remove Insert 9.3-1/2 9.3-3/4 9.3-1lf/llg 9.3-11j/12 9.3-1/2 9.3-3/4 9.3-11f/llg 9.3-llj/12 Amendment 25 2453"1217718"HC2 FII-16 March 1986 4 Nine Mile Point Unit 2 FSAR INSERTION INSTRUCTIONS VOIUME 20 Remove Insert 9.4"1/2 9.4-7/8 9.4-9/10 9.4-11/12 9.4-15/16 9.4-17/18 9.4-19/20 9.4-21/2la 9.4-21b/22 9.4-23/23a 9.4-29/30 9 '-31/32 9 '-33/33a 9.4-37d/38 9.4-47/48 9.4-49/50 9.4-57/57a 9.4-59/59a 9.4-61/62 9.4-69/70 F 9.4-2a F 9.4-2b F 9.4-8a F 9.4-8b F 9.4-8c F 9.4-8d F 9.4-8e F 9.4-8f F 9.4-8g F 9.4-8h F 9.4-8j F 9.4-8k F 9.4-81 9.4-1/2 9.4-2a/2b 9.4-7/8 9.4-9/10 9.4-11/12 9.4-15/16 9.4-17/18 9.4-19/20 9.4-21/2la 9.4"21b/22 9.4-23/23a 9.4-29/30 9.4"31/32 9.4-33/33a 9.4-37d/38 9.4-47/48 9.4-49/50 9.4-57/57a 9.4-59/59a 9.4-61/62 9.4-69/70 F 9.4-2a F 9.4-2b F 9.4-8a F 9.4-8b F 9 '-8c F 9.4-8d F 9.4-8e F 9.4<<8f F 9.4-8g F 9.4-8}1 F 9. 4-8j F 9.4-8k F 9.4-81 Amendment 25 2453-1217718-HC2 FII-17 March 1986 0 0 Nine Mile Point Unit 2 FSAR INSERTION INSTRUCTlONS VOLUME 21 Remove 9.5-19/20 9.5"21/22 9.5-23b/24 9.5-25/25a 9.5-29/30 9.5-63/64 9.5-65/66 Insert 9.5-19/20 9.5-21/22 9.5-23b/24 9.5-24.1/24.2 9.5-25/25a 9.5-29/30 9.5-63/64 9.5-65/66 Amendment 25 2453-1217718-HC2 FII-18 March 1986 l Nine Mile Point Unit 2 FSAR Remove F 9.5-4a INSERTION INSTRUCTIONS VOLUME 22 Insert F 9.5-4a Amendment 25 2453"1217718-HC2 FII-19 March 1986 4 e 0 Nine Mile Point Unit 2 FSAR INSERTION INSTRUCTIONS VOLlPK 23 Remove Insert 9A.2-5/6 F 9A.3-2 F 9A.3-3 F 9A.3-4 F 9A.3-5 F 9A.3-6 F 10.1-8a through 8g 9A.2-5/6 F 9A.3-2 F 9A.3-3 F 9A.3-4 F 9A.3"5 F 9A.3-6 F 10.1-8a through 8g Amendment 25 2453-1217718-HC2 FII-20 March 1986 J I Nine.Mile Point Unit 2 FSAR INSERTION INSTRUCTIONS VOLlkK 24 Remove 10.4-33/33a 10.4-33b/34 T 11.2-1 (1 through 5 of 5) Insert 10.4-33/33a 10.4-33b/34 T 11.2-1 (1 through 5 of 5) Amendment 25 2453-1217718-HC2 FII-21 March 1986 Nine Mile Point Unit 2 FSAR INSERTION INSTRUCTIONS VOLUME 25 Remove Insert T 11.4-4 (1 and 2 of 2) 11.5-11/lla T llA.1-13 (1 of 1) T llA.1-14 (1 of 1) T 11A.1-15 (1 of 1) T llA.1-17 (1 of 1) 12.2-9/10 T 11.4-4 (1 and 2 of 2) 11.5-11/lla T llA.1-13 (1 of 1) T llA.1-14 (1 of 1), T 11A.1-15 (1 of 1) T 11A.1-17 (1 of 1) 12.2-9/10 Amendment 25 2453"1217718-HC2 FII-22 March 1986 Nine Mile Point Unit 2 FSAR INSERTION INSTRUCTIONS VOLUME 26 Remove T 13.5-1a (1 of 1) 14-v/vi 14.2-5/6 14.2-9/10 14.2-29/30 T 14.2-1 (1/2 and 3/4) T 14.2-33 (1/2) T 14.2-73 (1/2) T 14.2-105 (1/2) T 14.2-112 (1/2) Insert T 13.5-1a (1 of 1) 14-v/vi 14.2-5/6 14.2-9/10 14.2-29/30 T 14.2-1 (1/2 and 3/4) T 14.2-33 (1/2) T 14.2"43A (1/2 and 3/-)"- T 14.2-73 (1/2) T 14.2"105 (1/2) T 14.2-112 (1/2) Table inadvertently deleted in Amendment 22. Amendment 25 2453-1217718-HC2 FII-23 March 1986 Nine Mile Point Unit 2 FSAR INSERTION INSTRUCTIONS VOLUME 27 Remove T 14.2-227 (1 and 2 of 3) 15.6-9/10 15.6-12a/12b 15.6-15/16 15.7-1/2 T 15.7-1 (1 of 1) Insert T 14.2-227 (1 and 2 of 3) 15.6-9/10 15.6-12a/12a.l 15.6-12a ~ 2/12b 15.6-15/16 15 '-1/2 T 15.7-1 (1 of 1) .Amendment 25 2453-1217718-HC2 FII-24 March 1986 Nine Mile Point Unit 2 FSAR Remove INSERTION INSTRUCTIONS VOLUME 28 Insert 18.1-1/2 18.1-1/2"'"Pages reissued with corrected date. Amendment 25 2453-1217718-HC2 FII-25 March 1986 I Nine Mile Point Unit 2 FSAR Remove INSERTION INSTRUCTIONS QUESTIONS AND RESPONSES VOLUME 1 Insert QSR F240.10-1/2 T 240.10-1 (1 of 2) QSR F250.1-1/2 QRR F240.10-1/2 QRR F240.10-3/- T 240.10-1 (1 of 2) QSR F250.1-1/2 Amendment 25 2453-1217718-HC2 FII-26 March 1986 Nine Mile Point Unit 2 FSAR Remove INSERTION INSTRUCTIONS QUESTIONS AND RESPONSES VOLUME 2 Insert Q&R 271.10-1/2 Q&R F280.10-1/2 Q&R F280.27-1/- SSC-7/8 SSC-9/10 Q&R F421.10"1/2 Q&R F421.10-3/- Q&R F421.25-1/- Q&R F421.37-1/2 Q&R F421.42-1/2 Q&R F421.43-1/2 T 421.47-1 (1 and 4a of 17) Q&R F430.23-3/4 Q&R F430.30-1/- Q&R F430.31-1/- Q&R F430.61"1/- T 430.61-1 (1 and 2 of 2) Q&R F430.62"1/- Q&R F430.71-1/- Q&R F430.74-1/2 Q&R 271.10-1/2 Q&R F280.10-1/2 Q&R F280.27-1/- SSC-7/8 SSC-9/10 Q&R F421.10-1/2 Q&R F421.10-3/- Q&R F421.25-1/- Q&R F421.37-1/2 Q&R F421.42-1/2 Q&R F421.43-1/2 T 421.47-1 (1 and 4a of 17) Q&R F430.23-3/4 Q&R F430.30-1/- Q&R F430.31-1/- Q&R F430.61-1/" T 430.61-1 (1 and 2 of 2) Q&R F430.62-1/- Q&R F430.71-1/- Q&R F430.74"1/2 Amendment 25 2453-1217718-HC2 FII-27 March 1986 Nine Mile Point Unit 2 FSAR Remove INSERTION INSTRUCTIONS QUESTIONS AND RESPONSES VOLUME 3 Insert Q&R F440.43-1/2 Q&R F440.44-1/- Q&R F450.1-1/- Q&R F460.20-1/- Q&R F480.19-1/- Q&R F480.33-1/- Q&R F630.4-1/- Q&R F810.1-1/- Q&R F440.43-1/2 Q&R F440.44-1/- Q&R F450.1-1/- Q&R F460.20-1/"'&R F480.19-1/- Q&R F480.33-1/- Q&R F630.4-1/- Q&R F810.1-1/- Amendment 25 2453-1217718-HC2 FII-28 March 1986 0 Nine Hile Point Unit 2 FSAR INSERTION INSTRUCTIONS DESIGN ASSESSHENT REPORT APPENDIX 6A Remove 6A-xv/xvi 6A-xxi/xxii F 6A.4-51 T 6A.9-7 (1 of 1) Insert 6A-xv/xvi 6A-xxi/xxii F 6A.4"51 T 6A.9-7 (1 of 1) Amendment 25 2453-1217718-HC2 FII-29 Harch 1986 Nine Mile Point Unit 2 FSAR Remove 9B.2-1/2 T 9B.5-1 (1 of 1) 9B.6-3/4 9B.8-5/6 INSERTION INSTRUCTIONS APPENDIX R REVIEW APPENDIX 9B Insert 9B.2-1/2 T 9B.5-1 (1 of'1) 9B.6-3/4 9B.8-5/6 Amendment 25 2453-1217718-HC2 FII-30 March 1986 Nine Mile Point Unit 2 FSAR Remove EP l-l through 1-8 EP 2-1 through 2-20 EP 3-1 through 3-14 EP 4-1 and 4-2 EP 5-1 through 5-3 EP 6-1 through 6-6 EP 7-1 through 7-4 EP 8-1 through 8-3 EP 9-1 through 9-11 EP 10-1 and 10-2 EP ll-l and 11-2 EP 12-1 through 12-3 EP 13-1 through 13-4 EP 14-1 through 14-5 EP 15"1 through 15-4 Q&R-1 through QM-14 ~ DAR-1 through DAR-8 SSA-1 through SSA-2 INSERTION INSTRUCTIONS LIST OF EFFECTIVE PAGES Insert EP l-l through 1-8 EP 2-1 through 2-20 EP 3-1 through 3-14 EP 4-1 and 4-2 EP 5-1 through 5-3 EP 6-1 through 6-6 EP 7-1 through 7-4 EP 8-1 through 8-3 EP 9-1 through 9-11 EP 10-1 and 10-2 EP ll-l and 11-2 EP 12-1 through 12-3 EP 13-1 through 13-4 EP 14-1 through 14-5 EP 15-1 through 15-4 QSR-1 through QRR-14 DAR-1 through DAR-8 SSA-1 and SSA-2 Amendment 25 2453-1217718-HC2 FII-31 March 1986 Nine Mile Point Unit 2 FSAR
SUMMARY
OF INCORPORATED CHANGES Iegend
Response
to NRC Question or request, or SER Item Editorial or typographical change that has not affected basis of FSAR.
N SN SS TS Nonsafety-related change in design,
- schedule, and/or procedure.
Change to a safety-related item that has no effect on SER.
Change to safety-related item that could affect the SER.
Change that affects the Technical Specification.
Amendment 25 1134-12177-HC3 SIC"1 March 1986
0
~pa ea Page 1.7-1
, Page 1.10-6 Page 2.4-6 Change Code Delete statement regarding as-designed/as-built condi-tions per NRC request Include statement regarding meeting the Commission Poli-cy Statement on Engineering Expertise on Shift (Letter No. NMP2L 0639 dated Febru-ary 28, 1986)
Per staff request, add fur-ther description of Unit 1
railroad crossing of the west berm Pages 2.4-4, 2.4-4a Confirmatory Issue 1 - add discussion of roof drainage provisions for the PMP Page 3.8-25b Per staff
- request, delete the exception to ASME Code Subsection NE-4452 Table 3.9B-4 Pages 6.2-51, 6.2-51a Table 6.2-62 Q&R F480. 19-1 Update table to list other applicable standards, to address SQRT audit issue (Letter No.
NMP2L 0646 dated March 3, 1986)
Update response to Question F480.19 Table 6.2-56, sheet 22, 23 Table 6A.9-7 Clarify configuration of containment penetration pip-ing per staff request Update submerged RHR piping stress results based on lat-est analysis results and to address a
staff question Amendment 25 1134-12177-HC3 SIC-2 March 1986
,~Pa ea Change Code Des cri tion Pages 8.3-20, 8.3-20a, 8.3-24, 8.3-24a, 8.3-25 Pages 8.3-51, 8.3-5la Address items from NRC PSB site visit concerning diesel generator overcurrent trip and operation of the HPCS diesel generator control switch (Letter No.
NMP2L 0645 dated March 3, 1986)
Clarify position on elect-rical separation as it relates to the use of flex-ible metallic conduit (Question F430.23)
Page 9.3-12 Page 9.5-25 Page 9B.6-3 Table 13.5-1a Page 15.6-16 Page Q&R F240.10-2 Table 240.10-1 Clarify that the PASS will not be fully tested and op-erational prior to exceeding 5 percent
- power, per NRC request Incorporate provision for filling diesel generator fuel oil storage tanks through the day tank connec-tions (Letter No.
NMP2L 0546 dated November 27, 1985)
Delete footnote relating to cold shutdown equipment per staff request (Letter No.
NMP2L 0634 dated Febru-
~
ary 28, 1986)
Clarify scheduled completion date commitment per staff request Delete the word "vessel" in last paragraph per staff request Revise description of diesel generator building stop log sealing material (Letter No.
NMP2L 0636 dated February 28, 1986)
Pages Q&R F271.10-1, 2
Clarify Question F271.10 response regarding ASME code commitments, consistent with 10CFR50.55a Amendment 25 1134-12177-HC3 March 1986
Pres Change Code Page Q&R F280.10-2 Page Q&R F280.27-1 Pages Q&R F421.10-2, 3
Page Q&R F421.25-1 Page Q&R F421.37-1 Page Q&R F421.42-2 Page Q&R F421.43-1, 2
Table F421.47-1, sheet 1,
4a of 17 Table 1.8-1, sheet 89 of 169 Update response to Question F280.10, Item 4 Update response to Question F280.27 to reflect develop-ment of pre-plan procedures Update response to Question F421.10 to reflect previous submittal of information by letter NMP2L 0152 dated Sep-tember 13, 1984 Update response to Question F421.25 based on submittal of required list in letter NMP2L 0653 dated March 6, 1986 Confirmatory Issue 24 - Up-date response to Question F421.37 based on submittal of study results in letters NMP2L 0526 dated November 4, 1985 and NMP2L 0588 dated January 17, 1986 Confirmatory Issue 26 - Up-date response to Question F421.42 based on submittal of study results in Ietter No.
NMP2L 0526 dated Novem-
~
ber 4, 1985 Confirmatory Issue 27 - Up-date response to Question F421.43 based on submittal of study results in Letters No.
NMP2L 0574 dated January 2,
1986 and NMP2L 0643 dated March 3, 1986 Incorporate requirements for testing of circuit breakers to address PSB site visit item (Letter No.
NMP2L 0645 dated March 3, 1986)
Amendment 25 1134-12177-HC3 SIC"4 March 1986
'~pa es'hangeCode Page Q&R F430.61-1 Table 430.61-1 Page Q&R F430.23-3 Page Q&R F430.30-1 Page Q&R F430.31-1 Page Q&R F430.62-1 Page Q&R F430.71-1 Page Q&R F430.74-2 Page Q&R F450.1-1 R,
TS Update the response to Question F430.61 to be con-sistent with the technical specifications Update Questioa F430.23 re-sponse based on previous submittal of the subject test reports Update Question F430.30 re-sponse based oa incorpora-tion of the subject information into the Envi-ronmental Qualification Document (EQD)
Confirmatory Issue 22 - Up-date Question F430.31 re-sponse to reflect availa-bility of procedures (Ietter No.
NMP2L 0653 dated March 6, 1986)
Confirmatory Issue 35 - Up-date Question F430.62 re-
- sponse, Item b, to reflect availability of the subject procedure'Letter No.
NMP2L 0657 dated March 10, 1986)
Confirmatory Issue 41 - Up-date Question F430.71 re-sponse to reflect availa-bility of procedures (Letter No.
NMP2L 0657 dated March 10, 1986)
Update Questioa F430.74 re-sponse based on submittal of the technical specifications Update Questiaa F450.1 re-sponse based on submittal of the technical specifications Amendment 25 1134-12177-HC3 SIC-5 March 1986
l
\\
I
~Pa es Change Code Descri tion Page Q&R F480.33-1 Page Q&R F630.4-1 Update Question F480.33 re-sponse based on submittal of the technical specifications Update Question F630.4 re-sponse to reflect avail-ability of revised proce-dures Page Q&R F810.1-1 Table 1.8-1, sheet 89a of 169 E.9-18 Update Question F810.1 re-sponse based on availability of the subject information in the Site Emergency
- Plan, FSAR Appendix 13B Editorial Revised based on submittal of the technical specifica-tions Page 1.10-59 Page 2.1-7 Pages 2.4-23, 2.4-28, 2.4-44 E
Page 2.5-1a Table 3.5-21 Table 3.6A-41, sheet 2 of 4 E
Page 3.7B-25 Page 3.9A-2a Page 3.9A-26c Typographical error Typographical error Editorial corrections Editorial Editorial Editorial Editorial Editorial correction Revised based on submittal of the subject test programs Page 3A.18-la Page 6.2-24c Figures 6.2-80, 6.2-82 Page 6.3-8b, Figure 6.3-2 E,
TS Editorial correction Editorial revision to be consistent with the techni-cal specifications Figures deleted consistent with deletion of correspond-ing text in Amendment 21 Editorial corrections Amendment 25 1134-12177-HC3 SIC-6 March 1986
~Pa es Change Code Pages 6A.3-7, 6A.3-10, 6A.3-16) 6A.3"19 Tables 6A.3-5, 6A.3-6, 6A.3-7, 6A.3-8, 6A.3-9, 6A.3-10, 6A.3-11 Figures 6A.3-9, 6A.3-11 6A.3"17) 6A.3-34) 6A.4"51 Pages 7.3-7, 7.3-7a Editorial corrections Editorial - correct valve numbers Page 8.2-22 Pages 8.3-20, 8.3-20a Table 8.3-9 Editorial clarification Editorial corrections Page 9.3-4 Page 9.4-57 Table 14.2-43A Editorial Editorial - P&ID was submit-ted in Amendment 23 I
Reinstate table that was inadvertently deleted in Amendment 22 Pages 18.1-1, 18.1-2 Page Q&R F250.1-2 Page g&R F440.43-2 Page g&R F440.44-1 Page g&R F460.20-1 E
r E
Editorial Revised based oa submittal of the PSI plan Editorial Editorial - the subject P&ID was submitted in Amendment 22 Editorial - the sabject fig-ures were revised in previ-ous amendments Pages SCC-7, SCC-9, SCC-10 Tables 2.2-1, 2.2-4, sheet 1 and 2 of 3 Revised based on submittal of the technical specifica-tions and preparation of procedures Update based on currently available information Pages 9.2-19, 9.2-20 N
Update makeup water treat-ment system
-4escription based on current plant design Amendment 25 1134"12177-HC3 SIC-7 March 1986
0
~ r
,~Pa es, Change Code Pages 9.5-64, 9.5-66 N
Update auxiliary boiler sys-tem controls based on cur-rent plant design Figures 10.1-8a through 10.1-8g N
Update PAID based on cur-rent plant design Pages 10.4-33, 10.4-33a, 10.4"34 N
Update reactor feed pump descriptions based on cur-rent plant design Table 11.4-4 N
Update solid radwaste system data based on final compo-nent data Page 12.2-10 N
Clarify auxiliary boiler steam system piping des-cription Page 15.7-2 Table 15.7-1 Update radiation monitoring description for the offgas system based on current plant design.9-70 SN Update SRP 12.2 conformance statement.
NMP2 now con-forms with the SRP except for the one difference noted.
Table 3.2-1, sheet 1, 10, 13 SN.
Table 3.2-2, Table 3.2-.4, sheet 2 of 2 Update based on current
~
plant design Tables 3.4-1, 3.4-2, 3.4-3, 3.4-4, 3.4-5, 3.4-6 SN Update penetration listings based on current plant design Pages 3.7A-23, 3.7A-23a, 3.9A-23a Tables 3.7A-ll, 3.7A-12 SN Incorporate discussion of as-built verification of piping systems to address NRC IE Bulletin 79-14 Table 3.9A-12, sheet 7 of 12 SN Update active valve list based on current plant design Page 3A.7-1 Table 3A.7-1 Figures 3A.7-1, 3A.7-2 SN Delete description of com-puter program ME-121.
This program not used in plant analyses.
Amendment 25 1134-12177-HC3 SIC-8 March 1986
t ~
'Plea'hange Code Table 3B-4 SN Incorporate previously miss-ing design peak pressure difference data Pages 4.6-12g, 4.6-35 SN>
TS Modify control rod drive system testing and surveil-lance descriptions to be consistent with the techni-cal specifications Table 5.2-1, sheet 5
SN Incorporate Code Case 1711 (N-100)
Pages 6.2-83, 6.2-83a SN Clarify configuration of the hydrogen recombiner cooling water block valves based on current system design Page 6.2-85 SN Clarify Type A test condi-tions Table 6.2-56, sheet 6, 17, 17a of 24 SN, TS Update isolation valve clo-sure signals for penetra-tions Z-21A and Z-23 consis-tent with current plant design Page 8.3-8 SN Clarify reserve transformer-to-auxiliary boiler trans-former interlock description based on current plant
~
design Page 9.2-7 Pages 9.2-17, 9.2-]8 Page 9.3-11g SN SN SN Modify description of ser-vice water supply to the HPCS diesel generator to agree with the current design Update drywell unit cooler control logic description based on current plant design Revise nitrogen gas supply pressure based on current plant design Pages 9.4-10, 9.4-11, 9.4-12, SN 9 4 17>
9 4 18>
9 4 19>
9 4 20 Update control building HVAC systems controls descrip-tions based on current plant design Amendment 25 1134-12177-HC3 SIC-9 March 1986
P~aea Change Code Pages 9.4-30, 9.4-31, 9.4-32, 9.4-33 Figures 9.4-8a through 9.4-8L SN Update reactor building HVAC systems controls descrip-tions and PSIDs based on current plant design Pages 9.4-49, 9.4-50 SN Update diesel generator building HVAC system con-trols description based on current plant design Figures 9.4-2a and 9.4-2b SN Update miscellaneous HVAC systems PSIDs based on cur-rent plant design Figure 9.5-4a SN Update fire protection halon system PAID based on current plant design Pages 9A.2-5, 9B.2-1, 9B.8-6 SN Revise hot and cold shutdown definitions to be consistent with the technical specifi-cations Page 11.5-11a Tables 11A.1-13, llA.1-14, llA.1-15, llA.1-17 SN SN Clarify that maintenance of monitors is included in plant procedures, not tech-nical specifications Correct doses from consump-tion of deer and clarify doses from releases of noble
~
gases in effluents Pages 14.2-6, 14.2-9, 14.2-107 14.2"29 SN Editorial corrections and clarification of Regulatory Guide 1.68 compliance Tables 14.2-1, sheet 3;
14.2"33, 14.2-73, 14.2-105, sheet 1;
14.2"112, 14.2-227, sheet 2
Update based on current preoperational test pro-cedures Table 1.8-1, sheet 122 SS, TS Update Regulatory Guide 1.108 position - clarify and to be consistent with the technical specifications Page 1.10-99c SS, TS Revise accumulator backup compressed gas system low pressure alarm setpoint to be consistent with the tech-nical specifications Amendment 25 1134-12177-HC3 SIC"10 March 1986
~a~es, Change Code Table 3.8-1, sheet 1;
Table 3.8-4, sheets 1, 3, 4
SS Update load combinations consistent with current structural design criteria Table 3.9A-1 SS Update design transients and numbers of cycles consistent with current plant design Page 6.1-5 Table 6.1-3 SS Incorporate discussion of the use of Carbo-Zinc ll inorganic zinc primer in the untopcoated condition and update listing of unqualified protection coatings inside containment Pages 6.2-68a, 9.4-21 SS Reference Section 15.6.5 for radiological consequences of a
LOCA when operating the containment purge and SGTS systems in the pressure con-trol mode (Letter No.
NMP2L 0648 dated March 5,
1986)
Page 6.2-87, Table 6.2-60 e
Table 6.2-56, sheet 8
Pages 6.5-2, 6.5-2a, 6.5-4, 6.5-4a SS, TS SS, TS SS, TS Clarify containment leak test requirements to be con-sistent with the technical specifications Incorporate Type C test re-quirements for valves 2RCS*V59A,B consistent with May 15, 1985 exemption request Incorporate discussion of SGTS modes of operation and consequences of a
LOCA oc-curring when operating in the pressure control mode (Letter No.
NMP2L 0648 dated March 5, 1986)
Pages 9.2-3, 9.2-4, 9.2-4a, 9.2-5a, 9.2-7, 9.2-7a, 9.2-8, 9.2-27, 9.2-28, 9.2-28a Table 9.2-1 SS, TS Update service water system description based on current system design and to support the technical specifications Pages 9.5-19, 9.5-22 SS Include dimmers. along with lighting fixtures as not being Class lE Amendment 25 1134"12177-HC3 SIC-11 March 1986
I
a
~Pa ea Change Code Cy Pages 9.5-24, 9.5-24a SS, TS Revise discussion of day tank capacity and fuel oil transfer pump operation for clarity and to support the technical specifications Page 9.5-25 Page 9.5-30 SS SS Revise description of diesel generator fuel oil storage tank and day tank venting provisions based on current plant design Correct erroneous shell side flow rate Figures 9A.3-2 through 9A.3-6 SS Update fire protection ar-rangement figures based on current plant design Table 9B.5-1 SS Clarify Note 1 regarding de-energized valves Table 11.2-1 SS Update liquid radwaste com-ponent data based on current plant design Pages 15.6-9, 15.6-12a, 15.6-12b SS, TS Incorporate discussion of consequences of a LOCA with SGTS operating in the pres-sure control mode (Letter No.
NMP2L 0648 dated March 5, 1986)
Amendment 25 1134-12177-HC3 SIC-12 March 1986
l I
PROPRIETARY Nine Hile Point Unit 2 FSAR INSERTION INSTRUCTIONS Remove DESIGN ASSESSHENT REPORT APPENDIX 6A Insert:
6A.3-7/7a 6A.3-9/10 6A.3-15b/16 T 6A.3-5 T 6A.3-6 T 6A.3-7 T 6A.3-8 T 6A.3-9 T 6A.3-10 T 6A.3-11 F 6A.3-9 F 6A.3-11 F 6A.3-17 F 6A.3-34 6A.3-7/7a 6A.3-9/10 6A.3-15b/16 T 6A.3-5 T 6A.3-6 T 6A.3-7 T 6A.3-8 T 6A.3-9 T 6A.3-10 T 6A ~ 3-11 F 6A.3-9 F 6A.3-11 F 6A.3-17 F 6A.3-34 Amendment 25 PFII-2 Harch 1986
'