Informs That GL 89-13 Required Tests or Activities Have Been Initiated & Required Continuing Programs Have Been Established Per
ML17056C366
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 04/23/1993
From: Terry C
NIAGARA MOHAWK POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-89-13, NMP1L-0755, NMP1L-755, NUDOCS 9304270119
Download: ML17056C366 (4)


Text

hCCEL~+ Qg~g@gTQ/Qg@TQQ@QQS' ACCESSION NBR:9304270119 DOC.DATE: 93/04/23 NOTARIZED: NO DOCKET FACIL:50-220 Nine Mile Point Nuclear Station, Unit 1, Niagara Powe 05000220 AUTH.NAME AUTHOR AFFILIATION TERRY,C.D.

Niagara Mohawk Power Corp.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

D

SUBJECT:

Informs that GL 89-13 required tests or activities have been initiated

& required continuing programs have been established per 911210 ltr.

DISTRIBUTION CODE:

AOSSD COPIES RECEIVED:LTR

(

ENCL 0 SIZE:

TITLE: Generic Ltr 89-13 Svc Water Sys Problems Affecting Safety-Related E

~

NOTES:

RECIPIENT ID CODE/NAME BRINKMAN,D.

INTERNAL: NRR DORMAN,D NRR/DRIL NRR/RSIB EXTERNAL: NRC PDR COPIES LTTR ENCL RECIPIENT ID CODE/NAME NRR/DORS/OGCB NRR D49A SPLB REG 01 NSIC COPIES LTTR ENCL D

R D

D NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACI'FIE DOCUMENT CON'I'ROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 9

ENCL D

NIAGARAMOHAWKPOWER CORPORATION/301 PLAINFIELDROAD, SYRACUSE, N.Y. 13212/TELEPHONE (315) 474-1511 April 23, 1993 NMP1L 0755 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.

20555 Re:

Nine Mile Point Unit 1 Docket No. 50-220 DPR-Gentlemen:

SUBJECT:

SERVICE WATER PROBLEMS AFFECTING SAFETY-RELATED EQUIPMENT (GENERIC LETTER 89-13)

The Nuclear Regulatory Commission (NRC), via Generic Letter 89-13, recommended several actions to be taken by licensees to assure that their service water systems were in compliance with applicable General Design Criteria.

Generic Letter 89-13 also required that licensees confirm to the NRC within 30 days of completion that all recommended actions or their justified alternatives have been implemented.

The purpose of this letter is to inform you that Generic Letter 89-13 required tests or activities have been initiated and that required continuing programs have been established as indicated in our letter dated December 10, 1990.

Very truly yours, C. D. Terry Vice President Nuclear Engineering JMT/mls 003816GG pc:

Regional Administrator, Region I Mr. R. A. Capra, Director, Project Directorate I-l, NRR Mr. D. S. Brinkman, Senior Project Manager, NRR Mr. W. L. Schmidt, Senior Resident Inspector Records Management 930/+7011 000220 930423 pDR ADOCK pD p