ML17056C142
| ML17056C142 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 12/03/1992 |
| From: | Durr J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Sylvia B NIAGARA MOHAWK POWER CORP. |
| Shared Package | |
| ML17056C143 | List: |
| References | |
| NUDOCS 9212090242 | |
| Download: ML17056C142 (6) | |
See also: IR 05000220/1992026
Text
DEC Os
>992
Docket Nos.
50-220
50-410
Mr. B. Ralph Sylvia
Executive Vice President - Nuclear
Niagara Mohawk Power Corporation
301 Plainfield Road
Syracuse, New York 13212
Dear Mr. Sylvia:
SUBJECT:
COMBINED INSPECTION REPORT NOS. 50-220/92-26 AND 50-410/92-30
This letter transmits the NRC Region I inspection report for the engineering and technical
support inspection conducted by Mr. R. Mathew of this office on October 19 through
October 29, 1992, at Nine Mile,Point Units 1 and 2, and the Niagara Mohawk Salina
Meadows Office in Syracuse, New York. Mr. Mathew discussed
the findings of the
=
inspection with Messrs. A. DeGracia, J. Conway, K. Sweet, and other members of your staff
at the conclusion of the inspection.
This inspection was directed toward areas important to public health and safety.
Areas
examined during this inspection are described in the NRC Region I inspection report, which
is enclosed with this letter.
Within these areas,
the inspection consisted of selective
examinations of procedures
and representative
records, interviews with personnel,
and
observations by the inspectors.
Based on the results of this inspection, the engineering and technical support activities
appeared
to be effective and of good quality.
However, one item pertaining to the seismic
review for a simple design change remained unresolved.
We also noted that the-backlog of
Deviation/Event Reports remained high and in need of continued management
attention.
090olp
9212090242
921203
ADOCK 05000220
8.
0
Mr. B. Ralph Sylvia
~
~
Your cooperation with us in this matter is appreciated.
Sincerely,
Jacque P. Durr, Chief
Engineering Branch
Division of Reactor Safety
Enclosure:
NRC Region I Inspection Report Nos. 50-220/92-26 and 50-410/92-30
cc w/encl:
J. Firlit, Vice President - Nuclear Support
C. Terry, Vice President - Nuclear Engineering
J. Perry, Vice President - Quality Assurance
Vice President - Nuclear Generation
K. Dahlberg, Unit 1 Plant Manager
M. McCormick, Unit 2 Plant Manager
D. Greene, Manager, Licensing
J..Warden, New York Consumer Protection Branch
G. Wilson, Senior Attorney
M. Wetterhahn, Winston and Strawn
Director, Power Division, Department of Public Service, State of New York
C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law
K. Abraham, (2)
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New York, SLO Designee
PEt; 03 BM
Mr. B. Ralph Sylvia
~
~
bcc w/encl:
Region I Docket Room (with concurrences)
C. Cowgill, DRP
J. Yerokun, DRP
L. Nicholson, DRP
S. Greenlee, DRP
W. Schmidt, SRI - Nine Mile
V. McCree, OEDO
R. Capra, NRR
J. Menning, NRR
D. Brinkman, NRR
DRS/EB SALP Coordinator
D. Holody, EO
RI:DRS
Mathew
11/zf92
RI:DRS
Ru~
11/Lf92
RI:DRS
Durr
12/EJ'92
OFFICIALRECORD COPY
A:NM92-26&30.RM