ML17056B933
| ML17056B933 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 08/04/1992 |
| From: | Brinkman D Office of Nuclear Reactor Regulation |
| To: | Sylvia B NIAGARA MOHAWK POWER CORP. |
| References | |
| IEB-92-001, IEB-92-1, TAC-M83899, NUDOCS 9208120057 | |
| Download: ML17056B933 (4) | |
Text
C V'
August 4, 1992 Docket No. 50-220 Hr. B. Ralph Sylvia Executive Vice President, Nuclear Niagara Mohawk Power Corporation 301 Plainfield Road
- Syracuse, New York 13212 DISTRIBUTION:
- Docket File PDI-1 Reading JCal vo CVogan OGC AMasciantonio, 13/D/18
- CCowgill, RGN-1 NRC 8 Local PDRs SVarga RACapra DBrinkman
- PHadden, 8/D/1 ACRS (10)
Plant File
Dear Hr. Sylvia:
SUBJECT:
RESPONSE
TO NRC BULLETIN 92-01, "FAILURE OF THERMO-LAG 330 FIRE BARRIER SYSTEM" (TAC NO. H83899)
By letter dated July 24,
- 1992, Niagara Mohawk Power Corporation (NMPC) provided a response to NRC Bulletin 92-01 for Nine Mile Point Nuclear Station Unit No.
1.
NMPC's response stated that compensatory measures have been implemented consistent with the plant Technical Specifications and licensing basis.
The compensatory measures (roving fire watches and verification of the operability of fire detectors on one side of the suspect fire barriers) were implemented on July 1,
- 1992, and will continue until definitive corrective actions are taken to restore operability to the affected fire barriers.
NHPC also stated that appropriate corrective actions to restore fire barrier operability are being developed through an industry program being coordinated by NUHARC.
This program will include establishment of a test data
- base, development of guidance for applicability of tests, development of generic installation guidance, and consideration and coordination of additional testing as appropriate.
The results of these efforts, when completed, will be applied to the Thermo-Lag installations within the scope of NRC Bulletin 92-01.
We have reviewed your response and find it acceptable.
,Please inform us when all corrective actions have been completed.
Further NRC review, if any, will be performed by inspection or audit.
Sincerely, lk t
Original signed by:
Donald S.
Brinkman,, Senior Project Manager Project Directorate I-l.
Division of Reactor Projects
,,I/II Office of Nuclear Reactor Regulation cc:
See next page OFFICE NANE PDI-1: LA CVo an g)
PDI-1: PH DBrinkman:avl SPLB PDI-1:D RACa ra DATE
/
92 8'/
/92
/
/92 9 /
/92 OFFICIAL RECORD COPY FILENAME: A: iNH183899, LTR 9'208i20057 920804 PDR' ADOCK-'05000220 8
'" 'DR
) fj gpss Hg CEzVZ~ I SPY
II t
I
~
~
l k'
Hr.
B. Ralph Sylvia Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station Unit No.
1 CC:
Hark J. Wetterhahn, Esquire Winston
& Strawn 1400 L Street, NW Washington, DC 20005-3502 Supervisor Town of Scriba Route 8, Box 382
- Oswego, New York 13126 Hr. Neil S.
Cams Vice President Nuclear Generation Niagara Mohawk Power Corporation
,Nine Mile Point Nuclear St'ation Post Office Box 32
- Lycoming, New York 13093 Resident Inspector U.S. Nuclear Regulatory Commission Post Office Box 126
- Lycoming, New York 13093 Gary D. Wilson, Esquire Niagara Mohawk Power Corporation 300 Erie Boulevard West
- Syracuse, New York 13202 Regional Administrator, Region I
U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406 Hs.
Donna Ross New York State Energy Office 2 Empire State Plaza 16th Floor
- Albany, New York 12223 Hr. Kim Dahlberg Unit 1 Station Superintendent Nine Mile Point Nuclear Station Post Office Box 32
- Lycoming, New York 13093 Mr. David K. Greene Manager Licensing Niagara Mohawk Power Corporation 301 Plainfield Road
- Syracuse, New York 13212 Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, New York 10271 Mr. Paul D.
Eddy State of New York Department of Public Service Power Division, System Operations 3 Empire State Plaza
- Albany, New York 12223
O~
I 4
I'