Docket Nos.
50-220
50-410
Mr. B. Ralph Sylvia
Executive Vice President - Nuclear
Niagara Mohawk Power Corporation
Nine Mile Point
Post Office Box 63, Lake Road
Lycoming, New York 13093
Dear Mr. Sylvia:
Subject:
NRC Region I Combined Inspection Report Nos. 50-220/92-11 and
50-410/92-13
This refers to the results of the routine resident safety inspection conducted by Messrs. R. Laura
and W. Mattingly, and Ms. C. Beardslee from April 1 through April28, 1992, at Nine Mile
Point Units
1 and 2, Scriba, New York.
Mr. Laura discussed
the inspection findings with
members of your staff at the exit meeting conducted on May 1, 1992.
This inspection was directed toward areas important to public health and safety.
The enclosed
NRC Region I Inspection Report describes
the areas examined during the inspection.
Within
these
areas,
the inspection consisted of observation of activities in progress,
interviews with
personnel,
and selective examinations of procedures
and representative
records.
Your staff operated Unit 1 and conducted refueling activities at Unit 2 safely over the period.
At Unit 1, operators responded well to an automatic reactor scram due to a malfunction of the
turbine control system.
Refueling outage activities at Unit 2 were observed
to be properly
controlled.
This report does
contain one issue,
pertaining to work control, that was not
conducted
in accordance
with your established
standards.
However,
we are particularly
encouraged
by your aggressive corrective actions and therefore the issue willnot be subject to
enforcement action.
920b020117
920522
ADOCK 05000220
OFFICIALRECORD COPY
a: CIR92-11.NMP
0
Niagara Mohawk Power Corporation
py g2, >992
Your cooperation with us is appreciated.
Sincerely,
Original Signed 3y:
Curti
J. Cowbell
Curtis J. Cowgill, Chief
Projects Branch No.
1
Division of Reactor Projects
Enclosure:
NRC Region I Combined Report Inspection Nos. 50-220/92-11 and 50-410/92-13
cc w/encl:
J. Firlit, Vice President - Nuclear Generation
C..Terry, Vice President - Nuclear Engineering
J. Perry, Vice President - Quality Assurance
S. Wilczek, Jr., Vice President - Nuclear Support
K. Dahlberg, Unit 1 Plant Manager
M. McCormick, Unit 2 Plant Manager
D. Greene, Manager, Licensing
J. Warden, New York Consumer Protection Branch
G. Wilson, Senior Attorney
M. Wetterhahn, Winston and Strawn
Director, Power Division, Department of Public Service, State of New York
C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law
K. Abraham, PAO - RI (2)
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New York, SLO Designee
OFFICIALRECORD COPY
a: CIR92-11.NMP
Niagara Mohawk Power Corporation
V.~V S~ >99P
bcc w/encl:
Region I Docket Room (with concurrences)
D. Holody, EC
C. Cowgill, DRP
J. Yerokun, DRP
L. Nicholson, DRP
S. Greenlee, DRP
R. Lobel, OEDO
.J. Lieberman, OE
L. Chandler, OGC
J. Partlow, NRR
S. Varga, NRR
R. Capra, NRR
D. Brinkman, NRR
J. Menning, NRR
DRSS SALP Coordinator
bcc w/Letter, Report Cover Sheet and Executive Summary Only:
T. Martin, RA
W. Kane, DRP
K. Smith, RC
W. Hehl, DRP
J. Wiggins, DRP
W. Hodges, DRS
W. Lanning, DRS
C. Anderson, DRS
L. Bettenhausen,
R. Cooper, DRSS
J. Joyner, DRSS
J. Durr, DRSS
RI:DRP
ura/mjc
5/tg/92
'DRP
Schmidt
5/%92
RI:DRP
LNicholson
5/ib'/92
RI:DRP
CCowgill
58%2
OFFICIALRECORD COPY
a: CIR92-11.NMP