ML17056B811
| ML17056B811 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 04/17/1992 |
| From: | Anderson C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Sylvia B NIAGARA MOHAWK POWER CORP. |
| Shared Package | |
| ML17056B812 | List: |
| References | |
| NUDOCS 9204280283 | |
| Download: ML17056B811 (4) | |
See also: IR 05000410/1992007
Text
APR 1 7 'R
Docket Nos.
50-410
Mr. B. Ralph Sylvia, Executive Vic'e
President - Nuclear
Niagara Mohawk Power Corporation
Nine Mile Point
Post Office Box 63, -Lake Road
Lycoming, New York 13093
Dear Mr. Sylvia:
Subject:
Region I Inspection Report No, 50-410/92-07
This refers to the inspection intended to promote public health and safety conducted by
Mr. P. Patnaik of this office from March 16-20, 1992 at the Nine Mile 2 Nuclear Power
plant in Oswego, New York. Mr. Patnaik discussed
the findings with the members of your
staff on March 20, 1992, at the conclusion of the inspection.
This inspection included review of the inservice inspection program for the reactor coolant
system, the erosion/corrosion program for the high energy piping systems and a sample of
nondestructive examination inspection data collected during the March 1992 outage.
These
are all important aspects of maintaining pressure boundary component integrity.
Within these areas,
the inspection consisted of-selective examination of procedures
and
representative
records, interviews with personnel
and observations by the inspector.
Within
the scope of this inspection, no violations were observed and, therefore, no response
to this
letter is required.
Your cooperation with us in this matter is appreciated.
Sincerely,
Original Signed Sy'.
i iftor d J. Anderson
Clifford J. Anderson, Chief
Engineering Branch
Division of Reactor Safety
Enclosure:
NRC Region I Inspection Report No. 50-410/92-07
9204280283
920417
ADOCK 050004l0
G
Mr. B. Ralph Sylvia
cc w/encl:
J. Firlit, Vice President - Nuclear Generation
C. Terry, Vice President - Nuclear Engineering
J. Perry, Vice President - Quality Assurance
S. Wilczek, Jr., Vice President - Nuclear Support
K. Dahlberg, Unit 1 Plant Manager
M. McCormick, Unit 2 Plant Manager
D. Greene, Manager, Licensing
J. Warden, New York Consumer Protection Branch
G. Wilson, Senior Attorney
Director, Power Division, Department of Public Service, State of New York
C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law
K. Abraham, PAO (2) All Inspection Reports
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New York, SLO Designee
bcc w/encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
'.
Lanning, DRS
C. Cowgill, DRP
J. Yerokun, DRP
L. Nicholson, DRP
S. Greenlee,
W. Schmidt, SRI - Nine Mile
R. Lobel, OEDO
R. Capra, NRR
J. Menning, NRR
D. Brinkman, NRR
RI:DRS
P tnaik
03/ /92
RI:DRS
RI:
RS
Grav
'nderson
03/ /92
04 i/7/92
OFFICIAL RECORD COPY
A:NMP9207. PP