ML17056B759

From kanterella
Jump to navigation Jump to search
Notification of Significant Licensee Meeting W/Util on 920409 in King of Prussia,Pa to Conduct Enforcement Conference Re Loss of Redundancy in Reactor Protection Sys
ML17056B759
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 03/25/1992
From: Larry Nicholson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
EA-92-048, EA-92-48, NUDOCS 9204060126
Download: ML17056B759 (6)


Text

MAR 25 1992 U.S. NUCLEAR REGULATORY COMMISSION

~

No. 92-43 REGION I EA No.92-048 NOTICE OF SIGNIFICANTLICENSEE MEETING Licensee:

Facility:

Niagara Mohawk Power Corporation Nine Mile Point Unit 1 Docket No.:

50-220 Time and Date:

9:30 a.m., AprB 8, 1992 Location:

Purpose:

USNRC, King of Prussia, Pennsylvania Division of Reactor Projects Conference Room Enforcement Conference Concerning Loss of Redundancy in the Reactor Protection System NRC Attendees:

C. Hehl, Director, Division of Reactor Projects (DRP)

S. Shankman, Acting Deputy Director, DRP C. Cowgill, Chief, Reactor Projects Branch No. 1, DRP L. Nicholson, Chief, Reactor Projects Section No, 1A, DRP K. Smith, Regional Counsel D. Holody, Enforcement Officer T. Easlick, Enforcement Specialist W. Schmidt, Senior Resident Inspector R. Capra, Director, Project Directorate I-1, Office of Nuclear Reactor Regulation (NRR)

D. Brinkman, Project Manager, NRR Licensee Attendees:

R. Sylvia, Executive Vice. President - Nuclear J ~ Firlit, Vice President - Nuclear Generation C. Terry, Vice President - Nuclear Engineering J. Perry, Vice President - Quality Assurance K. Dahlberg, Unit 1 Plant Manager M. McCormick, Unit 2 Plant Manager NOTE:

This meeting is closed to the public due to the subject matter.

Handicapped persons requiring assistance to attend or participate in the meeting should make their requests known to Larry Nicholson, Chief, Reactor Projects Section No. 1A, USNRC, Region I, 475 Allendale Rd., King of Prussia, PA 19406, (215) 337-5128, no later than two business days prior to the meeting.

Original Signed By:

Prepared by:

Lar E. Nicholson Larry E. Nicholson, Chief Reactor Projects Section No. 1A OFHCIALRECORD COPY 9204060126 920325 PDR ADOCK 05000220 S

PDR a:Mtg92-43.NMP

Meeting Notice No. 92-43 2

vuR Sg >ggg

~it~ri i~ti n:

J. Taylor, Executive Director for Operations (ED)

J, Sniezek, Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research (DEDR)

,H. Thompson, Deputy Executive Director for Nuclear Material Safety, Safeguards and Operations Support (DEDS)

B. Grimes, Director, Division of Reactor Inspection and Safeguards, NRR J. Lieberman, Director, Office of Enforcement J. Goldberg, Office of the General Counsel (OGC)

T. Murley, Director, Office of Nuclear Reactor Regulation W; Russell, Associate Director for Inspection and Technical Assessment, NRR S. Varga, Director, Division of Reactor Projects - I/II, NRR J. 'Calvo, Assistant Director for Region I Reactors, NRR R. Capra, Director, Project Directorate I-l, NRR J. Menning, Project Manager, NRR D. Brinkman, Project Manager, NRR L. Plisco, LPEB/NRR R. Lobel, Regional Coordinator, EDO Public Document Room (PDR)

Local-Public Document Room (LPDR)

State of New York NRC Resident Inspector bcc:

Regional Administrator Deputy Regional Administrator Division Directors Branch Chiefs Section Chiefs Public Affairs Officer M. Banerjee, RI J, McGrath, RI K. Smith, RI D. Holody, RI B. Letts, RI Region I Receptionist DRMA Files DRP Files Bulletin Board M. J. Campion, DRP J. Lanning, DRP OFFICIALRECORD COPY a:Mtg92-43.NMP

(l

Meeting Notice No. 92-43 RI:DRP SGreenlee/mjc 3+$92 RI:D LNi o

n 3/+92 O~<<CIAL RECORD COPY a:Mtg92-43.NMP