Forwards Insp Repts 50-220/92-04 & 50-410/92-04 on 920127- 31.No Violations Noted
ML17056B681
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 02/21/1992
From: Durr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Sylvia R
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17056B682 List:
References
NUDOCS 9202280030
Download: ML17056B681 (6)


See also: IR 05000220/1992004

Text

FE8 21 l392

Docket Nos.

50-220

50-410

Niagara Mohawk Power Corporation

ATl'N: Mr. B. Ralph Sylvia

Executive Vice President - Nuclear

301 Plainfield Road

Syracuse,

New York

13212

Dear Mr. Sylvia:

Subject:

Inspection Report Numbers 50-220/92-04 and 50-410/92-04

IThis letter refers to the safety inspection conduct& by Mr. G. A. Koch of this office on

January 27 through January 31, 1992 at the Nine Mile Point Nuclear Power Station Unit

Nos.

1 and 2.

The results of the inspection were discussed

by Mr. Koch with the

'maintenance

managers, Mr. K. Sweet and Mr. K. Coates on January 31, 1992.

<<The inspection reviewed Niagara Mohawk Power Corporation's maintenance

welding

activities as they apply

- 'Aine Mile Point Unit I and Unit 2. It was broad in scope and

covered welder qualification; weld procedure qualification; weld material storage and issue;

,welding performance;

and review of the system for controlling welding on plant components.

Successful control of these areas is necessary

to assure

the stations are capable of making

sound repair/modification welds.

No violatiops of NRC requirements were noted during the inspection.

However, several

weaknesses

were discovered in the system which controlled site welding.

These areas were

discussed

in detail with the above mentioned persons during the exit meeting and can be

found in the inspection report.

Despite these weaknesses,

we consider the system adequate.

92022B0030

920221

PDR

ADOCK 0'5000220

G

PDR

i(

ZL- .D l

1

FEB 21 199K

Niagara Mohawk Corporation

The stations ability to make quality welds is not being questioned

because

workers

interviewed during the inspection were knowledgeable of welding procedures,

used sound

welding practices and engineering judgement, and demonstrated

compliance with procedures.

Sincerely

Jacque

P. Durr, Chief

Engineering Branch

Division of Reactor Safety

Enclosure:

Inspection Report Nos. 50-220/92-04 and 50-410/92-04

cc w/encl:

J. Firlit, Vice President - Nuclear Generation

C. Terry, Vice President - Nuclear Engineering

J. Perry, Vice President - Quality Assurance

S. Wilczek, Jr., Vice President - Nuclear Support

K. Dahlberg, Unit I Plant Manager

M. McCormick, Unit 2 Plant Manager

D. Greene, Manager, Licensing

J. Warden, New York Consumer

Prospection

Branch

G. Wilson, Senior Attorney

Director, Power Division, Department of Public Service, State of New York

C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law

K. Abraham, PAO (2) All Inspection Reports

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New York, SLO Designee

FEB 21 3992

Niagara Mohawk Corporation

bcc w/encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

W. ~~ning, DRS

C. Cowgill, DRP

J. Yerokun, DRP

L. Nicholson, DRP

S. Greenlee,

DRP

R. Lobel, EDO

R. Capra, NRR

J. Menning, NRR

D. Brinkman, NRR

DRS SALP Coordinator

RI:DRS

Koch

f/g cr 4/(

02//92

RI:DRS

Gr~a

02//q/92

RI:DRS

Durr

02K/92

OFFICIAL RECORD COPY

C:NMPINSP.GAK