Advises That Revised Schedule for Completion of Installation of Hardened Wetwell Vent in Response to Generic Ltr 89-16 Acceptable.Work Will Be Completed During Sept 1992 Refueling Outage
ML17056B285
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 02/12/1991
From: Brinkman D
Office of Nuclear Reactor Regulation
To: Sylvia B
NIAGARA MOHAWK POWER CORP.
References
GL-89-16, TAC-74874, NUDOCS 9102150249
Download: ML17056B285 (6)


Text

February 12, 1991 Docket No. 50-220 Mr. B. Ralph Sylvia Executive Vice President, Nuclear Niagara Mohawk Power Corporation 301 Plainfield Road

Syracuse, New York 13212

Dear Mr. Sylvia:

Distribution:

.~P NRC/Local PDRs SVarga EGreenman RACapra CVogan DOudinot DBrinkman OGC ACRS(10)

Plant File JLinville MThadani

SUBJECT:

RECFIPT OF

RESPONSE

TO GENERIC LETTER 89-16, "INSTALLATIONOF A HARDENED METWELL VENT" - NINE MILE POINT NUCLEAR STATION, UNIT NO.

1 (TAC NO. 74874)

By letter dated October 30, 1989, Niagara Mohawk Power Corporation (NMPC) responded to Generic Letter (GL) 89-16, "Installation of a Hardened Metwell Vent."

NMPC proposed to install a hardened vent under the provisions of 10 CFR 50.59, as per GL 89-16 guidance, and estimated that the modifications would be completed by March 1994.

By letter dated January 22, 1990, the staff acknowledged receipt of NMPC's response and requested that NMPC reevaluate its schedule to determine if it would be feasible to complete the proposed modifications by January 1993.

By letter dated October 15, 1990, NMPC confirmed that the modifications to the venting system would be performed in accordance with the guidance provided in GL 89-16.

NMPC further stated that the work associated with the modifications would be completed during the 1992 refueling outage, scheduled to begin in September 1992.

The staff finds this revised schedule for completion of the modifications to the venting system acceptable.

It is requested that you notify the staff in writing if your schedule changes.

In addition, NMPC is requested to inform the NRC in writing when the modifications have been completed.

This requirement affects one respondent, and, therefore, is not subject to Office of Management and Budget review under P. L.96-511 Sincerely, ORIGINAL SIGNED BY:

9>02150249 9g0212-PDR ADOCK 05000220 P

PDR cc:

See next page Donald S. Brinkman, Senior Project Manager Project Directorate I-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

  • See previous concurrence PDI-1: LA PD CVyqayB a yding: ca PDI-I:Phg>

I-:Pll DBring~n

  • ll)ha)[ni

~QIC PDI-1:D RA)apr[

p ip/1 DOCUMENT NAME: MEMO TO SYLVIA 74874

m mg FN R

t Il Fm w,

N m

~

I h

Wl I

~

It I lt F g It Rl F

~

W 3

I I

N" I

I't R

Wl II m-I' I

Fh Ii W

~,F II m

I' t

'I F

i I

il F)

FN

~

N m

W N

R Ih

~ I R,

h w

R m'

I

'I m,

~

~

IR R

N

>> I N R

N

8 A~gO

+~

~

o 0Q I

C Vl 4'

40

+0

+w*e+

Docket No. 50-220 l

UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O. C. 20555 February 12, 1991 Hr. B. Ralph Sylvia Executive Vice President, Nuclear Niagara Mohawk Power Corporation 301 Plainfield Road

Syracuse, New York 13212

Dear Mr. Sylvia:

SUBJECT:

RECEIPT OF

RESPONSE

TO GENERIC LETTER 89-16, "INSTALLATIONOF A HARDENED METNELL VENT" - NINE MILE POINT NUCLEAR STATION, UNIT NO.

1 (TAC NO. 74874)

By letter dated October 30, 1989, Niagara Mohawk Power Corporation (NMPC) responded to Generic Letter (GL) 89-16, "Installation of a Hardened Metwell Vent."

NMPC proposed to install a hardened vent under the provisions of 10 CFR 50.59, as per GL 89-16 guidance, and estimated that the modifications would be completed by March 1994.

By letter dated January 22, 1990, the staff acknowledged receipt of NMPC's response and requested that NMPC reevaluate its schedule to determine if it would be feasible to complete the proposed modifications by January 1993.

By letter dated October 15, 1990, NMPC confirmed that the modifications to the venting system would be performed in accordance with the guidance provided in GL 89-16.

NHPC further stated that the work associated with the modifications would be completed during the 1992 refueling outage, scheduled to begin in September 1992.

The staff finds this revised schedule for completion of the modifications to the venting system acceptable.

It is requested that you notify the staff in writing if your schedule changes.

In addition, NMPC is requested to inform the NRC in writing when the modifications have been completed.

This requirement affects one respondent, and, therefore, is not subject to Office of Management and Budget review under P. L.96-511.

Sincerely, cc:

See next page Donald S. Brinkman, Senior Project Hanager Project Directorate I-l Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

k

.<'r. B. Ralph Sylvia Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station Unit 2 CC:

Hr. Mark J. Wetterhahn, Esquire

Bishop, Cook, Purcell 5 Re'ynolds 1400 L. Street, N.W.

Washington, D.

C. 20005-3502 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406 Mr. Richard Goldsmith Syracuse University College of Law E. I. White Hall Campus

Syracuse, New York 12223 Resident Inspector Nine Mile Point Nuclear Power Station P. 0.

Box 99

Lycoming, New York 13093 Mr. Gary D. Wilson, Esquire Niagara Mohawk Power Corporation 300 Erie Boulevard West
Syracuse, New York 13202 Mr. Peter E. Francisco, Licensing Niagara Mohawk Power Corporation 301 Plainfield Road
Syracuse, New York 13212 Hs.

Donna Ross New York State Energy Office 2 Empire State Plaza 16th Floor

Albany, New York 12223 Supervisor Town of Scriba R.

D.

P4

Oswego, New York 13126 Charlie Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, New York 10271 Hr. Richard M. Kessel Chair and Executive Director State Consumer Protection Board 99 Washington Avenue
Albany, New York 12210 Mr. Richard Abbott, Unit 2 Station Superintendent Nine Mile Point Nuclear Station Niagara Mohawk Power Corporation P. 0.

Box 32

Lycoming, NY 13093 Mr. Joseph F. Firlit Vice President

- Nuclear Generation Nine Mile Point Nuclear Station Niagara Mohawk Power Corporation P. 0.