ML17056B260
| ML17056B260 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 01/26/1991 |
| From: | Bettenhausen L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Sylvia B NIAGARA MOHAWK POWER CORP. |
| Shared Package | |
| ML17056B261 | List: |
| References | |
| NUDOCS 9102050034 | |
| Download: ML17056B260 (6) | |
See also: IR 05000220/1990027
Text
Docket Nos.
50-.220
JAN 26
1991
Niagara
Mohawk Power Corporation
ATTN:
B. Ralph Sylvia
Executive Vice President
Nuclear Operations
301 Plainfield Road
Syracuse,
New York 13212
Gentlemen:
SUBJECT:
REQUALIFICATION PROGRAM EVALUATION, NINE MILE POINT UNIT 1
(Examination Report 50-220/90-27
(OL))
During the, week of December
17,
1990 the
NRC conducted
a requalification program
evaluation at the Nine Mile Point Unit 1.
The evaluation
was conducted
in
accordance
with NUREG-1021, "Operator Licensing Examiner Standards,"
Revision
6.
The evaluation
had two purposes:
(1) to evaluate
individual licensed
operator
competency;
and (2) to evaluate
the effectiveness
of the licensed
operator training program.
At the conclusion 'of the evaluation,
findings related
to the preparation
and administration of the requalification examination
were
discussed
with those
members of your staff identified in the enclosed
report.
As a result of this evaluation,
the Nine Mile Point Unit 1 requalification
program continues to be satisfactory.
The
NRC results indicate that all fifteen
of the fifteen operators
examined
passed
the
NRC administered requalification
. examination
and all three crews that participated in the examination
performed
satisfactorily
on the simulator portion of the examination.
The operators
were
well trained
and prepared for the requalification examination.
The enclosed
examination report also reviewed your responses
to the three
unresolved
items from the previous requaliffcation program evaluation.
Your
responses
to the unresolved
items were found to be acceptable.
In accordance
with 10 CFR 2.790 of the Commission's
regulations,
a copy of
this letter and the enclosures will be placed in the
NRC Public Document
Room.
OFFICIAL RECORD
COPY
FLOREK/NMP1 - 0001.0.0
01/10/91
9i02050034 9iOi26
ADOCK 05000220;"
V
l
Niagara
Mohawk Power Corporation
2
Should you have any questions,
please
contact Mr. R. Conte, Chief,
Section, at (215) 337-5210.
< ~<jzQ. S1gaedBg.+
Lee
H. Bettenhausen,
Chief
Operations
Branch
Division of Reactor Safety
'Enclosure:
Examination Report No. 50-220/90-27
(OL) with Attachments
cc w/encl:
W. Hansen,
Manager,
Corporate guality Assurance
M. Colomb, Unit 2 Superintendent,
Operations
C. Beckham,
Manager,
Nuclear guality Assurance
Operations
R. Abbott, Manager,
Unit 2
J. Perry,
Vice President,
guality Assurance
K. Dahlberg,
Manager,
Unit 1
R. Randall, Unit 1 Superintendent,
Operations
J. Firlit, Vice President,
Nuclear Generation
C. Terry, Vice President,
Nuclear Engineering
and Licensing
J.
Warden,
New York Consumer Protection
Branch
M. Wetterhahn, Jr., Esquire
T. Conner, Jr.,
Esquit e
G. Wilson, Senior Attorney
J.
Keib, Esquire
S. Wilczek, Vice President,
Nuclear Support
R. Smith,
Manager Training
Director,
Power Division, Department of Public Service,
State
State of New York, Department of Law
Public Document
Room (PDR)
Local Public Document
Room (LPDR)
Nuclear Safety Information Center
(NSIC)
NRC Resident Inspector
State of New York, SLO Designee
of New York
OFFICIAL RECORD
COPY
FLOREK/NMP1 - 0001.0.1
01/10/91
11
r
pl
Niagara
Mohawk Power Corporation
3
bcc w/encl:
Region I Docket
Room (with concurrences)
Management Assistant,
DRMA (w/o encl)
D. Florek,
R. Conte,
L. Bettenhausen,
R. Bellamy,
DRSS
J. Linville, DRP
D. Vito, DRP
G. Meyer,
M. Miller, DRP
'. Caldwell,
D. Brinkman,
R. Capra,
OL Facility File
Master
Exam File
DRS files (3)
DR:
Fl
e
ajk
01/'1
"DRS:RI
Cont
01/y/91
DRS: RI
Be tenhausen
01~91
OFFICIAL RECORD
COPY
FLOREK/NMP1 " 0001:1.0