ML17056B241
| ML17056B241 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 01/11/1991 |
| From: | Brinkman D Office of Nuclear Reactor Regulation |
| To: | Sylvia B NIAGARA MOHAWK POWER CORP. |
| Shared Package | |
| ML17056B242 | List: |
| References | |
| GL-89-14, TAC-76073, NUDOCS 9101220157 | |
| Download: ML17056B241 (6) | |
Text
J ary 11, 1991 Docket No. 50-220 Mr. B. Ralph Sylvia Executive Vice President, Nuclear Niagara Mohawk Power Corporation 301 Plainfield Road
- Syracuse, New York 13212
Dear Mr. Sylvia:
Distribution:
PDI-1 Reading EGreenman DBrinkman OGC EJordan Wanda Jones ACRS (10)
OC/LFMB TDunning RACapra NRC Im Local PDRs SVarga CVogan DOudinot DHagan GHill (4)
,JCalvo GPA/PA Plant File HSilver JLinvi1 1 e
SUBJECT:
ISSUANCE OF AMENDMENT FOR NINE MILE 1 ON THE REMOVAL OF THE 3.25 LIMIT (TAC NO. 76073)
The Comission has issued the enclosed Amendment No.
121 to Facility Operating License No.
DPR-63 for the Nine Mile Point Nuclear Station Unit No.
1 (NMP-1).
The amendment consists of changes to the Technical Specifications in response to your application transmitted by letter dated February 26,
- 1990, as superseded October 26,
- 1990, and supplemented November 30, 1990.
This amendment removes a
r estriction that limits the combined time interval for three consecutive surveillances to less than 3.25 times the specified interval, and also adds the Bases applicable to a new Section 4.0.1, "Surveillance Intervals."
These changes are consistent with the guidance provided in Generic Letter 89-14, "Line Item Improvements in Technical Specifications - Removal of the 3.25 Limit on Extending Surveillance Intervals."
A copy of the related Safety Evaluation is enclosed.
A Notice of Issuance will be included in the Commission's next regular bi-weekly Federal
~Re ister notice.
Sincerely, QRlGINAL SIGNED BY:
Enclosures:
l.
Amendment No. 121 to DPR-63 2.
Safety Evaluation Donald S. Brinkman, Senior Project Manager Project Directorate I-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation cc: w/enclosures See next page PDI-1: LA P[g -1+E CVogan UM61not:avl
/~/z7/90
/g /gP/90 DOCUMENT NAME: AMENDMENT NO.
9i0i220i57 9i0iii PDR ADQCK 05000220 P
NRR/OTSP DBrinkman ~~
JCal vo
/a /<f/90
- q. /)(,/90 76073 G'// 0 0 o o 6 0
~~6 OGC n g PDI-1D RACapra I /w/9$ 0)/H /90 (0) eP I
t' k
Mr. B. Ralph Sylvia Niagara Mrhawk Power Corporation Nine Mile Point Nuclear Station, Unit No.
1 CC:
Mr. Mark J. Wetterhahn, Esquire
- Bishop, Cook, Purcell 5 Reynolds 1400 L. Street, N.W.
Washington, D.
C.
20005-3502 Supervisor Town of Scriba R.
D.
P4
- Oswego, New York 13126 Mr. Joseph F.
Firlit Vice President - Nuclear Generation Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station Post Office Box 32
- Lycoming, New York 13093 Resident Inspector U.S. Nuclear Regulatory Commission Post Office Box 126
- Lycoming, New York 13093 Mr. Gary D. Wilson, Esquire Niagara Mohawk Power Corporation 300 Erie Boulevard West
- Syracuse, New York 13202 Regional Administrator, Region I U.S. Nuclear Regulatory Comnission 475 Allendale Road King of Prussia, Pennsylvania 19406 Ms. Donna Ross New York State Energy Office 2 Empire State Plaza 16th Floor
- Albany, New York 12223 Mr. Kim Dahlberg Unit 1 Station Superintendent Nine Mile Point Nuclear Station Post Office Box 32
- Lycoming, New York 13093 Mr. Peter E. Francisco, Licensing Niagara Mohawk Power Corporation 301 Plainfield Road
- Syracuse, New York 13212 Charlie Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, New York 10271 Mr. Paul D.
Eddy State of New York Department of Public Service Power Division, System Operations 3 Empire State Plaza
- Albany, New York 12223
~
gP,it AtGtr
~c"
+
0 cs C
O Psn0
~ca
+n
~O
++*dr+
Docket No. 50-220 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 January 11, 1991 Mr. B. Ralph Sylvia Executive Vice President, Nuclear Niagara Mohawk Power Corporation 301 Plainfield Road
- Syracuse, New York 13212
Dear Mr. Sylvia:
SUBJECT:
ISSUANCE OF AMENDMENT FOR NINE MILE 1 ON THE REMOVAL OF THE 3.25 LIMIT (TAC NO. 76073)
The Commission has issued the enclosed Amendment No.
121 to Facility Operating License No.
DPR-63 for the Nine Mile Point Nuclear Station Unit No.
1 (NMP-l).
The amendment consists of changes to the Technical Specifications in response to your application transmitted by letter dated February 26, 1990, as superseded October 26,
- 1990, and supplemented November 30, 1990.
This amendment removes a restriction that limits the combined time interval for three consecutive surveillances to less than 3.25 times the specified interval, and also adds the Bases applicable to a new Section 4.0.1, "Surveillance Intervals."
These changes are consistent with the guidance provided in Generic Letter 89-14, "Line Item Improvements in Technical Specifications - Removal of the 3.25 Limit on Extending Surveillance Intervals."
A copy of the related Safety, Evaluation is enclosed.
A Notice of Issuance will be inciuded in the Commission's next regular bi-weekly Federal
~Re ister notice.
Sincerely,
Enclosures:
1.
Amendment No.121 to DPR-63 2.
Safety Evaluation cc: w/enc Iosures See next page Donald S. Brinkman, Senior Project Manager Project Directorate I-l Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
4