ML17056B207
| ML17056B207 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 12/20/1990 |
| From: | Hodges M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Sylvia B NIAGARA MOHAWK POWER CORP. |
| References | |
| NUDOCS 9101020016 | |
| Download: ML17056B207 (12) | |
Text
DEC 2 0 1990 Docket Nos.
50-220 50-410 Niagara Mohawk Power Corporation ATTN:
Mr. B. Ralph Sylvia Executive Vice President Nuclear Operations 301 Plainfield Road
- Syracuse, New York 13212 Gentlemen:
Subject:
NRC REGION I - UTILITY SYMPOSIUM/WORKSHOP ON ENGINEERING'S ROLE IN PLANT SUPPORT We appreciate your response to our letter of October 12, 1990, advising you of our plans to hold the subject meeting.
The interest shown to attend has been strong and final plans have been made to hold the symposium/workshop at the Sheraton Valley Forge Hotel, in King of Prussia, Pennsylvania on February 20, 1991 from noon to 5:00 p.m.
and February 21,
- 1991, from 8:00 a,m. to 4:30 p.m.
An agenda outline is enclosed.
The three topics discussed in our earlier transmittal will be the breakout session topics.
They are:
elements of a good engineering organization, licensee's actions with degraded conditions including operability/reportabi lity determinations, and the modification process including 10CFR 50.59 reviews.
A block of rooms is being held at the Sheraton Valley Forge Hotel.
Attendees are requested to make their own reservations and the enclosed reservation form provides details.
9101020016 901220 PDR ADOCK 05000220 P
PDR OFFICIAL RECORD COPY 50-220 50-410 WS 0001.0.0 12/20/90
DEC 2 0 1SSO Niagara Mohawk Power Corporation 2
The Region I staff is looking forward to your participation and a productive symposium/workshop.
Sincerely, n-.
i."..i c( '"q BY Lg H, gH"~NH",USEN Marvin W. Hodges, Director Division of Reactor Safety, RI
Enclosures:
As stated Technical
Contact:
Harold Gregg (215) 337-5295 Secretary
Contact:
Mildred Smallwood (215) 337-5191 Brenda Platchek (215) 337-5182
,OFFICIAL RECORD COPY 50-220 50-410 WS - 0002.0.0 12/20/90
pEt',
2, 0 lo-"0 Niagara Mohawk Power Corporation 3
cc w/encl:
W. Hansen,
- Manager, Corporate Quality Assurance M. Colomb, Unit 2 Superintendent, Op'erations C.
- Beckham, Manager, Nuclear Quality Assurance Operations R. Abbott, Manager, Unit 2 J. Perry, Vice President, Quality Assurance K. Dahlberg,
- Manager, Unit 1
R. Randall, Unit 1 Superintendent, Operations J. Firlit, Vice President, Nuclear Generation C. Terry, Vice President, Nuclear Engineering and Licensing J.
- Warden, New York Consumer Protection Branch
-M. Wetterhahn, Jr.,
Esquire
-T. Conner, Jr.,
Esquire G. Wils'on, Senior Attorney J.
Keib, Esquire S. Wile'zek, Vice President, Nuclear Support
- Director, Power Division, Department of Public Service, State of New York State of New York, Department of Law Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector K. Abraham, PAO (28)
SALP Reports and (2) All Inspection Reports State of New York, SLO Designee bcc w/encl:
Region I Docket Room (with concurrences)
R. Bellamy, DRSS J. Linville, DRP D. Vito, DRP G. Meyer, DRP M. Hiller, DRP J. Caldwell, EDO D. Brinkman, NRR R. Capra, NRR RI:DRS Gre 12 ~/90 RI:DRS Eapen 12/9P /90 RI: DRS Durr QlW 12/&/90 RI: DRS 12~/90 OFFICIAL RECORD COPY 50-220 50"410 WS - 0003.0.0 12/20/90
Symposium/Workshop Engineering's'Role In'upport Of Plant Activities AGENDA Wednesda Februar 20 1991 12:00-12:50 p.m.
Registration 12:50- 1:00 p.m.
Call to Assembly 1:00- 1:05 p.m.
Introduction 1:05-1: 15 p.m.
Welcome 1: 15-1:55 p.m.
Keynote Speaker 1:55-2:35 p.m.
Keynote Speaker H. I. Gregg, Sr. Reactor Engineer Division of Reactor
- Safety, RI M.
W. Hodges, Director Division of Reactor Safety, RI T. T. Martin Regional Administrator, RI J.
H. Sniezek, Deputy Executive Director for Operations, NRC E. J.
Mroczka, Sr. Vice President Nuclear Engineering and Operations-Northeast Utilities 2:35-3:00 p.m.
3:00- 5:00 p.m.
Break Breakout Sessions A.
Elements of a good engineering organization BE Licensee's actions with degraded conditions including operability/
reportability determinations C.
The. modification process including 10CFR 50.59 reviews OFFICIAL RECORD COPY 50-220 50-410 WS 0004.0.0 12/20/90
Thursda Februar 8:00-10:00 a.m.
21 1991 Breakout"Session's
- Refinement of most significant issues A.
C.
Elements of a good engineering organization Licensee's actions with degraded conditions including operability/
reportabi lity determinations The modification process including 10CFR 50.59 reviews 10:00-10:30 a.m.
10:30-11:30 a.m.
11:30" 1:00 p.m.
1:00- 2:00 p.m.
Break Speaker Lunch First Group Summary Feedback M.
R. Tresler, Engineering Manager Diablo Canyon, Pacific Gas and Electric Co./Chairman of Region V
Engineering Managers Forum Breakout Session Facilitators 2:00- 2: 15 p.m.
2:15-3:15 p.m.
Break Second Group Summary Feedback Breakout Session Facilitators 3:15-3:35 p.m.
Wrap-up D.
R. Helwig, Vice President Nuclear Engineering and Services, Philadelphia Electric Company 3:35-3:55 p.m.
Wrap-up J.
P. Durr, Chief Engineering Branch Division of Reactor Safety, RI 3:55-Closing Remarks M.
W. Hodges, Director Division of Reactor Safety, RI OFFICIAL RECORD COPY 50-220 50-410 WS " 0005.0.0 12/20/90
0
'J
ROOMRESERVATION Checkzn:
Tuesday, February 19, 1991 Check Out: Friday, February 22, 1991 Single Room: $87.00+ 7% Tax Per Night Double Room: $87.00+ 7% Tax Per Night FIRST NIGHTDEPOSIT NEEDED TO CONFIKM'RESERVATION
¹me:
Company:
Address:
City/State/Zip Code:
Home Phone Number: (
)
WorkPhone Number: (
)
Please Check One:
Single l Person Double 2 Persons, I Bed Double 2 Person, 2 beds Non Smoking-Room Preferred:
Sharing With:
ArrivalDate:
Departure Date:
Please enclose Check or Money Order (One Night's Lodging) payable to the Sheraton Valley Forge Hotel, or Major Credit Card Number and Date ofExpiration. No cancellations willbe accepted within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> ofArrivalDate. Timely cancelled Reservatr'ons willbe subject to a 10% handling fee.
Iauthorize the Sheraton Valley Forge Hotel to make charges on my Credit Card:
Credit Card Number:
Expiration Date:
Cardholder's Signature:
Reservations must be received 30 days prior to arrival, otherwise Reservations willbe accepted on a Space Available Basis Only and Group Rate willnot be guaranteed.
Please Mailto the FollowingAddress:
fa S
u b u
r d
s en b
)
s a
e e
as s
a f
a a
4 f
~k