ML17056A280

From kanterella
Jump to navigation Jump to search
Notification of Significant Licensee Meeting 89-125 W/Util in King of Prussia,Pa for Licensee Presentation of Power Ascension Test Program Plans & Actions to Correct Deficiencies W/Large Bore Pipe Supports
ML17056A280
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 08/23/1989
From: Barkley R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8909130247
Download: ML17056A280 (4)


Text

U.S.

NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF SIGNIFICANT LICENSEE MEETING No.89-125 Licensee:

Facility:

Docket No.:

Time and Date:

Location:

Purpose:

NRC Attendees:

Niagara Mohawk Power Corporation Nine Mile Point Unit 1 50-220 10:00 a.m., August 31, 1989

USNRC, Region I Office, King of Prussia, Pennsylvania Division of Reactor Projects (DRP) Conference Room Licensee Presentation of Their Power Ascension Test Program Plans at Nine Mile Point Unit 1 and Their Actions to Correct Deficiencies with Large Bore Pipe Supports

~ W. Kane, Director, Division of Reactor Projects (DRP)

J. Wiggins, Chief, Reactor Projects Branch No.

1, DRP R. Gallo, Chief, Operations Branch, Division of Reactor Safety (DRS)

R. Bellamy, Chief, Facilities Radiological Safety and Safeguards (DRSS)

J. Strosnider, Chief, Materials Process

Section, DRS D. Florek, Reactor Operator
Examinei, DRS W, Cook, Senior Resident Inspector R.
Temps, Resident Inspector R. Capra, Director, Project Directorate I-1, Office of Nuclear Reactor Regulation (NRR)

M. Slosson, Project Manager, NRR Licensee Attendees:

L. Burkhardt, Executive Vice President, Nuclear Operations E. Hoffman, Vice President, NMPC (Non-Nuclear Engineering NMP1 Restart Task Force K. Dahlberg, Unit 1 Superintendent N. Rademacher, Assistant to Executive Vice President Nuclear Note:

Attendance by NRC personnel at this meeting should be made known by August 25, 1989, via telephone call to James T. Wiggins, Region I, at FTS 8-346-5224 or Commercial (215) 337-5224.

This meeting is open to the public.

Prepared by:

ichard R. Barkley, eactor Engineer Reactor Projects Section No.

3B 8909i30247 890823 PDR ADOCK 0 000220 P

PDC OFFICIAL RECORD COPY MEETING NOTICE NO.89-125 " 0001.0.0 g/

Meeting Notice No.89-125 Distribution:

J. Taylor, Acting Executive Director for Operations (ED)

Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research (DEDR)

H. Thompson, Deputy Executive Director for Nuclear Material Safety, Safeguards and Operations Support (OEDS)

B. Grimes, Director, Division of Reactor Inspection and Safeguards, NRR J. Lieberman, Director, Office of Enforcement T. Murley, Director, Office of Nuclear Reactor Regulation F. Miraglia, Associate Director for Inspection and Technical Assessment, NRR S.

Varga', Director, Division of Reactor Projects - I/II, NRR Assistant Director for Region I Reactors, NRR R. Capra, Director, Project Directorate I-1, NRR M. Slosson, Project Manager, PD I-l, NRR J.

Dyer, Regional Coordinator, EDO Public Document Room (PDR)

Local Public Document Room (LPDR)

State of New York NRC Resident Inspector bcc:

Regional Administrator Deputy Regional Administrator Division Directors Branch Chiefs Section Chiefs Public Affairs Officer (2 copies)

M. Miller, RI J.

McGrath, RI D. Hol ody,, RI CD White, RI Region I Receptionist DRMA Files DRP Files Bulletin Board M. J.
DiDonato, DRP RI: DRP RBarkley/mjd 8/

/89 OFFICIAL RECORD COPY MEETING NOTICE NO.89-125 0002.0.0 08/23/89