ML17055D987

From kanterella
Jump to navigation Jump to search
Responds to Request for Addl Info on ATWS Review Re Alternate Rod Injection & Recirculation Pump Trip Sys.W/ Seven Oversize Drawings
Date released: 06/30/2017 Download: ML17055D987


Responds to Request for Addl Info on ATWS Review Re Alternate Rod Injection & Recirculation Pump Trip Sys.W/ Seven Oversize Drawings
ML18038A406
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 07/06/1988
From: Terry C
NIAGARA MOHAWK POWER CORP.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
Download: ML18038A406 (72)
Control Board Panel F Design Layout. Sheet 1
ML17055D993
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 12/17/1987
From:
NIAGARA MOHAWK POWER CORP.
To:
References
Download: ML17055D993 (1)
Elementary Wiring Diagram 4160 Volt Power Board II Control Circuits (Reactor Recirculation). Sheet 5
ML17055D992
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 07/06/1988
From:
NIAGARA MOHAWK POWER CORP.
To:
References
Download: ML17055D992 (1)
Elementary Wiring Diagram Anticipated Transient Without SCRAM Alternate Rod INJECTION-D.C. Valve Logic Channel No 11. Sheet 3 Final
ML17055D991
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 12/18/1987
From:
NIAGARA MOHAWK POWER CORP.
To:
References
Download: ML17055D991 (1)
Elementary Wiring Diagram Anticipated Transient Without SCRAM Channel No 12. Sheet 2
ML17055D990
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 12/18/1987
From:
NIAGARA MOHAWK POWER CORP.
To:
References
Download: ML17055D990 (1)
Elementary Wiring Diagram Anticipated Transient Without SCRAM Channel No 11. Sheet 1
ML17055D989
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 12/18/1987
From:
NIAGARA MOHAWK POWER CORP.
To:
References
Download: ML17055D989 (1)
Functional Line Diagram Anticipated Transient Without SCRAM Channel 11 & 12. Sheet 2 Final
ML17055D988
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 12/17/1987
From:
FOXBORO CORP.
To:
NIAGARA MOHAWK POWER CORP.
References
Download: ML17055D988 (1)
Functional Line Diagram Anticipated Transient Without SCRAM Channel 11 & 12. Sheet 1
ML17055D986
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 12/17/1987
From:
FOXBORO CORP.
To:
NIAGARA MOHAWK POWER CORP.
References
Download: ML17055D986 (1)