ML17055D750
| ML17055D750 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 02/23/1988 |
| From: | Jerrica Johnson NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| EA-87-104, NUDOCS 8804120362 | |
| Download: ML17055D750 (6) | |
Text
qpr p
<<~J
~
NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING Licensee:
Faci 1 ity:
Docket No.:
Time and Date:
Location:
Purpose:
NRC Attendees:
Niagara Mohawk Power Corporation Nine Mile Point Unit 2 50-410 1:00'.m.,
March 18, 1988 Region I Office, DRP Conference Room King of Prussia, PA Enforcement Conference Regarding NRC Office of Investigation (OI) Report No. I-85-020 Findings Involving"'the Validity of Information Submitted to the NRC Concerning Neutron Monitoring System Cable Installations W. Russell, Regional Administrator W. Kane, Director, Division of Reactor Projects E. Wenzinger, Chief, Projects Branch No. 2, DRP C. Anderson, Chief, Plant Systems
- Section, Division of Reactor Safety J. Johnson, Chief, Reactor Projects Section 2C, DRP W. Cook, Senior Resident Inspector, Nine Mile Point R. Capra, Director, Project Directorate I-1, NRR M. Haughey, Project Manager, PD I-l, NRR D. Holody,. Enforcement Officer J. Gutierrez, Regional Attorney Licensee Attendees:
W. Donlon, President J. Perry, Vice President equality Assurance A. Kovac, guality First Program Manager C.
- Beckham, Manager, guality Assurance Operations G. Wilson, Attorney, NMPC M. Wetterhahn, Conner
& Wetterhahn 88041 20362 880203 PDR ADQCK 050004i0 E,
PDR J.
- Johnson, Chief, RPS 2C Note:
Attendance by NRC personnel at this meeting should be made known by 4:00 p.m.,
March 9, 1988 via telephone call to J. Johnson, Region I at FTS 346-5234 or Commercial 215-337-5234.
Ox'i~<.pgl
~) '-, v Prepared by:
OFFICIAL RECORD COPY EC MTG NOTICE 88-027 0001.0. 0 02/19/88
Distribution:
Victor Stello, Jr.,
Executive Director for Operations James M. Taylor, Deputy Executive Director for Regional Operations James G. Partlow, Director, Division of Reactor Inspection 5 Safeguards, NRR J.
Lieberman, Director, Office of Enforcement T. E. Murley, Director, Office of Nuclear Reactor Regulation
J.
- Sniezek, Deputy Director, NRR T. Martin, Acting Associate Director for Inspection
& Technical Assessment, NRR B. Boger, Assistant Director for Region I Reactors, NRR B. Clayton, Regional Coordinator, EDO S.
Varga, Director, Division of Reactor Projects I-II R. Capra, Director, Project Directorate I-l, NRR M. Haughey, Project Manager, PD I-1, NRR Public Document Room (PDR)
Local Public 'Document Room (LPDR)
Department of Public Service, State of New York bcc:
Regional Administrator Deputy Regional Administrator Division Directors Branch Chiefs Region I Receptionist PAO DRMA Files DRP Files Bulletin Board M. J. DiDonato, DRP W. Cook, SRI NMP 1/2 C. White, OI-Region I NRC Attendees RI RP Johnson/rhl 2/~~/88 R
i ger OFFICIAL RECORD COPY EC MTG NOTICE 88.-027 0002.0.0 02/19/88
APR OS 1988 ~
Washington Public Power Supply System Box 1223 Elma, Washington 98541-1223 Attention:
Mr. G.
C. Sorensen, Manager Regulatory Programs Gentlemen:
SUBJECT:
ACCEPTANCE OF CHANGES TO THE QUALITY ASSURANCE PROGRAM FOR NUCLEAR PROJECT 3
We have reviewed the changes and corrections you submitted on February 26, 1988 to Amendment No.
7 of the FSAR Section 17.3.
Based on our review of these changes we find that the QA program description for the preservation stage of WNP-3 continues to meet the requirements of 10 CFR 50, Appendix B and is, therefore, acceptable.
If there are changes to other operative QA commitments existing in docketed correspondence outside of the SAR QA program description, you are obligated to notify this office.
Implementing such changes should be based on 10 CFR 50.55 (f)(3).
Should you have any questions concerning this review, please contact W. J.
Wagner of my staff on (415) 943-3731.
Sincerely,/:,/
Dennis F. Kirsch, Director Division of Reactor Safety and Projects cc:
G.
W. Knighton, NRR J.
G. Spraul, QAB Section Chiefs Branch Chiefs RSB/Document Control Desk (RIDS)
T WWafner:jb Ri hards 04/M/88 04/~/88 RPate 04/y~ /88 D risc 04/8'/88 ST C
PY R
VEST C
PY
/
NO S /
NO RON S C
PY REOUSTC P
YES /
NO YES /
N S
TO PDR
/
NO
J'