Enforcement Conference Rept 50-220/87-21 on 880107.Topics Discussed:Inservice Insp Program Deficiencies & Corrective Actions Taken for Licensee Identified Violations.Conference Outline Encl
ML17055D572
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 02/04/1988
From: Jerrica Johnson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML17055D571 List:
References
50-220-87-21-EC, NUDOCS 8802170246
Download: ML17055D572 (22)


See also: IR 05000220/1987021

Text

U.S.

NUCLEAR REGULATORY COMMISSION

REGION I

Inspection

No. 87-21

Docket No.

License

No.

Licensee

Faci 1 ity:

Location:

Date:

50-220

DRP-63

Niagara

Mohawk Power Corporation

310 Plainfield Road

Syracuse,

NY 13212

Nine Mile Point

Unit

1

NRC Region I, King of Prussia,

PA

January

7,

1988

Approved by:

J..

Johns

n, Chief,

Reactor Projects

Section

2C,

DRP

Date

Meetin

Summar

This Enforcement

Conference

was held to discuss

the findings

of Inspection

Report 50-220/87-21.

The topics discussed

at the meeting dealt

primarily with the Inservice Inspection

Program deficiencies

noted in the

inspection report

and the corrective actions

taken

by Niagara

Mohawk.

Additional topics were discussed,

including corrective actions

taken for

licensee identified violations (for details

see Attachment 1).

021 7024'@020>

8

ADOCK 05000220.

PDR

Details

Nia ara

Mohawk Power

Cor oration

C. Mangan,

Senior Vice President

T.

Lempges,

Vice President,

Nuclear Generation

J. Perry, Vice'President,

Quality Assurance

T.

Roman,

Station Superintendent,

Unit

1

R. Abbott, Station Superintendent,

Unit 2

A. Zalnick, Manager,

Nuclear Licensing

F. Hawksley, Superintendent,

Inservice Inspection

C. Beckham,

Manager,

Operations Quality Assurance

K. Thomas,

Licensing Engineer

G. Wilson, Attorney

M. Wetterhahn,

Attorney (Conner

and Wetterhahn)

Nuclear

Re viator

Commission

W. Kane, Director, Division of Reactor Projects

J. Johnson,

Chief, Reactor Project Section

2C,

DRP

R. Capra, Director, Project Directorate I-l, NRR

R. Benedict,

Project Manager,

PD I-l, NRR

M. Haughey,

Project Manager,

PD I-l, NRR

W. Cook, Senior

Resident

Inspector,

Nine Mile Point

W. Schmidt,

Resident Inspector,

Nine Mile Point

C. Marschall, Senior Resident

Inspector,

Ginna Nuclear Station

J. Strosnider,

Chief, Engineering

Branch,

DRS

P.

Eapen,

Chief, Special

Test

Program Section,

EB,

DRS

D. Holody, Enforcement Officer

J. Gutierrez,

Regional

Counsel

2.

~Pur ose

The Enforcement

Conference

was held at the request of NRC Region I to

discuss

the details of the Inservice Inspection (ISI) Program

and the

violations identified during the period of October

5 through October 30,

1987.

,Ni'a'jara

Mohawk was requested

to discussed

the following: the

problems%1eading

to; the safety significance of; the root cause of; and

correcti'vegactions

taken to prevent further ISI program violations.

3. Discussions

NRC management

made

a few brief opening

remarks

and then turned the

meeting over to Niagara

Mohawk,

who made

a presentation

based

on the

outline in Attachment

1.

4. Conclusions

Niagara

Mohawk agreed that there were violations of the ISI program

as

documented

in Inspection

Report

No. 50-220/87-21

and that the events

and

technical

issues

described

in the report were accurate.

Niagara

Mohawk

provided one clarification with respect

to the

number of Oeficiency-

Corrective Action (OCA) Reports that required resolution following the

plant startup

from the June

1986 refueling outage.

NRC

ENFORCEMENT

CONFERENCE

OUTLINE

ATTACHMEl'lT 1

T.

LEMPGES

I .

INTRODUCTIONS

K.

THOMAS/

C.

BECKHAM

T.

ROMAN

II.

UNIT 1 ISI

PROBLEMS

'EQUENCE

OF

RELATED EVENTS

DESIRED

INSPECTION

PROCESS

DEVIATIONS FROM DESIGNED

PROCESS

SAFETY SIGNIFICANCE

CAUSES

CORRECTIVE ACTION

lI

I II.

UNIT 1 TECHNICAL SPECIFICATION VIOLATIONS

FIRE

WATCH

RECIRCULATION LOOP

INOPERABLE

VIOLATION OF

TOTAL PEAKING FACTOR

R.

ABBOTT

IV.

UNIT 2 TECHNICAL SPECIFICATION VIOLATIONS

MISSED SURVEILLANCE CHECKS-AREA TEMP.

LPCI,

ADS

MISSED SURVEILLANCE CHECKS-DRYWELL RAD

MONITORS

MISSED SURVEILLANCE CHECKS-FIVE RAD

MONITORS

LOSS

OF MAIN STEAM FLOW INSTRUMENT

T.

LEMPGES

V.

EFFECTIVENESS

OF

SORC

C.

MANGAN;"'>";~'.

VI.

Q1P

CONCERN

T.

LEMPGES

C.

MANGAN

VII,

MANAGEMENT EFFECTIVENESS

VIII.

SUMMARY

4132G

UNIT 1

IS I

PROBLEM

SPRING 86 REFUELING OUTAGE:

IS I EXAMINATIONS PERFORMED

DCA'S WRITTEN

SOME DCA'S

NOT DISPOSITIONED

SOME DISPOSITIONS

NOT

IMPLEMENTED

DCA STATUS

UNKNOWN

PLANT STARTUP WITH UNRESOLVED DCA'S

AUGUST 86:

IDENTIFIED IMPROPER DISPOSITION

OF

RBCLC LEAK

PART 21

EVALUATION

MAY 87'ERVICE

WATER LEAK

REVISED DCA PROCEDURE

AUGUST 87'A AUDIT OF IS I

NCR

3

CAR

ISSUED

SEPT 87'ART 21

EVALUATION

'OR'NITIATED

.'p,

NRC

INSPECTION

E+<:

OCT 87:

ENGINEERING CLOSED REMAINING DCA'

UNIT 1 ISI

PROBLEM

QA 8 ANII NOTIFIED OF EXAMINATION SCHEDULE

EXAMINATIONS PERFORMED

RESULTS

REVIEWED BY SENIOR

LEVEL II OR

LEVEL III

DCA'S WRITTEN

DCA'S

LOGGED AND TRACKED BY ISI

COPIES DISTRIBUTED TO QA 8 ANII FOR

INFORMATION

DCA SENT

TO ENGINEERING FOR ACTION

DCA DISPOSITIONED BY ENGINEERING

APPROVED DISPOSITIONS

IMPLEMENTED

DOCUMENTATION COMPLETED PRIOR

TO STARTUP

UNIT 1

ISI

PROBLEM

SCHEDULED EXAMINATIONS DEFERRED

INACCESSIBLE WELDS

MISSED WELDS

POST

STARTUP DISPOSITIONS

ENGINEERING WAS NOT SENT ALL DCA'S

SOME DCA'S DISPOSITIONED

BY ISI BASED ON GUIDANCE

FROM ENGINEERING

DCA'S

NOT DISPOSITIONED PRIOR

TO STARTUP

DUE DATE NOT ENTERED

ON DCA

NO FOLLOWUP BY ISI

ENGINEERING NOT DEDICATED TO

IS I

NO

INTERFACING ENGINEERING PROCEDURE

ENGINEERING DID NOT TRACK DCA'S RECEIVED

ENGINEERS

NOT TRAINED IN DCA PROCESS

4132G

(CONTINUED)

APPROVED DISPOSITIONS

NOT

IMPLEMENTED

LACK OF

FOLLOWUP DCA STATUS

UNKNOWN

LACK OF

MANPOWER

PROCEDURE VIOLATION

DISPOSITIONED AFTER STARTUP,

INADEQUATE SUPERVISION

DCA RECORD

BOOK

NOT, MAINTAINED

PROCEDURE VIOLATION

LACK OF

MANPOWER

TRAINING

INADEQUATE SUPERVISION

COMPLETION REVIEW NOT PERFORMED

PROCEDURE

INADEQUATE

LACK OF

MANPOWER

INADEQUATE SUPERVISION

4132G

DEFICIENCIES

AND ERRORS

REQUIRED EXAMINATIONS NOT PERFORMED.

DID NOT CLOSE

OUT DCA'S PRIOR

TO STARTUP (VIOLATION).

OPERATIONS

NOT NOTIFIED OF IS I

PROGRAM STATUS.

DCA'S

NOT DISPOSITIONED

INCORRECT

USE

OF GENERIC DISPOSITIONS

DISPOSITIONS

NOT

IMPLEMENTED

CORRECTIVE ACTION FOR

RBCLC PART 21 DID NOT

GO BEYOND HEAT

EXCHANGER PROBLEM.

DID NOT CHECK OPEN DCA'S AFTER REVISING PROCEDURE

IN JUNE 87.

QA DID NOT PROPERLY INITIATE 'OR'ER

PROCEDURE

(VIOLATION).

LIC. DID NOT PROPERLY INITIATE 'OR'ER

PROCEDURE

(VIOLATION).

ENGINEERING DID NOT INITIATE 'OR'OR

OPEN DCA'S.

DCA'S

NOT PROMPTLY EVALUATED AFTER

NCR

ISSUED.

SAFETY IMPLICATIONS

UNCERTAINTY3;OF

EQUIPMENT STATUS

OPERATION WITH INOPERABLE COMPONENTS

FAILURE TO TAKE CORRECTIVE

AQTION

HOWEVER NO SERVICE RELATED DEFECTS

(0132G)

WELD FINISH NOT DESIGNED

FOR

ASME XI

INADEQUATE PROCEDURES

FAILURE TO FOLLOW PROCEDURES

RESPONSIBILITIES

INADEQUATELY DEFINED

POOR

COMMUNICATION 8

RECORD

KEEPING

LACK OF ATTENTION TO DETAIL

MANPOWER LIMITATIONS

INADEQuATE SUPERVISION

(0132G)

CLOSED ALL OPEN DCA'S

REVISED QAP 10. 20

AND 15. 01

INITIATE 'R 'HEN "NCR" ISSUED

AUDITORS RETRAINED

REVISED DCA PROCEDURE

IMPROVE REPORTING

(REQUIRES 'OR'ND

NCR REJECTABLE

INDICATIONS)

REQUIRES

ENGINEERING CLOSE

OUT

ENGINEERING PERSONNEL DEDICATED TO SUPPORT

ISI

WILL REVISE AP-8. 3

IDENTIFY NOTIFICATION REQUIREMENTS

AND DEFINE

INTERFACES

WILL REVISE DCA PROCEDURE

DEFINE APPROPRIATE

USE

OF DCA'S AND NCR'S

FOR

DOCUMENTING

IS I

INDICATIONS 8

DEFECTS

VERIFY DCA'S CLOSED PRIOR

TO STARTUP

WILL DEVELOP ENGINEERING PROCEDURES

FOR DISPOSITIONING

INDICATIONS

WILL REVISE NEL-017

AND -029

TO SIMPLIFY REPORTING

OF OR'S

WILL PROVIDE ADDITION TRAINING ON IS I

PROCEDURES

8

REQUIREMENTS

WILL CONSIDER

SURFACE

PREPARATION PRIOR

TO EXAMINATION

" 4 II"

WILL REVISE

ASME XI QA PROGRAM

WILL'PROVIDE ADDITIONAL ISI

PERSONNEL

WILL RESTRUCTURE

IS I ORGANIZATION

WILL REASSIGN

SOME ISI

PERSONNEL

( cI132G)

'I

T

A'