REGULATORY RMATION DISTR IBUTlON SYS,'l (RIDS)
ACCESSION NBR: 8707150436 DOC. DATE: 87/07/O'V NOTARIZED:
NO DOCKET 0 FACIL: 50-220 Nine Mile Point Nuclear Stations Unit 1> Niagara Poee 05000220 AUTH. NAME AUTHOR AFFILIATION MANGAN> C. V.
Niagara Mohawk Poeer Corp.
RECIP. NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Advises that util conservatively redefined heavy load as 1I 000 lb or greaterI per NUREG-0612I "Control of Heavy Loads at Nuclear Power Plants.
DISTRIBUTION CODE:
A033D COPIES RECEIVED: LTR I
ENCL Q SIZE'ITLE:
OR Submittal:
USI A-36 Control of. Heavy Load Near Spent Fuel-NUREG-06 NOTES:
RECIPIENT ID CODE/NAME EB NRR SINGHi A BENEDICT' COPIES LTTR ENCL REC IP IENT ID CODE/NAME PD1-1 LA PD1-1 PD COPIES LTTR ENCL INTERNAL: ARM/DAF/LFMB
/RSB RES/DE/EIB EXTERNAL:
LPDR NSIC 01 NRR/DEST/PSB NRR/PMAS/PMSB RES DEPY GI RES/DRPS/RPSIB NRC PDR TOTAL NUMBER OF COPIES REQUIRED:
LTTR 23 ENCL
V NIAGARA U MOHAWK NIAGARAMOHAWKPOWER CORPORATION/301 PLAINFIELDROAD, SYRACUSE, N.Y. 13212/TELEPHONE (315) 474-1511 July 9, 1987 (NMPlL 0168)
U.S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.C.
20555 Re:
Nine Mile Point Unit 1
Docket No. 50-220 DPR-63 Gentlemen:
The purpose of this letter is to clarify Ni'agara Mohawk' position with respect to the definition of a Heavy Load.
Our letter of August 1,
- 1982, transmitted a report on Heavy Loads which indicated that Niagara Mohawk defined a heavy load as an'ything weighing more than a fuel assembly, or approximately 700 pounds.
NUREG-0612, "Control of Heavy Loads at Nuclear Power Plants,"
indicates that a Heavy Load shall be defined as the weight of the plant's spent fuel assembly plus its lifting device.
Although the weight of a fuel assembly plus its handling tool is greater than 1000 pounds, Niagara Mohawk conservatively has redefined a heavy load as 1000 pounds or greater; this is also consistent with Nine Mile Point Unit 2 Technical Specification 3.9.7.
Very truly yours, NIAGARA MOHAWK POWER CORPORATION C.
V. Mang Senior Vice President DAC/pns 3187G xc: