~<au P
a
+
0 Cy I
ClO lP Op 4~
,g
~O
+a**+
t UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 NIAGARA MOHAWK POWER CORPORATION DOCKET NO. 50-220 NINE MILE POINT NUCLEAR STATION, UNIT NO.
1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 89 License No.
DPR-63 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Niagara Mohawk Power Corporation (the licensee) dated May 12, 1986, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the
~
common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No.
DPR-63 is hereby amended to read as follows:
8611260344 861117 PDR ADQCK 05000220 P
PDR j
c'
(2)
Technical S ecifications The Technical Specifications contained in Appendix A, as revised through Amendment No.
Bg, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of its issuance.
Attachment:
Changes to the Technical Specifications Date of Issuance:
Noyelgber 17, l986, FOR THE NUCLEAR REGULATORY COMMISSION i
~4~ C4k~
John
. Zwolinski, Director BWR Project Directorate Pl Division of BWR Licensing
ATTACHMENT TO LICENSE AMENDMENT NO. 89 FACILITY OPERATING LICENSE NO. DPR-63 DOCKET NO. 50-220 Revise the Appendix A Technical Specifications by removing the pages identified below and inserting the attached pages.
The revised pages are identified by the captioned amendment number and contain marginal lines indicating the area of change.
REMOVE 248 258 259 INSERT 248 258 259
C, I
FIGURE 6.2 1 NINE-MILE POINT NUCLEAR STATION MANAGEMENT ORGANIZATION CHART PRESIDENT Vice President Quality Assurance Senior Vice Presid ent Manager Nuclear Engineering 8c-Licensing Vice President Nuclear Generation General Superintendent Nuclear Generation Amendment Ho. 65 77> 89 Station Superintendent Nuclear Generation Unit 1
Audits 6.5.3.8 Audits of facility activities shall be performed under the cognizance of the SRAB.. These audits shall encompass:
a.
The conformance of facility operation to all provisions contained within the Technical Specifications and applicable license conditions at least once per year.
b.
The performance, training and qualifications of the entire facility staff at least once per year.
c.
The, results of actions taken to correct deficiencies occurring in facility equipment, structures, systems or method of operation that affect nuclear safety at least once per six months.
d.
The performance of all activities required by the Quality Assurance Program to meet the criteria of Appendix "B", 10CFR50, at least once per two years.
e.
The Facility Emergency Plan and implementing procedures at least once every 12 months.
f.
The Facility Security Plan and implementing procedures at least once every 12 months.
g.
The Facility Fire Protection Program and implementing procedures at least once per two years.
h.
Any other area of faci lilty operation considered appropriate by the SRAB, the. Vice President Nuclear Generation or the Manager Nuclear Engineering 5 Licensing.
i.
The radiological environmental monitoring program and the results thereof at least once per 12 months.
The Offsite Dose Calculation Manual and implementing procedures at least once per 24 months.
k.
The Process Control Program and implementing procedures for processing and packaging of radioactive wastes at least once per 24 months.
Amendment Ho. 5$,55,$ 9,89 258
~Authorit 6.5.3.9 Records The SRAB shall report to and advise the Vice President Nuclear Generation and Hanager Nucfear Engineering
& Licensing on those areas of responsibility specified in Section 6.5.3.?
and 6.5.3.8.
6.5.3.10 Records of SRAB activities shall be prepared, approved and distributed as indicated below:
a.
b.
Hinutes of each SRAB meeting shall be prepared, approved and forwarded to the Vice President Nuclear Generation and Hanager Nuclear Engineering
& Licensing within 30 days following each meeting.
Reports of reviews encompassed by Section 6.5.3.7 e,f,g and h above, shall be prepared, approved and forwarded to the Vice President Nuclear Generation and Hanager - Nuclear Engineering
& Licensing within 14 days following completion of the review.
c.
Audit reports encompassed by Section 6.5.3.8 above, shall be forwarded to the Vice President Nuclear Generation and Hanager - Nuclear Engineering
& Licensing within 90 days following completion of the review.
Amendment No.
6S.SS 89 259