ML17055C548
| ML17055C548 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 10/21/1986 |
| From: | Mangan C NIAGARA MOHAWK POWER CORP. |
| To: | Adensam E Office of Nuclear Reactor Regulation |
| References | |
| (NMP2L-0919), (NMP2L-919), NUDOCS 8610240331 | |
| Download: ML17055C548 (10) | |
Text
REQULA INFORMATION DISTRIBUTI STEN (RIDS)
ACCESSION NBR: 8610240331 DOC. DATE: 86/10/21 NOTARIZED: YES FACIL:50-410 Nine Nile Point Nuclear Stations Unit 2i Niagara Moha AUTH. NAME AUTHOR AFFILIATION NANQANiC. V.
Niagara Nohaek Potver Corp.
RECIP. NANE RECIPIENT AFFILIATION ADENSANiE. Q.
BMR Prospect Directorate 3
SUBJECT; Forwards list of comments on SSER 4i reflecting differences between SER 5 supplsi FSAR through Amend 27 5 subsequent ltr updates.
Comments do not adress status of open items or affect Tech Specs. Affidavit encl.
DISTRIBUTION CODE:
B001D COPIES RECEIVED: LTR ENCL SIZE:
TITLE: Licensing Submittal:
PSAR/FSAR Amdts 8c Related Correspondence NOTES:
DOCKET 0 05000410 RECIPIENT ID CODE/NAl')E BWR EB BMR FOB BMR PD3 PD BMR PSB INTERNAL: ACRS ELD/HDS3 IE/DEPER/EPB 36 NRR BWR ADTS NRR ROE,N. L R C-FY~
04 R
/NIB EXTERNAL: BNLtANDTS ONLY)
LPDR 03 NSIC 05 COPIES LTTR ENCL 1
1 1
1 1
1 1
6 6
1 0
1 1
0 1
1 1
1 0
1 1
1 1
1 1
RECIPIENT ID CODE/NAME BWR EICSB BWR PD3 LA HAUQHEYiN 01 BWR RSB ADN/LFNB IE FILE IE/DGAVT/GAB 21 NRR PWR-B *DTS NRR/DHFT/MTB RQN1 DMB/DSS
( ANDTS)
NRC PDR 02 PNL QRUELiR COPIES LTTR EN"L 2
2 1
2 2
1 1
0 1
1 1
0 1
3 3
TOTAL NUNBER OF COPIES REQUIRED:
LTTR 36 ENCL 31
V 4 q m P,.'%
~ 9 ~~ 3!Wt
.'i 4 f',t '7
'4
.i L
'l Wt
~WS
<Ww4
~'e k4
" 'i ~> 64<<>>
W 44,
)
WWWP
~ '
i4 ff Q j
<."5',W)
- Sli,
)
W<<Og << ~>~t '4) 4 ~ l'.'t dt il W
~'t W
4'i =,
4
~
I lt WW
'.A 4 '4.'W
'tg) 4.
I 44>>
V HIIASABA, Q QQog+QK NIAGARAMOHAWKPOWER CORPORATION/300 ERIE BOULEVARDWEST, SYRACUSE. N.Y. 13202/TELEPHONE (315) 474-1511 October 21, 1986 (NMP2L 0919)
Ms. Elinor G. Adensam, Director BNR Project Directorate No.
3 U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue Washington, DC 20555
Dear Ms. Adensam:
Re:
Nine Mile Point Unit 2 Docket No. 50-410 Enclosed is a list of Niagara Mohawk's comments on the Safety Evaluation Report Supplement 4.
Our comments reflect differences between the Safety Evaluation Report and Supplements, the Final Safety Analysis Report through Amendment 27, and subsequent letter updates.
Generally, the comments do not address the status of open issues'one of the comments affect the Technical Specifications.
Very truly yours, C. V. Mangan Senior Vice President LSL:pns 1987G Enclosure xc: g. A. Cook;,
NRC Resident Inspector Project File (2)
Bb10c?4033 i Sb1021
'DR ADOCK 05000410 E
~
PDR'<<)
r 4
~ l ~
A
~
4&
i',i&
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of Niagara Mohawk Power Corporation
)
(Nine Mile Point Unit 2)
Docket No. 50-410 AFFIDAVIT C. V.
Man an
, being duly sworn, states that he is Senior Vice President of Niagara Mohawk Power Corporation; that he is authorized on the part of said Corporation to sign and file with the Nuclear Regulatory Commission the documents attached hereto; and that all such documents are true and correct to the best of his knowledge, information and belief.
\\
Subscribed and swor to b fore me, a Notary Public in d
o the State of New York and County of
, this~ day of 1986.
otar ublic in and for
- County, New York My Commission expires:
JANIS M. MACRO Notary Pubtlo!n tho Stoto ot Now York Quollfled In Onondogo County No. 478 55 My Commission Explroo Morch 30> 19.
SSER 4
Pa e
Comments Reference 9-7 Last paragraph 11th Line:
Delete the
- sentence, "In addition, an approved flame-retardant coating has been applied to the cables that traverse the 20-ft.
zone to reduce the potential for fire propagation along the cables."
During the Nuclear Regulatory Commission's Appendix R audit at the Nine Mile Point Unit 2 Site in October, 1985, it was noted that the flame-retardant coating had not yet been applied to the cables traversing the 20-ft. zone.
The Nuclear Regulatory Commission reviewer at that time agreed that since the cables meet the standard of IEEE 383-1974 flame test (see FSAR Section 9A.3.5.5.5, Page 9A.3-46), application of a flame-retardant coating to the cables was not necessary.
FSAR Section 9A.3.1.2.5.10 (Page 9A.3-23) was subsequently revised to delete reference to the coating.
FSAR Page 9A.3-23 and 9A.3-46 9-12, 9-13, and 9-15 Page 9-12 Third Paragraph 8th Line, Page 9-13 Fifth Paragraph 1st Line, and Page 9-15 Section 9 '.1
~ 7 Item 12:
change "three" to "seven."
There are seven (not three) non-safety related locations that C02 fire suppression system are not being used in the interim.
These locations are identified in FSAR FSAR Figures 9A.3-4, 9A.3-5, and 9A.3-6.
They are the normal switchgear building rooms (Zones 601XL and 602XL in Figure 9A.3-4; Zones 612XL and 613XL in Figure 9A.3-5), turbine building switchgear rooms (Zones 726XL and 740XL in Figure 9A.3-6) and radwaste building switchgear room (Zone 395XL in Figure 9A.3-6).
(Note the zone number designation
-XL means that the zone is C02 protected.
See the legend on Figure 9A.3-2.)
As discussed in SSER 4 Page 9-12, our letter dated June 25, 1986 (NMP2L 0758) has discussed the reasons for not providing C02 fire suppression syst'm to these seven locations and also the alternate means of fire protection.
FSAR Pages 9.5-5 and 9.5-6 FSAR Figures 9A.3-4, 9A.3-5, 9A.3-6 1987G
Oll I
SSER 4
Pa e
14-5 Comments Sixth Paragraph Fourth Line:
Delete the
- phrase, "and (4) the drywell air coolers condensate flow rate monitoring system."
This monitoring system is not part of the Nine Mile Point Unit 2 reactor coolant pressure boundary (RCPB) leak detection system as indicated in FSAR Page 5.2-44.
Regulatory Guide 1.45, position C;3 recommended at least three separate detection methods:
(1) sump level and flow monitoring, (2) airborne particulate radioactivity monitoring, and (3) monitoring of condensate flow rate from air flow cooler or monitoring of airborne gaseous radioactivity.
Nine Mile Point Unit 2 RCPB leak detection system satisfied position C.3 by (1) sump level and flow monitoring, (2) airborne particulate radioactivity monitoring, and (3) monitoring of airborne gaseous radioactivity.
Reference FSAR Page 5.2-44 1987G
J