ML17055B334
| ML17055B334 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 03/03/1986 |
| From: | Mangan C NIAGARA MOHAWK POWER CORP. |
| To: | Adensam E Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML17055B335 | List: |
| References | |
| (NMP2L-0643), (NMP2L-643), NUDOCS 8603070336 | |
| Download: ML17055B334 (6) | |
Text
REGULAT INFORMATION DISTRIBUTION TEM (RIDS)
ACCESSION NBR: SE 03070336 DOC. DATE: 86/03/03 NOTARIZED: YES 'OCKET 0 FACIL: 50-410 Nine Mile Point Nuclear Stations Unit 2i Niagara Moha 05000410 AUTH. NAME AUTHOR AFFILIATION MANGANz C. V.
Niagara Mohawk Power Corp.
RECIP. NAME RECIPIENT AFFILIATION ADENSAM E. G.
BWR Prospect Directorate 3
SUBJECT:
Forwards Rev 2 to "High Energy Line Break Evaluation Rept (Effect on Nonsafetg-Related Control Components)
Nine Mile Point Unit. 2i " superseding 851211 Rev
- 1. High energy line break in turbine bldg bounded bg Chapter 15 of FSAR DISTRIBUTION CODE:
8001D COPIES RECEIVED: LTR ENCL S
2 TITLE: Licensing Submittal:
PSAR/FSAR Amdts 0 RelatadWRrrrespondence NOTES:
RECIPIENT ID CODE/NAME BWR ADTS BWR EB BWR FOB HAUGHEYz M Ol BWR RSB r
INTERNAL:
ACRS 41 ELD/HDS3 IE/DEPER/EPB 36 NRR BWR ADTS NRR PWR-B *DTS NRR/
/HFIB EG FILE 04 IB EXTERNAL: 24X DMB/DSS (AMDTS)
NRC PDR 02 PNL GRUEL' COP IES LTTR ENCL 1
1 2
1 1
1 1
1 1
1 1
0 1
1 1+
REC IP IENT ID CODE/NAME BWR PD3 PD BWR EICSB BWR PD3 LA BWR PSB ADM/LFMB IE FlLE IE/DGAVT/GAB 21 NRR PWR-A ADTS NRR ROE'. L NRR/DHFT/MTB RGN1 BNL(AMDTS ONLY)
LPDR 03 NSIC 05 COPIES LTTR E CL 1
1
\\
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 1
39 ENCL
I NNNJ
$ <r JNJ t
N
~
J'l I
N (kg
~ ~
I"
'C p>>
NN
NIAGARAMOHAWKPOWER CORPORATION/300 ERIE BOULEVARDWEST, SYRACUSE, N.Y. 13202/TELEPHONE (315) 474-1511 March 3, 1986 (NMP2L 0643)
Ms. Elinor G. Adensam, Director BWR Project Directorate No.
3 U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue Washington, DC 20555
Dear Ms. Adensam:
Re:
Nine Mile Point Unit 2 Docket No;-50=410.
Enclosed are ten copies of the NMP2 High Energy Line Break Evaluation Report (Effect on Nonsafety-Related Control Components),
Revision 2, dated February 1986.
This revision supersedes Revision 1, dated December ll, 1985 submitted on January 2, 1986.
In the December 11, 1985 report, it was stated that a high energy line break in the turbine building had been identified that could result in a transient that is not covered under the existing Chapter 15 of the Final Safety Analysis Report.
The evaluation of that event has been completed
- and, as reported on page 3-12 of Revision 2, it shows that the event is bounded by Chapter 15 of the Final Safety Analysis Report.
We believe this closes Safety Evaluation Report Confirmatory Issue No. 27.
Very truly yours, C. V. Mangan Senior Vice President NLR:ja 1367G Enclosure xc:
R. A. Gramm, NRC Resident Inspector Project File (2) 8603070336 860303 PDR ADOCK,050004l0 A
PDR i
II t
III V
t
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of Niagara Mohawk Power Corporation
)
(Nine Mile Point Unit 2)
Docket No. 50-410 AFFIDAVIT C. V.
Man an
, being duly sworn, states that he is Senior Vice President of Niagara Mohawk Power Corporation; that he is authorized on the part of said Corporation to sign and file with the Nuclear Regulatory Commission the documents attached hereto; and that all such documents are true and correct to the best of his knowledge, information and belief.
Subscribed and swor to b fore me, a Notary Public in d for he State of New York and County of
, thts~ day of 1986.
ot ry Public in and for
- County, New York My Commission expires:
JANIS M. MACRO Notary Public In tho State of New Vortex Qualified In Onondaca County No. 47845 5
P.c