ML17054C211

From kanterella
Jump to navigation Jump to search
Forwards Listed Additions & Revs to Facility Briefing Package Previously Sent on 870605,including Three Revised Briefing Slides,Revised Proposed Full Power License & Revised & Added Sections of Sser 6.W/o Encls
ML17054C211
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 06/26/1987
From: Stello V
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Asselstine, Roberts, Zech
NRC COMMISSION (OCM)
References
NUDOCS 8707060517
Download: ML17054C211 (2)


Text

Docket No. 50-410 MEMORANDUM FOR:

FROM:

JUN 36 1987 Chairman Zech Commissioner Roberts Commissioner Asselstine Commissioner Ber nthal Commissioner Carr Victor Stello, Jr.

Executive Director for Operations DISTRIBUTION w/o encl.

M~'. R f1 NRCPDR PDI-I Rdg.

C.

Vogan EDO Rdg.

D. Neighbors T.

Rehm R.

Capra J.

Keltemes,AEOD B. Boger S.

Varga F. Miraglia J. Sniezek T. Murley

SUBJECT:

CONSIDERATION OF FULL POWER LICENSE FOR NINE MILE POINT NUCLEAR STATION, UNIT NO.

2 Enclosed for your use are the following additions and revisions to the Nine Mile Point Nuclear Station Unit 2 (NMP-2) briefing package which was previously sent to you on June 5, 1987:

1.

Three revised Briefing Slides 2.

A revised Proposed Full Power License a.

The Exemption related to the PGCC has been deleted (2D.v of the old Proposed Full Power License) b.

An Exemption for the Neutron Monitoring System has been added (2D.vi of the revised Proposed Full Power License) c.

Changes in dates for the DCRDR in 2.C.(9) 3.

Revised and added sections of SSER6 4.

A report on NMP-2 operating experience.

Ori8inol sidney b>

VictorStog.le 87070605i7 870620b+>0 PDR ADOCK 05 pDR

'nclosures:

As stated cc:

SECY OGC CONTACT:

D. Neighbors x28140 Victor Stello, Jr.

Executive Director for Operations PDI-I py CVogan 6/g6/87 A

PDI-DNeig ors 6/j4 /87 ezek I/87 PDI-RCap

/87 P

ger 6/q</87 E

V llo

+87 SVar a

6y /SS

Il

,f Kl

~t P