ML17054B490

From kanterella
Jump to navigation Jump to search
Notification of 850319-22 Meetings W/Util in Scriba,Ny to Conduct in-progress Audit Review of Detailed Control Room Design Review.Meeting Agenda Encl
ML17054B490
Person / Time
Site: Nine Mile Point 
Issue date: 03/15/1985
From: Bournia A
Office of Nuclear Reactor Regulation
To: Schwencer A
Office of Nuclear Reactor Regulation
References
NUDOCS 8503250148
Download: ML17054B490 (12)


Text

~ r pe R&gr

~O 0

/p +~*y4 Docket No. 50-410 UNITED STATES NUCL'EAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 Ii'AR i 5 l985 MEMIORANDUMI FOR:

A. Schwencer, Chief Licensing Branch No.

2 Division of Licensing FROM:

SUBJECT:

DATE 8I TIME:

LOCATION:

PURPOSE:

Anthony Bournia, Project Manager Licensing Branch No. 2, Division of Licensing r

C FORTHCOMING MEETING WITH NIAGARA MOHAWK POWER. CORPORATION (NMPC)

ON NINE MIILE POINT 2 (NMP-2)

Tuesday, March 19, 1985; 8:00 a.m.

through Friday, March 22, 1985; 1:00 p.m.

I Nine Mile'Point 2 Site

Scriba, New York To conduct an in-progress audit review of the, Detailed Control Room Design Review.

(See enclosed Agenda)

PART IC IPANTS*:

NRC S.

Saba J.

Kramel NMPC r

N. Rademacher; et. al.

Enclosure:

As stated cc:

See next page 6-r4ll FWQ i~i I' ~

Anthony Bournia, Project'MIanager Licensing Branch No.

2 Division of Licensing

  • Meetings between NRC technical staff and applicants for licenses are open for interested members of the public, petitioners,

'intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy",

43 Federal Re ister 28058, 6/28/78.

8503250148 850315 t

PDR ADOCK 05000410 F

PDR l

'C Il 4

1

Docket No. 50-410 MAR 16 1S85 MEMORANDUM FOR:

A. Schwencer, Chief Licensing Branch No.

2 Division of Licensing FROM:

1

SUBJECT:

DATE 5 TIME:

LOCATION:

PURPOSE:'nthony Bournia, Project Manager Licensing Branch No. 2, Division of Licensing FORTHCOMING MEETING WITH NIAGARA MOHAWK POWER CORPORATION

'NMPC)

ON NINE MILE POINT 2 (NMP-2)

Tuesday, March 19, 1985; 8:00 a.m.

through Friday, March 22, 1985; 1:00 p.m.

Nine Mile Point 2 Site

Scriba, New York To conduct an in-progress audit review of the Detailed Control Room Design Review.

(See enclosed Agenda)

PARTICIPANTS*:

NRC S.

Saba J.

Kramel NMPC N. Rademacher, et. al.

Orieinal.signoct bye

Enclosure:

As stated cc:

See next page Anthony Bournia, Project Manager Licensing Branch No; 2

Division of Licensing

  • Meetings between NRC technical staff and applicants for licenses are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy",

43 Federal Re ister 28058, 6/28/78.

LB82/DL/PM ABournia:lb 03/if/85 LB 2/DL/BC ASch encer 03/j /85

ltl 4 lr

  • ,1 $ j,)W

. h tl h "gr) R h

U

~ i' I

S

)Urge

'f I

h ti ~

r

~

l tl rll

'lr h

~

h,

(

th p

I

)

l,'

t

~ I h

~

r,h

~ UP

~

0 ~ ',U j>>

,r $

Nine Nile Point 2

Mr. B. G. Hooten.

Executive Director, Nuclear Operatio'ns Niagara Mohawk Power Corporation 300 Erie Boulevard West

Syracuse, New York 13202 CC:

Nr. Troy B. Conner, Jr.,

Esq.

Conner 5 Wetterhahn Suite 1050 1747 Pennsylvania

Avenue, N.W.

Washington, D.C.

20006 Richard Goldsmith Syracuse University College of'aw E. I. 1thite Hall Campus

Syracuse, New York 12223 Ezra I. Bialik Assistant Attorney General Environmental Protection Bureau New York State Department of Law 2 World Trade Center New York, New York 10047 Resident Inspector Nine Mile Point Nuclear Power Station P. 0.

Box 99

Lycoming, Hew York 13093 Mr. John W. Keib, Esq.

Niagara Mohawk Power Corporation 300 Erie Boulevard West

Syracuse, New York 13202 Jay M. Gutierrez, Esq.

U. S. Nuclear Reaulatory Commission Region I

~631 Park Avenue lling of Prussia, Pennsylvania 19406.

Norman Rademacher, Licensing Niagara Mohawk Power Corporation 300 Erie Boulevard liest

Syracuse, New York 13202 I

4 C

E

'GENDA

'INE MILE POINT NUCLEAR STATION

'UNIT 2 DETAILED CONTROL ROOM DESIGN REVIE'H IN-PROGRESS AUDIT TUESDAY, MARCH 19, 1985

': '8:00A.M.

to 5:00 P.M.

Administrative processing for onsite access.

'Planning and preparation

- set up office space, short visit to NMP-2 control room, informal briefing and introductions.

Begin NRC discussions with various NMPC members and other knowledgeable participants concerning:

1.

The DCRDR Team:

1. 1 gualifications of members of the review team 1.2 The role and level of'ffort of the human factors speci a 1 i'st.

1.3 Task assignments and level of effort 2.

The Function and Task Anal ses (FBTA

.1. 1 Methodology and forms for data collection.

2.2 Development of operator information and control needs.

3.

Control Room Inventor 1.1 1.2 1.3 Inventory Process Control/display lists and specifications.

Method for comparison of FATA information and control requirements with available instrumentation.

MEDNESDAY, MARCH 20, 8:00 A.M./P.M.

4.

to 5:00 1985 Control Room Surve

1. 1 Survey lists and checklists.

1.2 Survey procedures.

1.3 Survey team.

5.

HED Assessment:

1. 1 Methodology for assessment, use of FSTA results.

1.2 Schedule for completion of corrections.

1.3

..Justification for not correcting HEDs.

~,,I)" 'I

6. Selection of Desi n Improvements:

1.2 1.3 k

Methodology and procedures for selecting design improvements.

The application of human factors expertise.

Evaluation of alternative solutions.

7.

Verification that HEDs are improved b

, corrections.

8.

Verification that improvements will not introduce new HEDs.

9.

Coordination of the DCRDR with the other programs (SPDS, tra>ning, R.G.

1.9

, an upgraded EOPs).

THURSDAY, tlARCH 21, 1985 8:00 A.N./P.f~i.

1.

Further discussion about the nine program elements with to special emphasis on task analysis, HED assessment, HED 5:00 resolution, and coordination of NtdPC initiatives.

~2.

In parallel with above activities, two members of the NRC team will audit one or more panels in the control room and review one or more emergency operating sequences in the control room with a reactor operator(s).

3.

Brief survey of the simulator 4.

Remote Shut Down Panel Audit 5.

Final discussions with team members.

6.

NRC audit team caucus.

FRIDAY, YiARCH 22, 1985 8:00 A.N.

Exit Briefing with NflPC representatives.

to 1:00 P.M.

'L II

/

1

Meetin Notices NRC Partici ants bcc:

Applicant 8 Service List NRC PDR Local PDR J.

Kramer PRC System NSIC LBP2 Reading HDenton/DEisenhut HThompson/Ffli raglia TNoval BYoungblood ASchwencer GKnighton EAdensam J2wolinski CGrimes GHolahan CThomas GLainas SVarga DVassallo JIii 1 1 er JStolz JKnight, Acting Dir.,

DE lIJohnston RBosnak, Acting, AD/CSE, DE RBernero LRubenstein MHouston Dtlul 1 er TSpeis FSchroeder FRowsome T)IRussell, Acting Dir., DHFS ACRS-16 OELD, Attorney Bordenick JPartlow BGrimes EJordan

FIngram, PA Receptionist (Only if meeting is held in Bethesda)

Project Hanager A. Bournia E. Hylton Pegion 1

'EP

)

6 N

~