ML17054A974

From kanterella
Jump to navigation Jump to search
Forwards Suppl 7 to Environ Rept - OL Stage (Filed in PDR Category C) & Amend 13 to FSAR (Filed in PDR Categories K & F)
ML17054A974
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 08/16/1984
From: Mangan C
NIAGARA MOHAWK POWER CORP.
To: Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML17054A975 List:
References
NMP2L-0129, NMP2L-129, NUDOCS 8408230332
Download: ML17054A974 (22)


Text

k REGULATOR INFORMATION DISTRIBUTION%STER (RIBS).

ACCESSI'UN NBR:8908230332 DOC DATE: 84/08/16 NOTARI2EP:

YES DOCKET

,FACIL:50-410 Nine Mile Point Nuclear Station> Unit 2s Niagara Moha 05000410 AU fH,NAME AUTHOR AFFILIATION

'ANGANPC ~ Vs Niagara Mohawk Power Cor'p, RECIP,NAME RECIPIENT AFFILIATION EISENHUTg D G ~

Division of Licensing

.c 5

o ~/D

SUBJECT:

For wards Supp) 7 to envir oq rept L Amend 13 to FSA DISTRIBUTION CODEs C001S COPIES RECEIVED:LTR ~

ENCL SI2ER

'/I:2+5~

TITLE: Licensing Submi ttal: Environmental Rept Amdt 8 Related Cor r espondence Su yy

't NOTES:PNL icy FSAR'S L

AMDTS ONLY' go QC 05000410 RECIPIENT ID CODE/NAME NRR LB2 BC 18 HAUGHEYgM 00 INTERNAL: ADM LFMB NRR/DE/AEAB 08 NRR/DE/EHEB NRR~

METB E~ FILE COPIES LTTR ENCL 1

1 1

1 1

0 1

1 1

1 1

'1 1

RECIPIENT ID CODE/NAME NRR LB2 LA 19 ELD/HDS3 NRR/DE/EEB 06 NRR/DE'/SAB 07 NRR/DS I/RAB 09 RGN1 COPIES LTTR ENCL 1

1 1

0 1

1 1

1 1

1 1

EXTERNAL: ACRS NRC PDR NTIS NOTES<

20 02 6

6 1

1 1

1 1

1 LPDR NSIC 03 05 1

1 1

1 TOTAL NUMBER OF COPIES REQUIRED'TTR 24 ENCL 22

'f tl t

II I

a 1

It tf It

Nl V Mllkek, A,

~ Q MQOQ+Ng NIAGARAMOHAWKPOWER CORPORATION/300 ERIE BOULEVARDWEST, SYRACUSE, N.Y. 13202/TELEPHONE (315) 474-1511 August 16, 1984 (NMP2L 0129)

Mr. Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Eisenhut:

/X 8'/zZ/rg Re:

Amendment 13 to Application to Operating License Nine Mile Point Unit 2 Docket No. 50-410 In accordance with 10CFR50.30(c)(l),

10CFR51.24 and your March 29, 1983 letter, enclosed are three originals and 60 copies of Amendment 13 to the Final Safety Analysis Report and 41 copies of Supplement 7 to the Environmental Report.

These changes incorporate certain responses into the text of the Final Safety Analysis Report or Environmental

Report, as

,appropriate.

Also included are changes which have resulted from our continuing review of these documents.

Very truly yours, JM:ja Enclosure C. V. Manga Vice President Nuclear Engineering 5 Licensing Pgol a4I~

~g S2 8008ib0 8408230 V, 05000" R

p,oQC pO

~ w r t

~,i(

0 II a

'4

'h III y

I

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Hatter of

)

)

Niagara Mohawk Power Corporation

)

)

{Nine Mi 1 e Po int Unit 2)

Docket No. 50-410 AFFIDAVIT

" C. V.'angan

, being duly sworn, states that he is Vice. President o

Niagara o

aw ower orporation; that he is authorized on the part of said Cor poration to sign and file with the Nuclear Regulatory Commission the documents attached hereto; and that all such documents are true'nd correct to the best of his knowledge, information and belief.

Subscribed and sworrjnto be ore me, a Notary Public iver,and for the State of New York and County of l9)

,. this'/I~~ day of

~

/ ~

$984.'

tary ub ic in and or C

y, M

Y k

My Commission expires:

'JANIS M. MACRO Notary Public In the State of Now York Quallllad In Onondaga County No. 4784555 c

C

~

a e ~

'i i

f

/

4

0 Nine Mile Point Unit 2 ER-OLS INSERTION INSTRUCTIONS VOLUME 1 Remove Insert Figure 2.5-2 Figure 2.5-2 Supplement 7

EII-2 August 1984

Nine Mile Point Unit 2 ER-OLS INSERTION INSTRUCTIONS VOIUME 2 Remove 2.7-3/2.7-4 3.4-9/3.4-10 5.3-45/5.3-46 5.4-9/5.4-10 Insert 2.7-3/2.7-4 3.4-9/3.4-10 5.3-45/5.3-46 5.4-9/5.4-9a 5.4-9b/5.4-10 Supplement 7

EII-3 August 1984

0 I

Nine Mile Point Unit 2 ER-OLS INSERTION INSTRUCTIONS VOLUME 3 Remove B Title Page Appendix 7

7B-i/-

Table 7B-1 Table 7B-2 Table 7B-2 Table 7B-3 Table 7B-3 Table 7B-3 Table 7B-4 Table 7B-4 Table 7B-4 Table 7B-4 Table 7B-4 Table 7B-4 Table 7B-4 (Sh 1 of 2)

(Sh 2 of 2)

(Sh 1 of 3)

(Sh 2 of 3)

(Sh 3 of 3)

(Sh 1 of 7)

(Sh 2 of 7)

(Sh 3 of 7)

(Sh 4 of 7)

(Sh 5 of 7)

(Sh 6 of 7)

(Sh 7 of 7)

Figure 7C-2 Supplement 7

7-i/7-ii 7.1-3/7.1-4 7.1-5/7.1-6 7.1-7/7.1-8 Table 7.1-2 (Sh 1 of 2)

Table 7.1-3 (Sh 1 of 2)

Table 7.1-3 (Sh 2 of 2)

Insert 7-i/7-ii

7. 1"3/7. 1-4 7.1-4a/7.1-4b 7.1-5/7.1-6 7.1-7/7.1-8 Table 7.1-2 (Sh 1 of 2)

Table 7.1-3 (Sh 1 of 2)

Table 7.1-3 (Sh 2 of 2)

Appendix 7B Title Page 7B-i/7B-ii Table 7B-1 Table 7B-2 (Sh 1 of 2)

Table 7B-2 (Sh 2 of 2)

Table 7B-3 (Sh 1 of 4)

Table 7B-3 (Sh 2 of 4)

Table 7B-3 (Sh 3 of 4)

Table 7B-3 (Sh 4 of 4)

Table 7B-4 (Sh 1 of 9)

Table 7B-4 (Sh 2 of 9)

Table 7B-4 (Sh 3 of 9)

Table 7B-4 (Sh 4 of 9)

Table 7B-4 (Sh 5 of 9)

Table 7B-4 (Sh 6 of 9)

Table 7B-4 (Sh 7 of 9)

Table 7B-4 (Sh 8 of 9)

Table 7B-4 (Sh 9 of 9)

Table 7B-9 Table 7B-10 (Sh 1 of 2)

Table 7B-10 (Sh 2 of 2)

Table 7B-ll (Sh 1 of 4)

Table 7B-ll (Sh 2 of 4)

Table 7B-ll (Sh 3 of 4)

Table 7B-11 (Sh 4 of 4)

Table 7B-12 (Sh 1 of 9)

Table 7B-12 (Sh 2 of 9)

Table 7B-12 (Sh 3 of 9)

Table 7B-12 (Sh 4 of 9)

Table 7B-12 (Sh 5 of 9)

Table 7B-12 (Sh 6 of 9)

Table 7B-12 (Sh 7 of 9)

Table 7B-12 (Sh 8 of 9)

Table 7B-12 (Sh 9 of 9)

Figure 7C-2 EII-4 August 1984

~

t'l

Nine Mile Point Unit 2 ER-OI,S INSERTION INSTRUCTIONS QUESTIONS AND RESPONSES VOLUME Remove EQR-i/EQR-ii Q&R E240.4-1/-

Table 451.16-7 Insert EQR-i/EQR"ii QSR E240.4-1/-

Table 451.16-7 Supplement 7

EII-5 August 1984

j

NINE MILE POINT NUCLEAR STATION UNIT 2 NIAGARA MOHAWK POWER CORPORATION ER-OLS AMENDMENT RECEIPT ACKNOWLEDGMENT I acknowledge receipt of:

Supplement 7

My copy has been

updated, and superseded pages have been removed and destroyed.

Set Reassi nment and/or Set Holder Chan e of Address (if necessary)

Please reassign this manual to, and/or change my address as follows:

Please furnish all requested information and return to:

A. L. Monahan Stone 6 Webster Engineering Corporation 3 Executive Campus P.O.

Box 5200 Cherry Hill, NJ 08034 Name of set holder Set No.

Company Signature Date C2/1217719/3/2RH

0 4'I ~

Nine Mile Point Unit 2 ER-OLS INSERTION INSTRUCTIONS The following instructions are for the insertion of the current Supple-ment into the Unit. 2 ER-OLS.

Remove pages,

tables, and/or figures listed in the REMOVE column and replace them with the
pages, tables, and/or figures listed in the INSERT column.

Dashes

(---) in either column indicate no action required.

Vertical bars have been placed in the margins of inserted pages and tables to indicate revision locations.

Supplement 7

EII-1 August. 1984

I

Nine Mile Point Unit 2 ER-OLS QUESTION E240

~ 4 (7')

Calculate the radiological consequences of a liquid pathway release from a postulated core melt accident.

The analysis should

assume, unless otherwise justified, that there has been a penetration of the reactor basement by the molten core
mass, and that a substantial portion of radioactively contaminated suppression pool water was released to the ground.

Doses should be compared to those calculated in the Liquid Pathway Generic Study (NUREG-0440, 1978).

Provide a

summary of your analysis pr'ocedures and the values of parameters used (such as permeabilities, gradients, populations

affected, water use).

It is suggested that meetings with the staff of the Hydrologic Engineering Section be arranged so that we may share with you the body of information necessary to perform this analysis.

RESPONSE

As agreed during a

meeting held with the NRC's Hydraulic Engineering Section on November 17,

1983, a response to this question will be submitted in the second quarter of 1984.

Supplement 5

QEcR E240.4-1 December 1983

C

Nine Mile Point Unit 2 ER-OIS TABjE 451.16-7 COMPARISON OF ANNUAI ONSITE 61-M (200-FT)

WIND DIRECTION FREQUENCY DUSTRIBUTIONS Directional Sector NNE NE ENE ESE SE SSE SSW SW WSW NW N

Calm Jan 1974 through Dec 1976 and Nov 1978 through Oct 1980 0

4.0 3.9 2.0 2.5 4 ~ 5 9.3 8.0 9.8 6.0 10.5 11.0 7.8 6.2 3.8 0.3 Jan 1974

.through Dec 1974 4.1 4.8 1.9 2.7 4.7 10.0 8.1

11. 6 5.1 4.7 9.1 9.5 8.3 6.1 3.9 4.9 0.4 Supplement 4

1 of 1

October 1983