ML17054A773
| ML17054A773 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 05/29/1984 |
| From: | Mangan C NIAGARA MOHAWK POWER CORP. |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML17054A774 | List: |
| References | |
| NMP2L-0067, NMP2L-67, NUDOCS 8406070081 | |
| Download: ML17054A773 (50) | |
Text
REGULATORY INFORMATION DISTRIBUTION Sr,.'TEM (RIDS)
ACCESSION NBR:8406070081 DOC ~ DATE: 84/05/29 NOTARIZED; YES DOCKET FACIL:50-410 Nine Mile Point Nuclear Station< Unit 2r Niagara Moha 05000410 AUTH,NAME AUTHOR AF F ILIATION MANGANgC.V.
'iagara Mohawk Power Corp.
RECIP.NAME RECIPIENT AFFILIATION EISENHUT<D.G, Division of Licensing
~~.,~~) c/a/eA
SUBJECT:
Forwards Amend 11 to FSAR ~
~ ~lj 4.~
DISTRIBUTION CODE:
8001S COPIES RECEIVED: LTR SIZE:
TITLE: Licensing Submittal:
PSAR/FSAR Amdts L Related Correspondence NOTES:PNL icy FSAR'8 8, hMDTS ONLY, 05000010 REC IP IENT ID CODE/NAME NRR/DL/ADL NRR L82 LA INTERNAL: ELD/HDS3 IE/DEPER/EPB 36 IE/DQASIP/QAB21 NRR/DE/CEB il NRR/DE/EQB 13 NRR/DE/MEB 18 NRR/DE/SAB 24 NRR/DHFS/HFEB40 NRR/DHFS/PSRB NRR/DS I/AEB 26 NRR/DSI/CPB 10 NRR/DSI/ICSB 16 NRR/DS I/PSB 19 NRR/DS I/RS8 23 RGN1 EXTERNAL: ACRS Ql DMB/DSS (AMDTS)
LPDR 03 NSIC 05 NOTES:
COPIES LTTR ENCL 1
0 0
0 3
3 1
1 1
1 2
2 1
1 1
1 1
1 1
1 1
1
'1 1
1 1
1 1
1 3
3 6
6
1 1
1 1
1 1
1 1
RECIPIENT ID CODE/NAME NRR LB2 BC HAUGHEYgM 01 IE FILE IE/DEPER/IRB 35 NRR/DE/AEAB NRR/DE/EHEB NRR/DE/GB 28 NRR/DE/MTEB 17 NRR/DE/SGEB 25 NRR/DHFS/LQB 32 NRR/DL/SSPB NRR/DS I/ASB NRR/DS I/CSB 09 NRR/DSI/METB 12 N
I/RAB 22 04 RM/DDAMI/MI8 BNL(AMDTS ONLY)
FEMA REP DIV 39 NRC PDR 02 NTIS COPIES LTTR ENCL 1
0 1
1 1
1 1
1 0
1 1
2 2
1 1
1 1
1 1
0 1
1 1
1 1
1 1
1 1
1 1
0 1
1 1
1 1
1 TOTAL NUMBER OF COPIES HEUUI ED:
LTTR 50 ENCL 47
R I
~
r,,
li H
7 NIIASARA Q PgQog@QK NIAGARAMOHAWKPOWER CORPORATION/300 ERIE BOULEVARDWEST, SYRACUSE, N.Y. 13202/TELEPHONE (315) 474-1511 May 29, 1984
'NMP2L 0067)
Mr. Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555
Dear Mr. Eisenhut:
Re:
Amendment ll to Application to Operating License Nine Mile Point Unit 2 Docket No. 50-410 In accordance with 10CFR50.30 (c) (1),
10CFR51.24 and your March 29, 1983 letter, enclosed are three originals and 60 copies of Amendment ll to the Final Safety Analysis Report.
These changes incorporate certain responses into the text of the Final Safety Analysis Report as appropriate.
Also included are changes which have resulted from our continuing review of these documents.
Very truly yours, Enclosure C. V. Manga Vice President Nuclear Engineering E Licensing ool p
840h07008i, 840529 PDR ADOCK 050004iO K 'DR
C3 I'
II 0
t
'4
~ I
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of
)
)
Niagara Mohawk Power Corporation
)
~
)
(Nine Mile Point Unit 2)
)
Docket No. 50-410 AFFIDAVIT C.
V. Man an
, being duly sworn, states that he is Vice President o
N>agar a o
aw ower orporation; that he is authorized on the part of said
'orpor ation"-to -sign and".fi.le.with.the Nuclear Regulatory Comnission the documents attached hereto; and that all such documents" are'rUe'"a'nd" correct to the best of his knowledge, information and belief.
Subscribed and sworn to before me, a Notary Public in and for the State of New York and County of
, this~ day of
~ 1984.
Notary ub sc sn and for o g
- County, New York My Commission expires:
gg[STINE AUSTNl Nota~ Public in the State of Neo Yotft air'(ed in Onondaga Co. No, 478768
~I tllT5lA3~!)TzNg AaY cJl lo ddsc d3 ai i.'dA chil SQNCN
.cH.Q o<~sbr~az0 rA h."<.,"e
~l,CK do@!2 m~ ~gQ y,$
Nine Mile Point Unit 2 FSAR INSERTION INSTRUCTIONS LIST OF EFFECTIVE PAGES Remove EP l-l through EP 1-7 EP 2-1 through EP 2-17 EP 3-1 through EP 3-12 EP 5-1 through EP 5-3 EP 6-1 through EP 6.-5 EP 9-2 EP 9-7 EP 12-1 and EP 12-2 EP 13-1 through EP 13-3 EP 14>>1 through 14-5 EP Q&R-1 EP Q&R-3 EP Q&R-5 through EP Q&R-9 Insert EP 1-1 through EP 1-7 EP 2-1 through EP 2-17 EP 3-1 through EP 3-12 EP 5-1 through EP 5-3 EP 6-1 through EP 6-6 EP 9-2 EP 9-7 EP 12-1 and EP 12-2 EP 13-1 through EP 13-3 EP 14-1 through 14-5 EP Q&R-1 EP Q&R-3 EP Q&R-5 through EP Q&R-9 Amendment ll FII-21 June 1984
NINE MILE POINT NUCLEAR STATION UNIT 2 NIAGARA MOHAWK POWER CORPORATION FSAR AMENDMENT RECEIPT ACKNOWLEDGEMENT I acknowledge receipt of:
Amendment ll My copy has been
- updated, and superseded pages have been removed and destroyed.
Set Reassi nment and/or Set Holder Chan e of Address (if necessary Please reassign this manual to, and/or change my address as follows:
Please furnish all requested information and return to:
A. L. Monahan Stone 8 Webster Engineering Corporation 3 Executive Campus P.O.
Box 5200 Cherry Hill, NJ 08034 Name of set holder Set No.
Company Signature Date C2/1217718/53/2RH
0
Nine Mile Point Unit 2 FSAR INSERTION INSTRUCTIONS The following instructions are for the insertion of the current amendment into the Nine Mile Point Unit 2 FSAR.
Remove
- pages, tables, and/or figures listed in the REMOVE column and replace them with the pages,
- tables, and/or figures listed in the INSERT column.
Dashes
(---) in either column indicate no action required.
Vertical bars have been placed in the margins of inserted pages and tables to indicate revision locations.
Amendment 11 FII-1 June 1984
~
I 5
4
Nine Mile Point Unit 2 FSAR 0 INSERTION INSTRUCTIONS VOLUME 2 Remove Table 1.8-1 (109 of 169)
Table 1.8-2 (6 of 14)
Table 1.8-2 (7 of 14)
Table 1.8-2 (9 of 14) 1.10"73b/1.10-73c 1.10-85/1.10/85a 1.10-85b/1.10-86 Insert Table 1.8-1 (109 of 169)
Table 1.8-2 (6 of 14)
Table 1.8-2 (7 of 14)
Table 1.8-2 (9 of 14) 1.10-73b/1.10-73c 1.10-85/1.10-85a 1.10-85b/1.10-86 Amendment 11 FII-2 June 1984
I
Nine Mile Point Unit 2 FSAR INSERTION INSTRUCTIONS VOLUME 3 Remove 2-vii/2-viii 2-xiiib/2-xir 2-xxria/2-xxrib 2-xxrii/-
2.1-3b/2.1-4 2.1-7/2.1-8 2.5-173/2.5-174 2.5-175/2.5-176 2.5-191/2.5-192 Insert 2-vii/2-viii 2>>xiiib/2-xir 2-xxria/2-xxrib 2>>xxrii/-
2.1-3b/2.1-4 2.1-7/2.1-7a 2.1-7b/2.1-8 Figure 2.1-20 2.5-173/2.5-174 2.5-174a/2.5-174b 2.5-175/2.5-176 2.5-191/2.5-192 2.5-192a/2.5-192b Table '2.5-44 Amendment 11 FII-3 June 1984
Nine Mile Point Unit 2 FSAR INSERTION INSTRUCTIONS VOIRK 4 Remove Insert Figure 2.5-105J Figure 2.5-135 Amendment ll FII-4 June 1984
C
0 Nine Mile Point Unit 2 FSAR INSERTION INSTRUCTIONS VOLUME 8 Remove Table 3.2-1 (16 of 26)
Table 3.2-1 (26b of 26)
Insert Table 3.2-1 (16 of 26)
Table 3.2-1 (26b of 26)
Amendment 11 FII-5 June 1984
0
Nine Mile Point Unit 2 FSAR INSERTION INSTRUCTIONS VOLUME 9 Remove 3.6A-7/3'A-8 Insert 3.6A-7/3.6A-S Amendment 11 FII-6 June 1984
iQ
Nine Mile Point Unit 2 FSAR INSERTION INSTRUCTIONS VOLUME 10 Remove 3.8-51/3.8-5la 3.8-63/3.8-64 3.8-65/3.8-66 Insert 3.8-51/3.8-5la 3.8-63/3.8-64 3.8-65/3.8-65a 3.8-65b/3.8-66 Amendment 11 FII-7 June 1984
Nine Mile Point Unit 2 FSAR INSERTION INSTRUCTIONS VOLUME 11 Remove Insert 3.9A-25/3.9A-26 3.9A-25/3.9A-26 3.9A-26a/3.9A-26b Amendment ll FII-8 June 1984
Nine Mile Point Unit 2 FSAR INSERTION INSTRUCTIONS VOLUME 13 Remove 5.2-27/5.2-28 Table 5.2-1 (3 of 8)
Table 5.2-1 (5 of 8)
Table 5.2-1 (6 of 8)
Table 5.2-1 (6a of 8)
Table 5.2-1 (7 of 8) 5.3-3/5.3-4 5.3-5/5.3-6 5 '-7/5.3-8 5.3-9/5.3-10 5.3-11/5.3-12 5.3-13/5.3-14 Table 5.4-2 6-vii/6-viii 6-ix/6-x 6-xiii/6-xiv 6-xv/6-xvi 6-xvii/6-xviii Insert 5 '-27/5.2-28 5.2-28a/5.2-28b Table 5.2"1 (3 of 8)
Table 5.2-1 (3a of 8)
Table 5.2-1 (5 of 8)
Table 5.2-1 (5a of 8)
Table 5.2-1 (6 of 8)
Table 5.2-1 (6a of 8)
Table 5.2-1 (6b of 8)
Table "5.2"1 (7 of 8) 5.3-3/5.3-4 5.3-5/5.3-6 5.3-7/5.3-8 5.3-9/5.3-10 5.3-11/5.3-12 5.3-13/5.3-14 Table 5.4-2 6-vii/6-viii 6-ix/6-x 6-xa/6-xb 6-xiii/6-xiv 6-xv/6-xvi 6-xvii/6-xviii Amendment ll FII-9 June 1984
Nine Mile Point Unit 2 FSAR INSERTION INSTRUCTIONS VOLUME 14 Remove Insert 6.2-33/6.2-34 6.2"35/6.2-35a 6.2-35b/6.2-36 6.2-37/6.2-38 6.2-69/6.2-69a Table 6.2-28 Table 6.2-29 Table 6.2-30 Table 6.2-31 Table 6.2-32 Table 6.2-33 Table 6.2-34 Table 6.2-35 Table 6.2-36 Table 6.2-37 Table 6.2-38 Table 6.2-39 Table 6.2-40 Table 6.2-41 Table 6.2-42 Table 6.2-43 Table 6.2-44 Table 6.2-45 Table 6.2-46 Table 6.2-47 Table 6.2-48 Table 6.2-49 Figure 6.2-29A Figure 6.2-29B Figure 6.2-30 Amendment ll 6.2-30a/6.2-30b 6.2-33/6.2-34 6.2-35/6.2-35a 6.2-35b/6.2-36 6.2-37/6.2-37a 6.2-37b/6.2-38 6.2-69/6.2-69a Table 6.2-28 Table 6.2-29 Table 6.2-30 Table 6.2-31 Table 6.2-32 Table 6.2-33 Table 6'.2-34 Table 6.2-35 Table 6.2-36 Table 6.2-37 Table 6.2-38 (1
Table 6.2-39 (1
Table 6 '-40 Table 6.2-41 Table 6.2-42 Table 6.2-43 Table 6.2-43A Table 6.2-43B Table 6.2-44 Table 6.2-44A Table 6.2-44B Table 6.2-45 Table 6.2-45A Table 6.2-45B Table 6.2-46 Table 6.2-47 Table 6.2-48 Table 6.2-49 Figure 6.2-29A Figure 6.2-29B Figure 6.2-29C Figure 6.2-29D Figure 6.2-29E Figure 6.2-29F Figure 6.2-29G Figure 6.2-29H Figure 6.2-29I Figure 6.2-29J Figure 6.2-30 Figure 6.2-30A FII-10 of 2and2of 2) of 6 through 6 of 6)
'I June 1984
Nine Mile Point Unit 2 FSAR INSERTION INSTRUCTIONS VOLUME 14 (Cont)
Remove Figure 6.2-31 (Sh 1 of 15 through 15 of 15)
Figure 6.2-32 Figure 6.2-52 Figure 6.2-53 Figure 6.2-54 Figure 6.2-55 Figure 6.2-56 Figure 6.2"57 Figure 6.2-58 Figure 6.2-59 Figure 6.2-60 Figure 6.2-61 Figure 6.2-62 Figure 6.2-63 Figure 6.2-64 Figure 6.2-65 Figure 6.2-66 Figure 6.2-67 Figure 6.2-68
" Figure 6.2-69 Insert Figure 6.2-31 Figure 6.2-31A Figure 6.2"31B Figure 6.2-32 Figure 6.2-33A Figure 6.2-33B Figure 6,2-52 Figure 6.2-53 (Sh Sh 6 of 6)
Figure 6.2-54 Figure 6.2-55 Figure 6.2-56 (Sh Sh 10 of 10)
Figure 6.2-57 Figure 6.2-58 Figure 6.2-59 (Sh Sh 5 of 5)
Figure 6.2-60 Figure 6.2-61 Figure 6.2-62 (Sh Sh 5 of 5)
Figure 6.2-62A Figure 6.2-63 Figure 6.2-64 (Sh Sh 5 of 5)
Figure 6.2-64A Figure 6.2-65 Figure 6.2-66 (Sh Sh 6 of 6)
Figure 6.2-66A Figure 6.2-67 Figure 6.2-68 Figure 6.2-68A Figure 6.2-69 Figure 6.2-69A 1 of 6 through 1 of 10 through 1 of 5 through 1 of 5 through 1 of 5 through 1 of 6 through Amendment ll FII-11 June 1984
Nine Mile Point Unit 2 FSAR INSERTION INSTRUCTIONS VOLUME 15 Remove 6.6-1/6.6-2 Insert 6.6-1/6.6-1a 6.6-1b/6.6-2 Amendment 11 FII-12 June 1984
~
e Nine Mile Point Unit 2 FSAR INSERTION INSTRUCTIONS VOLUME 17 Remove Insert 9.1-7b/9.1-8 9.1-8a/9.1-8b 9.1-7b/9.1-8 9.1-8a/9.1-8b Amendment 11 FII-13 June 1984
Nine Mile Point Unit 2 FSAR INSERTION INSTRUCTIONS VOLUME 18 Remove 9.2-5/9.2-5a Insert 9.2-5/9.2-5a Amendment ll FII-14 June 1984
Nine Mile Point Unit 2 FSAR INSERTION INSTRUCTIONS VOLUME 21 Remove
- 9. 5-51b/9. 5-52
- 9. 5-52a/9. 5-52b 9.5-53/9.5-54 Insert 9.5-51b/9.5-52 9.5-52a/9.5-52b 9.5-53/9.5-54 Amendment 11 June 1984
Nine Mile Point Unit 2 FSAR INSERTION INSTRUCTIONS VOLUME 25 Remove 12.2-1/12.2-2 12.2-3/12.2-4 12.2-15/12.2-16 Insert 12.2-1/12.2-1a 12.2-1b/12.2-2 12.2-3/12.2"4 12.2-15/12.2-16 Table 12.2-16 Amendment 11 FII"16 June 1984
Nine Mile Point Unit 2 FSAR INSERTION INSTRUCTIONS VOLUME 27 Remove 13.2-1/13.2-2 13.2-5/13.2-6 13.2-7/13.2-7a 13.2-7b/13.2-8 13.2-9/13.2-10 13.2-11/13.2-12 14-xi/14-xii Table 14.2-231 (1 of 3/2 of 3)
Table 14.2-2/1 (3 of 3)
Insert 13.2"1/13.2-2 13.2-2a/13.2-2b 13.2-5/13.2-5a 13.2-5b/13.2-6 13.2-6a/13.2-6b 13.2-7/13.2-7a 13.2"7b/13.2-8 13.2-8a/13.2-8b 13.2>>9/13.2-10 13.2-11/13.2-12 14-xi/14-xii Table 14.2-231 (1 of 3/2 of 3)
Table 14 '-231 (2a of 3/3 of 3)
Amendment ll FII-17 June 1984
P
Nine Mile Point Unit 2 FSAR INSERTION INSTRUCTIONS APPENDIX 9B Remove Figure 9B.4-2 9B.6-1/9B.6-2 9B.6-3/9B.6"4 Table 9B.6-1 Table 9B.6-2 (1 of 3 through 3 of 3)
Table 9B.6-3 Figure 9B.6-2 Figure 9B.6-3 Figure 9B.6-4 Figure 9B.6-5 Figure 9B.6-6 9B.8-1/-
9B.9-1/-
9B.10-1/-
Insert Figure 9B.4-2 9B.6-1/9B.6-2 9B.6-3/9B.6-4 Table 9B.6-1 (1
Table 9B.6-2 Table 9B.6-3 (1
9 of 9)
Figure 9B.6-2 Figure 9B.6-3 Figure 9B.6-4 Figure 9B.6-5 Figure 9B.6-6 9B.8-1/-
Table 9B.8-1 (1
75 of 75)
Table 9B.8-2 (1
38 of 38) 9B.9"1/-
9B.10-1/-
of 6,through 6 of 6) of 9 through of 75 through of 38 through Amendment ll FII-18 June 1984
R XC
Nine Mile Point Unit 2 FSAR INSERTION INSTRUCTIONS QUESTIONS AND RESPONSES VOLUME 1 Remove FQR-i/FQR-ii through FQR-xvii/FQR-xviii Q&R F100.4-1 Q&R F210.15-1 Q&R F220.23-1 Q&R F240.16-1 Q&R F251.1-1 Q&R F280.28-1 Insert FQR-i FQR-ii FQR-iii FQR-iv FQR-v FQR-vi FQR-vii FQR-viii FQR-ix FQR-x FQR-xi FQR-xii FQR-xiii FQR-xiv "
FQR"xv FQR-xvi FQR"xvii FQR-xviii Q&R F100.4-1 Q&R F210.15-1/Q&R F210.15-2 Q&R F220.23-1 Q&R F240.16-1 Q&R F251.1-1/Q&R F251.1-2 Q&R F251.4"1/Q&R F251.4-2 Q&R F251.5-1 Q&R F251.6-1 Q&R F280.28-1 Amendment 11 FII-19 June 1984
Nine Mile Point Unit 2 FSAR INSERTION INSTRUCTIONS QUESTIONS AND RESPONSES VOLUME 2 Remove FQR"i/FQR-ii through FQR-xvii/FQR-xviii Q&R F410.37-1 Q&R F430.3-1 Q&R F430.35-1 Q&R F430.37-1 Q&R F430.73-1 Q&R F430.76-1 Q&R F430.88-1 Figure 440.11-1 Q&R F460.19-1 Q&R F471.6-1 Q&R F471.19-1 Q&R F480.12-1 Q&R 'F480.24-1 Q&R F480.33-1 Q&R F480.38-1 Q&R F480m47 1
Q&R F640.13-1 Insert FQR-i FQR"ii FQR-iii FQR-iv FQR-v FQR-vi FQR-vii FQR-viii FQR"ix FQR-x FQR-xi FQR-xii FQR-xiii FQR"xiv PQR-xv PQR-xvi FQR-xvii FQR-xviii Q&R F4lOo37-1 Q&R F430.3-1 Q&R F430.35-1 Q&R F430.37-1 Q&R F430.73-1 Q&R F430.76-1 Q&R F430.88-1 Q&R F460.19"1 Q&R F471.6-1 Q&R F471.19-1 Q&R F480.12-1 Q&R F480.24-1 Q&R F480.33-1 Q&R F480.38"1 Q&R F480.47-1 Q&R F640.13-1 Amendment ll FII-20 June 1984
0:
l