Vol I & II of NRC Interrogatory on Production Costs Associated W/Availability Vs Unavailability of Nine Mile Point 2.
ML17054A103
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 05/13/1983
From:
ENERGY MANAGEMENT ASSOCIATES, INC.
To:
Shared Package
ML17054A104 List:
References
E320.1-(D), NUDOCS 8309210023
Download: ML17054A103 (280)


Text

O~(O 90cket~ ~~~~(g~gQ Confro) +

lMe ~ ofnacumltjIb gg,g~ Qgg egg FklE I WD54&Ka X XX 83092100Z3 830909 PDR ADOCK 05000410 A. PDR

TABLE OF CONTENTS VOLUME I SECTION Introduction PROMOD III Overview I.A Company/Area Definition I.B Inter. Area Transmission Limits I.C Week Definitions I.D Load Shape Report I.E Demand and Energy Forecasts I.F Fuel Cost Summary Reports I'. G Maintenance Dates Summaries I.H VOLUME II Generating Unit Input Summary Reports, II.A Existing Units II.A.1 Coal Conversion Units II.A.2 Major Unit. Additions 1986-1991. II.A.3 Hydro Unit Summary Report II.B Transaction Input Summary Report. II.C External System Transaction Summary I I. D Periodic -Changes to Existing Units II.E Periodic Changes to New Units II.E.1

I'I.A'enerating Unit: Input Sumary Report I

GENERATING UNIT INPUT

SUMMARY

REPORT The following report presents a summary of input data items to PROMOD III for each generating unit modeled in this study. This report is separated into eight general headings.

1. The first column on the left summarizes general information for the specific unit as follows:

COMPANY: Company identification number representing the company which owns the unit. Refer to the Company Definition Table for explanation of the numerical codes.

AREA Area identification number representing the area in which the unit resides. Refer to the Area Definition Table for explanation of the numerical codes.

UNIT TYPE: Designation of the unit type. Code definitions:

F - Fossil Unit T - Combustion Turbine N - Nuclear Unit RESERVE: Definition of the reserve contribution of the unit. Code definitions:

S - Contributes.to spinning reserve Q - Contributes to quick-start reserve.

MUST RUN: Designation of whether unit may be shut down.

E - May be shut down M - May not be shut down D - May be shut down on weekends only.

2. The second column lists the commission and retirement dates for all units which are commissioned and/or retired during the study interval. All other units are commissioned before 1986 and are retired after 1998.
3. The third column describes the capacity ratings (MW) of the unit as follows:

MIN Minimum capacity state at which the unit can operate when on-line.

MAX Maximum capacity state at which the unit can operate on a continual basis.

EMERG Maximum emergency capacity rating for the unit, which is dispatched for reserve purposes only. Note, in many instances MAX = EMERG. This means that the unit may operate continuously at its highest capacity rating.

CAP 1-7: Discrete capacity states for the unit representing the incremental loading points.

The fourth column summarizes the availability of the unit to serve load as follows:

FOR M: Mature forced outage rate of the unit, representing the percentage of time which the unit is not available to serve load.

MOR Maintenance outage rate of the unit, representing additional percentage of time the unit is not available to serve load during the weekend hours.

AVL 1-7: Percentage of time the maximum available capacity of the unit is the corresponding capacity state.

5. The fifth column summarizes the heat rate data for the unit as follows:

HR FAC Heat rate factor, a multiplicative factor used to modify the input heat rate data for the unit. A heat rate factor of 1.00 does not modify the input heat rate data.

AHR Average heat rate (BTU/KWH) at the first capacity state of the unit.

IHR 1-7 Incremental heat rate (BTU/KWH) at each capacity state of the unit.

6. The sixth column describes the fuels used by the unit as follows:

STRT-UP Fuel used to start up the unit.

FUEL 1 Primary fuel burned by the unit during normal operation (excluding start up).

STRT-UP Energy required to start up the unit (MBTU).

7. The final column summarizes all costs associated with the operation of the generation unit, as follows:

HANDLING  : Cost associated with the handling of the fuel burned by the unit (g/MBTU).

VAR 06M  : Variable operating and maintenance cost associated with the unit ($ /hWH).

FIXED 05M  : Fixed operating and maintenance cost associated with the unit ($ /WEEK).

The escalation rate applied to the handling and 06M costs is 6 percent.

The costs shown on the following pages are expressed in January 1981 dollars.

Certain units are owned by more than one company. For these units, the ownership percentage of each company is displayed under the heading "Multiple Ownership". If no such heading appears, the unit is fully owned by the company designated in column 1 of this report. Refer to the Company Definition Table for explanation of numerical company codes.

BI>.A..L Exi,sti,ng Uni ts.

. ill(C INTE>?>COG;.TOc>Y VN CIINE l>ILE POI>>T NUCLEAR Ul'IT MO,2 Et>ERGY > At>AGEl;ECIT ASSOCIATES> INC 30

))foe ccO ~ f 32J 1 Cu> REPT 9 OPTlOtv I SUBREPORT I 3/83 ooooooooooGENERAT I>"6 >>>eITS CHA>cDCTEP 1ST ICS oooooooooo 00000 NOSE'CO!l I 40000 <<CAPACITY<< REL]4&ILITY <<HEAT RATE <<e FUE L<<e <<<<>>! <<<<>>>> COST Mc> HTU/Ke>H TYPE l>IN% TOT%  %/YH CO>>PAC>Y 1 <<Rf JA c 1 >985 >>IN 15n FOR H 2 ' HR FAC I ~ o0 t>AN VL I N 8 0 ' 640 AREA ]V CV: ~

JA e I 1985 t>AX 585 FOR I 0 ' AHR I 11300 STRT<<UP RES F 00 100 ' LEASING 0 Oe0 U>IIT TYPE F JA>l 1 ]935 EMfRG 600 MO>? 0' ACCTG 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0' 0' VAR OeH 0.0 e.V RESERVE S P.E,T 1 4]00 CAP I ]SO AVL I 0' IHR I 8220 FUEL I PES F 00 UNLM 0 '100 ' F]XEC 00>e 0 6 '

]0>c' V C'A.> ] 1984 CAP 2 300 AVL 2 0 ' IHR 2 8310 FUEL 2 ~ ~ ~ ~ ~ o ~ ~ ~ ~ ~ ~ 0' 0' SALE AOO 0 0 '

CAP 3 450 AVL 3 Oe0 IHR 3 8800 FUEI. 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0' 0' CIA I>lT 0 PRIORITY CYCLE 18 CAP 4 585 AVL 4 0' IHR 4 9750 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0' 0' OVERHAUL 0 PE>IALTY 1 ~ VC PuS I 1 IOc> 3 CAP 5 600 AVL 5 9& F 0 It!R 5 9850 HEAT RATE FACTOR ]o00 SPY> >cNT 0 MA1UR In>G 0 ~ 0 F Pf OUE c>CY S2 CAP 6 0 AVL 6 0 ' IHR e 0 STRT>>UP 3878 t>BTU MUST PUtc VEVlnCIO>c I CAP 7 0 AVL 7 0 ' I C?R 7 0 84tlKlllO . 0 HBTU/H PRE CO>>M GEN 0 '

MAX SCt>O E. RATED 585 MIN VDNN TIME 24 I ~ ",o 4<<]9 1> TRANS ~ l.OSS  % 0 '

>> HULT ]PC.E O>>Nb >>SHIP COo!PAMY  % CO>>PAtlY <<COMPANY  % COMPANY I % CO>>PANY COMPANY 35 ' 2 4n 0 5 25 ' 4 0 ' 0 0 ' 0 0.0 n VoV 0 0 ' 0 0' 0 0 '

04000 RQSQ]0>l 2 00040 -CAPACITY RELIABILITY HEAT RATE >><<<<<<>><<<<>>>><<>>FUEL<<>><<<<>>>>>>>>>>>>>>>>>><< COST el c.'I BTU/K>cH TYPE MIN% TOT%  %/YH CON PA> lY 1 P>?f J4!l ] 1985 t>]tc ]50 FOR t> 4~2 HP FAC ] F 00 HAt>OL I>lG 0 ' 6e0 CO>'Atc I AHR I ))2)0 LEASING AREA ]C ] 1985 c>AX 5>>5 FOR 0~0 STRT UP RES F 00 100 ~ 0 0 0~0 UNIT TYPE F c>41 Jnx 1985 fl>ERG tc00 MOR 0 ' ACCTG '0 Su> P 0.0 0,0 VAR 0>'4 Oo0 6 '

RESERVE S PET J~~ I 2100 CAP 1 150 AVL 1 VS 0 IHR I 8250 FUEL 1 RES 2 F 00 UNLM 0 '100 ' FlxfD OeM 0 bo0

)00 AU N Jsre I 1984 CAP 2 300 AVL 2 0 ' IHR 2 8520 FUEL 2 ~ o ~ eee ~ ~ ~ e ~ ~ 0 ' Oo0 SALE AOV 0 0 '

CAP 3 450 AVL 3 0 ' Ic>R 3 9025 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0 ' t>AINT 0 PR ]OR]1 Y U CYCLE 18 C4P 4 585 AVL 4 0 ' ll>R 4 10050 FUEI 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0 ' OVERHAI>L 0 Pfc>ALTY I ~ 00 PVS I T I!>ic CAP 5 600 AVL 5 95 ' IHR 5 10180 HEAT RATE FACTOR 1,00 SPN t'NT 0 HAlU>?IrcG V,C y PF g>!Ec. CY 52 CAP e 0 AVL 6 0' IHR 6 0 STRT<<UP 3878 MBTU HUST >?Uc> f UEV I AT]c.!..': C>cP 7 0 AVL 7 0' IHR 7 0 84>>KING 0 MBTU/H PRF<<CVMH GEN 0 '

HA4 SC'llV E MATEO 585 t>IN DO>CN TIMf 24 I~U ~ cc 20 TRANS'OSS 0'

->>ULT IPLE O>>NE HSHIP

<<CQt',>rsilY CO<<PAC>Y -COCcP<>>Y  % COMPhNY  % COHPA>>Y <<COtr PANT 35 ~ c> 2 40,n 5 25 ' 0 ' 0 0 ' 0 0~0 cc ~ 0 0 0.0 0 0 ' 0~0

t<PC lt<TERHOGATGRY <tt<'NINE I'ILE POItlT NUCLEAR Ut!IT t!0 ~ 2 ENEPGV HAr<AGEt<ENT ~SSOCIATESt INC pAGE 131 ITE<e NO ~ E 32. ~ 1 iD) REPT 9 OPTION I SUGREPORT I 05/13/83

<<a<<a<<Oooo<<GENERATI:!G Ull]TS Cf!AHACTERISTICS <<aao" aa" oa aoaoa DANS!<<?R 1 oaaoa CAPACITY REi ]ABILITY l!EAT RATE- >>>>>>>>>>>>FUEL>>>>>>>>>>>> >>->>->>COST>>>>>>>>>>>>>>>>~

<<P BTU/Kt<H TYPE f']N% TOT%  %/YR COMPAtlY I PRE Jh'I ] 1985 tf]t4 30 FOI) I'. 4 ~ 1 Hft FAC 1 ~ 00 HANDL]tlG 0~0 6~0 AREA ]'0 CO<I JAN I 1985 MAX 61 FO<t I OO AHR I 12030 STRT UP HATGAS A -

100 ~ 0 . LEAS ING 0 0~0 UNI T TYPE F '<AT JA'< 1985 Et<ERG 61 HOR 0 ' nccTG 0 SU~P ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 VAf? Octo 0~0 6 '

RESERVE S  :!ET Jh <

1 1 2100 Chp I 30 AVL 1 0~0 If!R ] 9800 FUFL 1 RES I ~ 00 Ut'Ll< 0 0100 0 FIXED Ottt 13449 6 '

100 ~ 0 <

~ Jh<e !984 Chp 2 40 AVL 2 0~0 I f<R 2 94 if7 FUEL 2 ~ e ~ ~ ~ ~ e ~ ~ ~ ~ ~ 0~0 0~0 SALE AOD 0 0' Chp 3 55 AVL 3 0~0 ]HR 3 10450 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 HAINT 0 PR I OR I I Y O CYCLE 6 CAP 4 61 AVL 4 an If!R 4 l]150 FUEI 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 OVERHAUI. 0 PEtIALTY I ~ Oo +~ISI T IOil 3 Chp 5 62 AVL 5 95 ' IHR 5 113o0 HEAT RATE FACTOR ] F 00 SPt> l<NT 0 MATLIRI:IG 0,0 I:HER<UENCY 52 cAP:e 0 AVL 6 0~0 IHR 6 STRT U> 127 t(BTU MUST RUN 2 DEVIATION 5 CAP 7 0 AVL 7 0~0 IHR 7 0 BAtlKING 0 MBTU/H PRE COl",M GEt< 0 ~ 0 HAX SC<ID 2 RATED 61 flih DOtltl TIHQ 6 I~D~ " 21 TRANS'OSS 0~0 C aaaoa ->>>>>>>>>>>>>>-->>--FUEL>> >>>>>>>>>>>>>>>>>>>>>> >>>>>>>>>>>>>>COST>>>>>>>>>>>>>>>>>>

Oht<SKfiR CAPACITY REL]AB ]LIT Y HEAT RATE Mr BTU/KWH TYPE l<]tl% TOT%  %/YR COHPANY 1 PRE Jh~l 1985 MIN 30 FOR fl 3~7 HR FAC ]e00 HAtlDLIN 8 Oen 6 '

AREA 10 col <

.Ih<<1 1985 tlAX 61 FOR I 0~0 AHR I 12120 STRT"UP 'IATGAS A 100 ~ 0 LEAS]tlG 0 0~0 UNIT TYPE F <AT J<i ~ ' 1985 EtlERG 63 tCOR Oe 0 ACCTG 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 VAfl Defi 0~0 6 '

RESERVE S I?ET JA'< - 1 2]00 CAP I 30 AVL ] 0~0 IHR I 9650 FUEL 1 RES I ~ 00 UNLH 0 ~ 0100 ~ 0 FIXED OeM ]3663 6~0

]nneb t; JA:I 1 1984 CAP 2 40 AVL 2 0~0 IHR 2 9230 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~ 0 SALE ADD 0 Oen Cbp 3 55 AVI, 3 0 ' 1flR 3 10070 FUEL. 3 ~ ~ e ~ ~ ~ ~ ~ ~ ~ e ~ 0~0 0~0 HAINT 0 PRInftiTY 0 CYCLE e CAP 4 el AVL 4 0~0 IHR 4 11750 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 OVERHAUL 0 PEtlALTY I ~ On f'OS IT Tl<N 1 CAP 5 63 AVL 5 96 ' IflR 5 11750 HEA1'ATE FACTOR I ~ 00 SPN HNT 0 MATUR]<<G Oe<t t IIEOUEHC Y 52 chp e 0 AVL 6 0~0 IHR 6 i!0 STRT>>UP 127 MBTU MUST P>>N E i't V I AT 1<<t! 5 CAP 7 0 AVL 7 0~0 IHR 7 <0 BANK]tIG 0 HGTU/II PRE-COt!H GEN 0 ~ 0 MAX Sc!!il RATED 61 t'IIN OVWN T]HE 6 I'D'.e 22 TRAtlS ~ LOSS % 0~0

HttC It>>fl?ROGATO??V 0>> NINE MlLE; PoltiT HUCLEAR UiilT ti0,2 EtiERGY tiA>>AGEtifNT ASSOCIATKSt ltiC ITE4 !ro ~ E 320 ~ l ttt) REPT 9 OPTION 1 SUBREPORT I o /83

<<>>oooo>>>>o>>GK Nf RATING litilTS CHARAC1ERI ST ICS o>>o<<o>>ooo

>>oooo t1htiSK!1R <<oooo CAPACITY RKL I AB ILI T 7 I!EAT RATf ~ ~~w~e a ar w~ FUEL ~~w~aw~wma ~ ~~COST ~~a r SH BTU/KwH TYPF- tilN% TOT%  %/YH CO)187:IY ) proc Jhi'hr ) 985 Hlr~ en FOP. H 2~ l Hrt FAC I ~ 00 HA>>SLING O,O 6.0 AREA 10 1 iri r 1995 trAX 123 Foll I 0 ~ 0 AHR I 11500 STPT UP t!ATGAS A I 00 ~ 0 LEASI!io 0 0~0 Ut)IT TYPE F ~ t>

7 Jh1 1 ) 9r15 EtifRG 126 HOR 0 ' ACCTG ~ 0 SUPP ~ ~ ~ ~ e ~ ~ ~ 0~0 0~0 oeH 0~0 6 'tl RESFRVL 5 red.T 1>>'f I 198e cAp I eo AVL I 0~0 IHR I 8350 FUEL 1 RKS I ~ OO UiiLH 0,0100 ~ 0 F IXEO OeH 0 eeo lone u Jhrr l984 CAP 2 80 AVL 2 0.0 IHR 2 8675 FUEL 2 ~ ~ ~ ~ ~ e ~ ~ ~ ~ ~ ~ 0~0 0 ~0 SALE At)O 0 0 '

CAP 3 100 AVL 3 0~0 IHP 3 9020 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 r)AINT 0 PRIG>I TY 0 CYCLE 6 CAP 4 123 AVL 4 0~0 IHR 4 9450 FUEL 4 ~ ~ ~ ~ ~ e ~ ~ ~ ~ ~ ~ 0~0 0~0 OVERHAUL 0 PE>>i<<L TY 1 ~ 00 truSITIO" CAP 5 126 AVl. 5 97 ' 11)R 5 9470 HEAT RATE F4CTOR F 00 SPN leNT 0 t)ATURlriG 0 ~ u 1 rrfQlif'Y 52 CAP 6 0 AVl. 6 0~0 I)N e 0 STRT>>UP 311 tiBTU MUST RUN E Of Vl 17 Ill> CAP 7 0 AVL 7 O.u IHR 7 0 SAt!KING 0 Htt TU/b PRK COHr1 Gf N D~ 0 MAX SCr 0 f RATEO 123 Hlt>> OOKN TIME 24 I~0 ~ e 23 TRA!i'OSS  % 0~0 oo>>oo OhtiSKt tt 4 oooo<< CAPACITY Rf LIPS ILI TY HEAT RATE <<- --FUEL-"-"-"-""= ~~~~~~~~COST~~~~

QTU/Kt)H TYPE HIM% TGT%  %/YH CottPANY l A?K Jrrras 1985 HIN 90 FOR t' ~ 2 HR FAC 1 00 HANOL ING 0~0 6 '

AREA 1 r Cur1 Jete )985 MAX 215 FOR I 0~0 AHR I 10650 STRT-UP tiaTGAS A 100.0 LEASING 0 Oeo UtilT I YPE F rrA7 J>=- ) 1985 ENERG 226 HOR 0 ' ACCTG 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0 ~0 VAR OeM o.o e,o RESF Rvf S RF. I APR 1 1988 CAP 1 90 AVL I 0 ' IHR 1 8600 FUEL 1 RES 1 ~ OO Ut!LH 0 ~ 0100 ~ 0 FIXEO OeH O eeO loueu h tt JAr ) 9t)4 CAP 2 150 AVL 2 0~0 IHR 2 8850 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 SALE AOO D Oen CAP 3 190 AVL 3 0~0 IHR 3 9000 FUEI 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 HAINT 0 PRIOR I T Y 0 CYCLE 6 CAP 4 215 AVL 4 OerJ IHR 4 9100 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 OVKHHAUL 0 PENALTY 1 cut BUS I T IO 2 CAP 5 ?27 AVL 5 95eB 111R 5 9150 HEAT RATE FACTOR I ~ 00 SPN HNT 0 t)ATURIreG 0, 1 FRforrft:CY 52 CAP 6 0 AVL 6 0 ~ I1 IHR 6 STR'I UP 1009 !18'IU HUST RUer 8 OEV )AT) Jt" 5 CAP 7 0 AVL 7 0~0 IHR 7 0 BAttKING 0 HBTU/H PRE~COMM GEN 0~0 MAX SCr'0 RAT KO 215 HItq DOWN TINK 24 leoe o 24 TRANS ~ ).OSS Get) r3 LQ r L

t!r C I':TE: Rrro'OF:Y 04 NINF. NILE POlllT NUCLEAR Ulr]T ti0 ~ 2 Et!EpGY i!At'AGEHENT assOGIAYESt ]4C PAGE 13>

ITE>> rroe E, 32r<v] IV) REPT 9 OPT)Or I SUBREPORT I 05/]3/83 a<<oooo<<a<<<<GEtlEHATING IrNI TS CHARacTERISTICS aaooaoaaoa

<<<<aao OatISgaHG ) aaaoo CAPACI TY- REI. I AB ILI T Y HEhT RATE >>>>>>>>aa>>f UEL>>>>>>>>aa>>>>aa COS'I a>>

Qtr !t. BTU/Ke!n TYPE Hltl<<TGT<< <</YH COHPANY ) VPE Ja r )9B5 HIN 3Q fOR rl 4~ ] HR Fac 1 ~ 00 HANOL]tlG 0~0 6 '

APEa ]0 col'a>> 1

) )955 HA X 60 F0R I 0~0 AHR ] 1]700 STrtT UP NATGAS a ]oooo LEASING 0 0 ~ 0 UNIT TYPE F trA7 Ja<rl ] ) 985 EHERG 61 eIVR Ir e 0 ACCTG 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0 ~ 0 VAR OeH o,o eeo RESERVE S H~T Ot:C 3) 20]0 cap 1 30 AVL I 0 ' IHR ] 9500 FUEL I tlATGAS a UtlLil 0 ~ 0100 ~ 0 FlxED Oeet 13449 6eP

]OP ~ V Jar< ] ] 984 CAP 2 40 AVL 2 0~0 IHR 2 10375 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0~0 SALE AOD 0 0~0 o

CAP 3 55 AVL 3 Oeo ]IIR 3 1]700 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 Oeo HAINT 0 v gr)

PRIORITY .YCLE n CAP 4 61 A VI. 4 0~0 IHR 4 ) 2150 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0 ~0 OVERHAUL 0 PENALTY I e Or> POS] T]r)rq 0 CAP 5 62 AVL 5 95eB IelR 5 12200 HEAT HATE FACTOR ] F 00 SPN I'NT 0 HA)UP]."IG OeO fREOrlE>'CY 0 CAP 6 0 AVL e o.o lelR 6 0 STRT UV 127 HHTU HUST rtu:I UEV] 0110:r 0 Cap 7 0 AVL 7 0 ' IHR 7 0 BANKING 0 HBTU/H PRE CORM GEN 0 ~ 0 6

HAx SCHV E RATED 60 HIN DohN TIHE I I ~ Oe tr 25 TRANS'OSS 0~0 vQ aoaao Itqr)SKA,IG 2 oaqoo >>CAPACITY REL]ANIL)TY tlEAT RATE" a>>>>>>>><<>>>>>>>>f UEL>>>>>>>>>>a>>>>>>>>>>>>>> <<COST>> a 8 7U/K)III TYPE Hit)<< TGT<< <</YH COHPANY I PPE Jalr ) )995 tllN 30 FOR H 3 ' HP FAC ] ~ Po HANDLING 0~0 6 ' ~

.) C AREA 10 Coil Jar' )965 HAX 60 fOP ) 0 0~ AHR I ]I'700 STR7 UP tiATGAS A I 00 ~ 0 LE as]NO 0 0 ~ 0 Utl]T TYI'E F raT Jai' 1995 EHERG 63 HOR 0' accTG 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 VAR OeH o.o e.p RESFPVE S rlET Dl:c 8] 2010 CAP 1 30 AYL I Pic IHR 1 95o0 FUEL I tia)GAS A UNLH 0 ~ 0100 ~ 0 FIXFO OeH 13ee3 e.o v) r]

]Oooo Ja<'e ] )984 cap 2 40 AVL 2 0' IHR 2 10375 FUFL 2 ~ ~ ~ e ~ ~ oe ~ ~ ~ e 0~0 0~0 SALE ADD 0 0~0 CAP 3 55 AVL 3 0~0 ltrR 3 11700 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 HA INT 0 PRIORITY 0 CYCLE 0 CAP 4 61 AVL 4 0 ' 14R 4 12550 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 OVERHAUL 0 PENALTY ]coo POSIT]0 I C CAP 5 63 AVL 5 96 ' IHR 5 12550 HEAT RATE FACTOR ]coo SPN I"NT 0 I.,

HATURltiG 0 ~ 0 F REQUEll:Y Cap 6 o AVL 6 0~0 IHR 6 0 STHT>>UP 127 HBTU tlUST PUtl E DEvlaTIvN 0 CAP 7 0 AVL 7 0~0 IHR 7 P ua>>KING 0 HBTU/H PRE>>collie GEN 0 ~ 0 MAX SCHD E RATED 60 te]N OG!IN TIHE 6 I~D ~ rr 26 TRANS'OSS  % 0~0

t:HC InTF!>>IOGATORY ON FiliE NILE POlt:I NUCLEAR iJ! IT io. ENERGY t'A!AGE!'ENT ASSOCIATESt INC E 134 ITE'I rio ~ E 320 ~ I IU) ftEPY l 9 Of'T or! 1 SUBREpoRT I 5/15/83 4444440004GENERAT IHG !!f!ITS CriARACTERISTICS Oaaa>>4004 40400 Cox 'r 1 40040 -CAPnc!TY- IIEI.IABILITY -HEAT HATE" 8TU/KIiri

<<a aaa <<<<<<FUFL<<<<a <<aa aa<<<<<<a TYPE r'IN% Tt!7%

<<---a<<COS I----a  %/YK Cor!pnriY PRE Jii<l 1 l985 Hlri 4 FOR ii 15 ~ 0 HP FAC ]i 00 r!ANGLING o,o e.o AREA 10 COP JA ~

I 19!'5 HAX 21 Fof! I 0~0 aiiR I )4bbO STRT UP DIS GILD 100 ~ 0 LEASING 0 0~0 UNIT TYPE I ~: ir J-'i. I 1985 ENERG 24 tiOR 0~0 ACCTG ' SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0 ~ 0 VAR ODN o.o 64o RESFHVE BET J<" 1 2100 CAP 1 r,vL 1 0~0 lt!R I 14000 I'UEI. I DIS GILD UNLH O.OIOO.O FIXED ODH 0 600 100 ~ v J1>> 1 1984 Cnr 2 10 nvL 2 0 0 lf<R 2 14000 FUEL 2 ~ 0 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0 ~ 0 SAI.E AOD 0 0~0 CAP 3 16 nvL 3 Q.o IHR 3 14000 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0 ~ 0 I!A IfiT 0 PRIORITY 0 CYCLE 24 CAP 4 21 nvL 4 O.o IHR 4 14000 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 OVFRHAUI. 0 PENALTY 1 ~ "0 POSITIC'9 1 CAP 5 24 AVI. 5 85 ' IHR 5 14000 HEAT RATE FACTOR Iooo sPr'iNT 0 HATUHlt.G 0 0 52 CAP 6 nvL 6 0.0 Ii!R 6 '

~ FWEOUEr'CY'E 0 STRT UP 0 HGTU MUST RU!! E V I-'T l v:i 5 CAP 7 0 AVL 7 0~0 IHH 7 0 GntMIrio 0 HBTU/H PRE COHH GCN 0~0 HAX Sew!i E KnTED 21 t~lri oowN TINE 2 I~D~ o 27 TRANS'OSS  % 0~0 40044 Cnlpo I I 00040 CAf'AcI 7 Ya RELIABILITY I!EAT RATE" <<<<a<<a<<FUEL<<aaa<<aa<<<<<<<<<<<<a aaaa<<<<<<COSTa<<<<aa<<<<aa BTU/KWH TYPE MIN% TOT%  %/YK COHPA!iY Jni'I ) 19i) 5 HIN 4 FOR H 15 ~ 0 HR FAC 1 ~ no HANDLING o,o e.o AREA 10 JAW 1985 HAX FOR I 0~0 AHR 1 14000 STRT<<UP DIS GILD ]00 ~ Q LEASING 0 0~0 I

UNIT TYf'E T J/iia l985 EtlEPG 24 I',OR 0~0 ACCTG 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0~0 VAR 04K 0 ~ 0 6 '

6 RESFRVF

)oooo O RE r Jni'i JAN 2100 1984 CAP I 4 AVL I 0 ~ 0 IHR 1 14000 FUEL 1 DIS GILD Ur!LH 0 ~ 0100 ~ 0 FIXED ODH 0 6 '

CAP 2 10 AVL 2 0 ~ 0 IHR 2 14000 FUEl. 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0~0 SALE ADD 0 0~0 cAP 3 16 AVL 3 0~0 IHR 3 14000 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0~0 HAINT 0 PRIORITY PENALTY 2F'RE 0 CYCLE

).On f'uSI TIO~

24 CAP 4 CAP 5 21 24 nvL 4 AVI. 5 85 oeo IHR IHR 4 14000 5 14000 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~

HEAT RATE FACTOR I ~ 00

~ ~ ~ ~ 0 ~0 0~0 OVFRr!AUL SPti HNT 0

0 0.4 HATUPIi!G MUST RU!I HAX SCHu E

E FHEOUEWCY Iit.vi~7 lo>>

52 5

cnp e CAP 7 RATED o

0 21 AVL 6 0 ~ 0 AVL 7 Ooo IHR IKR 7, 6 0 0

STPT UP Hnt>KING 0 H8'TU 0 HBTU/ti PRE<<cot!H GEN

!)IN DOWN TIHF.

0 ~ 0 2

I~0~ 4 TRANS'.OSS % 0~0

r) s!RC ]s.'Ti!>Fti,(>ATORY 9'I ttltvE lllLE POIFIT NUCLEAR Ut! IT hso ~ 2 ENERGY !taltallE!'EIIT aSSOCIATESI INC PAGE 135 ITEI'>O ~ t. 320 ~ I ttI) RkPT 9 OPT IOt> 1 S]I8REPOtt I I 05/13/83 o<<oa<<<<o<<oGENF Rr I IMG ltt ITS CHARACTERIST]CS ao<<o<<a<<<<o

]nil oooo<< 'o KILL <<DDOD -cavaclYY- RE] ]LI I Y -pEAT RATk Fllf L aa aaaa> aa aa aCOST

~

OTII/Ktltl TYPF. Hit!% TOT%  %/YR

]

st>']

COHPA'IY . 2 ts>>Q Jass ] ]985 lv 69 FOP A ttA FAC 1 ~ 00 tr aft]ILI!48 0 ~ 0 6~ 0 AREA 15 C "s Jl"I ]995 MAX 350 FOR I 0~V APR I ]2983 STkT VP OIS VILU 100 ~ 0 LEAS Ihso 0 0~0 Utl]T '<<7 Ja 'i 1985 EFIE!IG 350 ooO ACCTG SUPP 0~0 0 0 VAP Vok 0~0

!'r TYPh. F ~

1 I>OR ~ ~ ~ ~ o ~ ~ ~ ~

RESERVF. 5 RET 1996 CAP 1 69 AVL ] 0~0 lhtR I 829] FUEL FIES 0 ~ 3tI Il!ILII 0 ~ 0100 ~0 FIXE]I OO<< S]6SS 6o9

]OOoo to ]984 caP 2 161 AVL 2 0~3 IHR 2 8837 FUEL 2 ~ ~ ~ ~ ~ ~ o ~ ~ ~ ~ ~ 0~0 0 ~ 0 sat.f. aoo 0 0~0 CAP 3 255 AVL 3 7>2 9273 FIIEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0 ~ 0 ttAINT 0 PRIOR] I Y v Cr CLh, 6 Cat 4 335 r>V L 4 0>V ltlR 4 9600 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0 ' OVERIIAUL 0 PEt!ALTY ],tssI t VS]T]t)sl 2 CAP 5 350 AVL 5 86 F 4 IHR 5 ttEAT RAT E FACTOR I ~ 00 SPN hsNT 0 HATUhtlsvG 0 0 I RE!lUh.t!CY 52 cap e n AVL 6 0~0 IMR e STRT UP 833 MBTU MUST RU'4 h. trk V 1 . T I Ot! 5 CAP 7 0 AVL 7 0~0 IHR 7 0 BA'IKIt'-'G 0 Mt!TU/H PRh: Cotlk OEN 0~0

('s I~0~ -'9 HAX Sct!V h. RATEU 350 HIN Ootok I]PE TRAtvs ~ LOSS 0 24

~ 0 ooaaa 4 3 ooo<<D capac]TY RELI 4" IL IT Y tlEAT RATh aaaaa a a aFUELaaaaaa aaaaaaa CVST 8TU/KIIH TYPE Mitt% TOT%  %/YR COMPA<<IY PPE ] 1985 M]N ]41 FOP. Io 9~4 HR FAC I ~ 00 HANOL]NO 0~0 6 '

AREA 15 Cots Jhtl 1 1985 MAX 471 FOR I 0.0 AHR 1 11404 STRT VP OIS OILO 100 ~ 0 LEAS II40 0 0~0 UNIT TYPE F ttrs T Jat> 1985 EHERO 50] tIOR 0 0 ACCTO 0 SUIP 0~0 0~0 VAR Ooft 0~0 e.o RESERVE 10 0 S

~ v Rh T R It AUlo J>alt 1

1 1985

]984 CAP 1 CAP 2 141 250 I',VL 1 AVL 2 3

~

]~8 IIIR 1 IIIR 2 8889 9000 FUEL ] RES 0 FUEL 2

'II o ~ ~ ~ ~ ~ ~ o UNLM oo ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

0 ~ 0]oooo Ooo ooo FIXED Ook 73788 SALE AOO 0 e,o 0~0 cAp 3 36] AVL 3 9 ' IPR 3 9428 FUEL 3 ~ ~ ~ ~ ~ ~ o ~ ~ ~ ~ ~ 0~0 ooO MAINT 0 PR]OR] I Y CYCLE 6 CAP 4 471 AVL 4 23of IHII 4 ]oooo FUf:l 4 o ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~0 0 ~ 0 OVERttAUL 0 PE!4AL T Y 1 ~ Oo I PQS I 10>'i 1 caP s sn] AVL 5 52 ~ 1 lt'R 5 102]b HEAT llaTF. FACTOP. I ~ 00 SPN MNT 0 HATUR]ssG 0 ~ v FREnslEI ICY 52 cap e o AVL 6 0 ~ 0 IHR 6 0 STRT<<UP l]50 tlRTU HUST '.s! t t)EV]<<T]Vls cAP 7. 0 AVL 7 0~0 It!R 7 0 Uat,'Kl!46 0 II]ITU/k PRE COMM OEN 0~0 HAX Scssn PATLU 471 I ot]N OVtrN TIME 24 l,n, -. 30 TRANs ~ Loss  % 0~o

~

) t (x

s i

'll?C lttTEHI'tiGn otvY OH ttlNE NILE POIIIT rIUCLE:AR UNlT rlo ~ 2 ENERGY <<AIIAGEt!ENT ASSOCIATESt IIIC E ]3o I TE<< tlo ~ k 32V ~ 1 tu) REPT 9 ttPTION 1 SUBPEPORT 1 05/13/83 aaooo4ooaaOEIIERAT]rvvt VIIITS CHARACTERISTICS oooooooaao oaoao tthVEtvS aaooo CAPACITY RELIABILITY "r!EAT RATE <<<<<<<<<<<<<<<<<<<<<<FUEL<<<<<<<<<<<<<<<<<<<< ]COAL "-"-- COST"---

@it BTU/KtvH TYPE lt]N% TOT%  %/YH COHPn IY . 2 Pt?E:th 7 1 ]982 tolN 386 fOR t' ~ 6 HR FAC I ~ 00 HANVLI NO 0~0 6~0 AREA ]5 CO':inY ] ]982 ."I AX 1!81 FOR I 0~0 AI'R 1 10843 STRT UP tIATGASD 0 LEAS]rIO 0 0~0 UNIT TYPF F 'vAT Jau ]985 EHERO 928 IiOR 0~0 ACCTO O SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0~0 VAR O<H 0~0 6 '

RESERVE S itET <<AY ] ?9t3 CAP ] 386 AVL ] 0~0 It!R 1 8702 FUEL I RES 0 ~ 30 UtILti 0 ~ 0100 ~ 0 FIXED Ottt]2]6]5 6 '

100 ~ 0 tin Y ] ]98] CAP 2 550 AVL 2 0 ' IPR 2 8803 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0~0 SALE AOD 0 0~0 CAP 3 715 AVL 3 0 ~ il IHR 3 8909 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0 ~ 0 HAINT 0 PR]0!? I TY 0 CYCLE 29 CAP 4 881 AVL 4 0 ' ]HR 4 8909 FUFL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0 ~ 0 OVERHAUL 0 PENALTY ]vJvt VOS]T]otv 2 CAP 5 928 AVL 5 91 ~ 5 IIIR 5 88b3 HEAT RATE FACTOR l,oo SPN IINT 0 HATUI? ItvQ 0 0 t REOtILt>CY 52 CAP 6 0 AVL 6 0~0 IHR 6 0 sTRT-ur 4eoo HBTU HUST Hurt t)EV ] AT I O'I 5 CAP 1 0 AVL 7 0 ' IHR 7 0 BANKING 0 HBTU/H PRE COHH GEN 0~0 HAX SCHIt c RATE,O 881 ttlN OONN TINE 24 I ~ Ov t 31 TRANS'OSS  % 0~0 oooaa <<STitv]>> aoaoo CAPACITY RELIABILITY "HEAT RATE <<<<<<<<<<<<f UfL<<<<<<<<<<<<<<<<<<<<<<<< <<<<<<<<<<<<<<COS f<<<<<<<<<<<<<<<<<<

t<M BTIJ/Kt!H TYPE HIN% TGT%  %/YH l

Cohrn iY 2

]5 Pit E JAN 1985 ttIN 36 FOR t4 Bv9 HR FAC 1+00 HANOLItlG 0 ~ 0 6 '

AREA Citt t Jhit 1 )985 HA X 146 FOR I 0~0 AHR 1 le394 STRT UP OIS OILD 100 ~ 0 LEASING 0 0~0 UN]T TYPE. F <<n T Jhii 1 ]985 EHERG 149 I.IOR 0~0 ACCTO 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ o,o o.o VAR OtH 0~0 6 '

'. C RESERVE S !IET ul'.c 1 ]998 CAP 1 36 avL ] ].e ltlR I 10061 FUEL 1 RE S 0 ~ 30 UtILH 0 ~ 0100 ~ 0 FIXEO 0<tt 23659 6.0

]IIOv0 h H JAN  ? ]984 CAP 2 73 AVL 2 4' IttR 2 10294 FUFL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 SALE AOO 0 0~0 CAP 3 113 AVL 3 23 ' ]HR 3 10548 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 HA INT 0 PRIORI TY 0 CYCLE 9 CAP 4 139 AVL 4 12 ~ 9 IftR 4 ]0929 FUFL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 OVERHAUL 0 PENALTY 1.00 POS]T]ON 5 CAP 5 149 AVL 5 48 F 4 IHR 5 ]o929 HEAT RATE FACTOR I ~ 00 SPN tvNT 0 HATURltvG 0 ~ Il f v'EOIIEv ICY 52 CAP 6 0 AVL 6 0~0 It!R 6 0 STRT<<UP 1450 HBTU Qv HUST I:o'I IIEYI;iT lott 5 CAP 7 0 AVL 7 0 ' IHR 7 BANKINO 0 HBTU/H PRE COIIH OE,tl 0~0 ~

),.

I~0~ '-'2 HAX SCttu E RAT EO ]46 ttIN DO~IN TINE TRANS'.OSS %

24 0~0 I

~

)

>4C I>! TEt:in>!>:T>>AY Ot> tflNE HILE F'Olt>T t>UCLLAR Ut>]T MO ~ 2 ENEPGY !>ANAGKt!ENT hSSOCIATES> It>c PAGE 137 I TE ~ >eo F. 32>>el I!>1

~ REPT 9 OPT]0>> 1 SVOREPORT 1 05/13/83 aao"aaaOENERATI>eG UNITS CteARACTERISTICS aoaoaaaoao oaaao aSTnqla 2 aooao <<CAPaCITY<< REL1ABILITY "HEAT RATE a aaaa a<<a<<a<<FUFl a<<a<< a<<a<<<<a<<a<< aaaaaaaaCPSTa aaaaaaea

~ >w OTU/K>IH TYPE Hlt>% TOT%  %/YR COHPA!IY . 2 f'PE J*>J ] 1985 tf IN 36 FOR M 4+i HR FAC 1 ~ 00 HAt>OL I NO 0~0 6 '

AREA 15 C2" Jaif 1 l985 MAX 159 FOR I 0~0 aHR 1 16285 STPT<<UP OIS OILD ]OO.O I.EAS INO 0 0~0 UNIT TY>E F '

/. I Jo> ~

] 1985 EMERG 164 t!OP 0.0 ACCTO 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0 ~ 0 VAR OeM Qeo 6 '

RKSERVE S 8>. T I>EC 1 l99>> CAP ] 36 DVL 1 0~0 ]HR 1 9814 FUEL ] PES 0 ~ 3D UNL"! 0 ']ooeo FIXED OeH 25867 6 '

1!>0 ~ 0 ci e! JA!> ) 1984 CAP 2 76 AVL 2 4 ' IHR 2 9916 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 SALE ADD 0 Qeo CAP 3 117 AVL 3 17 ~ 3 IHR 3 ]0289 FUEL 3 ~ e ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ oeo 0 ~ 0 >IA It>T 0 PRIORI TY 0 CYCLE 5 CAP 4 1S9 AVL 4 28 ' IHR 4 ]0909 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 OVERHAUL 0 PENALTY ]AC!> POSITIG!! 5 CAP 5 164 AVL 5 44 ' IHR 5 10909 IIEAT RATE FACTOR 1 ~ 00 SPN MNT 0 HATUF!ING oen F hi.!>iIE>'C Y 52 CAP 6 0 AVL 6 0~0 IHR 6 0 STRT UP 1450 Hf>TU MUST Ru i E >>EV]AY]ui> 5 CAP 7 0 AVL 7 0~0 If>R 7 0 >fA>IKING 0 HBTU/H PRE COHH GEN Qeo HAX SC>'!!> E RATED 159 HIN DowN TIHE 24 I ~ De w 33 TRANS'OSS 0~0 oaaao ASTI>gin 3 aaaoa CAPACITY RELI AGILITY "HEAT RATC aa aaaaaiiaaFUFL<<a<<a<<a<<a<<a<<a<<a <<a aaa CQSTaa a<<a<< a

!lie 8TU/KHH TYPF. MIN% TOT%  %/YR Co>ePAiIY  ? PPF. Jhif l985 HIN 79 FOR I! ]l0 30

~ HR FAC 1 ~ 00 Hat>DL ]NO Q.O beO AREa 15 CO>: Jni> ] 1985 MAX 340 FOR I ~ >>HR I 13881 STRT<<UP DIS OILD 100 ~ 0 LEASINO 0 0~0 UN I T 7 Y I'E F JAN ] 1985 Et>ERG 386 f'R 0~0 ACCTG 0 SUPP ~ ~ ~ ~ ~ ~ ~ e Qeo Qeo VAR OeH 0~0 6 '

RESERVE. S >'ET uEC ZQQ3 CAP 1 79 AVL 1 0~4 If>R 1 8970 FUFL 1 RES 0 ~ 3D UFILH Q~ 0100 ~ 0 f'IXED OeH 59149 6 '

100 ~ !> t> JA!I 1 l984 CAP 2 ]59 AVL 2 3 ' IHR 2 9082 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0 ~ 0 SALE ADD 0 Qeo CAP 3 249 AVL 3 6 ' IHR 3 9514 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ 'e ~ ~ 0~0 0~0 HA TNT 0 PRIORI TY 0 CYCI.E 7 CAP 4 340 AVL 4 ]S.O lf!R 4 9979 FUEI. 4 e ~ ~ ee ~ ~ e ~ ~ ~ ~ Qeo 0~0 OVERHAUL 0 PENALTY 1 e 00 P.>S I T los 5 CAP 5 386 AVL 5 63 ' IHR 5 10091 IIEAT RATE FAcToR ].oo SPN t'NT 0 NATU>tr << 0.0 I REauE>iCY 52 CAP 6 0 AVL 6 0' IHR 6 STI>T UP 4SOQ HUTU MUST iiur>  !'> OEV I A I ] ON 5 CAP 7 0 AVL 7 0 ~ 0 IHR 7 0 BAIIKINO O HGTU/ti PRK COMM GE!i Qeo MAX SC> 34 TRANS'OSS 0~0

~

lkc Ir:TK??1?OGATO~Y?!rr NINE MILK PolNT r~ucLEAR Ut!IT rl0,2 Et!E1?GY !4atiAGEHENT ASSr!CIATESr ltlC E ]3!r lrr- l ~ lr're E 3?Oil rO] REpT 9 ilpT]otr 1 sUBPtpORT 05/13/83 oaooooaaooGFNEHATING UNITS CHAHACIERISTICS aoano ESTOP]n 4 oaooa cApaciTY HEL I/OIL]TY -llEAT RATE" <<a<<ae e aa FUEL<<aa aaa a<<<<a<<a <<<<<<<<<<<<<<<<COST<<<<<<<<<<<<<<<<>>

!iV BTU/Krrk TYPE Mltl% TAT%  %/'Yk COHPA!!Y 2 PRE ]985 HIN 71 FOR tl 6~8 HR FAC I ~ 00 HANDLINO 0~0 6~0 AREA 15 Cori Jri< ] l985 HAX 358 FOR I 0~0 AHR 1 13350 STRT<<UP DIS OILD 100 ~ 0 LEASING 0 0~P UW]l TYPE F f <<r 19,5 EHKPG 387 Mor: O.o ACCTG 0 SUPP ~ ~ ~ ~ e ~ ~ ~ 0 ~ 0 0~0 VAH ooli 0~0 6 '

RESERVE'c S i!KT OKC 1 20ne CAP I 1] AVL I 0~0 IHR 1 8660 FUEL 1 RKS 0 'D UNLtl 0 ~ 0100 ~ 0 1'IXKD Otk 61049 6~0 100.0 Jhi< I I '984 CAP 2 166 AVL 2 4 ' IHR 2 9237 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~0 0~0 SALK ADD 0 0~0 CAP 3 262 DVL 3 14 ~ 8 IHR 3 9485 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 t?AINT 0 PRIOH11Y 0 CYCLE CAP 4 358 AVL 4 23r4 IHR 4 lo]61 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0 ' OVERHAUL 0 PE!lALTr P~15 I T I oil 5 CAP 5 387 AVL 5 50 ' IMR 5 lo]e] HEAT HATE FACT0R I ~ 00 SPN HNT 0 HATUr?ING 0 ~ 0 Fi?E(lUtr:CY 52 CAP 6 0 AVl. 6 0~0 IHR 6 0 STRT UP 2000 MBTU HOST RUil ri OEvlaTloh 5 CAP 7 0 AVl. 7 0~0 It?R 7 0 BANK]hO 0 MBTU/H PRE CO!r!4 OEN 0~0 HAX SCHO F. RATED 358 MIN DoirN TIME 24

]ID' 35 THliNS ~ LOSS 0~P oooaa ASTOt?Ia 5 oaooo CAPACITY RELIABILITY <<HEAT RaTE.- a aaaeaaaaa FUEL<< <<a<<aea<<aaaaa aaaaa<<aaCPST<<aaaaeaaa MH BTU/Ktrk TYPE HIM% TGT%  %/YR COMPAi'Y 2 Pi?E. J/!N 1 1985 rdIN 71 FOH t? 10 ~ 9 HR FAC ] F 00 HANDL]NG Ooo 6~0 AREA 15 COr! Jaii 1985 MAX 333 FOR I 0~0 AHR 1 13434 STRT UP DIS GILD 100 ~ 0 LEASING 0 0~0 UWI 7 tYPE Mii I J>rr 1985 Et!ERG 395 t!OR Oi 0 ACCTO SUPP 0 0 VAR OaH 0~0 6 '

]Ou.u S

I'ESFHVE l'KT A "0 DEC JAN 1 2007

]934 CAP 1 CAP 2 71 157 AVL 1 AVL 2 0~0 6,7 IHH

]HR 1

2 8814 9284 FUEL 1 RES 0 FUEL 2

'0

~ ~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

0~0 UNLM 0 ~ 0100 0~0 0

~

~ 0

~ 0 FIXED Otk 57891 SALE AOO 0 e.o Ooo CAP 3 245 AVL 3 ]F 1 IHR 3 9755 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0 ~ 0 r'AINT 0 PRIORI 1Y CYCLE 9 CAP 4 333 AVL 4 ]9e7 . IHR 4 10225 FUEL 4 ~ ~ ~ ~ ~ ~ a ~ ~ ~ ~ ~ 0~0 0 ~ 0 OVERHAUL 0 PENALTY ].n~ POS l T Ioi? 5 CAP 5 395 AVL 5 46 ' ]HR 5 10342 HEAT RATE FACTOR 1 ~ 00 SPN MNT 0 HAT?rR]rro O,n 1 REQirtr'!CY 52 CAP 6 0 AVL 6 0~0 ]MR 6 U STRT UP 911 HBTU MUST Hu'r Oc V I "T lair 5 CAP 7 0 AVL 7 0~n IHR 7 0 BANKING O t48TU/tr PRE COMM OEN 0 ~ 0 HAX SCPO L RATED 333 Mitt DO>'N TIME 24 Iro. o 3e TRANS'OSS  % 0 ~ 0

, C'

t'RC 1<<f Et<RnIIATIIoIY Otl Nll<E NILE POIttf tlUCLEAR UIIIT IIO ~ 2 ENERGY IIANAGEHEtIT ASSOC147ES) ltIC PAGE 139 l 74:I I'0 ~ 8 320 ~ I lIIl REPT 9 OPTIOrl 1 SUBPEPORT 1 05/13/83 aaaGEIvERAf 1<<G UtIITS CoIARACTEPISTICS aoaaooooao aaooa EAS'f Pet 5 oooao CAt DCITY RELIABILITY l",EAT RATE a e a e<<a <<FUEL<<a<<<<a<<<<aa ea<< aa eaaa<<COS fa<<<<<<<<a<<a<<

RTU/KWH TYPE ttltt4 Tof~  %/YH COI4P ANY ~ 2 P:IE Jtfi 1 1995 t41N 37 FOP. H 14 ~ 4 HR FAC 1 ~ 00 tlANOLING o.o 6.o AREA 15 Cuv JAI I 1 1905 HAA 125 FOR I 0~0 AHR 1 13800 STRT UP RES 0 'D loo,n LEASING 0 0 ~ 0 C' UNIT TYPE F >>AT I 19tf5 EIIEfto 137 HOR O.O ACCTG 0 SUPP ~ ~ ~ ~ ~ ~ e ~ 0~0 oeo VAR 0 ~ 0 6 '

RESFRVE S UEfo 1 f997 CAP 1 37 AVL 1 7eo IHR 1 138OO FUEL 1 RES 0 'D UNl.H 0 ~ 0100 ~ 0 OeI'IXED OoH 25225 6 '

100 ~ J >> Jot( l984 CAP 2 66 AVL 2 4 ' IflR 2 13800 FUEL 2 oe ~ ~ e ~ ~ ~ ~ o ~ ~ 0~0 0~0 SALE ADO 0 0~0 CAP 3 95 tVL 3 22el IHR 3 13800 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ e ~ o 0 ~ 0 0~0 HA INT 0 PRIOR I TV u CYCLE 10 CAP 4 125 AVL 4 26e8 IHR 4 13800 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0~0 OVERHAUL 0 PENALTY 1 ~ 'lti pus1 710<< 5 CAP 5 137 AVL 5 25.1 Il;R 5 13800 HEAT RATE FACTOR 1 ~ 00 SPH toNT 0 ll I4AfttglN<i 0 0 FAEOUEI CY 52 CAP 6 0 AVL 6 0 ~ 0 IHR 6 o STRT UP 1200 HBTU HUST RU 4

~

I'.EV I of I not 5 CAP 7 0 AYL 7 o.o IHR 7 0 BANKING 0 HLITU/H PRE.<<COIoH Gtt4 0 '

HAX SCHlo 2 RATED 125 MIN DOWN TlloE l.  ?

I ~ Do ". 37 TRANS'OSS 5 0~0 llew oaooo EAST PV 6 oaooo "CAPACITY RELIABILITY HEAT RATE aa<<a eeaeaaa<<FUEL<<<<<<a<<aa<<e<<a<<<< a<<<<<<a<<<<<<COST<<eeeaeeae tttf BTU/KtIH TYPE flltf% TOTS  %/YR Cot 1PAtIY 2 PRE JA<< I 1985 HIN 37 FOR fc 8 ' HR FAC 1 ~ o0 HANDLlllo 0~0 6 '

AREA 15 CO>> JAN 1 1995 HAX 120 FOR I 0~0 AflR 1 13800 S'f RT<<UP HES 0 ~ 30 100 ' LEASING 0 Ooo 6 '

UNIT TYPE F I'AT JA I 1 1995 ElIERG 137 POR 0~0 ACCTG 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0~0 VAR 0~0 RESERvE S foET UEC 1 1997 CAP I 37 AVL I 17 ' ItIR I 13800 FUEL 1 PES 0 ~ 3D UNLH 0 ~ 0100 ~ 0 Oot'IXED OtH 24275 6 '

'4 100 ' A " J'Il I 1984 CAP 2 63 AVL 2 7.7 IotR 2 13800 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0~0 SALE AOO 0 0~0 CAP 3 91 AYL 3 1 IlIR 3 13800 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0~0 HAINT 0 PRIORITY PENALTY 1 'O 0 CvCLE PJS t 'f I G<<

ll CAP 4 CAP 5 120 137 AVL AVL 4 11 5 43 '

' ItIR 4 13800 IHP, 5 13800 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~

HEAT RATE FACTOR F 00

~ ~ ~ ~ 0 ~ 0 0~0 OYERHAUL SPN I'NT 0

0 HATURIIVG 0 ~ 0 FHEituh.l'CY 52 CAP 6 0 AVL 6 0 ~ 0 ItIR 6 0 STRT UP 1200 otftTU HUST RU:o DEVI 'IT IO'I 5 CAP 7 0 AVL 7 0 ~ 0 IHR 7 0 BA IKItlG 0 l4ftTU/H PRE CUI4I4 GEN 0 ~ 0 HAX SCHO F. RATt.D 12O I41N OO~N 71148 24 I ~ D ~ c 30 'fRANS ~ LOSS 0~0

I

'tc I'ttEit>> eb:1ORY Ut" NlteE t']LE PO]tiT NUCLEak Uti]T tiO ~ 2 ENEPGY>>AttAGEHENT ASSOCIATESt lt:C 140 ITf tt eiOe F. 320 ~ 1 l>>) REPT 9 OPTIOtt 1 SttBREPORT 05/]3/83

>>oaaoaoaoGEttERATI>>G t!NITS cital?ACTEP ISTICS oaaooaoooo oaooo E4ST aoaoo CAPieCI TY REL lnBILITY -PEAT RATE" >> ~<~~~~~ FUELS ~awaa~aa aaa wmaw~~~cos T leg 8 7 I I/Ktt H TYPF'IN% TOT%  %/YR COHPA'ly ~ 2 PRE Ja t ] 1985 HI>> 75 FOtt tt tte2 HR FAC ] F 00 HAttDL It>G OeO 6.0 AREA 15 C'!>> Jail I ) 9A5 HaX ]66 FOP I 0 ' AttR 1 13264 S'lRT UP RES 0 ~ 3D 100 ~ 0 LEASING 0 0~0 UN]T TYI'E 'i41 J! N 1 19t15 FliERG 175 I:Ott 0 0

~ AccTG SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0,0 0~0 VAR Oek Oen 6 '

RESERVE S ~ iET uEC 1 2000 CAP 1 75 AVL 1 7 ' IHR ] 9771 FUEL 1 RES 0 ~ 3D U!ILt< 0 ~ 0100 ~ 0 FIXED Oett 31996 6~ 0 100 ~ 0 JA>> 1 1984 CAP 2 ]Ob AVL 2 4 ' IHR 2 9891 FUEL 2 ~ e ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 SALE ADD 0 0' CAP 3 136 AVL 3 13 ~ 5 IHR 3 10012 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 neO t tAlttT 0 PRIOR]TY u CYCLF. 12 CAP 4 166 AVL 4 Bek ]HR 4 1049'4 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ e ~ ~ ~ 0~0 0~0 OVERHAUI. 0 PENALTY 1 ~ Ov PCS] 7 [Ole 5 CAP 5 175 AVL 5 57 ' IPP 5 ]0494 ttEAT RATE FACTOR 1.00 SPN VNT 0 HATURltlb:te0 F4F.OUE"CY 5? CaP 6 0 AVL 6 0~0 IHR 6 STPT UP 1350 >>BTU HUST PU!t f. >>EV]AT]Os' CAP 7 0 AVL 7 Oeu IHR 7 84!!KING 0 HBTU/H PRE~CONN GEN 0~0 HAX SCHO E RATED 166 DO@et TINE 24 I'D' 39 TRANS'OSS  % 0 ~ 0 o"aoo ittiVE>>S aoooa CAPACITY- RELIABILII Y "HEAT RATE- wesewwee wmFUELam~wmam~aaaeaa COST BTU/KWH TYPF. HIN% TOT%  %/Yk COHPaity 2 PRE Jatt 1 1985 HIN 144 FOR H 5 ' HR FAC le00 HAt'lDL]NG 0 ' 6 '

AREA 15 Cbtt 19e5 HAX 375 FOR I 0~0 AHR ] ))714 STRT UP NATGASD 100 ~ 0 LF as ING 0 0 ~ 0 UNI I T'yPf F >>4 T Jhti ] 1985 EHERG 390 t OP Oe0 SUPP 0,0 OeO VAR Ook 0~0 6' RESERVF. S 100 ~ b Rt.T ie UFC Jale 1 2008 19l!4 CAP 1 CAP 2 144 220 AVL )

hVL 2 0

3

~

0 ACCTG IHR 1 IHR 2 876]

8869 FUEt 1 FUEL 2 RES 0 '0

~ ~ ~ ~ ~ ~ ~ ~

UNLH 0 e ~ e ~ ~ ~ ~ ~ ~ ~ ~ ~

']00 '

0~0 0 0

~

FIXED Oek 51120 SALE. AOD 0 6 ~ t]

0~0 CAP 3 298 AVL 3 15e2 IHR 3 9315 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0' >>AINT 0 PRIORITY 0 CTCLF 17 CAP 4 375 AVL 4 6' IttR 4 9958 FUFL 4 ~ ~ ~ ~ ~ ~ ~ ~ e ~ ~ ~ 0~0 0~0 OVERHAUL 0 PENALTY ],00 Pvs I T IO.! 5 CAP 5 390 AVL 5 69 ' IPR 5 10172 HEAT tthTE FACTOtt 1.00 SPN HNT 0 HATUk1>>b 0 ~ 0 Ft t'.O>>Ee.'y 52 CAP 6 0 AVL 6 0~0 lttR 6 STRT UP 2000 ttBTU

(. HUST RU I OE~'ll I'1 )( 5 CAP 7 0 AVL 7 0~0 IHR 7 BAttklrtG 0 HBTU/H PRE CQHH GEN 0 ~ 0 HAX SC>i>> RATED 375 >>]N DOttN T]t E 24 I~D~ o TRAteS ~ LOSS % 0~0

PC IJTEI.RGGA1ORY On NINE MILK POINT NUCLE.AR UNIT NO.2 ENEPGY t'Al!AGE!!FNT ASSOCIATES t INC PAGE 141 ITEM nti E 320 ~ 1 IU) REPT et OPTION 1 St)BRKPORT I 05/13/83 ooaoooooooGENERAT I!<G Ule)TS CIIAPACTKR]ST ICS RRRP'Roooao poooa IcAVfns aoooo CAPAC)TY I!KLIAOIL]TY HEAT RATE <<>><<<<>><<<<<<<<e FUFL<<<<<<<<<<<<<<<<<<<<<<<<<<<< <<COST>>

OTU/Kt!H TYPf: IOItl% TOT%  %/YH CotipaiiY 2 I'RF, JAN 1 1985 I1 )H 1 44 FOR M 4~8 HR FAC ]ooo IIAtettLlNG 0 ~ 0 6 '

AREA )5 CO~! JAsi ) )985 MAX 375 fOH I 0~0 At!R I 11748 STR7 UP l!ATGASD ]oooo L K AS I I!G 0 0 ~ 0 Utt)T 7 YPK F t'AT JAii ] )985 Kt!ERG 390 t:OR 0~0 ACCTG O SUPP ~ ~ ~ ~ ~ ~ ~ ~ o,o 0.4 VAR OoH 0~0 6 ')

RESERvE s HKT IiKC ) 2008 CAP 1 144 AVL 1 le9 IMR ] 8844 FUF.L 1 IIES 0,3U Utilti 0 ~ 0100 ~ 0 FIXKO OeM 51120 6~0 1 00 e(> A M JAie ) 1904 CAP 2 220 AVL 2 4 ' IHR 2 8953 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 SALE ADD 0 0~0 CAP 3 ?98 AVL 3 22el IMP 3 94o3 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 MAINT 0 PRIORI 7Y 0 CTCLf 16 CAP 4 375 AVL 4 8.5 IHR 4 10052 fUFL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 OVKI!HAUL 0 PENALTY 1 VOS)T)oi. CAP 5 390 AVL 5 58 ' IHR 5 ]0268 tlEA7 HATE FACTOR ]eoO SPN MNT 0 HA) Uto I t lo 9 ~ 0 I)LOOK<!CY 52 CAP 6 0 AVI. 6 0~0 II!P. 6 0 S7RT i!P 2000 MBTI!

MUST PU! I 6 I!Evl'T)on 5 CAP 7 u AVL 7 0~0 ]MR 7 0 RAhKING 0 t!BTU/H PRE CotlH GEN 0~0 HAX SCM!i E RATED 375 Mitt Do'ttN TIME 24 I~0~ - 41 TRANS'OSS  % 0 ~ 0

]<~it)At oaoo1 <<CAPACITY<< RELIABILITY "HEAT RkjTK" <<<<<<<<<<<<<<<<<<F UFL<<>><<<<<<<<<<<<<<<<<<<<<<<< COST MW BTU/l(!IH TYPE MIN% TOT%  %/'YH COMPAilY 2 PRE JA! 1 I )985 MIN 670 fOR M 13 ~ I HR FAC 1 ~ 00 MAND).ING 0 ~ 0 6 '

AREA 23 CO!1 JAIl 1 1985 MAX 864 FOR I 0~0 AHR 1 13964 STRT UP URANIUtl2 100 ~ 0 LEASING 0 0~0 UNIT TYPE t<<7 JAet 1985 Ei!ERG 864 POP 0~0 ACCTG 0 SUPP 0~ 0 0~0 VAR OeH 0~0 6eo RESERVE S RET JAII 1 210O CAP ] 314 AVL ] 0 ' It!R ] 10400 FUEL 1 URAte]UM2 Ut!LM 0~ 0]00 ' FIXED OeM424884 6eO

]oooo JAe! ]984 CAP 2 491 AVL 2 ]ot) IHR 2 9360 FUEL 2 ~ ~ ~ ~ ~ ~ ~ e ~ ~ ~ o O,o oeo SALK AOD 0 oeo CAP 3 670 AVL 3 16 ~ 5 IMR 3 10400 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0~0 MAINT 0 PR)014) TY CYCLF. 3A CAP 4 849 AVI. 4 32 ' IHR 4 104OO FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0~0 f OV RHAUI. 0 PENALTY ].OV POSIT]O<i 1 CAI' I!64 AVL 5 35e5 It!R 5 10400 HEAT RATE FACTOR 1 ~ 00 SPfl MNT 0 MATURING 0 ' FhKqUEACY 52 CAP 6 0 AVL 6 0~0 IHR 6 0 STRT"UP 2208 MBTU tiUST RUie UEV)17 loti 5 CAP 7 0 AVL 7 0 ' IHR 7 0 HANK]tio 0 MBTU/H PRE COMH GKN 0~0 MAX SCeIO RATEO 864 HIN Dot!N 7]ME 168 I ~D~

." 42 TRAtiS ~ LOSS 0~0 3

i

'c I

]WTEIIIIGGI'LEIIRY Ute TEef Ivtte L 320 ~ 1 fu) tf] tIE t<]LE PO]IIT tIUCLEAK Iftfl7 I'IO ~ ENERGY IfAIIAGEHENT ASSOCIATES RkPT 9 OPT]ut< 1 SIIBREPORT t INC I

GE 05/]3/83 144 ooooooooooGENERATING UtIITS CHARACTEPISTICS oooooooooo ooooo i.ATERSO ] ooooo >>CAPACITY Rkl]AIIILITY -HEAT RATE <<<<<<<<<<<<<<<<<<<<<<<<FUFL<<<<<<<<<<<<<<>><<>><<<<<<<< >> <<<<<<<< COST>><<<<>>>>>>>><<>>

BTU/QIIH TYPE tflN% TOT%  %/YH COKIeAtlY ~ 2 PHF. Jhi I I 1985 tf itv 162 FOR H 18 ~ 6 HR FAC ] F 00 HANDLING o.o eeO AREA ]5 COI'AII ] 1985 HAX 272 FOR I 0~0 AHR 1 15000 STRT UP RES 0 ~ 3D ]00 ~ 0 LEASING 0 0~0 UNIT TYPE F sIAT JW~ 1 1905 EtIEI'G 282 II OR 0~0 accTG o SUPP ~ ~ ~ ~ ~ ~ e ~ 0~0 0~0 VAR OeH O.O 6eI]

RESERVE S MET fvEC ) gvn6 CAP I ]62 AvL 1 0.0 IHR I ]5000 FuEL ] RES 0.3D utILH 0 ~ 0100 ~ 0 FiXED OeH 56794 6eo

]on.n A iI JAI: I f984 CAP 2 163 AVL 2 1 ~ 3 IHR 2 150o0 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 SALE AOD 0 Oet'I CAP 3 216 AVL 3 4,3 IHR 3 ]5000 FUEL 3 ~ ~ ~ ~ ~ ee ~ ~ ~ ~ ~ 0~0 Oen HAINT 0 PRIORI TY 0 CYCLE 2] ChP 4 28? AVL 4 75e8 IHR 4 15000 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ o,o n.n OVERHAUL 0 PENALTY ] ~ Uo t'V>] I IG>> 4 Chp 5 0 AVL 5 0 ' IHR 5 0 tlEA7 Rh TE F'ACTOR I ~ 00 SPIV tINT 0 HATURItlG 0 ~ 0 FREQuEIICY 52 CAP 6 0 AVL 6 O fI IKR 6 0 STR7 UP 885 KBTU HUST RUII OEV]h 7 IQII 5 CAP 7 0 AVL 7 0~0 IHR 7 0 BhtIK IIVG 0 IIBTU/H PRE CotIH GEN 0~0 MAX SCIID E RATE.D 272 KIN Oot'N TIICE 24 Ieoe w 43 TRAIIS ~ lOSS  % 0~0 0 ooooo 59TI; ST ooooo CAPAC17Y RE llA&IL]TY HEAT RATk >><<>><<>><<<<<<<<>>>><<<<FUEL<<<<<<>><<>>>><<<<>>>>>>>>>> <<>><<>><<<<<<<<COST<<<<>><<>>>><<<<>>

Hitl BTU/f:ffH TYPE MIN% TOT%  %/YR COKPAIIY 2 f'flE Jhiv I 1985 KIN 43 FOR el 7 7 HR FAC I ~ 00 I1AtIDLING 0~0 6~0 AREA ]5 COI'AII 1 ]995 HAX 102 FOR I 0~0 AVR 1 14000 STRT VP RES 0 ~ 3D 100 ~ 0 I.EASING 0 0.0 Utf]T TYPE F I'h I JAil 1 1985 EIDER G 102 t>OR 0~0 ACCTG SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0~0 VAR Oetf 0~0 an RESERVE S IIF-T OEC ] 2013 CAP 1 43 AVL I 0~0 ltIR ] 14000 FUEL I RES 0 'D UNLH 0 '100 ' FIXED OeH 13904 6.0

]nnen h H JAPe ] 1984 CAP 2 44 AVL 2 4 ' IVR 2 ]4000 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0~0 SALE AOD 0 0~0 CAP 3 63 AVL 3 39 ' ItI'R 3 14000 FUEI 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~0 0~0 IIAIHT 0 PRIORITY 0 CYCLE 20 CAP 4 82 AVL 4 39 ' ]KR 4 ]4QOO FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~0 0~0 OVERHAUL 0 PEI>ALTY ]eon PoS I T I Otv 5 cAP 5 102 AVL 5 9' lt'R 5 ]4000 I1EAT RATE FACTOR ].OO SPN KNT 0 HA]ua]IIG c.n FPEOOEIICY 52 CAP 6 0 AVL 6 0 ~ 0 IfiR 6 STRT UP 286 tfBTU HUST RU.II DEVI I T IGi'I 5 CAP 7 0 AVL 7 0~0 IHR 7 BAIIKI:IG 0 HBTU/H PRE. COKH GEN 0~0 HAX SCKD E RATED 102 HIN DOIIN TIKE 8 I ~ Oe V 44 TRANS'OSS  % 0~0

I;PC I:TE.:III><eht>I>?Y UN tllNF. r!ILE P<JIiIT tIUCLEI 8 U IIl NO ~ 2 El'IERGY llAIIAGEIIEtT ASSIICIATESr Itic PAGE 144 IT:.'I 0, r. 320.1 1'I)

< REPT 9 OPTION 1 SUPI?Er>ORT I 05/13/83

>oooo<<ooaGErlERATIrIG Ut>l TS CHAt?ACTEPISTICS oaooaoaaaa oaoao 74't>l Sf aaoao CAPACITY P EL ABI I l. I T Y HEA7 RATE a<<r fUEL<< <<e<<<<<<<<a<<a<<<<a <<a<<e aae COST<<eea BTU/tttlh TYPE>>lrl% TOT%  %/YR CO>>P hIIY ~ 2 PRE J 1985 >>I ll Fot? t1 HR FAC I ~ 00 HANDLING 0~0 e.o AREA 15 C?>: I J nfl 1985 >IAX 147 t'OR I 0~0 Al>R I leOOO STR7 UP RES 0 ~ 3D 100 ~ 0 LEASING 0 0 '

Utl17 TYPE <

Ih7 Jh i~

I 1935 El"ERG 147 I<OP 0~0 ACCTG SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0 ~0 0~0 VAR OeH 0~0 6 '

8 F'ESERVE RET t>EC 1 2007 CAP 1 27 AVL 1 0 ~5 ll'R I 160"0 FUEL I RES 0>3D UNLll 0 ~ 0100 ~ 0 FIXFQ Oetl 24917 6 '

100 ~ I> 1984 CAP 2 58 AVL 2 4.6 IHR 2 16000 FUEL 2 e ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 SALE AUD 0 0~0 CAP 3 82 AVL 3 ?8 ' IIIR 3 16000 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 >>AINT 0 PR I OII I IY CYCLE 39 CAP 4 106 AVL 4 33 ' IHR 4 160o0 FUEI. 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 Oeo OVERHAUL 0 PEIIALTY 1 ~ 00 POS I 7 It>>I CAP 5 147 AVL 5 25e3 IPR 5 16000 HEAT R4TE FACTOR 1 ~ 00 SPN HNT 0 HATURING O,C Fl?E lIIFt:CY 52 CAP 6 0 AVL e o,n IIIR 6 STRT"UP 339 tlBTU HUST '?Ul> UE e 1 47 lull 5 CAP 7 0 AVL 7 0 ~ 0 IHR 7 Rar?KING o HBTU/H PRE<<COH>> GEN 0~0 HAX SC>L E RATED 147 HIW DOIIN TIHE 8 a

(i <<5 TRANS'OSS 0~0 gUuSoiI aoooo CAPACITY RELIABILITY <<HEAT RATF<< <<a<<a<<a<<a <<aa<<FUE Laa<<<<a<<a<<ea aa<<aea<<<<COST<<<<<<<<<<<<<<a<<

HM BTU/KItH TYPE HIN% TOT%  %/YH CO>IPAIIY 2 t>>?E Jhr< I 1985 HIN 36 FOR H 39 ' HR FAC I ~ 00 HANDLING o.o e.O AREA 15 CO JAtt 1 1985 HAx 326 FOR I Oeu AHR I 15000 STRT<<UP DIS GILD looeo LEASING 0 0 '

UtllT TYPE F J el? 198S E>IEtr G 346 o,o o.n VAR Oe>> o.o eeo C'aooo RESERVF. S I?AT

? ET DEC 1 2011 CAP I 36 l.lof?

AVL 1 0~0 0~0 ACCTG IHR I ISooo SUPP FUEL 1

~ ~ ~ ~ ~ ~ ~ ~

RES 0 'D Ut>Lte 0 ~ 0100 ~ 0 FIXED OeH 74257 6 '

100 ~ 0 J A>R 2 15000 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0~0 SALE AOO 0 0 '

CAP 3 261 AVL 3 6 ' IHR 3 15000 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ e 0~0 0~0 >>AINT 0

. ~ (' PRIORITY 0 CYCLE 39 CAP 4 340 AVL 4 23 ~ 1 lllR 4 15000 FUEL 4 ~ ~ ~ e ~ ~ ~ ~ ~ e ~ ~ 0 ' 0 ' OVERHAUL 0 PE>>ALTY lenu POS1710:.I 1 CAP 5 380 AVL 5 31 ~ 3 IHR 5 15000 HEAT RATE FACTOR 1 ~ 00 SPN HNT 0 tlATUtrlt>3 0 ~ 0 FR" <IUEI;CY 52 crpe o AVL 6 0~0 IHR e STRT<<UP 1042 HBTll

{> HUST RUII DE r IAT IU I 5 CAP r O AVL 7 0~0 I IIR 7 BANKI>IG 0 >>87U/H PRE<<col'H GEN 0~0 I

Scl 326 >>IN DQIIN TINE I'D'r'6 HA>t D E RATED TRANS'OSS 0~0

?

TE'NTEIJOOGCtuiY intr ttlwE t:ILE PO]t'7 tIUCLECR UrtlT ito. Ef"'EROY 'ANAGENEttT ASSOCIATES t It!C GE 144

] >>r), E 32u,] REPT 9 OPTIOtt I SU&REPORT I 05/13/83 aao oooo aooGE>>ERa 7 ] NG UN] IS CHAI ACTOR I ST ICS oaooaaoaao oaoaa A KILL 7 ] aaoao <<ccPACITY<< REL]AIIILII Y HEAT RATE" <<a<<<<a<<<<aaaFUEL<<aa<<<<a<<<<a<<<<<<aa ]Qual <<aa<<a<<aco'ST<<<<<<aaaaaa BTU/KIJH TYPE IIIN% TOT%  %/YR COIIPh IY 2 t'itt.'U:> Jh:I ] I 9n5 tiIN 8 FOR N 21 ~ 0 HR FAC ] F 00 HANDLING o.o e.o AREA ]5 i!At> ]985 MAX ]8 FOR I 0~u AHR ] 17000 STR7 UP D IS GILD 0 LEASING 0 0 ~ tt UNIT TYPE t Jia 7 Ja>>. i ]9PS EMCP6 ]P. '!tttt Q ~ 0 ACCTG O SUPP ~ ~ ~ ~ ~ ~ e ~ 0 ' 0 ' VAR 0~0 6 '

RESERVE 100.0

!; RcT J>'i Jrnr 2]iio CAP ] 8 cvL I au IHR I 16975 FUEL 1 DIS 0]LO UIILM 0 ~ 0100 ~ 0 0+i'IXED Oan 0 6 '

~>

I ~

]98>4 CcP 2 ]4 AVL 2 0 ~ 0 IHR 2 ]6975 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ OIO 0~0 SALE ADD 0 0~0 CCP 3 ]p AvL 3 79 ' IHR 3 ]6975 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ csee 0~0 0~0 MA INT 0 PRIORITY CYCLF. 19 CcP 0 CVL 4 Oeo IHR 4 0 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 OVERHAUL 0 PErtqiTY ].0 I I'vSI 7IU i 5 CAP 5 0 AVL 5 Qso IHR 5 0 HEAT RATE F'ACTOR I ~ 00 5ptr HNT 0 NATU>t I J.G ~ 0 Fi>ERUE,C Y 52 CCP 6 n AVL 6 0.0 IMR 6 STRT UP 8 HRTU HUS7 Ruit E UEY]AT]OI > CA>P 7 0 AVL 7 0 ~ 0 IMR 7 0 BANKING 0 HBTU/H PRE'OMM GEN 0~0 HAX SCr!0 c. RATED 18 t! IH DOIIN 7]ME 2 I'D' 4I TRAINS ~ ].OSS  % 0 ~ 0 aoaaa ASTOR 7 aaaaa CAPACITY REL I AB IL I T Y HEAT RATE <<<<<<<<<<a<<<<a<<a<<<<FUELa<<<<a<<<<a<<<<aaa<<<< COST BTU/Kt!H TYPE Hlti% TOT%  %/YR ARE'5 CO IPAIIY t>itE c(i> i JAt"'

JAIi

]985 MIN FOR M 2] HP. FAC ]+00 HANDLING 0 ~ 0 6 '

] 1985 HAX 18 FOR I 0 ~ 0 AHR I 175o0 STRT UP DIS GILD 100 ~ 0 LEASINO 0 0~0 UNI T I Yl'E Iia 7 JC>i ] ]985 EMERG 18 MOR 0.0 ACCTG SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0 ~ 0 VAR 0+H 0~0 6eo RESF IIVE 4 MET i

Jar J-"I I z]no CAP I 8 I 9 ' 'VL IMR I 17497 F'UEL 1 DIS GILD UNLM 0 ~ 0100 ~ 0 flXED OAM 0 6 '

]OQ ~ It ] 1984 CCP 2 15 AVL 2 0 0

~ IMR 2 174>> FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0 ~ 0 SALE ADD 0 oeO CCP 3 18 AVL 3 70 ' IHR 3 17497 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ a ~ ~ ~ 0~0 0 ~ 0 MA IttT 0 PRIORITY CYCLE 35 CCP 4 AVL 4 0' IHR 4 0 FUEL 4 ~ a ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0 ~ 0 OVFRHAUL 0 PEIIALTY 1 Ou POSIT]QN 5 CCP 5 0 AVt.5 0 o IHR 5 nEAT RATE FACTOR 1.00 SPN NNT 0 HATUIlt!I'I i!stl F itf.,)UE,r JCY 52 CAP 6 0 AVL 6 0~0 ]HR 6 STRT UP 8 t!87lt MUST RU>ii HAX SCHt uEY]AT IO: ~ 5 CAP 7 AVL 7 0~o IHR 7 U Bht!K I JIG 0 MBTU/H PRE<<COMM GEN 0 '

E RATED 16 HIN DOWN TIME 2 I ~ Os" 4t TRANS'OSS  % 0 ~ b Q)

ltRC It>TE>Ht>3sf470fIY Ulf NlhlE ll]LE PO]t!T tlUCLEAR Uttl T ttoe2 ENEf!GY t',AttAGEt!Etll ASSOCIATESt Itic pAGE ,]45 ITE>> r!Q. f'. 320.1 I>l) f!EPT 9 OPT ION 1 Sttt!REPORT 1 O5/13/83 aaaaoaaaoaOEttEttATING Ut! ITS CHAttACTEtt]STICS aaaooooaoo aaaaa ASTO/ 7 24 ooooa CAPAC]TY I FE.L AB ILI T Y t!EAT RATE <<>>>>>>>>>>>>>><<>>FUEL<<e>>>>>>>><<>>>>>>>>>>>>>> >>>>>>>>>>>>>>>>cos7>>>>>>>>>>>><<>>>>

Ht> BTU/KftH T'TPF. !41tt% TOT%  %/YR COHPAt!Y ~

2 Pt!E, JAr> 1985 Hilt t'X 305 FOR tt 21 ~ 0 HR FAC leon HANOI.1ttO 0~0 6 '

AREA 15 Cot'kt> I ]985 552 FOR I 0~0 AHR 1 14000 STf 7<<UP nls OILO ]00 ~ 0 LEASINO 0 0~0 UNIT TYPE 7 ts>t T JAN 1 ]9>t5 EI!Ef ) 4 >! Jer> 1984 CAP 7 368 AVL 2 0' IHR 2 13991 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ O.O neO SALE AOO 0 0~0 CAP 3 438 AVL 3 0~0 IfiR 3 13991 FUEl 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ e ~ 0~0 0~0 '! A I NT 0 PR]0817 Y CYCLE 35 CAP 4 506 AVL 4 17 ~ 4 IHR 4 13991 FUEL 4 e ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 OVERHAUL 0 PE'!ALT Y I ~ no P>tS I 7 IGtt 1 CAP 5 552 AVL 5 6] ~ 6 If R 5 13991 BEAT RATE FAC70R 1 ~ 00 SPN ttNT 0 MATURI!to 0 ~ 0 f RERUEi:CY 52 .CAP 6 0 WVL 6 O 0 lf!R 6 0 STRT UP 234 f>BTU HUST RUrl l!EV 1 AT IO!I CAP 7 0 AVL 7 Oeo IHR 7 0 BAHKlrlG 0 HBTU/H PRE>>CUt!M OEN 0 ~ 0 flAX SCHlt E RATF!) 552 HIN OOWN 7]ME 2 I eo ~ >t 49 TRAtlS ~ LOSS  % 0~0 aaooa ASTOR 7 5q oaaao <<CAPAC IT'f>> REI.I4.!t]LI TY HEAT RATE >>>>>>>>>>>>>>>>>>FUEL>><<>>>><<>>>>>>>><<>><<<<>> <<<<<<>>COST H ll

!  %/YR BTU/KI!H 7'TPE MIN% TOT%

CO>ep At!Y 2 PRE Jl t ~ 1985 le I tt 12 FOR tt 2] ~ 0 HR FAC 1 ~ 00 HANot.l>>o o.o e.o JAll I STRT Up 0]S OILO s

AREA CO>> 1 1985 MAX 57 FOR 0~0 AHR I 17533 100 ~ 0 I.EAST!tO 0 0~0 UNIT TYPE T t:t>7 JAts 1 1985 El'ERG 57 ttOR 0~0 ACCTG 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 VAR OeH 0 ' 6~0 C' RESERVE 't ET Jeil 1 z]oo CAP 1 12 Avl 1 o,o IHR ] 17500 FUEL 1 OIS OllO UNlfl 0 ~ 0100 ~ 0 FIXEO Otf! 0 6~0 100 ~ 0 Jr tl 1 l984 CAP 2 24 AVL 2 0 ' ]HR 2 ]7500 FUEl 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 SALE AUO 0 0~0 CAP 3 36 AVL 3 0~0 IHR 3 17500 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 NAIF!T 0 C PR]ORITY CYCLE 35 CAP 4 48 AVL 4 17 ' IHR 4 ]7500 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0,0 oeo OVERHAUL 0 PENALTY 1 ~ QQ POS 17 10> I 2 CAP 5 57 AVL 5 61 ' IHR 5 ]7500 ftEAT HATE FACTOR 1 ~ 00 SPtl t>NT g, MAT>JRlr>O 0.0 F t7E 7t!E!!CY 52 cAp e o AVI. e o.o IflR 6 0 STRT UP 36 HBTU MUST >It!<< OEV I <710>I 5 CAP 7 0 AVl 7 0~0 IHR 7 Q BAt!KING 0 HBTU/H PRE COHH OEN 0~0 HAX Sctttt RATEO 57 HIN 00!tH 'TIME i?

I ~ Oe TRANS'OSS  % 0~0 C

, 0

I:HC I:;TtitrGGATOHY VII NII'IK BILK PV]t'7 IIUCLEAR UNIT llo, EI>ERGY I'AHAGEt'.ENT ASSOCI ATES t INC GE 140 ITE<l >'IG ~ E 320 ~ 1 IV) REPT 9 OPT IOtl 1 SUBREPORT 1 05/]3/83

!I ooooooaooaGENEHATII'G UN ITS CtlAHACTEPISTICS ooohoooooa I

44444 I ll 44444 CAVACITY HE.LIAb]LITY <<<<<<<<<<<<<e<<f UEL<<<<<<<<<<<<<<<<<<<<<<<<<<<< ---COS T---<<-

>>>STOI! IIEAT HATE IC!!> BTU/Kt<H TYPE HIN% TOT%  %/YH COt<PAIIY ~

2 P>? 8 JA I I 1985 tt it! 24 f'R t; 4~4 HR FAC ]r00 HANDLING 0 6 '

AREA ]5 C JH J>) lt l985 t!AX 47 FOR I 0 ' AIIR I ]7471 STRT<<UP OIS GILD 100 ~ 0 LEASING 0 0 '

6' 1

Util T TYPE 7 <!AT Jh!< 1985 ERE PG 47 PQP 0 ' ACCTG 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0 ' VAH 0+)4 0 RESEHVt: C HKT JA'I 1 Z]n0 CAP 1 24 AVL ] 33 ' IHR I 17498 FUEL ] OIS GILD Util.tl 0 ~ 0]00 ~ 0 FIXED 0tH 0 6' 100 h:< Jht! 1984 Chp 2 47 AVL 2 62,4 IIIR 2 17498 FUEL 2 re 0 ' 0' SALE ADO 0 0 '

PR lOH]TY

~ I>

CYCLE 1

35 CAP CAP 3

0 0 AVL AVL 3 0 '

IHR IHR 3,'.

4,' 0 FUEL FUEL 3

4

~ ~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~

~ ~

~ ~ ~ ~ Q~

0~0 0 0' 0'

IIAII>IT OVERHAUL 0

0 V 4 4 0 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

PEtlAL TY ].0!! POSIT ]Vt! 3 CAP 5 0 AVL 5 0 0 IHR 5 J 0 HEA7 RATE FAC70H ] F 00 SPN HNT 0 HATUR]I:G 0<0 f I?EOUE ICY 52 CAP 6 0 AVL 6 0 ' IIIR 6 0 STPT UP 21 MBTU HUST P.Ult K ufVIATIO!4 5 CAP 7 0 AVL 7 0 ' IHR 7 II Bht!KING 0 HBTU/H PRE CVHH GEN t<IN 00)IN 0 ~ 0 HAA SC<IV RATED 47 7 IHE I ~ Ot à 51 TRANS'OSS  % 0 '

44444 ASTOR T ]3 44444 CAPACITY REL IABILI T Y HEAT RATE <<<<<<<<<<<<<<<<<<<<f UEL<<<<<<<<<<<<<<<<<<<<<<<<<<<< <<<<<<<<<<<<<<<<COST<<<<<<<<<<<<<<<<<<

BTU/V) H TYPE HIN% TOT%  %/'YH

C COHPANY 2 PRE Jh<I Jh<I

]985 to1N HH 25 FOP t'1 ~ 0 HR FAC I ~ 00 HANDLING 0~0 6 '

AREA 15 CVt! ] 1985 I<AX 48 FOR I 0~0 AHR ] 17471 STRT<<UP OIS OILD 100 ~ 0 LEASING 0 0 UtllT TYPE 7 t!AT JA" I 1985 EtIE.HG 48 I'IOR 0~0 ACCTG 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0 ' VAR 0+H 0 ' 6 '

RESERVE 0 HET Jot! I 2100 CAP I 25 AVL ] 25 ' IltR I 17498 FUEL 1 DIS GILD UNLH 0 ~ 0100 ~ 0 F]XEO Ott! 0 6 '

]OO.O A ri J>' i 1984 CAP 2 48 AVL 2 53 F 4 IHR 2 17498 F<JKL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0 ' SALE ADO 0 0 '

CAP 3 0 AVL 3 0 ' ltlR 3 0 FUFL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0 ' tIA]NT 0 PRIG>? I [Y 0 CYCLE 35 CAP 4 0 C VL 4 0.0 IHR 4 0 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0 ' OVERHAUL 0 Pft!ALTV ].OO PVSI 7]0<> 4 CAP 5 0 AVL 5 0' It!R 5 0 HEAT RATE FACTOR 1 ~ 00 SPN t!NT 0 HAT!)RIi>G 0 ~ 0 f t)KI)!!EI:CY 52 Chl 6 0 SVL e 0.0 IHR e 0 STRT<<UP 26 HBTU e HUST HU!' Df v I t 7 1 Vt! 5 CAP 7 0 AVL 7 0 ' IHR 7 0 Bht'KIIIG 0 tiBTU/H PRE COHH GKN t! IN 0~0 HAX SCHV f. RATED 4I? DOWN TIHE 2 I

I'D' 52 TRhNS ~ LOSS  % 0 '

e

I!RC IIITff'll!)'<<ATORYON NIIIE t'ILF. POlt!7 NUCLEAR Ul!IT tlo ~ 2 Kt ERGY I'.AtlAGEHENT ASSOCIATKSt INC PaeE I TEel NO ~ E 32<<0 ~ 1 IU) REPT 9 OPT IQN 1 SUfrREPOf?T 1 05/13/83

<<aaaaaa<<a<<GE!'Er?Al ltl!i Util TS CrehfrACTEf?ISTICS a<<a<<a<<4<<aa a<<a<<a Goy <<!r,?,S I2 4444<< <<CAPACITY PELlt&ILITY I!EAT RATE a>>a a<< << aaFUF'Laa>>a<<<<aa<<a<<aaaa <<aaa<<aa<<COST<<>>>>a<<<<aaa Col't AI!Y 2 PRF, JA!!

C<,'l<<J1!e 1 1985 Ml I>

r<W 155 FOR l'1 ~ 0 BTU/KI!H HP FAC leoo TYPE MIN% TeT%

HANDLINO 0 ~ 0

%/YR 6 '

ARE< 15 1 1985 HAX 336 FOR I 0 ~ 0 AHR 1 15143 STRT UP DIS OILP 100 ~ 0 LEASINO 0 0~0 UHI 7 TYPE T 1147 J lr I 1985 EMEI?G 336 trof, 0 ~ 0 ACCTG 0 SUPP eeeee,e, 0~0 0~0 VAR Oe<< 0~0 6eo RESERVE v

' t'a'! I 2100 1984 CAP I 155 AVL 1 0 ~ 0 IHR 1 15115 FUEL 1 DIS OILD UNLH 0 ~ 0100 ~ 0 FIXKD Oete 0 6 '

100 CAP 2 205 AVL 2 0 ~ 0 IHR 2 15115 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Oeo 0~0 SALE ADD 0 0~0 CAP 3 246 AVL 3 0 1 IHR 3 15115 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0,0 Oeo MAINT 0 PRIORI TY u CYCLE 19 CAP 4 287 AVL 4 27 ' IHR 4 15115 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0,0 0 ~0 QVfRFIAUI. 0 PENALTY 1 ~ OO POS I 7 IO! 6 CAP 5 336 AVL 5 51 ~ 3 IHR 5 15115 HEAT RaTf. FACTOR l.oo SPN I!NT 0 HATURlrie 0 ~ 0 FREJUEIICY 52 CAP 6 0 AVL 6 0~0 IHR 6 0 STRT<<UP 156 HBTU MUST r?Urr l>EV I AT IO!1 5 CAP 7 0 AVL 7 0~0 IHR 7 0 Bat!KING 0 HBTU/H PRE Cor<M OEN Hax scl!I: E RATED 336 HIN DOWN TIME I ~ Oe s 53 TRANS'OSS  % Q~ Q Girl'Al!US 34 aaaaa CAPAc1 7 Y- RELI AHILI7 Y <<MEAT RATE FUEL<< <<>>aaa<<<<>><<a<<>> <<<<<<>>a>><<<<COST<<<<<<<<>>a<<aa

'I

~ I reW BTU/Klr<< TYPE MIN% TOT%  %/YR (1 COr PAr!Y Pi<E JAI I 1 1985 MIN 155 FOR Il 21 ~ 0 HP FAC I ~ 00 HAttDI.ING 0~0 6 '

AREA 15 Cotl JAI ~

1 1985 HAX FGR I o.o AHR 1 15143 STRT UP OIS OILD 100 ' LEASINO 0 0~0 UNIT TYPE 7 lla7 Jhrl 1 1985 EHERO I'QR o~0 ACCTO 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 VAR Deft 0~0 6 '

RESERVE 0 100 ~ ll PET Jai'I 1 21oo cap 1 155 AvL 1- oeu IHR 1 1511S I'UEL 1 OIS OILD UNLM 0 ~ 0100 ~ 0 F lxED oct! 0 6 '

JAN I 19II4 CAP 2 205 AVL 2 0.0 IIIR 2 15115 FUEI. 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 OeO SALE AOD 0 0~0 CAP 3 246 AVL 3 0 ~ 1 IHR 3 15115 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 Oeo HAINT 0 PRIORITY u CYCLE 19 CAP 4 287 AVL 4 27e6 IHR 4 15115 FUEL 4 i ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 OVERHAUL 0 PEtesLTY leo!I POS I T IO!e 1 CAP S 336 AVL 5 51 ~ 3 IHR 5 15115 HEAT RATE FACTOR I ~ 00 SPII MNT 0 f!A'IURltle 0~0 FHECUErrCY 52 CAP 6 o CVL 6 O.o IHR 6 0 STRT UP 141 HBTU HUST I?II<< E DF.V I <<:71!r'I 5 CAP 7 0 AVL 7 ohio IHR 7 =0 BA"!KING 0 HBTII/H PRE COMM GEN 0~0 MAX SC<<r) RATED 336 f reIN Dow<< TIME 2 I ~ De f S4 TRANS ~ I.OSS 0~0

0 i 'E

'ff?C INTEf<ROGA)ORY ON N INE tllLE POINT NUCLEAR UllIT NO ~ 2 EffERGY MArl4GE11EllT ASSOCIATES'r>C ]411

]TEre No ~ E 32>>t, 1 rD) REPT 9 OPTIOt4 I SUBPEPORT I 05/13/83 44<<444444<<GENEHAflNG UNITS CHAHACTERISTICS oa<<4444444 44<<4<< HUOSOr- 1 ]2 CA>ACITY RELIAB]LITY HEAT RATEa a aa aaa aFUr,La aaaaeaaaaaa aaaea aCPST>>>>aaaeaaaa BTU/trlfH TYPE l'IN% TOT%  %/YR COMPAie Y 2 Rr>>f.'l'>>>> )985 ill rf 18 FOR H 2]en HR FAC 1,00 HArloL]NG 0.0 e.0 APEA 15 CQri JA>>I ] ]985 MAX 36 FOR I 0~0 AHR I 15786 STRTaUP DIS 0]LO 100 ~ 0 LEASING 0 0~0 S UtilT TYPE 1 !i>T JArl 1985 Et>>ERG 36 l!OP 0~0 ACCTG 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0.0 Oen VAR Dell 0~0 6 '

I RESERVE RET Jkrfl 1 2100 CAP 1 18 AVL 1 2~ 1 IHR I 15792 FUEL 1 OIS GILD UNLt1 0 ~ 0100en FIXED OeM 0 6~0

>> 100,:r 4 r'. Jr>>r>> 1 1984 CAP 2 36 AVL 2 76e9 IHR 2 ]5792 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 SALE AUD 0 0~0 I

8 PRIORITY CAP 3 0 AVL 3 0~0 IHR 3

0 FUEL 3 ~ e ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0 ~0 MAIHT 0 o CYCLE 35 CAP 4 0 AVL 4 0~0 111R 4 0 FUEL } ~ ~ ~ ~ ~ ~ ~ ~ ~ e ~ ~ 0~0 0~0 OVERHAUL 0 I PErlALTY l.nn 1'05] T 1 CAP 5 0 AVL 5 0~0 IHR 5 ' HEAT RATE FACTOR 1 ~ 00 SPN HNT 0

~ 0 MATURlrrG 0 ~ 0 IO>>,'REOUErrCY 52 CAP 6 0 AVL 6 Oen IHR 6 0 STRT UP 16 HBTU MUST RUri E UE V]ATI ori 5 CAP 7 0 AVL 7 0 ' IHR 7 0 84rWIWG 0 MBTU/H PRE coHrf GEN 0 ~ 0 MAX SCHlr E RATED 36 H]N 00trN TIME 2 0 I~0 ~ fr 55 TRAt<e ~ LOSS  % 0~0 ooaaa rlUrrSUrr 35 <<aaao aCAPAr.]TY- REL]ABILITY "HEAT RATE ~ aaa aaaaaaaaFUFL>>>>aaaaaaaaaaaaa aaaaaaaaCOSTaaaaaaaae t>> 4I BTU/trrrH TYPE H]N% TOT%  %/'YR

e CO~'PA "lY 2 PRE JArf ] 1985 MIN 16 F'R Mi 21 ~ 0 HR FAC I ~ 00 HANOL]NG 0~0 6 '

ARE4 ]5 Ci)M JE v I 1985 MAX 47 FOR I 0~0 AHR 1 180o0 STRT UP DIS GILD 100 ~ 0 LEASING 0 0~0 Ute] T TYPE T reAT J>> > I 1985 El!EPG 47 110f? 0~0 4CCTG 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ Oen Oen VAP OeM 0.0 eel]

RESERVE NET JAN ] 2100 CAf' 16 AVL 1 0~0 IHR I 180o.o FUEL ] OIS GILD UNLM 0 ~ 0100 ~ 0 f IXED 0eM 0 eeO e 100 ~ O 4 I! JAil ] 9P4 CAP 2 32 AVL 2 2 ' IMR 2 18000 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ . ~ ~ ~ ~ 0~0 0 ~ 0 SALE ADO 0 0~0 CAP 3 47 AVL 3 76 ' IHR 3 18000 FUEL 3 ~ ~ ~ ~ ~ ~ e ~ e ~ ~ ~ 0~0 0 ~ 0 HAINT 0 l 0 PR]5R]TY PEtrALTY 1 ~ OC U CYCLF.

Pi)S]T]5rl 35 CfiP 4 0 AVL h 0>>0 AU IHR 4 IllR 5 0 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~

RATE FACTOR I ~ 00

~ ~ ~ ~ 0~0 0 ~ 0 OVERHAUI. 0 I CAP 5 0 AVl. 5 0 HE4T SPN rrlVT 0 MATr)R]rlG 0 ~ .". F REnrlE<'CY 52 CAP 6 0 AVL,6 0 ' IHR 6 0 STRT UP 21 HBTU MUST RUN E OEV ]AT IO'1 5 cAp r c AVL 7 OeO IHR 7 0 BAllKING 0 MBTU/H PREacorrrt GEN Oeo HAX SCHO E RATED 47 M]N 00<M TIME  ?

I ~ Oe TRANS'OSS 0 ~ 0 0

)RC Ii)TEI<r OGATO<IY ')<I Nlt<E NILE POIr<T NUCLEAP Ur<IT r)0,2 ENERGY t)ANAGEt<ENT ASSOCIATES) INC PAGE 149 I TE<! Ii<)o f. I?<z ~ I IUt REPT 9 OPTION 1 SUGREPORT I 05/13/83 PPPPPPPPPPGENERAT ING V)<ITS CHARACTERISTICS PPPPPPPPPP ppppp 1<<HI+ < I 1 ppppp I CAP<<C 7 Y REL I <) I< ILI 7Y -HEAT RATE >> <<>>>>>>>>>> FUEL>><<>>>><<>>>>>>>><<<< >>>>>>>>COST>>>>>>>>>>>>>>>>>>

liP 8TU/KMH TyPE >>IN@ TOT% 5/YR CO<)PA<ly ~

2 P IE Jhr< 1985 Hl N 1 n FOR >> 2110 HR FAC i+00 HA))DL I NO 0~0 6 '

AREl 23 Cgi) 1 1995 <<AX 25 FOR I 0 ~ 0 AHR 1 19000 STRT UP DIS GILD IOoo0 LEASING 0 0~0 UtilT TYPE T J<<<'< 1 1985 EtiERG 25 t:OP 0 ~ 0 ACCTO 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 VAR OPH 0~0 6 '

RESERVE <<i T Jhi~ 1 2100 CAP 1 10 AVI. I 0 ~ 0 IHR 1 18999 FUEL I DIS GILD UNLH 0 ~ 0100 ~ 0 FIXED OiH 0 6 '

100.0 II JA<< 1 1984 CAP 2 17 AVL 2 0 ~ 0 IHR 2 18999 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 SALE ADO 0 0~0 CAP 3 25 AVL 3 79 ' IHR 3 18999 FUEL 3 ~ e ~ ~ ~ ~ o ~ ~ ~ ~ ~ 0~0 0~0 >>AINT 0 PRIORITY <) CYCLF. 19 CAP 4 0 AVL 4 0 ~ 0 IHR 4 0 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0 ' OVERHAUL 0 PEN'LTY leo<) PJSI 7 IC s 3 CAP 5 0 AVL 5 0 ~ 0 lt<R 5 t)EAT RATE FACTOR lioo SP>t HNT 0 HATURI))G 0 ~ 0 F RF.O<JE,)i 'Y 52 CAP 6 O AVL n.o IHR 6 0 sT<<T UP 10 HHTU HUST R<JN E t)EVIAIIO<) 5 CAP 7 9 AVI. 7 0~0 IHR 7 0 Bht'KIFIG 0 H8TU/H PRE>>CO)<H QEN 0~0 HAX SCHU RATED 25 HI)< DOWN TINE I~0 ~ A 57 TRAt> >>>>>>>>>><<>>>>>>>>>>>>FUFL<<<<<<>>>>>>>> <<COST HP BTU/K)<H TyPE Hlt)>> TGTa 5/YR COHPAtlY 2 PRE JArl 1985 HIN 10 FOP H 21 ~ 3 HR FAC I ~ 00 HANDLINO ooo 6 '

AREA 28 CO<'A<" 1 1985 HAX 27 FOR I 0~0 AHR 1 17000 STRT UP DIS GILD 100 ~ 0 LEAS INO 0 0~0 UlllT TYPE I <<AT JArt 1 1985 EHERG 27 t<OR 0~0 ACCTQ 0 SUPP ~ I

~ ~ ~ ~ ~ ~ ~ 0~0 0~0 VAR 0+H o.o e.o RESERVE 4 NET J<<N I 2100 CAP 1 10 AVL 1 0 ' IHR 1 16979 FUEL 1 OIS GILD UNLM 0 ~ 0100 ~ 0 FIXED Ott< 0 eoO

)Oooo A '< Jhr< 1 1984 CAP 2 18 AVL 2 10 ' IHR 2 16979 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 SALE ADD 0 0~0 CAP 3 27 AVL 3 67 ' IHR 3 16979 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 IIAINT 0 I

PR I OR I Y 0 CYCLE 19 CAP 4 0 AVL 4 0~0 It)R 4 0 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 OVERHAUL 0 PE,NALTY 1I'-'0 POS)T IC~< 3 CAP 5 0 AVL 5 0~0 IHR 5 0 HEAT RATE FACTOR 1,00 SPN HNT 0 HAt<<RI<<G HUST RUi' 0 I: F ~LvuE<.CY UEll "Tlo <

52 5

CAP 6 C<)P 7 0

0 AVL AVL 6

7 0~0 0~0 IHR IHR 7 6;, 0 0

STRT-UP BAt'KING 13 HHTU 0 HHTU/H PRE CUHH GEN 0 ~0

f. RATED 27 HIN TIHE 2 I<V< 4'>

HAX SC<<!) DOWN TRANS'OSS I oeo

~

I l

t:HC ?ATE!>HOG;,tnIIY Ov ff?4E MILE POI~T IIUCLEtf-. Ut>IT tfo, EflERGY tlAftAOE>>'IENT ASSOCIATESt INC OE LSQ IIE.< NO, f. 32>2 ~ 1 IU) REPT 9 OPT?Of> 1 SUBREPORT 1 05/13/LI3 yyyyaooo<<GENFRATING Util TS CHhf>f CTEPISTICS ayoay aaaaa Lt>L?p>' 3 aaaaa CAPACLTY RE,L I ABILITY -HEAT RATE- w ~ w waFUEI mwaa~we~wawwww a w ~ a a ~ e w C 0 5 7 w eo a w ~ ~ ~ ~ e M>> I?TU/KIIH TYPE I'III% TOT%  %/'YR C0>>PAtlY P>:.f C>>>'A>i J I! 1 1985 >>> IN 8 FOR M 21 ~ 0 Hl? FAC I ~ 00 MAIIDLINe 0~0 6 '

AREA 23 1 1985 >IAII 20 FOP I 0~0 AHH I 17000 STRT UP DIS OII.D ]f>0 ~ Q LEASING 0 0~0 Ut>17 TYI'E. T 'll. f JA.l ) ]995 El!EPG 20 Ilof> o o ACCTO 0 SUPP e ~ ~ ~ ~ ~ ~ ~ 0 ' 0 ' VAR 0>>M 0~0 6' RESE RVE a> Pi T J>><< 8]00 CAP 1 8 AVL I 0 ~ 0 IHR 1 16943 FUEL I DLS 0?LD UNLM 0 ~ 0100 ~ 0 FIIIED 0>>M 0 6 '

]io ~ 0 t'> J/>>s 1 !984 CAP 2 15 AVL 2 0>>0 IHR 2 ]6943 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0~0 SALE ADI) 0 0~0 CAP 3 20 AVL 3 79 ' IHR 3 16943 FUEL 3 ~ ~ ~ ~ ~ ~ e ~ ~ ~ ~ ~ 0 ~ 0 0~0 HA 1t'IT 0 PP.?ORITY 0 CYCLE 19 CAP 4 0 AVL 4 0~0 IHR 4 0 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ >> ~ 0 ~ 0 0~0 OVERHAUL 0 PEiNALTY 1 ~ io I>QS]71>i> ~ 3 CAP 5 0 AVL S 0>>0 IHR 5 0 HEAT RATE FACTOR I ~ 00 SPN MNT 0 NATU>?Itte 0 ' f PEOJEI>CY S2 cAp 6 0 AVL 6 o.O IHR 6 0 STRT UP 8 MIITU f1UST fI>I'I E i.'E V I A 7? 01! 5 CAP 7 0 AVL 7 0~0 IHR 7 0 bANKING 0 1187U/H PRE COMM OEN 0~0 HAX SCt I> E RATED 20 MIN DO>tN f?ME 2 I~G~ >> 59 TRAI'IS ~ I.OSS  % 0~0 aaaaa KE>l7 7 ] yyyya CAPACITY RELIABILITY HEAT RATE wwmew wwwmFUELaaamaaaieaaawwe e a a a a a ~ ae C 0 $ 7 a m a m w <<m w I>>

Mff BTU/K>>>M 7YPE 211N% TO7%  %/YR CGr PAtlY 2 PRE, JA': 1985 HLN 6 f OR t'I 21 ~ 0 HR FAC ]>>00 HAIIDL]Ne o.o e,o AREA Cilia JAM 1 1905 IIAX ]2 FOP. I 0~0 AHR I ]BOOO STRT UP DIS OILD 100 ~ 0 LEAS ?NO 0 O>>O Util? TYPE e>AT JAft 1985 EHERG 12 ftOR 0~0 ACCTe 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0>>0 0 ~ 0 VAR 0>>M o.o e.o C> RESERVE e>ET JArl Jh>>

] i'.]G 0 CAP 1 6 AVI. I 0~0 IHR I 17999 FUEL 1 DLS OILD Ut>>Lff 0 ~ 0100 ~ 0 FII>ED OfM 0 6 '

I ]Q>I>>f> 1 1984 C4P 2 9 AVL 2 0>>0 IHR 2 17999 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ >> ~ ~ ~ 0~0 Q~0 SALE ADD 0 0~0 CAP 3 ]2 AVL 3 79 ' IMR 3 17999 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0>>0 0 ~ 0 MAINT 0 PR?01'1TY 0 CYCLE 35 CAP 4 0 AVL 4 0~0 If>R 4 0 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 OVERfIAUL 0 PE>IALTY 1>> 0 ) "i)SLT]0>> CAP 5 0 AVL 5 0>>0 IHR 5 0 HEAT HATE FACTOR 1 ~ Qo SPN MNT 0 HATUH?tlG 0 ~ 0 fI EO>IEI ICY 52 cAp e o PVL 6 0 ' IIRe '

0 STR7 UP 5 t1BTU MUST >tv>> E OEVLAT? f>t> 5 CAP 7 0 AVL 7 0>>0 IHR 7 BANK?>le 0 HBTU/ft PRK COHM GEN 0~0 HW SC<<G E RATED 12 >'IN Dowtl TIME I~0~ N ev TRANS ~ LOSS  % 0~0 C

'IRC IIITE!I!?>'> I'ORY ON tlINE I',II.E POIIIT NUCLEAR Ut>IT tl0,2 ENERGY I'ANAGEt"EFIT ASSOC I ATES t Itic PAGE 15]

Ill.t> ND ~ E >2>!e] IU) RE.PT 9 OPTION I SUBREPORT I 05/13/83 aoooaoooooGE>IERATING UNITS CHtPACTERISTICS oaooooaaaa aaoaa >>n>>>E.t>S T I oaoao CAPACITY RELIth>ILITY "I'EAT RATE aaaaFUf Laaaaaaaaa aaaa CPS fa a aa BTU/KIIH TYPE t>III% TOT%  %/YR CoAIIY 2 PPE ] ]985 >> It> FOR H 21 ~ 0 HR FAC I ~ 00 HANDLltlG 0~0 6 '

ARED ]5 C >I Ji>> ] 1985 >>AX 18 FOR I 0~0 AHR I ]6500 S'fRT UP DIS GILD ]oooo LEASING 0 0~0 U!o]T f YPE t!AT stase ] ]9es E>?ERG ]e HOR 0 ' ACCTG 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ Oeo 0~0 VAR OoH 0~0 6' RESERVE > hf J>>I> ] 2] >I 0 CAP 1 8 A'VL I 10 ~ 0 IHR 1 164"0 FUEL I DIS GILD UNI.H 0 ~ 0100 ~ 0 FIXED Dote 0 6'

]0!> ~ >> t~ Ji',Ii 1 1984 C4P 2 15 AVL 2 0 ~ 0 IHR 2 16480 FUFL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Ooo Oeo SALE AOO 0 0~0 cAP 3 ]e AVL 3 69 ' lt!R 3 16480 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ o ~ Oeo Oeo >IAINT 0 PR I GR I I'Y 0 CYCLE 19 CAP 4 0 AVL 4 0~0 IHR 4 0 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Oeo 0~0 OVFRHAUL 0 PENALTY I ~ OG l P IS t ] tnt> 2 CAP 5 0 tVL 5 0 ~ 0 IHR 5 0 HfnT RAff FacTOR I.oo SPN HNT 0 Haf!!R]iiG 0~0 f t?I. Qt!L>:CY 52 CAP 6 0 nVL 6 0 ' IHR 6 0 sTRT UP 8 rBTU HUST Ru>I Dfv] at 10>> 5 CAP 7 0 AVL 7 0 ~ 0 ]HR 7 0 BAIIKING 0 HBTU/H PRE aCOHH Gf tl 0~0 HAX SC>II> E RATFO 18 WIN DOWII fit>f Ieoe O 6] TRANS'OSS 0 ~ 0 ooaoa gnyft g f 23 aoaoo CAPACITY RELIABIL]TY HEAT RATE a a a a a a a F U E L a a a oe a a a a a a a a a a aaaaa aaaCPSTaaaaaaaaa H>> BTU/KNH TYPE HIN% TOT%  %/YR Co>IPA>IY 2 PRF. Jar> ] 1985 II IN ] 51 f'R H 2] ~ 0 t>P FaC I.oo HANDLING o.o 6.o AREA ]5 COI J>'ii" ] 1905 HAX 320 FOR I 0 ~ 0 AHR ] ]3909 STRT"UP DIS DILO ]oooo LEASING 0 0~0 Uti]T TYPE T >!AT ] ]985 E>>ERG 320 I'OP 0 ~ 0 ACCTG SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 VAR DoH 0 ~ 0 6 '

RESE HVE BET Jt t' ] 2]00 CAP 1 151 tVL ] 0 ~ 0 IHR ] 13899 FUEL 1 DIS GILD UNLH ooo]00 ~ 0 FIXED OoH 0 6 '

100>0 Ii Jail> ] ]984 CAP 2 200 AVL 2 Oeo IHR 2 13899 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Ooo Ooo SALE AOD 0 0' CAP 3 240 AVL 3 0>S IHR 3 ]3899 FUEL 3 e ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 HAINT 0 i PR]QRlfY 0 CYCLE. 19 CAP 4 280 AVL 4 20>S IHR 4 ]3899 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 OVERHAUI. . 0 Pf eALTY ]AGO P'>Slflo>> 2 CAP 5 320 AVL S %ceo IHR 5 13899 HEAT RaTE FACTOR 1.00 SPN t>NT 0 1 HAT>)>> 8lt O ~ 0 F Rf >]t >E r'CY S2 CAP 6 0 AVL 6 0~0 IHR 6 ' STRT UP 128 f'.BTU 0 HUST R>l>'

HAX SC>>II Ieu, a 62 E

of V I AT IOII 5 CAP 7 RATED 320 0 A"L 7 0~0 IHR 7 0 BANKING 0 HBTU/H PRfaCOHH GEN I!IN OOIIN TIHE TRANS'.OSS 0 ~

0~0 0

a 0 ITE <

)VTEttR<<)ATOHY vs E 320 '

ON

)D)

NINE NILE Polt)T NUCLEAR ulllT NO, EivERGY tlAtiAOEt'fNT ASSOCIATES t REPT 9 OPTION I SUBREPORT INC 1

GE o5/13/83 152

<<a>>a>>a>>a>>GEliEPATltiG U) ITS CHAPACTERISTICS a>>a>>4>>aaa>>

O'LVENS I 47 a>>a>>a -CAPACITY- RELIA)t)LITY ~HEAT RATE a~~~w~a~www~aFUEL<<aam~a~w~~~~~~ ~ e erma COST aaa~ww~te I e'>t BTU/Kt>H TYPE HIN% TOT%  %/YH CO>)PANT PRE JAN )985 HIN )9 FOR ll 21 ~ 0 HR FAC HANOL)NG o,n e.o AREA )5 C O'!<<e ) )995 HAX 77 FOR I 0 ' AHR 1 le333 S7RT UP D IS 0ILO 100 ~ 0 LEAS llvG 0 0 ~ 0 Ut)IT TYn'E >'<T JA't 1 )985 EMEHO 77 ttOR 0~0 ACCTG i 0 SUteP ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0 ~ 0 VAR OeH 0 ~0 6 '

0l'ESERVE'.

RET JA< ) 2)no CAP ) )9 AVL I Oeo IHR 1 )6355 FUEL ) DIS OILU UNLI< 0 ~ 0100 ~ 0 FIXED 0eH o eeo 100 ~ 0 A H Jhv 1 )984 CAP 2 38 AVL 2 F 7 I)IR 2 16355 FUFL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 SALE. ADO 0 0~0 CAP 3 57 CVL 3 34 ' IHR 3 16355 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0 ~0 n'AINT 0 PRIORITY CYCLF- 37 CAP 4 77 AVL 4 44 ' IHR 4 16355 FUEL 4 ~ ~ ~ ~ ~ ~ e ~ ~ ~ ~ ~ Oeo 0~0 OVERHAUL 0 PE>VALTY 1 ~ 00 POS I TIO>> 4 CAP 5 0 AVL 5 oeo ltiR 5 HEAT HATE FACTOR ).OO SPN HNT 0 HATVRING 0 ~ 0 F RE.erUEn'CY 52 CAP 6 0 lVL 6 0 ' IHR e 0 STRT UP 34 tiBTU HUST Ri)N E UE.V) AT)oil 5 CAP 7 0 AVL 7 Oeo IHR 7 0 Bht)K) f36 0 t<BTU/nt PRE~COtlnt GEN 0~0 HAX SCi<0 E RATED 77 Hlti DottN TINE 2 I ~ t)e V e3 TRANS'OSS oeo aaaaa HAYE iS T )) aaaaa CAPACITY REL I At))L)TY -HEAT R)ITE- w e a a w a a e m>> a e eo F U E L a a ~ a a a a ~ w w a a a ee COST~

Hlf BTU/(ttl; TYPE HIN% TOT%  %/YH COHPANY 2 PRF. JA t 1 1985 i<IN 23 FOR H 21 ~ 0 HR FAC 1 ~ OO HANDLING 0 ~ 0 6eo ARFA )5 Ctgtl 1 )985 HAX 92 FOR I 0~0 AHR 1 13125 STRT UP OI S GILD I 00 ~ 0 LEASING 0 0~0 Ul)IT TYPE ) H>> 7 JA> I 1 1985 EHERG 92 llOR 0~0 'CCTG SUPP ~ ~ ~ ~ ~ ~ ~ ~ O,O O.O VAR 0>>H 0~0 6 '

RESERVE ~

l .4ET Jhil 1 2100 CAP 1 23 AV) 1 0~0 IHR I 13135 f UEL I DIS GILD UNLH 0 ~ 0100 ~ 0 FIXED OeH 0 eeo 100 ~ 0 A t~ Jr st 1 1984 CAP 2 46 AVL 2 0 ~ 4 IHR 2 13135 FUEL 2 ~ ~ ~ ~ ~ ~ ~ e ~ ~ ~ ~ 0~0 0~0 SALE ADO 0 0 '

CAP 3 69 AVL 3 27,3 IHR 3 13135 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 HAINT 0 C PRI>)RITY 0 CYC).E 37 CAP 4 92 AVL 4 51 ~ 3 IHR 4 13135 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 OVEHHAUL 0 PENALTY ) duo POS I I )Ol' 4 CAP 5 0 AVL 5 O.O IHR 5 0 HEAT RATE FACTOR I ~ 00 SPN MNT 0 I HATURING 0,:> HF:-)ttEttCY 52 CAP 6 0 AVL 6 O.O IHR 6 STRT"UP 39 HBTU C HUST R>Jrt E. ilEV),ETIO> 5 CAP 7 0 AVL 7 0 ' IHR 7 0 BAtiKING 0 HBTU/H PRE Con)H GEN 0~0 HAX SCHO E HATED 92 HIN DOwN TIHE e4 TRANS'OSS  % 0 ~ t)

Q'

r RC ]tv TL>>>t!>GA]tf<Y O!i NI>>E H?LE POI>>T t>UCLEAR u>:IT tfo ~ 2 Et>ERGY >.ANAGE>'FNT ASSOCIATES< INC PAGE 15>

IT>;r> NOo E Go uo] LO) t>EP T 9 OPT IO>v I SL>&REPORT I 05/13/83 0400004044GFNF'RAT?l>G f>t>ITS CHar>ACTEPISTICS 404 40404 RA?El!S T ] 04040 <<cAPac?TY REL ?Dr>IL?TY >>EAT RATE ~ <<>><<a FUEL>> asia>><<a a<<aa <<COST<<<<a<<<<a-RTU/KRH TYPE HIW% TGT%  %/YR COroPA>>Y t'f>E. JL.> ] 1985 Hill 6 FOR o'1 ~ 0 HR FAC ] F 00 HANOLING 0 ' 6 '

AREA ]5 CO,i Jl> ] ]9>>5 tv AX 14 FOR I 0~0 AHR I 18000 STRT"UP OIS OILO 100 ~ 0 LEASING 0 040 Uti?T TY>'E T JA!r ]985 E>!EHG 14 t OP Po0 ACCTG SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0 ' VAR 04H 0' 6 '

RESERVE r>ET Jf,if r ] 2100 CAP 1 6 hVL 1 0~0 ]HR I 17998 FUEl 1 OIS OILO Ut>LH Oo0100 ~ 0 FIXED Oo>o 0 6 '

100.) 4 t! Jhfi 1984 CA> 2 11 AVL 2 0 ' II R 2 17998 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ os ~ ~ Oo0 0~0 SALE. AOO 0 0 '

CAP 3 ]4 AVL 3 79 ' IHR 3 ]799" FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 o!AINT 0 PH]OR? TY CYCLF 36 CAP 4 0 AVL 4 0 0

~ IHR 4 0 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0 ' OVERHAUL 0 PEr'>ALTY 1 ~ 0 f> POSIT]0> ~ 2 CAP 5 0 AVL 5 0' 1>>R 5 0 HEAT HATE FACTOR 1 ~ 00 SPN HNT 0 NATU>t I>> G t >>En! >E>!CY 52 CAP 6 0 AVL 6 Uoo IHR 6 STRT UP 5 HHTU HUST RrJrv OEV]al]U i 5 CAP 7 0 AVL 7 0' It!R 7 0 8A>>KING 0 H>>TU/H PRE COHH GEN 0 '

'o HAX SC>! J I oOo 4 65 E RAT EO 14 tt?N OOlrN TINE TRANS'OSS  % 0~0 2

('s 59?rt T ] 00400 <<CAPACITY<< REL.?a>> ILI T Y "HEAT RATE a<<<<<<>> <<<<>>a<<<<aFUEL<<aaaaaaaa<<<<a>><< COST I ><M BTU/K>>H TYPE H?N% TOT%  %/YH COr>PA>iy Pf>k JAr "o 1985 Hlti 20 FOR H 21 ~ 0 HR FAC I ~ 00 NANO>. ING 0 ~ 0 6 '

AREA 15 O'.J > ~ J<<r> 1985 t! AX 40 FOR I 0~0 At>R ] 158S7 STRT UP OI5 OllO 100 ~ 0 LEASING 0 0 '

UNI T TY4E T c!OT Jar> ]905 E<<ERG 40 HOR 0~0 ACCTG SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0 ' VAR 0+H 0 ' 6 '

RESERVE, RET Jg,io 2100 CAP 1 20 AVl I 13 ~ 9 IHR I ]5875 FUEL 1 OIS OllO UNLH 0 ~ 0100 ~ 0 F?XEO OoH 0 6.0 100r0 A r> JfI!!t'0444

] 1984 CAP 2 40 AVL 2 65 ~ 1 IHR 2 1587S FUEl 2 ~ o ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0 ' SALE AOO 0 boO CAP 3 0 AVL 3 0 '  ?HR 3 P FUEI. 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Po0 0~ HAINT 0 PH?ORITY 36 Chp 4 lt!R 4 Po0 OVERHAUL 0',0 CYCLE 0 AYL 4 0~0 0 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 PEr>aLTY ] o 0!> >rrpS] lfri~

I 2 CAP 5 0 AVL 5 an I!iR 5 0 t>EAT HATE FACTOR 1 ~ 00 SPN MNT 0 HATURI">3 n ~ 4 FREOUFr>CY 52 CAP 6 n AVL 6 0~0 IHR 6 0 STRT UP 18 Ht>TU HOST RUri OEV]WT 5 CAP 7 0 AVL 7 0~0 ]>oR 7 0 8ANK?t>G 0 HGTU/H PRE CO!tL> GEN 0 ~ 0 HAX SCHO c. RATEO 40 M]N 00'rvN T?HE I.O. 4 66 TRANS'OSS  % 0 '

NtFC ]<tTEI-'.ItOGAT 'OY QN ttIHE tt?I.E PO?N7 t UCLEtk UNIT Ito ~ 2 ENERGY ~A>>AGEttEtlT 4SSOCIATESt ]NC E 154 ITEtt ttOe E 32(e] IO) REPT 9 OPT IOt! 1 SltBREPORT 1 05/13/83 aoaaooooaoGEIIERATIHG UN?TS CHAethCTERIST? CS oaaooaaoao aaoao 74TH 7 I aoaoo -CAPAC?TY>> I!EL ?ABILITY <<HEAT RATE- aa <<<<<<<<<<<<<<<<aaf UFL>> COST ltW BTU/KWtt TYPE tt?N% TG[%  %/'TR COHIPAt!Y ~

2 PHE J>>> ] 1985 H?eI 20 FOR H 21 ~ 0 Htt FAC ] F 00 ttANDL?NG 0~0 6 '

AFFK 4 15 CON Jhi t ] 1985 HAX 40 FOR I 0~0 AHR I ]57]4 STRT UP OIS OILO 100 ~ 0 LEAS]NG 0 oy4 UNIT TYPE T 'eAT Jhit ]9tt5 Kl<EFIO 40 I-tOR 0 0 ACCTG 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ oeo 0~0 VAR OeH o.o 6.4 RESERVE tet T J'i~ 1 2]00 CAP 1 20 AVL 1 0~0  ?HR I 15674 FUEL 1 DIS OILD UNLH 0 ~ 0100 ~ 0 FIXED OeH 0 6 '

]:io ~ 0 I 1984 CAP 2 40 AVL 2 79 F 0 IHR 2 ]5674 FUEl 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0 ~ 0 SALE ADD 0 0 '

Chp 3 0 hVL 3 0 ~ 0 IIIR 3 0 FUEI 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 HAINT 0 PR?ORITY 0 CYCLE 36 CAP 4 0 AVI. 4 0~0 IHR 4 0 FUEl 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0 ~ 0 OVERifAI!L 0 PEttALTV ]euu PF'S?T 10'. 2 CAP 5 0 AVL 5 0 ~ 0 IHR 5 0 HEAT RATE F'ACTOR 1 ~ 00 SPN t;NT 0 HATURlttG 0 ~ 0 t'FtF.DIJON'ICY 52 CAP 6 n nvl 6 O.O IHR 6 0 S'IRT<<UP ]8 HHTU HUST RUtt E UEV147]uit 5 CAP 7 0 AVL 7 0 ~ 0 IIIR 7 0 PA"IK? ttG 0 HBTU/H PRE<<COHH OEN 0~0 HAX SCtitt E PATED qo ttlN DOWN TIHE I ~ 0 ~ - 67 TRANS'OSS % 0 ~ 0 aaaao t/ARRUP I 1 oaoao <<CAPACITY>> RELIABILITY "HEAT RATE <<aa<<<<<<<< <<<<>>>><<FUEL<<<<a<<<<<<>>>>a>><<<<a>> <<<<a<<<<a<<<<CPSTaaaa<<<<<<<<<<

tt!t RTU/KIFH TYPE te?N% TOT%  %/'Ytt C Coe'PAHY 2 PRF JAIl ]985 HIN 87 fok tt 21 ~ 0 Hlt FAC ] 00 HANI!LING OeO 6eo AREA 15 CUH JAii ] 1985 FAX 184 FUR I 0~0 AHR 1 15200 STRT UP DIS 0?LD 100 ~ 0 LEAS ?NO 0 0~0 UNIT TYPE F t AI Jhii ] ]985 EHEPG 184 teOR 0~0 ACCTG 0 SUPP e ~ ~ ~ e ~ ~ ~ oeo 0~0 VAR OeH 0~0 F 0 C' RESERVE PET Jhit ] 2100 CAP 1 87 AVL 1 0~0 ItlR 1 15226 FUEL 1 n?S GILD UNLH O.O]OO,O F?XE.D OeH o 6.4

]on.t Je (~ ]984 CAP 2 115 AVL 2 0.0 IHR 2 15226 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0~0 SALE ADD 0 0~0 CAP 3 138 AvL 3 ue] IHR 3 15226 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 HAINT 0 PRIORITY 0 CYCLE 19 CAP 4 ]61 AVI 4 27 ~ 9 IHR 4 ]5226 FUEL t ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 OVFRHAUL. 0 PEt ALT'Y ] ~ uu POS]T?Did 2 CAP 5 184 AVL 5 51eo IHR 5 15226 I'EAT RATE FACTOR I ~ 00 SPN HN7 0 HA'IUR?>0 0 ~ 0 FttECUci CY 52 CAP 6 0 AVL 6 0 ~ 0 IHR 6 0 STPT<<UP 89 I!BTU MUST Pl!t' >h.VI F?0'>

~ 5 CAP 7 0 AVL 7 0 ~ 0 IHR. 7 0 UAttr IN<3 0 ItBTU/H PRE>>COHH GEN 0~0 MAX SCHU E PATEtt 184 HIN DOWN TIHE leod F 68 TRhNS ~ I.OSS  % 0~0 c

NVC litTEt'etpe'TQPY UN N]tlE telLE PO]tiT NUCLEAR Ut~]T ttp ~ 2 Et<EfteY NAt>AGE~ENT ASSOCIATKSe ItiC PAeE ]5b

]TEN NO ~ E 3PL e] tt)) REPT 9 OPTION 1 SUBREPORT 1- 05/13/83 ooaaaoooaoGEtiFHA TING VNI TS CtiARACTERI ST ICS oooooaaaoo Lr~

ooaoa NAtekea I 2 aooao CAPACITY RELIAB]LITY HEAT RATE aa<<a aaa<<FUELS <<<<aaaa<<a<<>>aa a>>a<<>>cpST<<>>aa\a<<>>>>

BTU/KttH TYPE MIN% TOT% 5/YR CP<<P4tiY 2 PRi'A;i ]985 MIN 87 FGP. H 21 ~ 0 HR FAC I ~ OO HANOL]NG 0~0 6 '

AREA 15 Ceto J" < 1985 SAX 184 FOR I 0 ~ 0 AHR 1 15200 STRT UP OIS OILO ]00 ~ 0 LEASING 0 0~0 UNIT TYPE T !iAT Je'-N ) 1985 Et;Etee 184 VGR Qre ACCTe 0 SUPP r~~~~~~~ 0~0 0~0 VAR Oeg 0~0 6ep RESERVE NET JiJi ] 2100 CAP 1 87 AVL I 0~0 IHR I 15226 . FUEI. 1 OIS OILO UNLN 0 ~ 0100 ~ 0 FIXEO OeH 0 6 '

100 ~ 0 o ~ 1 JAe ] ]984 CAP 2 115 AVL 2 Qre IHR 2 ]5226 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ e 0~0 0~0 SAt.E APO 0 0 ~ O.

CAP 3 138 AVL 3 0~ 1 IHR 3 ]5226 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 ttA]NT 0 PRIORITY CYCLE 19 CAP 4 161 AVL 4 27e9 IHR 4 15226 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0~0 OVKRHAUl. 0 PENALTY 1 ~ 00 POS I T I pri CAP 5 184 AVL 5 Slee IHR 5 ]5226 HEAT RATE FACTOR I ~ 00 SPN MNT 0 HATURING Qee F RLRUK(jcY 52 ~

CAP 6 0 AVL 6 0~0 IHR 6 STRT UP 89 HBTU NUST RUt~ OEV I AT ION 5 CAP 7 0 AVL 7 0~0 IHR 7 0 BAtiKING 0 HBTlj/H PRE-COMM eEN 0~0 HAX Sc.ii) E RATED 184 HIN OO~N I~O~ 4 69 TRANS, LpSS i 0~0

~ 6 oaaoo B RHETT oaoao <<CAPACI 7 Ya PEL]ABIL]TY -HEAT RATE- >>>> <<a>>>>aaaFUEL>>aa>>>>a>>a<<>>aaaa a>>>>>>a<<a>>CPST>> >>a>><<a>>>>

MV RTU/KkH TYPE HIM% TGT%  %/YH CUMPDFIY 3 PHF tA>> 1 1985 MIN 40 FOR H 7 ' HR FAC ]rOQ HANULING 0~0 6 '

APE< 12 CVt> J.Vs 1985 MAX ]82 FOP I 0~0 AliR ] ] 2332 STRT UP OIS OILO 100 ~ 0 LEASING 0 0 ~ 0 UN] I TYPF. F tiAT JAt~

J4ii 1985 Et'ERG HOR 0~0 AccTG 0 SUPP ~ ~ ~ ~ e ~ ~ ~ 0 ~ 0 0~0 VAR 0+M 0~0 6 '

RESERVE S ttK7 2100 CAP I AVL ] 0~0 IHR I 8775 FUEL 1 RES I ~ SO UNLtt Oee]00 ~ 0 FIXKO OtM 27246 6eQ V, ]GO.G M JA: ~ 1 1984 CAP 2 ]32 PVL 2 Oee IHR 2 9694 FUEL 2 e ~ ~ ~ ~ ~ ~ ~ ~ ~ e ~ 0~0 0~0 SALE AOO 0 0~0 CAP 3 AVL. 3 0~0 IHR 3 9865 FUEL 3 ~ ~ ~ ~ e ~ ~ ~ ~ ~ ~ ~ 0~0 Oee MAIN'f 0 PRIOR] TY 0 CYCLE ] CAP 4 AVL 4 0 ' IHR 4 9873 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 OVERHAUL 0 PENALTY ]rQQ POSIT]OH 3 CAP 5 ]90 AVL 5 93 ' IHR 5 9876 HEAT RATE FACTOR 1 ~ 00 SPtk HNT 0 HATURIFiG 0 ' F RE.QUEtiCY 52 CAP 6 0 AVL 6 0 ~ 0 IHR 6 0 STRT"UP 469 HBTU HUST RUi> E OKV]4T]VN 5 CAP 7 0 AVL 7 0 ~ 0 IF!R 7 0 BANKltlG 0 t<BTU/tl PRE"COMM GEN 0~0 HAX ScttO RATFO 182 HIN OO'HN LIME 8 I ~ U ~ 0 70 TRANS'.OSS Oep 0

"IRC Il>TFlIII>GAIG>

I ~ I Y Grl NINE NILE POINT NUCLEAR Ul:IT NO ~ 2 ENEPGY I'AIIAGErlKNT ASSOCIATESr II"C E 15o ITEil rlo ~ E 32ne1 {Ut REPT 9 OPTION I SIIBREPORT I 05/13/83 aaaaaaaaaaGENERATI>IG IIIIITs cHARAGTKRlsTIcs aaaaadaaad a<

> IITU/KleH <<<<<<<<<<<< FUEL>> <<<<<<>>>> TYPE Hill% TOT% <<<<<<<<<< -- --coST- - -- "  %/YH COHPANY 3 PRE Jr ~ 1 1985 re IN . 40 FOR t' ' HR FAC F 00 HANDL ING 0~0 6 ' AREA 12 CQI ~ Ju>> I 1985 tlhX 182 FOR I 0 ' tlat AtlR I 12332 STRT-UP OIS OILO 100 ~ 0 LEASING o oeO Utel T TYPE F tnt Jfe 1 1985 EIIEPG 190 I~OR 0~0 ACCTG 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0,0 oeo VAR OeH oeo 6 ' RESERVE S GET A >. TING>I JA>( 1 21nn CAP 1 40 AVL I 0~0 IHR I 8775 FUEL 1 RES I ~ 50 UNLH 0 ~ 0100 ~ 0 FIXEO Oek 27246 6 ' lnnen JA'J 1984 CAP 2 132 AVL 2 0~0 IHR 2 9694 FUEl 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~0 0~0 SALE AOO Q 0~0 CAP 3 161 AVL 3 0 ~ 0 IHR 3 9865 FUEL 3 e ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 tlA IN 7 0 PR I VR PKIIALTY ll Y CYCLE. t'oSl 1 CAP 4 182 hVL 4 0 IHR 4 9873 FUEL 4 ~ ~ e ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 OVERHAUL 0 1 ~ On 4 CAP 5 190 AVL 5 93>0 IIIR 5 9876 HEAT RATE FACTOR 1.00 SPN HN7 0 HA TUB I > IG >) ~ 0 FREO'IE>ICY 52 CAP 6 0 hvl. 6 0 ~ 0 IHR 6 U STP7 UP 469 HBTU HUST Ru't OE'>'.~ T I 7'i 5 CAP 7 0 hVL 7 neo IPR 7 0 PAIIKING 0 HBTU/H PRE COeIM GEN 0 ~ 0 HAX Scell) E RATEO 182 tIIN ootrrt TINE, 8 leoe < 71 TRANS'OSS  % 0 ~ 0 C'adda pT JEFF 3 ddaad CAPACITY>> RELI AGILI 7 Y >>HEAT RATE >><<<<<<<< <<>>>>>>>><<<<FUEL>>>>>><<<<>>>>>>>>>>>>>>>>>> >><<>>>>>>>>>><<COST>><<<<>>>>>>>>>>>> el'Vi BTU/KIIH TYPE HIN% TOT%  %/YR COHPAreY 3 PIIK JAII I 1985 PIN 35 FOR H 7 ' HR FAC I ~ 00 HANDLING 0 ~ 0 6 ' AREA 12 C 7>> Jh>e 1 1985 HA X 185 FGR 0~0 AHR 1 12915 S7RT UP OIS OILO 100 ~ 0 I.KAS ING 0 0 ~ tl UNIT TYPE F tin 7 Jhll 1985 Et! ERG 190 tlOR oen ACCTG 0 SUPP Qeo 0~0 VAR Oat>> 0~0 6 ' RESERVE lno,~ S Rt. 7 h >5 APR JAi> 1 1 1987 1984 CAP 1 CAP 2 35 84 AVL AVL 2 0~0 0~0 IHR IHR I 2 8737 9219 FUEL 1 RES 2 FUEL 2 '0 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ UNLH 0 ~ 0100 ~ 0 ~ ~ ~ ~ 0~0 0~0 FIXEO OeH 40909 SALE AOO 0 6 ' 0~0 cAP 3 109 AVL 3 0~0 IHR 3 9498 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 IIAINT 0 PRIORITY CYCLE. 1 CAP 4 185 AVL 4 oeo IHR 4 9841 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 OVERHAUL 0 PE>NALTY 1>On POS I 7 I 0>>> CAP 5 190 AVL 5 93 ' IHR 5 9862 HEAT RATE FACTOR I ~ 00 SPN HNT 0 HATURlllG neo FREQUKtICY 52 CAP 6 0 AVL 6 n,o IHR 6 0 STR7 UP 495 HBTU HUST Puli 0 IIKVIAT10:I 5 CAP 7 0 AVL 7 n~0 IHR 7 0 RANKING 0 MBTU/H PRE>>corlH GEN oeo HAX SCHL> E RATEO 185 IIIN OGDEN TINE 8 IeO, a 72 TRANS'OSS % 0~0 NPC I ITE<<soOGATO~Y OH N ttE 3?Os] IU] tIILE PO]rIT NUCLEAfs Ut IT NO ~ 2 Et'EROY MANAGE11ENT ASSOCIATES t INC PAGE 15) ITEM 1'Oo F. REPT 9 OPT]ON 1 SUBPEPORT I 05/13/83 aoaoaaoaaoof TERAT]too Ut>ITS CHARACTER JSTJCS ooaoaooaao APRIL aaooo PT JEFF oaoaa cAPAO I 7 Y- PELI IT Y HEAT RATE FUfL" aaa aaaCOST ~ et. t]7 II/KtoH TYpf >>ltI% TOT%  %/'YR COMPA>IY ~ 3 t'RQ Jht ~ 1 ]985 M]N 35 f'R ga 7~0 IIR FAC 1 ~ 00 HANOI. INO 0~0 6~0 AREA 12 Co~o JAeo 1 1985 MAX 185 FOP oen AHR 1 129]5 S7R7aUP DIS OJLD ]on.n LEASJNO o oo0 UttlT TYPE F 1985 Et.f RG 190 t lop ooo ACCTO SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 VAR OoM 0~0 6 ' RESERVE S Rf 7 ipH ]988 CAP I 35 AVL 0~0 ltlR I FUfL I RES 2 'O UNLM 0 ~ 0100 ' FIXED OoM 40909 6 ' ]no.n A oo Joss ] 1984 CAP 2 84 AVL 2 0 ' IHR 2 9219 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 ooo SALE AOD 0~0 CAP 3 109 AVL 3 noo IHR 3 9498 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ooo 0 ~ 0 HAINT 0 PRIOHI TY 0 CYCLE 1- CAP 4 185 AVL 4 0' IHR 4 9841 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 OVERHAUL 0 Pf NALTY 1, nn POS I 7 I V'1 3 CAP 5 190 AVL 5 93 ' IHR 5 9862 HfAT RATE FACTOR I ~ 00 SPN MNT 0 MATURING 0 ~ 9 FPE.OUt.",C Y 52 CAP 6 AVL n.o JHR 6 STRT UP 495 tIBTU HUST RUN 1JE v]d 7 Io:s 5 COP 7 AVL 7 0~0 IHR 7 BANKING 0 HBTU/H PRE Cot1N GEN 0 ~ 0 HAX SCHU E RATED 185 I<IN DO1tN Tltof 8 I~D~ > 73 TRANS> LOSS 0~0 GLE ti,;gag 4 aaaao CAPACITY" Rf L I ABILITY "HEAT RATE aaaa aaaaaaaaFUf Laaaaaaa aaaaea <<aaaaaaecOSTaaaaaaaaa I stH BTU/KIIH TYPF. tt]tI% 787%  %/YR ' COMPA<IY 3 tsRE JA(s 1 1985 MIN 35 FOP H ]O.O HP FAC I ~ 00 HANDLING 0 ' 6 ' s AREA 12 CO'o JAI~ ] 1985 teAX I]0 FOP I 0 ~ 0 AIIR 1 12136 STRT UP DIS OILO 100 ~ 0 LEAS]stG 0 0 ~ (I UtIIT TYPE F 1" $ 7 JAsl 1985 Etsf pn 112 MOR 0 ' AccTG 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 VAR OoH 0 ~ 0 6 ' C RESERVE S 11ET 1!ECJt'oooa 1 1997 CAP 1 35 AVL I 0 ~ 0 IIIR ] 977" FUEL 1 PES I ~ 0D UNLH 0 ~ 0100 ~ 0 FIXED Dost 23726 6 ' i ]go.u Jd e ] ]984 CAP 2 72 AVI P 0 ~ 0 IHR 2 10326 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0 ' SALK ADO 0 0~0 I CAP 3 110 AVL 3 0 ~ 0 IHR 3 1]424 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 MAINT 0 C PR I OR I 7 Y 0 CYCLF 2 CAP 4 112 AVL 4 9nen lt1R 4 11424 FUEL 4 ~ ~ ~ ~ ~ o ~ ~ ~ ~ ~ ~ 0~0 0~0 OVERHAUI. 0 PENALTY 1 ~ Oi> IeOS] t]ni ~ 5 CAP 5 0 AVL 5 0 ~ O. IHR 5 0 HEA7 RATE FACTOR I ~ 00 SPN toNT 0 HATUR]116 0 0 FOE~) <Jti ~CY 52 CAP 6 0 AVL 6 n.o JHR 6 0 STRT UP 286 HB7U HUST RUN DE<]AT I 5 CAP 7 0 AVL 7 n.o JHR 7 0 BAtlKJNG 0 toBTU/H PRE COMM Oft1 oso HAX SC11D 1; RATf.O 110 MIN BONN TIME 8 I sOo o 74 TRANSe LOSS % 0 ~ 0 ~ ' >h " 'f 1 NRC itiTERROGATORY ON NIt E HII.E Poltlg NUCLEAR UNIT N0,2 ENERGY feANAGENENT ASSOCIATEse INC PAGE 1 TE> t!0 ~ E 320 ~ 1 lul REPT 9 OPTION 1 SURREPORT 1 15'5/13/83 ? 4+ooo+p++eGEttEfcAT ING util TS cvARccTER 1sT les awe<<oo<oo 004oo GLORI(>>(ioO 5 0 oooo Ct>P AC I T Y RELI>>81L IT Y I<EAT RATE FUEL>>>>>>>> ----cosT -- tht etu/set T YPF. I: It<% TG T%  %/YR CCHPaNY JA<< I 96>3 te I th 35 fOR ': 10 ~ 0 qP FAC IGLOO NANULING 0 ~ 0 6 ' AREA 12 CO"'Ã" 1 f985 110 FOP I 0~u Aqa I 12136 STPT-uf'UPP OIS Oll.o 100 ~ 0 I.EASING 0 0~0 6' UNIT TYPE F 1985 Eteil<G 112 <<OR 0 CCCTG 0 ~ ' ~ ~ ~ ~ ~ ~ 0~0 0~0 VAR OeN Oeo RESERVE 5 PET JC "> 1 cl00 CAP 1 35 AVL 1 0 ' IHR 1 9778 FuEL 1 ftES 1,00 uwLtt 0 ~ 0100 ~ 0 FIXED OeN 23726 6 ' h 100eO w 1 1984 CAP 2 72 PVL 2 Oeo lf<P 2 10326 FU.EL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Q ~ 0 0~0 SALE AOO 0 0~0 CAP 3 110 AVL 3 0~0 IBR 3 11424 FU:L 3 ~ ~ ~ ~ ~ ~ e ~ ~ ~ ~ ~ 0,0 0~0 HAINT 0 { PRIORITY 0 CYCLE 2 CAP 4 112 AVL 4 90 ' ll R 4 11424 FUFL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 OVERHAUL 0 h PENALTY 1 ~ 00 POSIT IOt ~ 3 CCP 5 0 AVL 5 0~0 IuR 5 hECT RAI E FACTOR 1 ~ 00 SPN teNT 0 HATUPIeeG 0 HUST Pu< 't E t REouit CY 0 e'<iAT IV' 52 5 C'P 6 CAP 7 0 0 WVL e AVL I O.O 0 ~ 0 IHR 6 IHR 7 0 0 STFT UP Bt.up I>$ 6 286 HBTU 0 wGTU/N PRE-CONN GEN Oeo ( (:.'.. HAx SChu E RATED l]G NIN DOWN TINE 8 I eDe tt 75 TRANS'OSS  % 0~0 C e I <<<<<<e ee e<< - ~ ttRC INTERROGATORY ON N]tSE MILE PGIN'I NUCLEAfi UNIT NQ ~ ENERGY MAtsAGEHENT ASSOCIATES s INC PAGE 159 . ITEs4 tso ~ E 32ov] (D) HEPT 9 OPT]ot4 ] SUBRKPORT I 05/13/83 apaapapaaaGEhiKHAT ]NO UNITS CHRf'ACTERISTICS aaaaaaaaaa aaaPa PT JEFF qaaaa -CapACITY- AE.L IAb]LI TY l E'T R'TE <<e a>><<<<FUEL<<<<a<<e aaa<<ee<<a ~ <<<<a<<a CQSTa <<<<<<a<<<<a Hl: BTU/KssH TYPE Hlt4% TG7%  %/YH COs1PASSY 3 PRE JAs ~ 1 1985 M]te 8 f OP t 1]eb HP FAC ] F 00 HANDLING o,o e.o AREA 12 CQH JAe >>985 MR is 45 FGR I Oeb AtsR ] ]70b5 STAT-up DIS OILD looeo LE AS]NG 0 0 ' UNIT TYPE S14 T JR 'e 1985 EHE PG 4& t QP Oeo ACCTG 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ Ovo Ovo VAR Omits Ovo 6 ' RESERVE 5 PET NOV ] 1993 CAP 1 8 AVL 1 Oeo IHR ] 8436 FUFL 1 PES 1 ~ OD UNLH Ovo]00 ' FIXED 0<H 17530 6 ' ]ooen 4 sl JR" 1 ]984 CRP 2 23 AVl. 2 0 ~ 0 IHR 2 10955 FUEL 2 evvev.vv v>ee 0,0 OvO SALK aOD 0 0 ~ 0 CAP 3 4S AVL 3 o ~ 0 lt R 3 12779 fUEL 3 v ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 HA TNT 0 PRIORI TY 0 CYCLE ] CAP 48 AVL 4 89 ~ 0 Is'sl 4 ]3794 FUEL 1 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 OVERHAUL 0 PENALTY ],sso POS I T IOiv 1 CRP 5 n RVL 5 OeSs 14P. 5 HEAT RATE FACTOR 1 ~ 00 SPN tsNT 0 HATUR]ivo 0 ' f KEOUEt CV 52 C"P t 0 RVL 6 CD 0 lwR e 0 STRT uP 125 fsBTU MUST Rutn UEVIAT]Q4 5 CAP 7 0 AVL 7 beb IwR 7 0 Usss4K ING 0 HBTU/H PRE COHM GEN 0 ~ 0 MAX SCHD RATFu 45 H]t4 DossN TIME 8 I'D's 77 TRANS'.OSS  % 0~0 papaa pT JEFF 2 papap -CAPAC]TYee REL I Ass]i.l TY HEAT RATE <<<<a <<<<<<<<a <<a <<a a F' E La <<<<a <<<<a a <<<<<<<<<<a aa << <<<<<<COST<<a<<a<<<<aa<< HW F TU/KtsH TYPE HIM% TOT%  %/YR COHPANY 3 PRE JRtv 1985 MIN 8 FOR ss 1) vo HP FAC ] ~ Oo HA~DLI~G 0~0 6 ' AREA ]2 CQH JAn 1 1985 ssAX 45 FGR I 0~0 AfsR ] ]'7065 STRT UP OIS OILO ]00 ~ 0 LEASINO 0 0~0 UNIT TYPE F fsA 7 JAs4 1985 EHERG 48 tsOR 0~0 ACCTO 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0 ~ 0 VAR 0aM 0 ~ 0 6 ' RESERVE 5 PKT NQY ] 1995 CAP 1 8 AVL I 0 ~ Ss IfsR ] 8436 tUEL 1 RES 1 ~ OD UNLM 0 ~ 0100 ~ 0 FIXED OaM 17530 6~0 100 ~ 0 4 M JAti 1984 CAP 2 23 AVL 2 0~0 ItsR 2 ]095S FUE.L 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0 ~ 0 SALK AOO 0 0 ~ 0 CRP 3 45 AVL 3 0 ' It'tk 3 12779 FUEL 3 ~ ~ ~ s ~ ~ ~ ~ ~ ~ ~ ~ 0 '0 0 ' MAINT 0 PRIORI T Y 0 CYCLE 1 CAP 4 48 AVL 4 89eo IfsR 4 13794 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0 ~ 0 OVERHAUL 0 PENALTY 1 ~ OO POSITION 3 CAP 5 0 AVL 5 0~0 ]HR 5 tsEAT RATE FACTOR I ~ 00 SPN HNT 0 HATURINO 0 ~ o FREQUEt4CY 52 CAP 6 0 AVL 6 0~0 IHR 6 0 STPT UP ]25 I'BTU HUST PUN E DEvlATION 5 CAP 7 0 AVL 7 0 ' IHR 7 0 tsANKING 0 ssBTU/H PRE COMM OEN 0~0 HAX SCtsD E RATED a5 HIN DotsN TIHE 8 IeO ~ ss 78 TRANS'.OSS  % 0~0 ENERGY MANAGEMENT ASSOCIATESt ]ttc 60 ITEN t(o ~ E 320 ~ ] IU] REPT 9 OPTION 1 SUBREPORT 1 /83 aaaaooaaoaGENERATING UllfTS CHARACTERISTICS aooaooaaao oaaao N PORT aa444 CAPAC1TY REL]ABIL IT Y HEAT RATE ao ~~ we~ ~awaFUE( a~mwawoaam~aew a~aaaaeo~co$ Tawwwaaamg NW BTU/KVH TYPK H]th% TAT%  %/YR COMPANY PRE JAN 1985 HIN 70 roR H 14 ~ 0 HP FAC ]ioo HANDLING 0~0 64 0 AREA CON JAN ] 19es HAA 353 FOH I 0~0 AHR 1 11525 UP OIS GILD 100 ~ 0 LEASING 0 ORO UNIT TYPE F JAN 1985 EHERG 370 NOR 0 ' ACCTG 0 SUPP ~ o ~ ~ ~ ~ ~ ~ 0 ~ 0 0~0 VAR 0+H 0~0 6~0 t) RESERVE RKT JAN ] 2]00 CAP ] 70 AVL 1 0~0 ItlR 1 8667 FUEL 1 RES 2 ~ BD UtILtt 0 ~ 0100 ~ 0 FIXED OiM 8]429 eao ]oooo A H JAN ] 1984 CAP 2 170 AVL 2 0~0 IHR 2 934) FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 SALE AOD 0 0~0 CAP 3 274 AVL 3 0~0 IHR 3 9577 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 HAINT 0 i) PRIORITY 0 CYCLE 3 CAP 4 363 AVL 4 0~0 IHR 4 10482 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0 ' OVERHAUL 0 PENALTY ]IQQ POS1 7 ION 5 CAP 5 370 AVL 5 86 ' IHR 5 10592 HEAT RATE, FACTOR ]ooo SPN HNT 0 HATUR]NG Q.o FREQUENCY 52 CAP 6 0 AVL 6 0 ~ 0 IHR 6 0 STRT~UP 990 MBTU HUST Rut< E DEVI AT ION 5 CAP 7 0 AVL 7 0 ~ 0 IHR 7 0 BANKING 0 HBTU/H PRK COHH GKN 0~0 HAX SCHD E RATED 3e3 PIN DOWN TIHE 8 I ~ Do ¹ 79 7RANS ~ I.OSS 0~0 0 oaaoa ao4 4'4 ~~~~ee~~~coST N PORT ~CAPACITY RELIABILITY -HEAT RATE" FUEL~ HP BTU/rwH Typf MIN% TGT%  %/YR COHPAIIY 3 PRE JAN ] 1985 HIN 70 FOR H 14 ~ 0 HR FAC 1~00 HANDLING 0 ' 6 ' AREA 12 COM JAN ] 1985 MAX 363 F'0R I o~0 AHR 1 11525 STRT~UP DIS OII.D ]00 ~ 0 LEASING 0 0~0 UNIT TYPE F liAt JAN ] ]9es EHERG 370 HOR 0 ' ACCTG SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0 ~ 0 VAR ORH O,O 640 RESERVE S RET JAN I 2100 CAP 1 70 AVL 1 0~0 IHR 1 e667 tuEL 1 RKS 2 'D UNLtI 0 '100 ' Flxfo OoH 81429 100 ~ 0 A H JA¹I ] ]984 CAp 2 170 AVL 2 0 ~ 0 IHR 2 9341 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 SALE AOO 0~0 PRIORITY CAP 3 274 AVL 3 0~ IHR 3 9577 FUKL 3 ~ ~ ~ ~ t ~ ~ ~ ~ F 4 ' ~ 0 0~0 0 0 CYCLE 3 CAp 4 363 AVI 4 Ooo IHR 4 10482 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 oVFRHAUL 0 PENALTY ] F 00 POSITION CAP 5 370 AvL s ee.o IHR S 10>>2 HEAT RATE FACTOR 1 ~ 00 SpN HNT 0 MATURING 0,0 FREOUENcY 52 CAP e 0 AvL 6 o ~ 0 IHR 6 STRT~UP 990 HBTU HUST Ruit K DKV I AT ION 5 CAP 7 AVL 7 0~0 IHR 7 wANKIIIG 0 HBTU/H PRE COMH GKN 0~0 '7 MAX SCHD E RATED 363 MIN DOWN TIME 8 I ~ De ¹ 80 TRANS'OSS 0 ~ 0 ~ 7 NRC ll4TERROOATORY ON NINF. MILE POINT NUCI.EAR UI4]T NO ~ 2 ENf RGY t~4ttAOEHE ttT ASSOCIATES y INC PAGE ]6] ITEM t<O ~ E 320 ~ 1 Itt I REPT 9 OPTIotl 1 SUBRKPORT 1 05/13/83 oaooaoaoaoGENERATING UNITS CHAHACTKR]STICS aaaooooooo PORT 3 ttoooa CAPACITY RELIABILITY "ttF->T RATE a aaaaa<<aaeaFUf L<<eaa<<aa<<aaa<<aa COST V tq bi PTU/K'AH f TYP tt I tl% TG T%  %/YR 6.o COMPANY 3 PR f JAoq 1985 Hll't 70 FOtt M 14.0 HR FAC I 00 HANDL]NO o.o AREA 12 COlt JAN 1 1985 HAX 363 FOR I 0~0 AHR ] 11525 STRT<<UP DIS OILO 100 ~ 0 LEASING 0 0~0 UNIT TYPE F ttAT JAN ] 1985 EPERG 370 HOR 0 ' ACCTG SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0 ~0 VAR O<H O.O 6]o JAN 2]00 CAP ] 70 AVL I 0~0 IHR ] 8667 FUEL ] RES 2 ~ 80 UNLt' ~ 0100 ~ 0 FIXED O>H 81429 6 jp RESERVE S RET 1 ]oooo A tt JAN ] 1984 CAP P. 170 AVL 2 0' IHR 2 9341 FUEL 2 e Ies ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0~0 SALE ADD 0 0~0 CAP 3 274 AVL 3 0~0 IHR 3 9577 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0~0 MAINT 0 3 CAP 4 363 AVL 4 0~0 IHR 4 10482 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0~0 OVKRHAUL 0 PRIORITY 0 CYCLE PENALTY 1 ~ 00 POSIT ION 3 CAP 5 370 AVL 5 86eo IHR 5 ]0592 ttfAT RATE FACTOR I.OO SPN HNT 0 HATURING 0 ~ 0 FREOUfttCY 52 CAP 6 0 AVL 6 0~0 IHR 6 0 STRT UP 990 HB'TU HUST RUN E DEVIATION 5 CAP 7 0 AVI. 7 0 ' IHR 7 0 BANKING 0 HBTU/H PRE-COMM'Gftt ttIN DOMN TIME 0~0 8 HAX Setto E RATKO 363 -I.D. It 8] TRANS'OSS  % 0~0 0 ooqaa ll pORT 4 oooo" <<CAPACITY<< RELIABILITY <<HEAT RATE <<a<<a<<<<a<<<<aaa<<FUEL<<aaa<<aaa<<a<<a<<a aaaaaa<<aCOST<<<<aa<<aaa<< HH BTU/KBM TYPE MIN% TOT%  %/Ytt ]4eo ]coo HANDLING oeo 6.o 0 COMPA'4Y ARE A 12 3 PRE COct JAN JA 4 1985 1985 MIN HAX 363 70 FOR H FOR I 0~0 HR FAC AHR I ))525 S'TRT UP DIS GILD ]00 ~ 0 LfASINO 0 0 ~ 0 UNIT TYPE JAV I 1985 EttfRG 370 HOR 0~0 ACCTO 0 SUPP ~ a ~ ~ ~ ~ ~ ~ 0~0 0~0 VAR OaH 0~0 6.0 RESERVE F S HAT PET JAN 2100 CAP I 70 AVL 1 0~0 IttR 1 8667 tUEL 1 RES 0 ~ TD Ut'LH 0 ~ 0100 ~ 0 f IXEO OiM 81429 6 ' 100 ~ 0 A I'AN 1 I 1984 CAP 2 170 AVL 2 0 ' IHR 2 9341 9577 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 0~0 0~0 SAlE HAINT ADD 0 0 0~0 CAP 3 274 AVL 3 0~0 IHR 3 PRIORITY O CYCLE 3 CAP 4 363 AVL 4 0 ' IHR 4 ]0482 FUEL 4 ~ ~ ~ ~ ~ I~ ~ ~ ~ ~ ~ 0~0 0~0 OVERHAUL 0 PENALTY 1 ~ 00 POSITION 5 CAP 5 370 AVL 5 86 ' IHR 5 10592 HEST RATE FACTOR 1 ~ 00 SPN MNT 0 MATURING 0 0 FREQUENCY 52 CAP 6 O AVL 6 0~0 IHR 6 0 STRT UP 990 MBTU 0 AVL 7 0~0 IHR 7 0 ttANKINO 0 HBTU/H PRE COMM GEN 0~0 HUST RUN E DEVIATION 5 CAP 7 HAX SCHD f RATE D 363 HIN DoltN TIME TRANS ~ LOSS 0~0 8 I~D~ k 82 NRC INTERROGATORY ON NINE MILE POltIT NUCLEAR Ut.IT tl0 ~ 2 ENERGY HANAGEI'EFIT ASSOCIATES t ltjC 1 h ITEM te0 ~ E 320 ~ 1 IV) REPT 9 OPTION I SUBREPORT I de'i3/83 oo>>oetooooOENKRATItjG UrtITS CHARACTERISTICS oooooooooo poooo LILCO T 1 poooo CAPACITY RELIABILITY HEAT RATE aaaaaaaaaaaaaFQELaaaaaaaaaaaaaa aaaaaaaaCOSTaaaaaaaaa j4br BTU/Kitrt TYPE Hltl% TGT%  %/YR COrIPAIIY 3 PRE JAre 19&5 MIN 60 FOR tl 15 ~ 0 MR FAC F 00 HANDLING 0~0 de0 AREA 12 COM JAN 1 1985 I1AX 228 FOR I 0 ' AHR 1 13960 STRT UP DIS OILV 100 ~ 0 LEASING 0 0 ' UNIT TYPE T I!DT JA!t 1985 El ERG 228 teOR 0.0 ACCTO 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0 ' Oe0 VAR OeM 0 ' 6e0 RESERVE 0 RET JAN 2100 CAP 1 60 AVL 1 0' IHR 1 13910 FUEL 1 DIS GILD UNLH 0,0100eo FIXED OeH 10103 6~0 100 ' A H JAN 1 1984 CAP 2 120 AVL 2 5' IHR 2 13920 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0 ' SALE ADO 0 oe0 f;, CAP 3 228 AVL 3 79 ' IHR 3 13940 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0 ' HA INT 0 PRIORITY 0 CYCLK 4 CAP 4 0 AVL 4 Oe0 IHR 4 0 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0 ' OVERHAUL 0 PENALTY le00 POSITION 1 CAP 5 0 AVL 5 Oe0 IHR 5 0 HFAT RATE FACTOR F 00 SPN IDENT 0 HATURING Oe0 FREOUEtjCY 52 CAP 6 0 AVL 6 0,0 IHR 6 0 STRT UP 120 MttTU HUST RUtl E OEV I ATION 5 CAP 7 0 AVL 7' ~ 0 IMR 7 0 BANKING 0 MBTU/H PRE-COMM OEN 0 ' HAX SCHV E RATED 228 MIN VOVN I IHE 2 I ~ 0 ~ jt 83 TRANS'OSS  % 0 ' 'c a hh Ct aaaaaaaaCOSTaaaaaaaaa ooooo- LILCO T 2 poooo CAPACITYa RELIABILITY HEAT RATE aaa aaaaaaaaaFUFLaaaaaaaaaaaaaa litt BTU/Ktjtt TYPE HIN% TGT%  %/.YR COHPAIIY 3 PjtE JAll 1 1985 HIN 135 FOR H 15e0 HR FAC I ~ 00 HANDLINO 0 ' 6 ' )I-: ARKA 12 CVI>> JAtl I 1985 MAX 625 FOR I 0 AHR 1 13600 STRT UP DIS GILD 100 ~ 0 LEASING 0 0 UNIT TYPE T i"AT JAN I 1985 ENKRG 625 HOR Oe0 ACC78 0 SUPP ~ ~ ~ ~ e ~ ~ ~ 0,0 OeO VAR OeM 0 ' 6 ' RESERVE 0 RET JAN I 2100 CAP 1 135 AVL I 0' IHR I 13610 I'UEI. I DIS OILO UNI H 0 ~ 0100 ~ 0 FIXFO OeH 2917 6~0 100e0 A I'l JAN I 1984 CAP 2 222 AVL 2 0~0 IHR 2 13630 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0 ' SALE AOD 0 0 ' CAP 3 310 AVL 3 F 1 IHR 3 13640 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ e ~ ~ 0 ' 0~0 MAINT 0 PRIORI TY 0 CYCLE 4 CAP 4 425 AVL 4 14el IHR 4 13640 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0~0 OVKRHAUL 0 PEFIALTY 1 ~ 00 POSITION 2 CAP 5 625 AVL 5 70 ' IHR 5 13650 HEAT RATE FACTOR F 00 SPN IINT 0 HATURINO 0 ' FREOUKteCY 52 CAP 6 0 AVL 6 0' IHR 6 0 STRTaUP 313 HBTU HUST Ruti K DEVIATION CAP 7 0 AVI. 7 Oe0 IHR 7 0 IIANKINO 0 HBTU/H PRE COHH OEN 0 ' HAX SCHV E RATED 625 MIN OOKN TIHE 2 I ~ De O 84 TRANS'OSS 0' NRC INTERROGATORY ON t(INE tllLE PO]teT NUCLEAR UNIT tla ~ 2 ErlERGY HANAGEMENT ASSOCIATES1 INC PAGF. ]63 ITEM NO ~ E 320 ~ I lO) REPT 9 OPTION I SUBREPORT 05/13/83 ooaao"oaaoGENERATINO UNITS CHARACTERISTICS oaooo LILCO T 3 aooao CAPACITY RELIAB ILITY -HEaT RATE- aaa<<<<<<<<<<aaa<<f UE] a<<aaa<<<<a<<aa<<aa <<<<<<<<<<<<aCQS7<<aaaaa<< el el BTU/KttM TYPE MIN% TOT%  %/Yk COMPANY 3 PRE JAtl I 1985 MIN 40 FOR M 15 ~ 0 MR FAC I' 00 HANDLING 0 ' 6 ' AREA 12 COM JAtl 1 1985 MAX 188 Fate I 0~0 AHR 1 13870 STRT UP OIS GILD ]00 ~ 0 LEASING 0 0 ' UNIT TYPE T MAT JAIL 1985 Ete ERG 186 MOR 0.0 AccTG 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0 ' VAR OeM 0 ' 6 ' RESERVE 0 RET JAtt 1 2100 CAP 1 40 AVI. 1 0 ' IHR I 13880 FUEL I DIS O]LO UNLM 0 ~ 0100 ~ 0 FIXED OeM 8323 6 ' 100 ~ 0 A t1 JAN 1 1984 CAP 2 120 AVL 2 13e3 IHR 2 ]3900 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0 ' SALE AOD 0 0 ' CAP 3 ]88 AVL 3 71 ~ 7 IHR 3 13920 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0 ' t1A INT 0 PRIORITY 0 CYCLE 4 CAP 4 0 AVL 4 0 ' IHR 4 0 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0 ' OVERHAUL 0 PENALTY 1 ~ DP PUS IT ION 1 CAP 5 0 AVL 5 0 ' IMR 5 0 tlEAT RATE FACTOR I ~ 00 SPN elNT 0 HATUR]NO 0,0 FREnUENCY 52 CAP 6 0 AVL 6 0 ' IHR 6 0 STRT UP 104 HBTU HUST Rut'l E OEV IATIOtl 5 CAP 7 0 AVL  ? 0 ' IHR 7 0 BANKING 0 MBTU/H PRE CatlM GEN PeP HAX SCMU E RATED 188 MIN DowN T]teE 2 I~D~ N 85 TRANS ~ LOSS  % DeP ooaoo LILCO T oaoao <<CAPACITY RELIABILITY tiEAT RATE <<<<<<a <<a<<<<a<<FUEL<<a<<a<<aa<<aa<<aa<< COST BTU/KttM TYPE MIN% TOT%  %/YH COMPANY 3 PRE JAw 1 1985 Ml'IN 30 FOR M ]5 ~ 0 MP. FAC ] F 00 HANDLINO 0,0 6 ' AREA 12 COM JAN ] 1985 MAX 144 FOR I DE 0 AHR 1 15550 STRT UP DIS GILD 100 ~ 0 LEASING 0 0 ' UNIT TYPE T t1AT JAN ] ]985 Et1ERO 144 MOP 0 ' ACCTG 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0'0 VAR OeM 0~0 6 ' o RESERVE a HET JA~ I 2100 CAP 1 30 AVL ] 0 ' IHR 1 15560 FUEL I DIS GILD UNLM 0 ~ 0100 ~ FIXED OeM 6383 6eP 100 ~ 0 A tl JAN 1 1984 CAP 2 90 AVL 2 ]V.5 IHR 2 15580 FUEL 2 e ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0' SALE AOD 0 0 ' CAP 3 144 AVL 3 74 ' IHR 3 15600 FUEL 3 ~ ~ ~ ~ ~ ~ i ~ ~ ~ ~ ~ 0' 0' MAINT 0 PRIORITY 0 CYCLE 4 CAP 4 0 AVL 4 0' IHR 4 0 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0' 0' OVERHAUL 0 PENALTY lePP POSITION 2. CAP 5 0 AVL 5 DeD IHR 5 0 tlEAT RATE FACTOR I ~ 00 SPN MNT 0 HATURING 0,0 FREOUENCY 52 CAP 6 0 AVL 6 De0 IMR 6 0 STRT UP 78 HBTU MUST RUll E DE V I AT IOtl 5 CAP 7 0 AVL 7 0 ' IHR 7 0 BANKING 0 HBTU/H PRE COMM OEN 0 ' HAX SCMO E RATED 144 MIN DalfN TIME 2 I.O. r 86 TRANS'OSS  % 0' NRC INTERROGATORY ON NINE HllK POIt}T NUCLEAR Ut>IT NO ~ 2 ENERGY MANAGE}!ENT ASSOCIATKSt INC 164 ITEM NO ~ E 320 ~ 1 lU) REPT 9 OPTION 1 SUBREPORT I /13/83 <<4444<<<<44<<GENERAT]elG Up]TS Ct!ARACTERISTICS 4<<<<oooo<<4<< o4444 LILCO T 5 oooo>> aCAPACITY RELI A}t]LITY aHEAT RATE BTU/K}tH l a a a 'a a a a a a F U F a a a a a a a a a a a a a a TYPK M]tl% TOT% a a CPSTaa aaaaaa %/YR COMPANY 3 PRK JAN 1 1985 M]tl ]8 FOR t! 15 ~ 0 HR FAC I ~ 00 HANDLING 0~0 6eo AREA ]2 COM JAN 1 1985 MAX 98 FOR I 0 ~ 0 A}IR I 151]0 STRTaUP 0]S GILD 100 ~ 0 LEASING 0 OeO UNIT TYPE 7 MAT JAI'l 1 ]985 EMERG 98 tlOR 0~0 ACCTG 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0~0 OeO VAR QeM 0~0 6 ' RESERVE 0 RET JAN 1 2]oo CAP 1 18 AVL ] 0~0 IHR ] .15130 FUEL 1 DIS OllD UNLM 0 ~ 0100 ~ 0 FIXED OeM 4335 6 ' 100 F 0 A M JAN 1 1984 CAP 2 54 AVL 2 ]F 0 IHR 2 ]5]50 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ e ~ 0~0 0~0 SALE AOD 0, oeo CAP 3 98 AVL 3 69 ' IHR 3 ]5]80 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0 ~0 MA]MT 0 PRIOR17Y 0 CYCLE 4 CAP 4 0 AVl 4 oeo IHR 4 0 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 OVERHAUL 0 PEN4LTY 1 ~ 00 POSI 7IOte CAP 5 0 AVL 5 0 ~ 0 IHR 5 0 }(EAT RATE FACTOR ] ~ 00 SPN MNT 0 HATURING 0 ~ 0 FREQUEtlCY 52 CAP 6 0 AVL 6 0 ' IHR 6 0 STRTaUP 78 MBTU HUST RUN E OEV I ATIOtt 5 CAP 7 0 AVL 7 0~0 IHR 7 0 BANKING 0 H87U/H PRE COMM GEN 0~0 HAX SCHO E RATED 98 MIN 00}tN TIME 2 led 4 87 TRANS ~ LOSS  % 0~0 44444 LILCO T 6 oo<<44 aCAPACITY RELIABILITY aHEAT RATE aaaaaaaaaaaaaFUElaaaaaaaaaaaaaa COST M}e BTU/gH TYPE MIN% TOT%  %/YR 0 COMPANY AREA 3 ]2 PRK COM JAN JAtt ] 1985 I ]985 HIN MAX 16 42 FOR H FOR I ]5!0 0~0 HR FAC f ~ 00 AHR I 17800 STRTaUP O IS GILD ] 00 ~ 0 HANDLING lEAS]NG 0 0 0 6~0 0~0 UNIT TYPE T MAT JAN 1 ]985 EMERG 42 MOR 0~0 ACCTG O SUPP ~ ~ ~ ~ e ~ ~ ~ 0~0 0~0 VAR OeM 0~0 6 ' Q RESERVE 0 RET JAN 1 2]00 CAP I 16 AVL 1 0~0 IHR 1 178]0 FUEL I OIS GILD UNLH 0 ~ 0100 ~ 0 FIXED OeM 1860 6~0 100 ~ 0 4 M JAN 1 1984 CAP 2 30 AVL 2 8 ' IHR 2 17820 FUEI 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 SALE AOD 0 0 ~  !] CAP 3 42 AVL 3 76 ' IHR 3 17840 FUEL 3 e ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 HAINT 0 PRIORITY 0 CYCLE 4 CAP 4 0 AVL 4 0~0 IHR 4 0 FUEl' ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 OVERMA}ll 0 PENALTY ]e 00 POSI 7 ION 2 CAP 5 0 AVL 5 0~0 IHR 5 0 HEAT RATE FACTOR F 00 SPN MNT 0 MATUR]NG oeC FREOUENCY 52 CAP 6 o AVL 6 0~0 IHR 6 STRT UP 26 HBTU MUST RUN E DEVIATION 5 CAP 7 0 AVL 7 0 ~ 0 IHR 7 0 BANKING 0 HBTU/H PRE COMM GEN 0~0 HAX SCMO E RATED 42 MIN DOWN TIME 2 I eOe 4 88 TRANSe LOSS  % 0~0 Je ttRC INTERROGATORY ON NINE t"ILE POINT NUCLEAR Ut"IT tip,2 ENERGY tlANAOEHENT ASSOCIATES) ltlC PAGE lee 1TEH Npe E 320 ~ 1 IOI REPT 9 OPTION 1 SUBREPORT 1 05/13/83 <<oo<<44<<DDDGENERATINO UNITS CHARACTERISTICS 4<<o<<4<<4<<4<< <<4"44 GOUOEY 7 <<D4D<< CAPACITY RELIABILITY "HEAT RATE >>aaa<<aaaa<<aaaFUEL>>a<<a<<a<<aa>>aaaa ~ aaaaaa>>CPST<<a<<a<<a<<a<< Hll BTU/KITCH TYPE ttIN% TGT%  %/YR Cpo!PANY 4 PAE JAN 1 1985 MIN 8 FOR tt 1 ~ 6 HR FAc l,oe HANOLINO e.8 e.p AREA 6 Cpbt JAN 1985 HAX FOR I 0~0 AHR I 14875 STRT<<UP DIS OILU 100 ~ 0 LEASINO 0 0~0 Ut!IT TYPE F ttAT JAN 1985 EHERG 44 NOR 0~0 ACCTO,' SUPP ~ ~ e ~ ~ ~ ~ ~ 0 ~ 0 pep VAR OeH F 0 6 ' RESERVE . S RET JAN I 2100 CAP 1 8 AVL 1 0~0 IHR I 89'90 FUEL 1 COAL2 ~ OU UNLH 0 ~ 0 1 00 ~ 0 FIXED Oett 20893 6 ' 100e0 A tt JAbC 1 1984 CAP 2 AVL, 2 14 ' IHR 2 1007e FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0~0 SAI.K AOD 0 0 ' CAP 3 AVL 3 84ol IHR 3 12130 fUEL 3 ~ ~ ~ ~ ~ ~ e ~ ~ ~ ~ ~ 0 ~ 0 0~0 HA lteT 0 PRIORITY 0 CYCLE 13 CAP 4 0 AVI. 4 0~0 IHR 4 ', 0 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0~0 OVERHAUL 0 PENALTY F 00 POSI T Ipt> I CAP 5 0 AVL 5 pep IHR 5 0 ttEAT RATE FACTOR I ~ 00 SPN HNT 0 MATURING 0 ~ 0 FREOUEflCY 52 CAP 6 0 AVI. 6 Oep IHR 6 0 STRT<<UP 522 HBTU HUST Rt.t"! E DEVIATION 5 CAP 7 0 AVL 7 0~0 IHR 7 . 0 BAtlKINO 0 HRTU/H PRE>>Cpettt GEN 0 ~ 0 MAX SCHO K RATED hp ttIN DOWN TIME 8 Iepe I TRANS'OSS % 0~0 0 <<oooo GPUOFY 8 <<4<<<<4 <<CAPACITY>> RELIABILITY HEAT RATE >><<a<<a<<a>>a<<a<<<<FUEL<<aaaa>>aaaaaaaa a<<a<<a<<a<<CPST<<aaaaa<<a<< BTU/KWH TYPE 'MIN% TOT%  %/YR COHPAtIY 4 PRE JAN 1 1985 HIN Met 39 FOR M I 1 ~ 2 HR FAC 1 109"3 'p it!0 ~ 0 HANDLINO 6 '0 6 ' AREA 6 CON JAN I 1985 HAX 82 FOR 0~0 AHR 1 ST)T>>UP DIS OILU LEASINO 0 ~ 0 UNIT TYPE F HAT JAN 1 1985 EHERG 85 HOR 0~0 ACCTO 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0~0 VAR OeH. 0~0 6' RESERVE S RET JAN 1'100 CAP I 39 AVI. 1 0~I IHR 1 $ 029 FUEL 1 COAL2epU UNLH 0 ~ 0100 ' FIXED OeH 39843 6' 100op A H JAN 1984 CAP 2 52 AVL 2 15 ~ 1 IHR 2 9450 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 F 0 SALE ADD 0 0~0 CAP 3 85 AVL 3 83 ' IHR 3 11483 FUEL 3 ~ ~ ~ ~ ~ ~ e ~ ~ ~ ~ ~ F 0 0~0 HAINT 0 PR1ORITY 0 CYCLE 13 CAP 4 0 AVL 4 0~0 IHR 4 FUEL 4 e ~ ~ ~ ~ ~ e ~ ~ ~ ~ ~ 0~0 0~0 OVERHAUL 0 PEtIAI.TY 1 00 POSITION I CAP 5 0 AVL 5 0~0 IHR 5 I 0 HEAT RATE FACTOR I ~ 00 SPt'l HNT 0 MATURItIG Oep FREQUENCY 52 CAP 6 0 AVL 6 0 ' IHR 6 ' STRT<<UP 569 HBTU MUST RUN E OEVIATI)W 5 CAP 7 0 AVL 7 F 0 IHR 7 BANKINO 0 HBTU/H PRE<<COt H GEtt 0~0 bJ HAX SCIIO E RATED 82 MIN DOWN TINE 8 I epe It 90 TRANS'OSS  % 0~0 b of 9 ip iQ 0 TORY ON NINE H]LE POINT NUCLEAR UNIT, NO ~ 2 ENERGY MANAGEMENT ASSOCIATES) INC ]6b 0 ~ 1 IO) REPT 9 OPTION I SUBREPORT 1 05/13/83 ooooooooooGENERATING UNITS CHARACTERISTICS oooooooooo ooooo GREttIDGE I ooooo CAPACITY RELIABILITY HEAT RATE ca<<a<<aaaaaa<<<<FUf Laaaeeaaaaaaaaa aaaaaaa<<CPSTaaaaaaaae 8TU/KIIM TYPE HIM% TOT%  %/YR COIIPArlY 4 PRE JAN 1 1985 H]rt 6 FOR M 5~0 HR FAC 1 ~ ]9 HANDLING 5 ' 6 ' AREA 6 COM JAN 1 1985 MAX 20 FOR I 0~0 AHR 1 14603 STRT<<UP DIS OILU 100 ~ 0 LEASING 0 0 ' 6' IIEET UNIT TYPE F MAT Jhtl 1 1985 El~ERG 23 MOR 0~0 ACCTG 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ O.O 0.o VAR 04M 0~0 RESERVE S RET JAtt I <<l]00 CAP 1 6 AVL 1 0~0 IHR ] ]0/15 FUEL 1 COAL >2U UNLH o,oloo.o FIXED OtM 13344 6' ]00 ' A M JAN 1 1984 CAP 2 ]0 AVL 2 35e1 IHR 2 10708 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 SALE AOD 0 0' CAP 3 23 AVL 3 59 ~ 9 IHR 3 12312 FUEL 3 ~ ~ t ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 MA 0 PRIORITY CYCLE 13 CAP 4 0 AVL 4 0 ~ 0 IMR 4 0 FUEL 4 ~ ~ ~ ~ i ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 OVERHAUI. 0 PENALTY ].Ou POSITION 1 CAP 5 0 AVL 5 0 ~ 0 ]MR 5 0 HEAT RATf FACTOR 1 ~ 00 SPN MNT 0 HATURING 0 ~ 0 FREOUftlCY S2 CAP 6 0 AVL 6 0~0 IHR 6 i 0 STRT<<UP 355 MBTU HUST RUtt E DfV I ATION 5 CAP T 0 AVL 7 0~0 IHR 7 0 BANKING 0 HBTU/H PRE<<COMM GEM 0~0 8 MAX SCHU E RATED 20 MIN Oot<<N TIME I ~ D ~ tt 91 TRANS'OSS 0~0 e GREtllDGE 2 oooco CAPACITY<< RELIABILITY <<HEAT R TE eaaeaaaaaaaa<<FUE Li?aaaaaaaaeaaaa <<COST MIt BTU/KIIH TYPE MIN% TOT%  %/YR COMPANY 4 PRE JAN I 1985 HIN 6 FOR M 10 ~ 8 HR FAC feoo HANDLING 5 ' 6 ' AREA 6 COM JAN 1 1985 HAX 20 FOR I 0~0 AHR 1 15536 STRT<<UP DIS OILU 100 ~ 0 I.fAS]No 0 0~0 UN]T TYPE F MAT JAN 1985 EMERG 20 HOR 0~0 ACCTG I 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 VAR OoM 0~0 6' RESERVE S RET JAN I 2100 CAP I 6 AVL 1 0~0 IHR 1 ]0229 FUEL I COAL 12U UNLM 0 ~ 0100 ~ 0 FIXED 04M 13962 6 ' 100 ~ 0 A M JAI'I 1 1984 CAP 2 ]5 AVL 2 0 ~ 0 IHR 2 ] 708 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0~0 SAI.E AOO 0 0~0 CAP 3 23 AVL 3 89 ' IHR 3 1 024 FUEI. 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 t~AINT 0 PRIORITY 0 CYCLE 13 CAP 4 0 AVL 4 0~0 IHR 4 FUEL 4 ~ ~ ~ ~ o ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 OVERHAUL 0 PENALTY 1 ~ Go POSITION 1 CAP 5 0 AVL 5 Ooo IHR 5 HfAT RATE FACTOR 1 ~ 00 SPN MNT 0 HATURING 0 ~ 0 FREQUftICY 52 CAP 6 0 AVL 6 0 ~ 0 IHR 6 STRT UP 250 MBTU MUST Rurt E DEVIATION 5 CAP 7 0 AVL 7 Oeo IHR 7 0 BANKING 0 HBTU/H PRE<<COHH GEM 0~0 MAX SCMD E RATED 20 MIN Oott N I T HE 8 I ~ 0, tt 92 TRANS'.OSS  % 0~0 .IRC INTERROGATORY ON NINE t'tILE POINT NUCLEAR UNIT IVO ~ 2 ENERGY HANAGEtIENT ASSOCIATES t INC PAGE 16t ITErt NO ~ E 320o1 ID) REPT 9 OPTION 1 SUBREPORT 1 05/13/83 >>aaoaoa>>o>>GENE RATING UNITS CHARACTER ISTICS a>>boo>>oooo I aaoao GRErllOGE 3 aoao>> CAPACITY<< RELIABILITY HEAT RATE a a<<<<a<<a<<a<<a<<FUEL<<a<<a<<<<a<<a<<a<<a<< <<<<<<<<<<a<<<<COST<<eaaaeeaa O'H BTU/Ktth TYPE HIM% TOT%  %/YH COMPANY 4 PRE JAr> 1 1985 HII~ 12 FOR tt Se3 HR FAC I ~ 00 HAtIDLING 5 ' 6 ' AREA 6 CQH JAN 1 1985 MAX 54 FOR I 0~0 AHR 1 14555 STRT<<UP DIS OILU 100 ~ 0 LEASING 0 0 ' UNIT TYPE F rtaT JAN I 1985 EHERG 54 , I<OR 0~0 ACCTG 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0~0 VAR O>>H 0~0 6 ' RESERVE S RET JA'5 2100 CAP 1 12 AVL 1 0I2 IHR 1 10332 FUEL 1 COAL >2U UNLH 0 ~ 0100 ~ 0 FIXED O>H 33367 6.o 100 ' R M JAV 1 1984 CAP 2 24 AVL 2 17 ~ 8 IHR 2 Id750 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 SALE ADD 0 oeo CAP 3 55 AVL 3 76 ' IHR 3 12257 FUEL 3 ~ ~ ~ ~ e ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 HAIIVT 0 PRIORITY 0 CYCLE 13 CAP 4 0 AVl 4 0~0 IHR 4 0 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 OVERHAUL 0 PENALTY leoo POSIT lot) CAP 5 0 AVL 5 0~0 IHR 5 0 hfAT RATE FACTOR I ~ 00 SPN HNT 0 t]ATURItlG oeo FREQUENCY S2 CAP 6 0 AVI. 6 0 ' IHR 6 0 STRT<<UP 723 HBTU MUST RvtI E OEVI AT Iotl CAP 7 AVL 7 0~0 IHR 7 0 BANKING 0 MBTU/H PRE<<COMH GEN 0~0 HAX SCHV E 540'ATED HIN DOMN TIME 8 I~D~ ¹ 93 TRANS'OSS  % 0~0 8 aaaa>> GREtIIOGE + o>>aoo <<CAPACITY<< REL I ABILI TY <<HEAT RATE<< aeeaaeaaaaaaaFUf La<<a<<a<<a<<<<a<<a<<a aaeaaeaacPSTaeeeaaaaa HH BTU/KIIH TYPE MIN% TOT%  %/YR 9 COMPANY 4 PRE JAN 1 1985 MIN 38 FOR H 716 HR FAC I ~ 04 HAtlOLING 5 ' 6 ' AREA 6 CON JAN 1985 HAX 100 FOR I 0 I0 AHR I 10141 STRT UP DIS OII.U 100 ~ 0 LEASING 0 0>>0 UNIT TYPE F t<AT JAN 1 1985 EHERG 106 NOR 0~0 AccTG 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0>>0 VAR 0>>H 0~0 6 ' RESERVE S RE 7 JAft 2100 CAP 1 38 AVL 1 6 ' IHR 1 90o4 FUEL 1 COAL >2U UNLM 0 ~ 0100 ~ 0 FIXED O>>M 63022 6io 100 ~ 0 A tc JAN 1984 CAP 2 90 AVL 2 34 ' IHR 2 9684 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 SALE AOD 0 0~0 CAP 3 lO6 AVI. 3 51 ~ 0 IHR 3 9798 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 MA INT 0 PRIORITY 0 CYCLE 13 CAP 4 0 AVL 4 0~0 IHR 4 0 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 OVERHAUL 0 PENALTY F 00 POSIT Ioti 1 CAP 5 0 AVL 5 0~0 IHR 5 0 HEAT RATE FACTOR 1 ~ 00 SPN HNT 0 HATURItvG Q.u FREQUENCY 52 CAP 6 . 0 AVL 6 0~0 IHR 6 0 STRT<<UP 605 HBTU HUST RUN E DEVIATION 5 CAP 7 0 AVL 7 0~0 IHR 7 0 BANKING 0 MBTU/H PRE COMH GEN 0~0 MAX SCHD E RATED 10Q MIN DowN TIHE tt I'D' 94 TRANS ~ LOSS % 0 ~ 0 NRC IttTERROGATORY ON NINE t'IILE POINT NUCLEAR UNIT NO ~ 2 ENERGY ttANAGEMENT ASSOCIATESe INC K 168 ITEH t30 ~ E 320 ~ 1 ID) REPT 9 OPTION 1 SUBREPORT I O5/13/83 <<<<<<<<<<<<<<<<GEIIKRATING UNITS CHARACTERISTICS <<<<<<<<<<<<<<<<<<<< e HICKI.ING I <<<<<<<<<< >>CAPACITY>> RELIABILITY >>HEAT RATE >>>>>>>>>>>>>>>>>>>>>>>>>>FUELS >>>>>>>>>>>>>>>>>>>>>>>>>> >>>>>>>>>>>>>>>>COST>>>>>>>>>>>>>>>>>> MW BTU/KWH TYPE HIN% TOT%  %/YH CotePANY 4 PRE JAN 1 1985 Mitt 6 FOR H 1 ~ 9 HR FAC I ~ 09 HaNDI. INe 3 ' 6 ' AREA 6 CON JAN 1 1985 MAX 37 fOR I 0~0 AHR 1 17641 STRT>>UP DIS OILU 100 ~ 0 LEaslNG 0 0~0 UttIT TYPE F tlAT Jail 1 1985 KtIERG 37 IVOR 0~0 ACCTG SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 VAR OeH O,O 6eO RESERVE S RET JAN I 2100 CAP 1 6 AVL 1 0~0 IHR 1 10487 FUEL 1 COALI ~ OU UNI.M 0 ~ 0100 ~ 0 FIXED OeM 25741 6 ' 100 ~ 0 A M JAN 1 1984 CAP 2 18 AVL 2 lo ~ 0 IHR 2 11783 FUEL 2 ~ ~ ~ e ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 SALK AOD 0 0~0 CAP 3 37 AVL 3 88 ~ 1 IHR 3 l)491 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 MAINT 0 PRIOR I 7Y 0 CYCLE 13 CAP 4 0 AVL 4 0 ~ 0 IHR4 .' FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 OVERHAUL 0 PENALTY 1 ~ 00 POSITION CAP 5 0 AVL 5 0 ~ 0 IHR 5 0 HEAT RATE FACTOR 1 ~ 00 SPN Mr<7 0 MATURING 0 ~ 0 FREOUEtiCY 52 CAP 6 0 AVI. 6 0 ~ 0 IHR 6 STRT>>UP 361 HBTU HUST RUN M DEVIATION 5 CAP 7 0 AVL 7 0 ~ 0 IHR 7 0 BANKING 0 MBTU/H PRE>>COMM GEN 0~0 HAX SCHD E RATED 37 MIN DOWN TIHE 8 I ~ De tt 95 1 TRANS'OSS 0~0 f <<<<<<<<<<HICKLING 2 <<<<>><< CAPACITY>> RELIABILITY wHEAT RATE >>>>>>>>>>>>>>>>>>>>>>>>>>FUEL>>>>>>>>>>>>>>>>>>>>>>>>>> COST MW BTU/KWH TYPE HIN% TOT%  %/YM CO" PAtiY 4 PRE JAtt 1 1985 HIN 14 FOR lt 0~0 HR FAC I ~ 21 HANDLING 3e9 6 ' AREA 6 COM JAN 1 1985 HAX 50 FOR I 0~0 AtIR 1 15070 STRT UP DIS OILU 100 ~ 0 LEaSINe 0 0 ~ 0 UNIT TYPE F MAT Jatt 1 1985 Et1ERG 50 HOR 0~0 accTe,, 0 SUPP ~ e ~ ~ ~ ~ ~ ~ 0 ~ 0 0~0 VAR OeM 0~0 6' RESERVE S RET JAN I 2100 CAP 1 14 AVL I 0~1 IHR I 1 (23 FUEL 1 COAL 1 ~ OU UNLH 0 ~ 0100 ~ 0 FIXED OeH 34781 6~ 0 100 ' A M JAN 1 1984 CAP 2 26 AVL 2 14 ~ 8 IHR 2 I 094 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0~0 SALE ADO 0 0~0 CAP 3 50 AVL 3 85 ~ 1 IHR 3 1 687 FUEI 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 MAINT 0 PR10RITY 0 CYCLE 13 CAP 4 0 AVL 4 0~0 IMR 4 "" 0 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 OVERHAUL 0 PKNAI.TY 1 ~ 00 POSIT IOtt 1 CAP 5 0 AVL 5 0~0 IHR 5 )i I 0 HEaT RATE FAGT0R I.oo SPN MNT 0 HATURllge 0 ~ 0 FREQUEttCY 52 CAP 6 0 AVI. 6 0~0 IHR 6 S7PT UP 551 H87U MUST RUN H DEVIATIOtt 5 CaP 7 0 AVL 7 0~0 IHR 7 t 0 BANKING 0 HBTU/H PRE>>COMH GEN 0~0 Max scHD E RaTED 5O MIN 00'WN TIME 8 I'D' 96 TRANS'OSS  % 0~0 riRC INTERROGATORY ON NINE HILE PolttT NUCLEAR UNIT NO 2 EltEROY MANAOEHKNT ASSOCIATES ~ INC PAOf ITEM Noe E 320>>1 to) REPT 9 OPTION 1 SUBREPORT 1 16'5/13/83 oooa aaaaoaGENERATINO UNITS CHARACTERISTICS oaaoaaaaaa ooooa JENrtISOer 1 aaaao CAt ACITY<< RELIABILITY HEAT RATE<< aaeeaeaeaaaaeFUf Laaaaaaa eaaaaa aaaaaeaeCOSTaaaaaaaaa BTU/KWM TYPE MIN% TOT%  %/YH COMPANY AREA 4 e PRE COM JAN JAtt 1 1985 1985 HIN HAX MW 5 33 FOR H FOP I 2 ' 0~0 HR FAC AMR 1 I'll 16760 STRT<<UP DIS OILU 100 ~ 0 HANDL I NO LEAS INO 4~7 0 6~0 0~0 UttIT TYPE F MAT JAN 1985 El<ERG 35 MOR oeo ACCTO SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 VAR OeM 0~0 6 ' RESERVE S RET JAN 1 2100 CAP 1 5 AVL 1 0~0 IHR 1 10978 FUEL 1 COALleoU UNLH 0 ~ 0100 ~ 0 FIXED OeH 27938 6 ' \ooeo A 11 JArt 1 1984 CAP 2 23 AVL 2 8>>3 IHR 2 12611 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 SALE '>>DD 0 0~0 CAP 3 35 AVL 3 89 ~ 2 IHR 3 13849 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 MAINT 0 PRIORITY 0 CYCLE 13 CAP 4 0 AVL 4 0~0 ltlR 4 0 FUKL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 OVERHAUL 0 PENALTY i>>00 POSITION 1 CAP 5 0 AVL 5 0~0 IHR 5 0 HEAT RATE FACTOR F 00 SPN HNT 0 HATURING 0 ~ 0 FREOUENCY 52 CAP e O AVL 6 0~0 IHR 6 0 STRT<<UP 381 MBTU MUST RUN M DEVIATION 5 CAP 7 0 AVL 7 0~0 IHR 7 0 ttANKINO 0 MBTU/H PRE<<COMM OEN 0~0 MAX SCHD E RATfD 33 H IN Dort N T INK 8 I ~D~ tr 97 TRANS'.0SS 0~0 0 aaaao JENNISON 2 <<CAPACITY ~ REL I AB ILI T Y <<HEAT RATE aeaaaaaaaaaa<<FUEL<<a<<a<<a<<a<<a<<a<<a COST~  %/YM Q COMPANY AREA 4 6 PRK COH JAN JAN 1985 1985 HIN HAX HW 5 37 FOR H FOR I 0~2 0~0 HR FAC llll BTU/KWM AHR I 15082 STRT<<UP DIS OILU TYPE HIN% TOT% 100,0 HANDLING LEASING 0 e.o 0~0 UNIT TYPE F HAT JAN 1 1985 KHERO 40 MOR 0~0 ACCTO O SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 VAR OaM 0~0 6 ' Q RESERVE S RET JAN 1 2100 CAP 1 5 AVL 1 oeo IHR 1 10707 FUEL 1 COAL> ~ OU UNLH 0 ~ 0100 ~ 0 FIXED OeH 32799 6 ' 1OO.O n t1 JAN 1984 CAP 2 23 AVL 2 11 ~ I IHR 2 11768 FUEL 2 ~ ~ ~ ~ ~ ~ e ~ ~ ~ ~ ~ 0~0 0~0 SALE ADD 0 0~0 CAP 3 41 AVL 3 88 ~ 7 IHR 3 14637 FUEL 3 ~ ~ ~ ~ ~ ~ e ~ ~ ~ ~ ~ 0~0 0~0 HAINT 0 PRIORITY 0 CYCLE 13 CAP 4 0 AVL 4 0~0 IHR 4 '0 FUEL 4 ~ e ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0>>0 OVfRHAUI. 0 PENAI.TY 1 e Oo POSITION 1 CAP 5 0 AVL 5 0~0 IHR 5 0 HEAT RATE FACTOR 1 ~ 00 SPN HNT 0 HATURlteo O.O FREOUEtlCY 52 CAp e o AVL 6 0~0 IHR 6 0 STRT<<UP 467 HBTU MUST RUN M DEVIATION>> 5 CAP 7 0 AVL 7 0~0 IHR 7 0 BANKINO 0 HBTU/H PRE<<COHH OEN 0 ~ 0 HAX SOHO E RATED 37 MIN DOWN TIME 8 1>>D>> a 98 TRANS ~ LOSS 0 ~ 0 0 0 tIRC ?NTKRROGATORY ON NINE MILE POINT NUCLEAR UNIT NO ~ 2 EtIERGY MANAGEMENT ASSOCIATES t ?NC E 170 ITEH NO ~ E 320 ~ 1 IDI REPT 9 OPTION 1 SUBREPORT 1 05/13/83 4P+oo+++~oGENKRATING UNITS ChARACTERISTICS <<eooo4oo44 4 4~ooo M?LLIKKN 1 004oo -)APACITY<< RELIABILITY HEAT RATE <<<<aa<<aaaa<<aa<<f UEL<<<<<<<<<<<<a<<a<<<<aaa COST MW BTU/KWH TYPE MINN TOT%  %/'Yk COHPAtty 4 PRE JAN 1 1985 Hlt> 46 FOR M I~4 HR FAC 1 ~ 00 HANDL?NG 3~7 6~ 0 AREA 6 COM JA<I 1 19e5 MAX 148 FOR I 0~0 AHR 1 11044 STRT<<UP DIS OII.U 100 ~ 0 LEASING 0 0 ~O UNIT TYPE F MAT JAtI I ?985 Et! ERG 160 NOR 0~0 ACCTG 0 SUPP ~ ~ s ~ ~ ~ ~ ~ 0 ~ 0 0 ~ 0 VAR 04M o.o 6.o RESERVE S RET JAtl 1 2100 CAP 1 46 AVL 1 0~3 IHR 1 7581 fUEL 1 COAI.2 OU UNI.M 0 ~ 0100 ' FIXED 0+M 29188 6~0 100 ~ 0 A H JAN 1984 CAP 2 79 AVL 2 9 ' IHR 2 8286 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0~0 SALE ADD 0 0~0 CAP 3 160 AVL 3 88>5 IHR 3 90SO FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0~0 MAlNT 0 PRIORITY 0 CYCLE 13 CAP 4 0 AVL 4 0~0 IHR 4 o FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ des 0 ~ 0 0~0 OVERHAUL 0 PEtIALTY 1 ~ 00 POSITION 1 CAP 5 0 AVL 5 0~0 IHR 5 0 HEAT RATE FACTOR I ~ 00 SPN MNT 0 HATURING 0 ~ 0 FREQUENCY 52 CAP 6 0 AVL 6 0~0 IHR 6 0 STRT<<UP 2111 HBTU MUST RUtt E DEVIATION 5 CAP 7 0 AVL 7 ooo IHR 7 0 BANKING 0 HBTU/H PRK<<CO>M GEN 0~0 HAX SCMD E RATED 148 HIN DOWN TIHE 8 I~D~ tt 99 TRANS'OSS  % 0~0 a ~ooo4 MILL?KEN 2 poooa CAPaCITY- RELIABILITY <<HEAT RATE <<aaa<<ya<<aa<<aaFUELaaaaaaaa<<aaaa<< <<<<aa COST<< <<a<<aaa<< BTU/KWM TYPE HltI% TOT%  %/Yk COMPANY 4 PRE JAN 1985 H?N HW 46 FOR II 1 ~ 7 HR fAC 1 '2 HANDL?NG 3 ' 6 ' AREA 6 Gott JAN 1985 HAX 143 FOR I 0 ~ 0 AHR 1 103<3 STRT UP DIS OILU 100 ~ 0 I.EASING 0 0~0 UNIT TYPE F MAT JAN 1 lees EMERG 160 MOR 0 ' ACCTG 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 VAR O>M 0 ~ 0 6' RESERVE S RET JAN 2100 CAP 1 46 AVL I 0~0 IHR 1 7966 fUEL 1 COAL2 ~ OU UNLM 0 ~ 0100 ~ 0 flXED 04M 28948 6 ' 100 ' A tI JAN 1 1984 CAP 2 69 AVL 2 11 ~ 1 IHR 2 8398 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 SALE ADD 0 0~0 CAP 3 160 AVL 3 87 ' ?HR 3 9766 fUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0 ~ 0 HAINT 0 PRIORITY 0 CYCLE 13 CAP 4 0 AVL 4 0~0 IHR 4 0 FUEL 4 e ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 OVERHAUL 0 PENALTY F 00 POSITION 1 CAP 5 0 AVI. 5 O.o IHR 5 0 HEAT RATE FACTOR F 00 SPN HNT 0 tIATUR?tlG 0 ' FRKOUENCY 52 CAP 6 0 AVL 6 0~0 IHR 6 STRT<<UP 1181 HBTU HUST RUtt E DEVIATION 5 CAP 7 0 AVL 7 0~0 IHR 7 0 BAIIKING 0 HBTU/H PRE COMM GEN 0~0 HAX SCHD E RATED 143 MIN DOWN TIME 8 I ~ 0 ~ tt 100 TRANS'OSS  % 0~0 NRC INTERROGATORY ON NINE tllLE POItIT NUCLEAR UNIT NO ~ 2 ENERGY HAtlAOEMENT ASSOCIATE'Si INC PAGE 17l ITEM NO ~ E 320el IO) REPT 9 OPTION 1 SUBREPORT I 05/13/83 aaoaaooaooOENERAT INO UNITS CHARACTERIST ICS oooooaoooa ~ ooooo HOHERCTY 1 oaooo CAPACITY RElIAB IL IT Y >>HEAT RATE- rara<<<<aaaaaa<<FU fLa<<a<<a<<a<<a<<a<<aa aaa<<aaaaCPSTa<<aaaaaaa 0 COMPANY 4 PRE JAN 1 1985 HIN Htl 100 FOR H 7 ' BTU/KIIH HR FAC I ~ 10 TYPE MIN% TOT% HANULINO 4 '  %/YH 6 ' t'e l-0' ' Dls OILU I 1985 265 FOR I 10193 STRT>>UP 100,0 LEASINO 0 ~ AREA 5 COlt JAN 1 HAX AHR 1 0 UNIT TYPE f MAT JAN 1 1985 EHERO 305 HOR 0' ACCTO 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ QeQ QeQ VAR OoH 0' 6' RESERVE S RET JAN 1 2100 CAP 1 100 AVL I 10 ' IHR I 7655 FUEL 1 COAI.2 'U UNLM 0 '100 ' FIXED ooH110300 6,0 100 ' A tl JAN I 1984 CAP 2 200 hVL 2 48 ' IHR 2 8199 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0 ' SALE ADD 0 0~0 CAP 3 309 AVL 3 33 ' IHR 3 8564 fUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0 ' HAINT 0 e, PRIORITY 0 CYCLE 39 CAP 4 0 AVl 4 0~0 IHR 4 0 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0 ' OVERHAUI, Q e / PENALTY 1 00 POS IT 10tl 1 CAP 5 0 AVl 5 0~0 IHR 5 0 HEAT RATE FACTOR F 00 SPN MNT 0 Rj. O HATURINO 0 ~ 0 FREQUENCY 52 CAP 6 0 AVL 6 0 ' IMR 6 0 STRT UP 9729 HBTU MUST RUN E DEVIATION 5 CAP 7 0 AVI. 7 ~ 0 ' IHR 7 0 BANKING 0 MBTU/H PRK COHot OEN 0 ' t'j lP MAX SCHD E RATED 265 HIN DOttN TIME 8 CI IeO ~ tt 101 TRANS'OSS  % 0' 0 44444 HOHERCTY 2 4oaoa >>CAPACITY>> REL, I ABILITY "HEAT RATE>> aaaa<<a<<a<<a<<a<<FUEL>>aaaaaa<<raaaaa a<<a>>a<<a<<CQSTaaaaaaaaa O'W BTU/KtiH TYPE HIM% TOT%  %/YR 0 COMPANY 4 PRE JAN I 1985 MIN 100 fOR tl 9~7 HR FAC I ~ 14 HANDLINO 4~3 6.0 ' 0 ', I AREA COH JAN 1 i985 HAX 265 FOR 0~0 AHR 1 10193 STRT<<UP OIS OILU IQQ ~ Q LEASINO 0 0 I UNIT TYPE F MAT JAN I 1985 EHERG 290 MOR 0 ' ACCTO 0 SUPP ee ~ ee ~ ~ e 0 ' 0 ' VAR OoH 0 ' 6 ' RESERVE 5 RET JAN 1 2100 CAP 1 100 AVL I 10 ' ltlR I 7655 t UEL 1 COAL2 ~ QU UNLH Q~Q I QQ 0 ~ t IXKD OoH110300 6 ~ g e 100 ~ 0 A H JAN I 1984 CAP 2 200 AVL 2 15 ' IHR '2 8199 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0' 0' SAlE ADD 0 ' I CAP 3 309 AVL 3 65 ' ItlR 3 8564 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0' 0' MAINT 0 I: PRIORITY 0 CYCLE 39 CAP 4 0 AVL 4 0' IHR 4 0 fUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0' 0' OVERHAUL 0 EQ PENALTY 1e00 HATURINO QeQ tlUST RUN E POSITION FREQUENCY DEVIATION '2 1 5 CAP 5 CAP 6 CAP 7 0 0 0 AVl 5 AVI. 6 AVL 7 0~0 0 0 IHR IHR IHR 5 6 7 0 0 HEAT RATK FACTOR I ~ 00 STRT>>UP BANKINO 7872 MBTU 0 HBTU/H SPN MtIT PRK COtlM OEN 0 0 ' Ijg HAX SCh0 E RATED 265 HIN DOtlN TIME 8 I ~ 0 ~ tl 102 TRANS'.OSS 0' ~ Q ~ 1 e IQ 0 NRC INTERROGATORY ON NINE I ILE POINT NUCI EAR UNIT NO ~ 2 ENERGY H4NAGEHENT ASSOCIATESt INC f 172 ITEN ttO ~ E 320 ~ 1 IU) REPT 9 OPTION 1 SUBRfPORT 1 05/]3/83 ooo>><<oooo<<Gfttf ItAT ING UNITS CHARACTERISTICS ooo>>o>><<>>o>> <<oooo HOMEPCTY 3 <<oooo CAPACITY Rf L IABILI TY aHEAT RATE aaaa aaaaaaaaFUK Laaaaaaaaaaaaaa aCPST MW BTU/KWM TYPE MIN% TOT%  %/Ytt COMPANY 4 PRE JAM 1 1978 MIN 100 FOR M 8~2 HR FAC ]g0] HANDLING 4 ' 6 ' AREA 5 COtd JAIL 1 1978 MAX 315 FOR I 0 ' AHR 1 1]355 STRTaUP DIS OILU 100 ~ 0 LEASING 0 0 6' UNIT TYPE F MAT JAtt 1 1981 EMERG 326 MOR 0' ACCTG 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0' VAR 0+M 0' RESERVE S RET JAN 1 2]00 CAP 1 100 AVL 1 2 ' IMR 1 7990 tUEL 1 COAL2 ~ OU UNLH 0 '100 ' FIXED OqM 99607 6' 100 ~ 0 A M JAN 1 1977 CAP 2 200 AVL 2 8~0 IHR 2 8438 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0 ' SALE AOD 0 0' CAP 3 326 AVL 3 81 ~ 0 IHR 3 9010 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ s ~ ~ 0 ' 0 ' MAINT 0 PRIORITY 0 CYCLE 39 CAP 4 0 AVL 4 0 ' IHR 4 0 FUEI. 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0 ' OVERHAUL 0 PfttALTY 1 e00 POSITION 1 CAP 5 0 AVL 5 0 ' IHR 5 0 HEAT RATE FACTOR 1 ~ 00 SPN HNT 0 MATURING 0 ~ 0 FREQUE t'CY 52 CAP 6 0 AVI. 6 Oe0 IHR 6 0 STRTaUP 9548 HBTU HUST RUtl E DEVIATIOtt 5 CAP 7 0 AVL 7 0 ' IHR 7 0 BANKING 0 HBTU/H PRKaCOHM Of N 0~0 HAX SCHD E RATED 3]5 HIN DOWN TIME tt I.U. tt 103 TRANS'OSS  % 0 ' oooo>> 9aMILE ] oooo>> CAPACITY REL! ABILITY aHKAT RATEa aaaaaaaaaaaaaFUELaaaaaaaaaaaaaa aaaaaaaaCPSTaaaaaaaaa HW BTU/K'WH TYPE HIN% TGT%  %/'YH Q COMPANY 5 PRE JAN 1985 HIN 300 FOR M ]e9 HR FAC 1.00 HANDLING 0~0 6~0 AREA 2 COtl JAN 1985 MAX 610 FOR I 0 ' AHR 1 10347 STRTaUP URANIUMS 100 ~ 0 LEASING 0 0~0 UNIT TYPE RfSf RYE MAT JAN JAN 1 1985 2]09 EMERG 6]0 300 tIOR 0~0 4' ACCTG 10349 0 SUPP 0 ' Oo0 Oo0]00o0 VAR OqM FIXED 0 O.H4242]S ' 6 e>>0 Q S RET CAP AVL IHR FUEL 1 URANIUMS UNLH 100.0 A tt 'Att 1 1984 1 2 454 'AP AVL 1 2 26 ' IHR 1 2 ]0349 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0' 0' SAI.E ADD 0 0 ' CAP 3 5]0 AVL 3 46 ' IHR 3 10349 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0' 0' HAINT 717286 0 PRIORITY 0 CYCLE 25 CAP 4 610 AVL 4 21 ~ 3 IHR 4 10349 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ e ~ ~ ~ 0' 0' OVERHAUL 717286 PENALTY 1 ~ UU POSIT lON 1 CAP 5 0 AVL 5 0 ' IHR 5 HEAT RATE F'ACTOR ] F 00 SPN HNT 0 HATURlttG 0 ~ 0 FREOUEIICY 104 CAP 6 0 AVL 6 0 ' IHR 6 0 STRTaUP 1000 HBTU MUST RUt> E DEVIATIOtt 5 CAP 7 0 AVL 7 0~0 IHR 7 0 BANKING 0 HBTU/H PRE COMM Of N Os0 MAX SCtIV E RATED 6]0 t4]N DOWN TIME 24 I~D~ 4 104 TRANS'.OSS  % 0 ' NRC INTERROGATORY ON NINE MILE POINT NUCLEAR UttIT NO ~ 2 ENERGY MANAGEMENT ASSOCIATESt INC PAGE 17> ITEM NOe E 320el (D) REPT 9 OPTION I SUBREPORT 1 05/13/83 oaoaaaoooaGEltERAT ING UNITS CttARACTERISTICS aaoaooooaa aaoaa DUNKIRK 1 ooaaa CAPACITY RELIABILITY HEAT RATE <<<<<<<<<<<<<<<<<<<<<<<<<<f UEL<<<<<<<<<<<<<<<<<<<<<<<<<<<< << COST<< M>t BTU/KttH TYPE MIN% TOT%  %/YH COMPANY 5 PRE JAN I 1985 Mint 20 FOR H 9 ' HR FAC I ~ 09 HANDLING 0~0 6io AREA 1 COM JAN 1985 HAX 85 FOR I Oeo AHR 1 12019 STRT<<UP COAL2 ~ 4 100 ' LEASING 0 0~0 UNIT TYPE F ftAT JAN 1985 EHERG 85 MOR 0~0 AccTe o SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0 ~0 0~0 VAR OeH o,o 6.o RESERVE S RET JAft 2100 CAP 1 20 AVL 1 Oeo IHR 1 7941 FUEL 1 COAL2 ~ 4 UNLM 0 ~ 0100 ~ 0 FIXED OeM 63030 6.O 100eO A H JAN 1984 CAP 2 60 AVL 2 16 ' IHR 2 8552 FUEL 2 ~ ~ e ~ e ~ ~ ~ ~ ~ ~ ~ 0~0 0 ~ 0 SALE AOD 0 0~0 CAP 3 78 AVL 3 25 ' IHR 3 9106 FUEL 3 ~ ~ ~ ~ ~ ~ ~ e ~ ~ ~ ~ 0~0 0 ~ 0 MAINT 0 PRIORITY 0 CYCLE 15 CAP 4 85 AVL 4 48eB IteR 4 9757 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0 ~0 OVERHAUt. 0 PENALTY F 00 POSITION 5 CAP 5 0 AVL 5 Oeo IHR 5 0 HEAT RATE FACTOR 1 ~ 00 SPtt HNT 0 HATURItvO 0 ~ 0 FHEOUENCY 52 CAP 6 0 AVL 6 0~0 IHR 6 0 STRT<<UP 1000 MttTU MUST RUN E. DEVIATION CAP 7 0 AVI. 7 0~0 IHR 7 0 ,BANKING 0 HBTU/H PRE COMM GKN 0~0 MAX Sct!D E RATED 85 HIN DottN TIME 24 I ~ D~ tt 105 TRANS'OSS 0~0 e DUNKIRK 2 ooaoo CAPACITY<< RELIABILITY HEAT RATE<< <<<<r<<<<rr<<<<<<<<<<f UEL<<<<<<<<<<<<<<<<<<rr<<<<<<, <<r<<<<rrr<<COST<<<<<<<<<<<<<<<<<< BTU/Ktt" TYPE MIN% TOT%  %/YH '00 ' Mtl COttPANY 5 PRE JI.N 1985 HIN 20 FOR H 9 ' HR FAC I ~ 06 HANDLING 0~0 6 ' ARKA UNIT TYPE RESERVE 100 1 F S Cott HAT .RET A H JAN JAN JAN JAN 1 1 1 1 i985 1985 2100 i984 MAX EHERG CAP 1 CAP 2 85 85 20 72 FOR I HOR AVL AVL 1 Oeo 0~0 0~1 2 40 ' AHR 1 12019 AccTe IHR IHR 1 2 7941 8892 o STRT<<UP COAL2e4 SUPP ~ ~ ~ ~ ~ ~ ~ ~ FUEL 1 COAt.2 FUEI 2 ' UNLH ~ ~ ~ ~ ~ ~ e ~ ~ ~ ~ e 0 0 ~ ~ 0~0 0 0 ~ 0100 ~ 0 0 ~ 0 0 LEASING VAR Oett SALE ADD 0~0 F IXED 00H 63030 0 6 0~0 6e0 0~0 CAP 3 85 AVL 3 50 ' IHR 3 9757 FUEL 3 ~ ~ ~ ~ ~ e ~ ~ ~ ~ ~ ~ 0 ~ 0 0~0 HA INT 0 PRIORITY 0 CYCLE 15 CAP 4 0 AVL 4 0' IHR 4 0 FUEL 4 ~ ~ ~ ~ ~ ~ ~ e ~ ~ ~ ~ 0~0 0~0 OVERHAUL 0 PF MALTY 1. 0 0 POSITION 4 CAP 5 0 AVL 5 0~0 IHR 5 .0 HEAT RATE FACTOR 1 ~ 00 SPN HNT 0 MATURING 0 ~ 0 FREOUENC'Y 52 CAP 6 0 AVL 6 0~0 IHR 6 0 STRT<<UP 1000 HBTU HUST RUN M DEVIATION 5 CAP 7 0 AVL 7 Oeo IHR 7 0 ttAttKING 0 HBTU/H PRE CottM GEN 0~0 HAX SCHD E RATED 85 MIN DottN TIME 24 I~0 ~ tt 106 TRANS'OSS  % 0~0 0 0 ttRC INTERROGATORY ON NINE Hllf POINT NUCLEAR UNIT N0.2 ENEReY MANAeEMENT ASSOCIATEsi INC K 174 ITEt< NOe f 320 ~ 1 IOI REPT 9 OPTION 1 SUBREPORT I 05/j3/83 oooo<<oooo<<Of NERAT ]NO UNITS CHARACTERISTICS <<oaaoa<<<< <<oooo DUNKIRK 3 ooaoo CAPACITY RELIABILITY >>HEAT RATE e a e>> a a a e e a a a>> F U E L a>> a a e e a>> &e e a a e e aeaaaea>>COST>>aaaaaaae MW BTU/gWH TYPE HIN% TOT%  %/YM COMPANY 5 PRE JAN 1 1985 IIIN 50 FOR H 13 ~ 0 HR FAC 1,"e]3 HANDLING 0 ' 6 ' AREA 1 CORI JAN 1 1985 MAX 190 FOR I 0 ' AHR I ]I15]3 S7RT UP COAL2 ~ 4 100 ~ 0 I.fASING 0 0~0 UNIT TYPE F MAT JAN 1 ]985 EMERO 190 r'OR 0~0 ACCTG 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0,0 0en VAR OeM 0' 6 ' RESERVE S RET JAN 1 2100 CAP I 50 AVL 1 0 ' IHR I F587 FuEL ] COAL2e4 UNLH 0 '100 ' FIXED OeM 81763 6 ' 100.0 A I. JAN 1 1984 CAP 2 ]13 AVL 2 10 ~ 5 IHR 2 8133 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0 ' SALE ADO 0 0 ' CAP 3 164 AVL 3 21 ~ 9 IHR 3 8986 Fufl 3 ~ ~ e ~ ~ ~ ~ ~ ~ ~ ~ ~ 0,0 Oee HA]MT 0 PRIORITY 0 CYCLE POSITIOtt 34 CAP 4 190 AVI. 4 5' IHR 4 9720 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ e 0 ' ne0 OVERHAUI. 0 PEIIALTY 1 ~ 00 5 CAP 5 0 AVL 5 F 0 IHR 5 0 HEAT RATE fACTOR I ~ 00 SPN HNT 0 MAT UR I re 0 0 ~ 0 FRKOUENCY 52 CAP 6 0 AVL 6 an IHR 6 0 STRT UP 1950 MBTU HUST Rurl E DE V I AT I err 5 CAP 7 0 AVL 7 0~0 IHR 7 0 BANKINO 0 MBTU/H PRE COMM GEN 0 ' HAX SCHU f RATED 190 MIN DOWN TIME 24 I ~ Oe ¹ 107 TRANS'OSS 0 ' oooo<< DUNKIRK 4 a<<a<<a CAPACITY>> RELIABILITY HEAT RATE aaaaaaaaaaaa>>FUfly&aaeeaa>>eaaaea aaaaaeaaCP$ 7>>ace>>a>>a>> MW BTU/KWH TYPE HIN% TOT%  %/YR COMPANY 5 PRE JAN 1985 HIN 50 FOR M 13 ~ 9 HR fAC 1 ~ 09 HANDL]NO 0~0 6 ' AREA I COM JAN ] 1985 HAX 185 FOR I 0 ' AHR 1 105]3 STR7>>UP COAL,2 ' ]00 ' I.EAS I NO 0 F 0 UNIT TYPE F MAT, JAN 1 1985 E11ERO 185 MOR 0 ' ACCTe 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0 ' VAR OaM 0 ' 6 ' Q RESERVE S RET JAN I 2100 CAP I 50 AVL I 0 ' IHR 1 7587 FUEl 1 COAL2 ~ 4 UNlH 0 ~ 0100 ~ 0 FIXED OaM 81763 6~0 ]00 F 0 A M JAN 1984 CAP 2 155 AVL 2 24.5 IHR 2 8726 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0' SALK ADD 0 0' CAP 3 ]75 AVL 3 24 ' IHR 3 9304 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ' F 0 MAINT 0 PRIORITY 0 CYCLE 34 CAP 4 185 AVL 4 37 ' IHR 4 9860 FUEI. 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0 ' OVERHAUL 0 PENALTY 1 e 00 POSIT ION 2 CAP 5 0 AVL 5 F 0 IHR 5 0 HEAT RATE FACTOR ] F 00 SPN MNT 0 HATURINO 0 0 FREQUErtCY 52 CAP 6 0 AVL 6 an IHR 6 0 STRT>>UP 1950 HBTU MUST RUI'I M DEVIATIOrr 5 CAP 7 0 AVL 7 F 0 IHR 7 i "ANKING 0 MBTU/H PRE COHH OKN F 0 HAX SCHD E RATED 185 MIN DOWN TIHE 24 I ~ Oe tr 108 TRANS'.OSS F 0 NRC INTERROGATORY ON NINE MILE POINT NUCLEAR Utl]T NO ~ 2 EtIERGY HANAOEMKNT ASSOCIATES o INC PAGE ]7o ITEM Noo E 320 ~ I (0) HEPT 9 OPTION 1 SUBREPORT 1 05/]3/83 >aaaaaaaaaGKNERAT ING UNITS CHARACTERISTICS aooaaoaaoa MUNTLEY 63 11111 CAPACITY REL]ABILITY HEAT RATE <<a a a e a e a os a oo e a F U F Los a a a so a a a a a e a a e aa COST Mlt BTU/KHH TYPE tllN% TOT%  %/YH COHPANY 5 PRE JAN 1 1985 MIN 20 FOR H 9 ' HR FAC 1 ~ 03 tlANDLING 0~0 6oo AREA ] Coll JAN ] ]985 MAX 90 FOR I 0 0 AHR 1 ]3376 STRT<<UP LFCL 1 ~ 8 100 ~ 0 LEASINO 0 0~0 UNIT TYPE F HAT JAN ] ]985 EHERG 90 MOR ooo ACC'TG 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ oeo 0 ~ 0 VAR OoH 0~0 e.o RESERVE S RKT JAN ] 2]no CAP 1 20 AVL I Ooo IHR ] 9754 FUEL 1 LFCL 1 ~ 8 UNLH 0 ~ 0100 ~ 0 FIXED OeM 5433] 6 ' 100 ~ 0 A tl JAN 1 1984 CAP 2 37 AVL 2 7 8 IHR 2 ]0]31 FUEL 2 ~ ~ ~ ~ ~ ~ ~ o ~ ~ ~ ~ 0~0 0~0 SALE ADO 0 0~0 CAP 3 69 AVL 3 28 ' IHR 3 ))297 FUEL 3 ~ o ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ooo 0~0 HAINT 0 PRIORITY 0 CYCLE 3] CAP 4 90 AVL 4 54 ' IHR 4 12092 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 OVERHAUL 0 PENALTY 1 ~ 00 POSIT]ON 5 CAP 5 0 AVL 5 0~0 IHR 5 0 HEAT RATE FACTOR I ~ 00 SPN MNT 0 tlA7 UR I NG 0 ~ 0 FREOUEIICY 52 CAP e 0 AVL 6 0~0 IHR 6 0 STRT<<UP 1000 HBTU HUST PUN E DEVIATION 5 CAP 7 0 AVL 7 0~0 IHR 7 0 BANK]NO 0 HBTU/H PRK COMM GEN ooO t1AX SCHD E RATED '90 HIN 001IN TIHE 24 I oD ~ Il 109 TRANS'OSS  % 0~0 0 aaooa IIUNTLKY 64 aooap CAPACITY RELIABILITY <<HEAT RATE aaaaeaaaaeaeooFUEL<<aaooeaaaaaaaaa <<a<<ac<<a<<COST<<aaeaaaae Hlt BTU/KIIH TYPE HIN% TOT%  %/YH COMPAtlY 5 PRE JAN ] 1985 HIN 20 FOR H 10 ~ 7 HR FAC ] F 10 HANDLINO 0~0 6' AREA 1 COH JAN ] 1985 HAX 85 FOR I 0~0 AHR 1 12647 STRT<<UP LFCI. 1 ~ 8 100 ~ 0 LEASING 0 0~0 UNIT TYPE F MAT JAN 1 ]985 EHERG 85 MOR 0 ~ 0 ACCTO 0 SUPP ~ ~ ~ ~ ~ ~ ~ e 0~0 0~0 VAR OoM 0~0 6 ' RESERVE 5 RET JAN 1 2100 CAP 1 20 AVL 1 0 ~ 2 IHR 1 8823 FUEL 1 LFCL 1 ~ 8 UNLH 0 ~ 0100 ~ 0 FIXED OWM 5433] eoo ]oooo A M JAN 1 1984 CAP 2 45 AVL 2 12 ~ 3 IHR 2 9383 FUEL 2 ~ ~ ~ ~ ~ ~ o ~ ~ ~ ~ ~ 0~0 0~0 SALE ADD 0 0 ' CAP 3 72 AVL 3 30 ' IHR 3 10483 FUEL 3 ~ ~ ~ ~ ~ ~ o ~ ~ ~ ~ ~ Oeo 0~0 HAINT 0 PRIORITY 0 CYCLE 31 CAP 4 85 AVL 4 4e.5 IHR 4 12029 FUEI 4 ~ ~ ~ ~ ~ ~ e ~ ~ ~ ~ ~ 0~0 0~0 OVKRHAUL 0 PENALTY 1eOO POS]TION 2 CAP 5 0 AVL 5 ooo ltlR 5 0 HEAT RATE FACTOR ] F 00 SPN MNT 0 MATURING 0 ~ 0 FREOUEtlCY 52 CAP 6 0 AVL 6 0~0 IHR 6 0 STRT<<UP ]otto HBTU tlUST RUN E DEVIATION 5 CAP 7 0 AVL 7 0~0 IHR 7 0 BANKING 0 HBTU/H PRE-COMM GEN 0 ' MAX SCHD E RATED 85 H]N DOIIN TIHE 24 I ~ De 4 110 TRANS'OSS  % 0~0 II j t ~ I. I o tlRC INTERROGATORY ON NINE MILE POINT NUCLEAR UNIT t~og2 ENERGY MANAGEMENT ASSOCIATESt INC f ]70 ITEH NO ~ E 320<<1 IU) REPT 9 OPTION 1 SUBREPORT 1 05/]3/83 a<<a<<ao<<aa<<GENERATING UNITS CHARACTERISTICS oaaaaaa o<<4<<a HUNTLEY 65 <<<<<<aa "CAPACITY>> REL I AB]L IT Y -HEAT RATE" aeaaaaaaaaaa>>FUEL<<a>>a<<a<<>>a>>a<<a<< ac>>a<<a<<>>COST<<aaa<<a<<ae HW BTU/KWH TYPE HIN% TGT%  %/YH COMP AttY 5 PRE JAtt 1985 HIN 20 FOR H 9 ' HR FAC ] ~ 12 HANDL]NO 0~0 6 ' AREA COM JAN 1 1985 HAX 85 FOR I 0' AHR 1 12019 STRT UP LFCL 1 ~ 8 100 ' LEASINO 0 0 ' Ut>]T TYPK F MAT JAN 1 1985 EMERG 85 ttOR 0 0 ~ ACCTO SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0' VAR O>M 0~0 6' RESERVE S HET JAN 2100 CAP 1 20 AVL ] 0 ' IHR ] 7941 FUEL 1 LFCL 1 ~ 8 UNLH 0 '100 ' FIXEO O<<M 45767 6~0 100 ~ 0 A H JA?t 1 1984 CAP 2 51 AVL 2 Se9 IHR 2 8367 FUEI 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0' SALK AOO 0 0~0 CAP 3 72 AVL 3 29 ' IHR 3 8897 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0 0 ~ MAINT 0 PRIORITY 0 CYCLE 31 CAP 4 85 AVL 4 54 ' IHR 4 9928 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0' OVERHAUL 0 PENALTY 1,00 POSITION 1 CAP 5 0 AVL 5 0 ' IHR 5 0 HEAT RATE FACTOR 1 ~ 00 SPN MNT 0 HATURING 0 ' FREQUfttcY 52 CAP 6 0 AVL 6 0 ' IHR 6 0 STRT>>UP 1000 MBTU MUST RUN f OEV I AT ION 5 CAP 7 0 AVL 7 0 ' IHR 7 s 0 BANKINO 0 HBTU/H PRE>>COMM GEN 0~0 tIAX SChO E RATE 0 85 MIN OOWN TIHE 24 I ~ Oe a 11] TRANS'OSS 0 ' HUNTLEY 66 <<aa<<>> CAPACITY<< RELIABII.ITY HEAT RATE aaeaaeaeaaae>>FUFL>>aaaeaa<<aeeaaa aaeaea>><<COST<<<<a>>a>>a<<a MW BTU/KWH TYPE HIM% TOT%  %/YH 0 COMPANY 5 PRE JAN 1 1985 MIN;= 20 FOR M 9 ' HR FAC ]e09 HANOL ING 0.0 6.0 AREA 1 COM JAN 1 1985 HAX BS FOR I 0~0 AHR 1 12013 STRT>>UP LFcl. 1 ~ 8 100 0 LEAS INO 0 0 ' UtIIT TYPE F MAT JAN ] ]985 EMERG 85 HOP. Oo0 AccTG SUPP ~ ~ ~ ~ ~ ~ ~ ~ ~ Oo0 0 ' VAR O~H 0 ' 6 ' Q RESERVE S RET JAN 1 2100 CAP 1 20 AVL 1 0 ' IHR 1 8397 FUEl ] LFCI, ] ~ 8 UNLH Og0100 0~ 'FIXED OtH 45767 6 ' ]00e0 A M JAtt ] 1984 CAP 2 70 AVL 2 29 ' IHR 2 9332 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 0 ~ 0' SALE AOO 0 0' CAP 3 84 AVL 3 23 ' IHR 3 9801 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0' 0' HAINT 0 PRIORITY 0 CYCLE 31 CAP 4 85 AVL 4 36 ' IHR 4 10234 FUEI. 4 ~ ~ ~ ~ ~ ~ ~ s s ~ ~ ~ OgO 0' OVERHAUL 0 PENALTY ]o00 POS]7IOtt 4 CAP 5 0 AVL 5 0' IHR 5 0 HEAT HATE FACTOR 1 ~ 00 SPN MNT 0 tIATURING 0 ~ 0 FREOUEtlcY 52 CAP 6 0 AVL 6 0' IHR 6 0 STRT>>UP 1000 HBTU HUST RUll t1 OEV I AT ION 5 CAP 7 0 AVL 7 0' IHR 7 0 BANKINO 0 MBTU/H PRE>>COHH Gf N 0~0 MAX SchD E RATE 0 85 MIN OOWN TIHE 24 I ~ 0 ~ tt 112 TRANS. LOSS % Oev NRC INTERROGATORY ON NINE NILE POINT NUCLEAR UNIT NO ~ 2 ENERGY HANAGEHKNT ASSOCIATES) II'IC PAOK 17f ITEN tlO ~ E 320 ~ 1 ID) REPT 9 OPTION I SUBREPORT I 05/]3/83 <<a<<a<<<<<<a<<<<GENKRATINO UNITS CHARACTERISTICS <<<<<<ao>><<<<<<a <<<<<<<<<< HUNTLEY 67 a<<<<<<<< CAPACITY RELIABILITY aHEAT RATE aaaaaaaaaaaaaFUELaaaaaaaaaaaaaa aaaaaaaaCPSTaaaaaaaaa Hif BTU/KWH T YP E H IN% TOT%  %/'YR COMPANY 5 PRE JAN ] 1985 HIN 50 FOR tl ]3 6 HR FAC I ~ 10 HANDLINO 0 ' 6 ' AREA COH JAN I 1985 HAX 185 FOR I 0~0 AHR ] ]05]3 . STRTaUP HFCL I~8 100 ~ 0 LEASINO 0 0 ' UNIT TYPE F HAT JAN ]985 EHERG 185 HOP Oo0 ACCTG SUPP ~ ~ ~ ~ ~ ~ o ~ 0 ' 0' VAR 0<<H 0' 6' ) I RESERVE S RET JAtI ] 2100 CAP ] 50 AVL I 0 ' IHR ] :7587 FUEL I HFCL I ~ 8 UNI.H 0 '100 ' FIXED OtH 83369 6' 100 ~ 0 A H JAN ] 1984 CAP 2 133 AVL 2 13 ~ 7 IHR 2 8413 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0 ' SALE ADD 0 0' CAP 3 174 AVL 3 27 ' IHR 3 9259 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0 ' HAINT 0 /) PRIORITY 0 CYCLE 31 CAP 4 185 AVL 4 45e] IHR 4 9860 FUEL 4 ~ ~ e ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0' OVERHAUL 0 PENALTY I ~ 00 POSITION 5 CAP 5 0 AVL 5 0' IHR 5 0 HEAT RATE fACTOR le00 SPN HNT 0 1 HATURINO 0 ' FREOUEt1CY 52 CAP 6 0 AVL 6 0 ' IHR 6 0 STRT UP ]950 HBTU '3 HUST RUN 1'I DEVIATION 5 CAP 7 0 AVL 7 0~0 IHR 7 0 BANK]oIO 0 HBTU/H PREaCOHH OEN 0 ' -.'. HAX SCHD E RATED 185 HIN DOWN TIHE 24 I ~ O ~ tt l]3 TRANS'OSS  % 0' <<<<44<< HUNTI.EY 68 <<<<<<<<<< aCAPACITYa RELIABILITY "HEAT RATE aaaaaaaaaaaaaFUELaaaaaaaaaaaaaa ----COST----- HW BTU/KWH TYPE HIN% TOT%  %/YR CO'1PANY 5 PRE JAtI 1985 HIN 50 FOR H 12 ~ 4 HR FAC I ~ o9 HANDLING 0.0 6eO AREA 1 COH JAtt 1985 HAX 190 FOR I 0 ' AHR I 10513 STRTaUP tIFCL I~8 100,0 LKASINO 0 0 ' UNIT T'YPE F HAT JAN 1 1985 EHERG 190 HOR 0 ' ACCTG 0 SUPP e ~ ~ ~ ~ ~ ~ ~ 0 ' 0' VAR OeH 0 ' 6 ' RESERVE S RET JAN I 2100 CAP I 50 AVL 1 Oe] IHR 1 7587 FUEL 1 HFCL I ~ 8 UNI.H 0 0100 0 ~ ~ flXED OeH 83369 6 ' o) 100 ~ 0 A H JAN 1 1984 CAP 2 100 AVL 2 12o8 IHR 2 7951 FUEL 2 ~ e ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0' 0' SALE ADD 0 0' CAP 3 169 AVL 3 28e5 IHR 3 9137 FUEI. 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0' 0' HA INT 0 PRIORITY 0 CYCLE 31 CAP 4 190 AVL 4 46.] IHR 4 10140 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0' 0' OVERHAUL 0 o) PENALTY 1 ~ 00 POSITION 5 CAP 5 0 AVL 5 0 ' IHR 5 0 HEAT RATE FACTOR I ~ 00 SPN HNT 0 I HATURIt<G 0.0 FREOUENCY 52 CAP 6 0 AVL 6 Oe0 IHR 6 0 STRTaUP 1950 HBTU HUST RUN H DEVIATION 5 CAP 1 0 AVL 7 Oe0 IHR 7 0 BANK]NO 0 HBTU/k PRE COHH GEN 0 ' ~ y HAX Sct10 E RATED 190 HIN DOWN TIHK 24 IeD ~ << 114 TRANS'OSS  % 0~0 Qi NRC INTERROGATORY ON NINE MILE POINT NUCLEAR UNIT hOeR ENERGY HANAGEttENT ASSOCIATESt INC 17tt ITEM NO ~ E 320 ~ 1 ID) REPT 9 OPTION 1 SUBREPORT 1 05/)3/83 ooooo<<ooooOENERATIttG UNITS CHARACTERISTICS oaooooaooo 'I r aoaoo OSWEGO 3 oaaao [ CAPACITY RELIABILITY HEAT RATE eaaaaaaaaaaaafUELaaaaaaaaaaaaaa p a a e a 'a a a C 0 S 7 a e a a a a a a a HQ BTU/KWR TYPF. HIN% TOT%  %/'YH CoeIPANY 5 PRE JAet ~ 1985 MIN 20 FOR H 4 ' HR FAC I ~ 02 HAhDLINO 0~0 6 ' AREA 2 f COH JAN 1985 HAX 78 FOR I 0~0 AHR 1 14737 STRTaUP RES 0 ~ TU 100 ' I.EAS INO 0 0~0 UttIT TYPE HAT JAN 1985 EttERG 80 HOR 0~0 ACCTO 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0 ~ 0 VAR 0aM 0 ' 6 ' RESERVE S RET JAN 1 2100 CAP 1 20 AVL I 0~0 IHR 1 92o4 FUEL 1 RES 0 ~ TU UNLM 0 ~ olooeo FIXED OaH 26764 6 ' looeo A H JAt4 1 1984 CAP 2 33 AVL 2 0~0 IHR 2 9370 FUKI 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0~0 SALE AUD 0 0~0 CAP 3 80 AVL 3 96 ' IHR 3 9971 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0~0 MAINT 0 PRIORITY 0 CYCLE 31 CAP 4 0 AVL 4 ooo IHR 4 0 FUEL 4 ~ ~ ~ i~ ~ a ~ ~ ~ ~ ~ 0 ~ 0 oao OVKRHAUI. 0 PENALTY F 00 POSITION 2 CAP 5 0 AVL 5 0~0 IHR 5 0 HEAT RATE FACTOR F 00 SPN MNT 0 MATURING 0,0 FREQUENCY 52 CAP 6 0 AVL 6 0~0 IHR 6 0 STRT UP 640 HBTU HUST RUN K DEVIATION 5 CAP 7 0 AVL 7 0~0 IHR 7 0 BANKING 0 MBTU/H PRKaCOHH GEN 0~0 HAX SCHV E RATED 78 HIN OoteN TIHE 24 I ~ De tt 115 TRANS ~ LOSS % 0~0 ooooo OSWEGO 4 ooaoo -CAPACITY REL IAHIL IT Y aHKAT RATKa aaaaaaaaaaaaafUELaeaaaeaeeeeaaa eaaaeaaaCOST a a a aeaaaa HW BTU/KIiH TYPE MIN% TOT%  %/YR COMPANY 5 PRK JAN 1 1985 NIN 30 fOR H 12ao HR FAC 1106 HANDLINO oeo 6eo AREA 2 COM JAN I 1985 HAX 90 FOR I 0~0 AHR I 12193 STRT UP RKS 0 'U 100 ' LEASING 0 0~0 UNIT TYPE F ttAT JAN 1 1985 EMERG 90 ttOR 0~0 ACCTO 0 SUPP ~ ~ ~ ~ ~ ~ a ~ 0+0 0 ~ 0 VAR OaH 0 ~ 0 6 ' RESERVE S loooo RET JAtt I 21OO CAP 1 30 AVL 1 0~1 IHR 1 8778 FUEL 1 RES 0 ~ TU UNLH 0 ~ 0100 ' t'IXKD 0aM 22615 6 ' A H JAN 1 1984 CAP 2 52 AVL 2 4o8 IHR 2 8783 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 SAI.E ADD 0 0~0 CAP 3 80 AVL 3 82 ~ 1 IHR 3 8790 FUEL 3 ~ e ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 HAINT 0 PRIORITY 0 CYCLE 23 CAP 4 90 AVL 4 I~0 IHR 4 8793 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 OVERttAUL 0 PENALTY 1 00 POSI T ION 5 CAP 5 0 AVL 5 0~0 IHR 5 r' 0 HEAT RATE fACTOR 1 ~ 00 SPN MNT 0 MATURING 0 ~ 0 FREQUENCY 52 CAP 6 0 AVL 6 0~0 IHR 6 STRTaUP 640 HBTU HUST RUtt E DEVIATION 5 CAP 7 0 AVL 7 0,0 IHR 7 0 ttANKING 0 HBTU/H PRF. COMM GKN 0~0 MAX SCHD E RATED 90 HIN DowN TIHE 24 I~0~ 8 116 TRANS'.OSS 0~0 3 0-feRC INTERROGATOR'Y ON NINE MILK POINT NUCLEAR UttIT tfo ~ 2 ENERGY MatfaOEHENT ASSOCIATES t It<C PAGE 17V ITEH NO ~ E 320 ~ 1 Io] REPT 9 OPTloN I SUBftEPORT I o5/13/83 0440400440GENERATINO UNITS CHARACTERISTICS 0004404440 00>>a OSWEGO 40440 "CAPACITY<< RELIABILITY -HEAT RATE <<<<>><<<<<<<<>><<<<<<<<>>FUEL<<<<>><<<<<<<<>><<<<<<>><<<< <<<<<<>><<<<<<<<COST<<<<<<<<<<<<<<<<<< HW BTU/KWH TYPE HIM% TOTS  %/YM COMPANY 5 PRE Jatos ] 1985 MIN 20(T FOR H 24 ' HR FAC 1 ~ 00 HANUL ]NO 0~0 6~0 AREA UNIT TYPE 2 COH tfaT JAN I 1985 1985 HAX 850 850 FOR I 0~0 oeo AHR 1 117o4 STRT UP RES 2 ~ 8U 1 00 ~ 0 LKasING, 0 0~0 F JAN ] Ef;ERG HOR aCCTG o SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 VAR OeH 0~0 6~0 RESERVE S RET JAN I 2100 CAP 1 200 AVL 1 0~0 IHR I 8679 FUEL 1 RES 2.8U UNLM Q,O]OO.O FIXEO OeH]33820 6~0 100 ~ 0 A H JAN 1 1984 CAP 2 3)) AVL 2 0~0 IHR 2 8784 i FUEl 2 ~ ~ e ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0 ~ 0 SALE AOO 0 0~0 PARTIce SALE CAP 3 622 AVL 3 oeo IHR 3 9076 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 HA INT 0 PRIORITY 0 CYCLE 23 CAP 4 850 AVL 4 75 ' IHR 4 9290 I'UEL 4 ~ ~ e ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 OVERHAUL 0 PENALTY 1 ~ 00 POSIT]ON 5 CAP 5 0 AVL 5 0 ' IHR 5 0 HEAT RATE FACTOR 1 ~ 00 SPft Htlf 0 HATURIt 8 0 ~ 0 FREQUENCY 52 CAP 6 0 AVL 6 0~0 IHR 6 0 STRT<<UP 3875 MBTU MUST RUN 0 DEVIATION 5 CAP 7 0 AVL 7 0~0 IHR 7 BANKINO 0 HBTU/H PRK<<cof<H OEN 0~0 HAX SC<<O E RATEO 850 MIN 00WN TIME 24. I ~ Ue ff 117 TRANS'OSS  % 0~0 MULTIPLE OWNKRSHIP-COMPANY  %>>COMPANY COHPANY  %<< COMPANY %>>COMPANY <<COMPANY 5 100 ' 4 0 ~ 0 0 0~0 0 oeo 0 0~0 0 0~0 0 Oeo 0 0~0 0 0~0 0 oeo aaaaa OSWEGO aa000 -capacITY- RELIABILITY <<HEAT RATF<< <<<<<<<<<<<<<<<<<<<<>>>>FUEL<<<<<<<<<<<<<<<<<<<<<<<<<<<< r<<<<<<>><<<<<<cosT<<>><<<<<<<<>>>><< HW BTU/KWtf TYPE MIN% TOT%  %/YR COHPAI<Y 5 PRE JAN 1 1985 HIN 200 FOR H 24 ' MR FAC ] ~ Oo HANUL]NO 0~0 6e AREA 2 COH JAN ] 1985 Max 850 FOR I 24 ' AMR 1 ))704 STRT UP RES 0 ~ TU 100 ~ Q LEAS INO 0 0~0 UIIIT TYPE F HAT Jaft 1 1985 EMERG 85O MOR 0 ' aCCTG'o SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 VAR O*H 0~0 6 ' RESERVE S RET JAN 1 2]oo Cap 1 200 AVL ] 0~0 IHR 1 8'679 FUEL 1 RES 0 ~ 7U UNLM 0 ~ 0100 ~ 0 FIXKO OeH]33820 6~0 looeo A H Ja'N 1 ]984 CAP 2 3]1 AVI. 2 0~0 IHR 2 8784 FUEl 2 ~ ~ e ~ ~ ~ e ~ ~ ~ ~ ~ 0 ~ 0 0 ~ 0 SALE A00 0 Oeo PARTI'ALK CAP 3 622 AVL 3 0~0 IHR 3 9076 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 MAINT 0 PRIORITY 0 CYCLE 23 caP 4 850 AVL 4 75 ' IHR 4 9290 FUEL 4 ~ ~ ~ ~ ee ~ ~ ~ ~ ~ ~ 0~0 0~0 OVERHAUL 0 PENALTY 1 ~ 00 POSIT]0 e 3 CAP 5 0 AVL 5 Oeo IMR 5 0 HEAT RATE FACTOR 1 ~ 00 SPtk MNT 0 HATURINO 0 FREOUEN'Y 52 cap 6 0 AVL 6 0~0 IHR 6 0 STRT UP 3875 HBTU MUST RUN E OKVIAT ION 5 CAP 7 0 AVL 7 0~0 IHR 7 0 BANKItlo 0 HBTU/H PRE<<CUHH GEN 0~0 HAX SCHD E RATEQ 850 HIN OoefN TIME 24 1,0. <<>>8 TRANS'OSS  % 0~0 MULTIPLE OHNERSHIP <<COMPANY  %- <<COHPANY co<<pANY  % CQMpaNY, % coHpaNY COMPANY 5 76 ' 7 24 ' 0 0~0 0 . 0~0 0 0~0 0 0~0 0 oeo 0 0~0 0 0~0 0 I 0 ' 0 NRC INTERROGATORY ON MINK MILE, POINT NUCLEAR UNIT Ho ~ 2 EtIEROY MANAOEHENT ASSOCIATKSt INC K 18tt ITEM NO ~ E 320 ~ 1 IDI REPT 9 OPTION 1 SUBREPORT 1 05/13/83 OooooOooooGENERAT INO UNITS CHARACTERISTICS ooooo" oooo ooooo ALBANY ooooo CAPACITY REI.IABILITY HEAT R(TE>> aaaaaaaaaaaaaFUEL>>>>a>>a>>a>>ra>>a>>a aaaaaaa>>COST>>>>aaaa>>aa >Itt BTU/Kt' TYPE MIN% TOT%  %/YR CONPAtlY 5 PRE JAN 1 1985 HIN 2% FOR H 4~0 HR FAC I ~ 00 HANDLINO o,o e.o AREA 4 COH JAtl 1 1985 HAX 97 FOR I 0~0 AHR I 13018 STRT>>UP RES 2 'D 100 ' LEASINO 0 oett UHIT TYPE F MAT JAH I 1985 ENERe loo HOR oeo ACCTG 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0 ~ 0 VAR 0>M o.o e.o RESERVE S RET DEC 31 2000 CAP 1 25 AVL I 0~9 IHR I 8873 FUEL 1 RES 2 'D UHLH 0 ~ 0100 ~ 0 FIXED OeM 22080 6 ' 100 ' A ti JArt 1 1984 CAP 2 67 AVI. 2 11 ' IHR 2 9098 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0 ~ 0 SAI.K ADD 0 0 ~ 0 CAP 3 91 AVl 3 40 ~ 4 IHR 3 9226 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0 ~ 0 MAIHT 0 PRIORITY 0 CYCLE 22 CAP 4 97 AVL 4 0.0 IHR 4 9259 FUEl 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0 ~ 0 OVERHAUl 0 PENAI.TY leoo POSITION 5 CAP 5 100 AVL 5 43.1 IHR 5 9275 HEAT RATE FACTOR I ~ 00 SPN HNT 0 MATUIIING oeo FPEQUEIICY 52 CAP e o Avl e 0.0 IHR 6 I 0 STRT UP 640 HBTU MUST RUN N DEVIATIott 5 CAP 7 0 AVL 7 0~0 ltIR 7 BANKINO 0 HBTU/H PRE>>COHH GEH 0 ~ 0 MAX SCHD E RATED 97 ttlH 001tH TIHE 24 I'D't 119 ]aors TRANS'OSS 0~0 ooooo ALBAttY 2 oopoo CAPACITY>> RELIABILITY HEAT RATE aaaaaaaaaaa>>aF UEL>>aaaaaa>>aaaaaa ra>>ra>>a>>COST>>aaaaaaaa e Mtt BTU/KttH TYPE MIN% TOT%  %/YR Cot1PANY PRK JAN I 1985 MIN 25 FOR H 3~3 HR FAC I ~ 00 HAHDllNO 0~0 6 ' AREA Cat1 JA< I 1985 HAX 97 FOR I 0~0 AtIR 1 13425 STRT UP RES F 00 0 LKASINe 0 0~0 UNIT TYPE F MAT JAcl 1 1985 EMERG 100 HOR 0~0 ACCTG , 0 SUPP ~ ~ ~ ~ ~ ~ e ~ 0~0 oio VAR OeM 0~0 6' RESERVE S RKT DEC 31 2000 CAP 1 25 AVL I I~6 IHR 1 772 FUEL I RES F 00 UNLH 0 ~ 0100 ' FIXED OeM 22080 eeo 100eo A H JAH 1 1984 CAP 2 67 AVL 2 lle6 IHR 2 088 FUEL 2 ~ ~ ~ ~ ~ ~ ~ e ~ ~ ~ ~ 0~0 0~0 SALE ADD 0 0~0 CAP 3 91 AVL 3 40 ' IHR 3 269 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 HAINT 0 PRIORITY 0 CYCLE 22 CAP 4 97 AVL 4 0~0 ltIR 4 9314 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 OVERHAUl 0 PENALTY 1,00 POSITION 6 CAP 5 100 AVL 5 43 F 1 IHR 5 9337 HEAT RATK FACTOR F 00 SPN MNT 0 HATURING 0 e 0 fREOUEttCY 52 CAP 6 0 AVL 6 0~0 IHR 6 0 STRT>>UP 640 HBTU MUST RUN E OEV I AT Iott 5 CAP 7 0 AVL 7 0~0 IHR 7 0 &AHKINO 0 HBTU/H PRE>>COHM GEN 0~0 HAX SCHO E RATED 97 MIN DattN TINE 24 I ~ D ~ tt 120 TRANS'.OSS  % 0~0 NRC INTERROGATORY ON NINE MILE POINT NUCLEAR UNIT NO ~ 2 ENERGY HANAOEHENT ASSOCIATESI INC PAGE 181 ITEH NO ~ E 320 ~ 1 (D) REPT 9 OPTION 1 SUBREPORT 05/13/83 ooooooooooGKNERATINO UNITS CHARACTERISTICS Poooo>>ooo ooooo ALBANY 3 oopoo CAPACITY RELIABILITY HEAT RATE aaeaaaaaaeaaaFUELaaaaaaaaaaaaaa aaaaaaaaCOSTaaaaaaaaa HW BTU/KWH TYPE Ieltv% TOT%  %/YH COHPAtly 5 PRE JAiv 1 1985 HIN 25 FOR Iv 3~3 HR FAC 1 ~ 00 HANOL INO 0~0 6 ' AREA 4 COH JAsl 1 1985 MAX 9$ FOR I 0 AHR 1 12305 STR'TeUP RES F 00 ]00 ' LEASINO 0 0~0 UNIT TYPE F IIAT JAiV 1 1985 EIIERG 100 MOR Oe0 ACCTG 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0 ' VAR OeH 0 ' 6' RESERVE S RET DEC 3] 2000 CAP 1 25 AVL I 1 ~6 IHR I 8894 FUEL 1 RES 2 'D UNLH 0 ~ 0100 ~ 0 FIXED OeM 22080 6 ' 100 ~ 0 A te JAtt 1 1984 CAP 2 67 AVL 2 lleb IHR 2 9283 FUEL 2 ~ ~ ~ ~ ~ ~ e ~ e ~ ~ ~ 0 ' 0 ' SALE ADO 0 0 ' CAP 3 91 AVL 3 40e4 IHR 3 9505 FUEL 3 ~ e ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0~0 HA ItIT 0 PRIORITY 0 CYCLE 22 CAP 4 97 AVL 4 0 ' IHR 4 956] FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0 ' OVERHAUL 0 PENALTY 1 ~ 00 POSITIO.I CAP 5 100 AVL 5 43 1 ~ IHR 5 9589 HEAT RATE FACTOR ]e00 SPN HNT 0 MATURIVO Oe0 I'REOUENCY 52 CAP 6 0 AVL 6 0' IHR 6 STRTeUP 640 HBTU HUST RUN M OEVI AT IOtI 5 CAP 7 0 AVI. 7 0.0 IHR 7 0 BANKINO 0 HBTU/H PRK>>COMM OEN 0 ' MAX SCeID E RATED 97 HIN DOWN TINK 24 I ~ D~ II 121 TRANS'.OSS  % 0 ' 0 o<<oo ALBAIvY 4 pppop CAPACITY RELIABILITY aHEAT RATE.>> a a a a a a a a a a a a a F U K L a a a a a a e a si a a a a e eaaaeaaeCOSTaaaaaeaaa HW BTU/KWH TYPE MIN% TOT%  %/YH e COMPANY PRE JAN 1 1985 HIN 25 FOR H 3 ' HR FAC 1 ~ o0 HANDLING 0 ' 6 ' AREA 4 COH JAiV ] 1985 HAX 97 FOR I Oe0 AHR ] ]2629 STRTaUP RES 2 'D 100 ~ 0 LEASINO 0 Oe0 UNIT TYPE F HAT JAN ] ]985 EMERG 100 HOR Oe0 ACCTO 0 SUPP ~ ~ ~ ~ ~ ~ ~ e 0~0 0 ' VAR OeH 0' 6 ' O RESERVE S RET DEC 31 2000 CAP 1 25 AVI 1 1 ~ 6 IHR 1 9121 I'UEI. 1 RES 2 'D UNI.H 0 '100 ' FIXED OeH 22080 6 ' 100 ~ 0 A M JAN ] )984 CAP 2 67 AVL 2 lle6 IHR 2 9192 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0' SALK AOO 0 Oe0 CAP 3 9] AVL 3 40eh IHR 3 9233 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0' HAINT 0 PRIORITY PENALTY 1,00 0 CYCLE 22 CAP 4 97 AVL 4 Oe0 IHR 4 9243 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0' 0 ' OVERHAUI. 0 POS]7IOte 2 CAP 5 100 AVL 5 43el IHR 5 9248 HKAT RATK FACTOR le00 SPN HNT 0 HATURINO 0 ~ 0 FREOUEHCY 52 CAP 6 0 AVL 6 Oe0 IHR 6 STRTaUP 640 HBTU MUST RUN E DEVIATION 5 CAP 7 0 AVL 7 OeO IHR 7 . 0 BAtIKINO 0 HBTU/H PRK COtIH Gatv 0~0 MAX SCHD E RATE.O 97 I HIN DOeIN TiteE 24 I ~ D ~ II 122 TRANS'OSS 0 ' WRC INTERROGATORY ON NINE HILE POIttT NUCLEAR UWIT NO ~ 2 ENERGY HAttAOEHENT ASSOCIATES'NC E 18C ITEM Noe~ E 320 ~ 1 tOl REPT 9 OPTION I SUBPEPORT I 05/13/83 ooooooooooOENERAT INO UNITS CHARACTER IS71CS oooo" oo<<o ooooo ROTT ~ GT 0 oooo% <<CAPACITY RELIABILITY <<HEAT RATK aaaaaaaaaaaaaf UEL>>aaaaaaaaa<<aa aaaaaaa<<CPS7>>aaaaaaaa vW BTU/KWH 7YPE HIW% TOT%  %/YR COHPAttY 5 PRE JAtj I 1985 HIN 3? FOR H 25eo HR FAC I' 00 HANDLINO 0 ~ 0 6 ' AREA UWIT TYPE 4 CON <AT JAN JAN I 1985 1985 HAx lhe fOR I 0~0 AHR I 16180 STRT<<UP NATOAS A 100 ' LEASINO 0 0 ' T 1 Et IERG HOR 0~0 ACCTO 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0~0 VAR OeH o.o e.o RESERVE 0 PET JAN 2100 I I 14626 14'AP 1 1 37 AVL 0~0 IHR FUEL 1 ttATOAS A UtlLH 0~0 I 00 ~ 0 FlxED ooH 0 beo 100 ' A H JAN 1 1984 CAP 2 73 AVL 2 0~0 IHR 2 14626 FUEL 2 i~e ~~~ ~ ~ ~ ~~~ 0~0 0~0 SALE ADD 0 0 ' CAP 3 109 AVL 3 0~0 IHR 3 14626 fUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 HAIN? 0 PRIORITY 0 CYCLE 14 CAP 4 146 AVL 4 75 ' IHR 14626 FUEL 4 PENALTY 0 HATURING 0 ~ 0 '0 POS I 7 Iotl FREOUENCY 52 I CAP cAp e 5 0 AVL 5 oeo IHR 4 5 ~ 0 ~ ~ ~ e ~ ~ ~ ~ HEAT RATE FACTOR F 00 ~ ~ ~ ~ 0~0 0~0 OVERHAUL SPN HNT 0 0 o AVL 6 oeo IHR 6 } 0 STRT UP 0 HItTU HUST RUet E DEVIATION 5 CAP 7 0 AVL 7 0~0 IHR 7 I 0 BANKING 0 HBTU/H PRE<<COMM GEN 0 ~ 0 HAX SCttD E RATED 146 HIW DOWN TIHE I I~D ~ ¹ 123 TRANS'OSS oeO o<<oo ALB. GT O ooOOo <<CAPACITY>> RELIABILITY HEAT RATE aaaaaaaaaaaaaf UEL>>a<<a>>a<<a<<a<<a<<a aaaaaaaaCPST<<>>a<<>>a<<<<a HW BTU/KWtt TYPE HIW% TOT%  %/YH COMPANY 5 PRE JAN 1 1985 MIN FOR M 25eo HR FAC I ~ 00 HAttDLING 0~0 eel AREA 4 COM JAN 1985 HA X 164 FOR I 0~0 AHR 1 15370 STRT UP NATGAS A 100 ' LEAS INO 0 0~0 UttIT TYPE 7 I"AT JAW I 1985 EHERG 164 HOR 0~0 ACCTO 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 VAR OeH 0~0 6 ' RESERVE 0 RET tt JAtt 1 2100 CAP 1 41 AVL I 0~0 IHR 1 13286 FUEL I NATGAS A UNLM 0 ~ 0100 ~ 0 FIXED OeH 0 6 ' 100 A JAte 1984 CAP 2 82 AVL 2 0 ~ 0 IHR 2 13286 FUEL 2 ~ ~ ~ ~ ~ ~ ~ i ~ ~ ~ ~ 0~0 oeo SALK ADD 0 0~0 CAP 3 123 AVL 3 0 ~ 0 IHR 3 13286 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 HAINT 0 PRIORITY 0 CYCLE 14, CAP 4 164 AVL 4 75 ~ 0 IHR 4 13286 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 OVERHAUL= 0 PENALTY 0 ~ 70 POSITION I CAP 5 0 AVL' 0~0 IHR 5 0 HEAT RATK fACTOR I ~ 00 SPW MNT 0 HATURINO 0 0 fREOUENCY 52 CAP 6 0 AVL 6 0~0 IHR 6 0 STRT<<UP 0 MBTU HUST RUW E OEVIATIOtl 5 CAP 7 0 AVL 7 0~0 IHR 7 0 ttANKINO 0 HBTU/H PRE<<COHH OEN 0~0 HAX SCHO E RATED 164 etIN DOWN TIME I ~ De tt 124 7RANS ~ LOSS 0~0 0 0 ) Z" NRC INTERROGATORY QN NINE HILE POINT NUCLEAR UNIT IIO ~ 2 Kr!ERGY 14AIIAOEI!ENT ASspcIATESr INC PAGK 184 ITEH NO ~ E 320 ~ I <Ot REPT 9 OPTION I SUBREPORT I 05/33/83 ooaaoooaoaOENERAT ING UNITS CHARACTERISTICS oooooaoooa ooaoa BLrwllrrf 1 oooaa <<CAPACITY- REli AB ILI T Y "HEAT RATE << <<>>>>>>>>e>>>>>>>>>>>><<FUEL>>>><<<<<<>>>>>><<>><<>><< <<>><<>><<<<>>>>COST<<>>>><<>><<<<<<<< t I'ir BTU/Kr!H TYPE HIN% TGT%  %/YR COHPANY 6 PRE JAIL 1 1985 HI ~ 150 FOR tl 6~ 0 HR FAC 1,00 HANOLItlG 0 ' an AREA 11 CVH JAN I 1985 HAX 602 FOR I 0~0 AHR I 11600 STRT<<UP RES 0 ~ 7D 100 ' LEASING 0 0~0 UtllT TYPE F tI A 7 JArl 1985 Et>ERO 602 HOR 0 ' ACCTO ' SUPP ~ ~ ~ ~ ~ ~ ~ ~ happ 0~0 0~0 VAR 04M 0~0 6 ' RESERVE S RET JAN 1 2100 CAP 1 150 AVL 1 0~0 IHR I 83"0 FUEL I RES 0,7D UrtLH 0,0100.0 FIXED OeH101890 6~0 100 ~ 0 A H JAI) I 1984 CAP 2 300 AVL 2 pep IHR 2 8580 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 SAI.E ADD 0 0~0 CAP 3 400 AVL 3 2 ' IHR 3 8950 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 '1A INT 0 PRIORITY 0 CYClE 29 CAP 4 500 AVL 4 10 ' IHR 4 9600 FUEL 4 e ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 OVFRHAU1. 0 PENAL.TY lenn POSITION 5 CAP 5 602 AVL 5 81 ~ 3 IHR 5 10500 HEAT RATK FACTOR 1 SPN HNT 0 HATURINO 0 ~ 0 FREQUENCY 52 CAP 6 0 AVL. 6 0~0 IrlR 6 0 STRT<<UP 369 HBTU HUST RUrr DEVIATION 5 CAP 7 0 AVL 7 0~0 IHR 7 0 BAHKII46 0 HBTU/H PRE COI<H GEN 0~0 HAX SCHD E RATED 602 HIN DOWN TIHE 24 I ~ Oe Ir 127 TRANS'OSS 0~0 HUL TIPLE OWI(ERSHIP<<<<>>>><<->><<>>>><<<< <<CQHPANY COHPANY COHPANY % COHPANY % "CprIPA!4Y CQHPANY 2 66 ' 6 33 ' 0 0 ' 0 0~0 0 0~0 0 0 ' 0 0 ~ 0 0 0~0 0~0 0 0~0 oaoaa BQ))LII4E 2 aaooa <<CAPACITY RELIABILITY HEAT RATE >><<>>>>>><<<<<<<<>>f UfL<<<<>>>>>><<<<<<<<<<>> <<<< << <<<< >><<>>CPST>> <<>><< HW BTU/KWH TYPE HIN% TOT%  %/YH COHPANY 6 PRE JAN 1 1985 HIN 150 FOR H 6~ 1 HR FAC I ~ 00 HANDLINO 0 ~ 0 6en AREA 11 CO!1 JAN 1985 HAX 600 FOR I 0~0 AHR I 11435 STRT UP RES 0 ~ 70 10' LEAS INO 0 0~0 UNIT TYPE F eIAT JAN 1985 El'IERO 600 HOR 0 ~ 0 ACCTO ) 0 SUPP ~ e ~ ~ e ~ ~ ~ Oep pep VAR 04tl 0~0 6~d RESFRVE S RKT JAt4 1 2100 cAP 1 150 AVL 1 0~0 IHR 1 8250 FUEL 1 PES 0 ~ TD U"LH 0 ~ 0100 ~ 0 FIXED QeH101890 6~0 100 ~ 0 A H JAN 1984 CAP 2 300 AVL 2 0 ' IHR 2 8500 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 SALE AOD 0 pen CAP 3 400 AVL 3 0 ~ 0 IHR 3 8940 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0~0 HAINT 0 PRIORITY 0 CYCLE 30 cAP 4 500 AVL A nen IHR 4 9725 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 OVERHAUL 0 PEtrALTY 1 ~ nn POS I T I 0!4 5 CAP 5 600 AVL 5 93 ' IrIR 5 10960 HEAT RATE FACTOR F 00 SPN HNT 0 HATURING 0 ~ 0 FREOUKticY 52 CAP 6 0 Avl 6 p,n IHR 6 0 sTR7 Up 369 HBTU HUST Rurl K DEVI AT Iptl 5 CAP 7 0 AVL" 7 0~0 IHR 7 0 BANKINO 0 HBTU/H PRE<<COHH OEN 0~0 HAX SCHO E RATED 600 HIN DOWN TINE 24 leDe II 128 TRANS'OSS 0 ~ 0 -""-- -"-"" HULTIPLE OWNERSHIP"-" "-- Cpi!PA)4Y <<COI!PAI4'Y COI)PA!4Y  % COIIPAt4Y  % CPHPANY <<COHPANY 2 66,7 6 33 ~ 3 0 nen 0~0 0 0~ V 0 0 ~ 0 n n,n 0 O.n 0 0~0 V.n i ~ << ~ ~ NRC ]h7ERROGATORY ON IIINE t>>ILE POINT NUCLEAR UN17 t. ENf ROY HAt>>AGEMENT ASSOCIATKSI It>>C PAOt, ]85 0 ITEH NO E 320 ~ 1 {D) IIKPT 9 OPT IOt4 I SUBREPORT 1 05/]3/83 OoooooooooOEt!ERAT INO UNITS CHARACTERIST]CS oooooooooo ooooo LOVf77 ooooo CAPACiTY RELIABILITY HEAT RATE <<<<<<a>>FUEI <<<<aa<<<<a<<aa<<aaa a<<aa<<a>>CQS[aaaaaaa<<<< Ntw BTU/KWH TYPE MIN% TG7%  %/YM CO>>>>PAtIY 6 PRE JAN 1985 HIN T FOR H 3 ' HR FAC 1,00 HAtIDL]NG 0~0 6 ' AREA ]1 COH JAt4 ]985 I>>AX )9 FOR I 0~0 AHR $ 16382 STRT UP IIES 0 'D 100 ~ 0 LEASING Q 0 ' UIIIT TYPE. F l>>AT JA>>4 1985 Et>>ERO ]9 MOR 0~0 ACCTG 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 VAR OtH 0~0 6 ' RESERVE S RET JArt I 2]oo CAP 1  ? AVL 1 Q.o IHR I 10240 FUEL I RES 0 ~ 30 Ut>>LM 0 ~ 0100 ~ 0 FIXED Oct>> 3225 6 ' ]00 ' A H JAN ]984 CAP 2 '-16 AVL 2 0 ' lt>>R 2 l]180 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 SALE ADD 0 0 ~ 0 CAP 3 19 AVL 3 96 ' It>>R 3 11630 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 I HiA NT 0 PRIG>>I ITY 0 CYCLE 26 CAP 4 0 AVL 4 0 0 ~ IHR 4 Q FUEL 4 ~ e ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0 ~0 OVERHAUl. 0 PENtLTY ] F 00 POSIT 10!4 5 CAP 5 0 AVL 5 0' IHR 5 0 HEAT RATE FACTOR ] F 00 SPN HNT 0 HATUR]ttO 0 ~ 0 FREQUENCY 52 CAP 6 0 AVL 6 oeO IHR 6 0 STRT>>UP 47 t48TU MUST RUN K t]E V I AT I 0!4 CAP 7 0 AVL 7 oeo it>>R 7 0 BANKING 0 HBTU/tt PRE COHH GEN 0~0 HAX SCHu E RATED 19 HIN DOWN Tlt>>E 8 I ~ Oe o 129 TRANS'OSS 0~0 ooooo LOVETT 2 ooooo <<CAPACI7Y>> RELIABILITY HEA RATE a <<a <<<<a a a>>>> <<a <<F U E L a <<<<yo a a <<<<a <<a a <<a MW 8 U/KWH TYPE MIN% TOT%  %/YH COMPANY 6 PRE JAN 1 1985 H]N FOR H 20 ' HR F C 1 ~ 00 HANDL]NO 0 ' 6 AREA )) Cot>> JAN 1985 HAX 20 FOR I 0~0 AHR i 16186 STRT>>UP RES oe3D 100 ~ 0 LEASING 0 0~0 UtllT TYPE F tlAT JAN 1 1985 EHEHG 20 MOR 0 ' ACCTG 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 VAR OeH 0~0 6eo RESERVE S RET JAtt I 2100 CAP 1 7 AVL 1 0~0 IHR 1 10120 FUFL 1 RES 0 'D UNLH 0 ~ 0100 ~0 FIXED OeH 3399 6.O 100 ~ 0 A H JAN I 1984 CAP 2 16 AVL 2 0 ~ 0 IHR 2 11020 FUL'L 2 ~ ~ ~ ~ ~ ~ e ~ ~ ~ ~ ~ 0~0 0~0 SALE ADO 0 0~0 CAP 3 20 AVL 3 T9 ~ 1 IHR 3 11480 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ e ~ 0~0 0~0 HA INT 0 PRIORITY 0 CYCLE 26 CAP 4 4 AVL 4 Qeo IHR 4 0 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 OVERHAUL 0 PENALTY I eoo POSITIOII 4 CAP 5 0 AVL 5 0 ~ 0 IHR 5 0 HEAT RATE FACTOR ],00 SPN HNT 0 MATURINO 0,0 FREQUEt4CY 52 CAP 6 0 AVL' oeo IHR 6 S7RTe UP 49 H87U HUST RUN E DEVIATIOII 5 CAP 7 0 AVL T 0~0 IHR 7 ~ 0 BANKING 0 HBTU/t$ PRE COHH OEt>> 0 ' HAX SCHD E RATED 20 J !4]r OOwN 7 it>>E 8 I~D~ >>>> ]30 I>> TRANS'OSS  % 0~0 ~, tlRC INTERROGATORY OW NINE t'ILE POINT NUCLFAR Ut'IT NO ~ 2 ENERGY HANAGEHKtlT ASSOCIATES ~ Itic PAGt. lao ITEN NO ~ E 320>>] (0) RKPT 9 OPTIOl>> 1 SUBREPORT 1 05/13/tt3 oooOooooaoGENKRAT ING Utl]TS CHARACTERISTICS oaaao !.OVETT 3 ooaaa -CAPACITY" REL14BILITY HEAT RATE" <<<<<<<<<<<<<<<<<<<<<<<<f UfL<<<<<<<<<<<<<<<<<<<<<<<<<<<< <<COST<<<< <<<<<<<< << Hll 8 TU/I,I!H TYPE Hltl% TOT%  %/YR COHPAtlY 6 PRE JAN 1 ]985 HIN 15 FOR H 8 ' HR FAC l>>42 HANDLING 0 ' 6 ' AREA 11 COH JAft 1 1985 HAX FOP. I 0>>0 AHR I 14583 ST!tT UP RES 0,30 100 ~ 0 LF AS]NO 0 0>>0 Ut!IT TYPE F H4 7 JA!>> 1985 EtILIto 63 HOR 0~0 ACCTG 0 SUPP 0~0 0~0 VAtt Ot tI 0~0 6 ' RESERVE 5 100>>0 RET 11AR JAN ]'988 i984 CAP cAP 2 ] 15 40 AVL AVL 1 2 0~0 0~0 IHR IHR 1 9518 97]T FUEL 1 FUEL 2 RES 0 '0 ~ ~ ~ ~ ~ ~ ~ ~ UtlLH o.oloa.o 0>>0 0~0 FIXED O>>H loe78 SALK AOD 6.o 0~0 A H , 2 ~ ~ ~ e ~ ~ ~ ~ ~ ~ ~ ~ 0 CAP 3 63 AVL 3 91>>5 IHR 3 9900 FUEL 3 ~ ~ ~ ~ ~ >> ~ ~ ~ ~ ~ ~ 0~0 0~Q HAINT 0 PRIORITY 0 CYCLE 26 CAP 4 0 AVL 4 0~0 IHR 4 0 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 OVERHAUL 0 PENALTY ]>>00 POSITION 3 CAP 5 0 AVL 5 0~0 IHR 5 0 HEAT RATE. FACTOR 1 ~ 00 SPN HHT 0 HATURING 0.0 FREQUENCY 52 CAP 6 0 AVL 6 0 ~ 0 IHR 6 0 STRT<<UP 78 HBTU HUST RUN E DEVI AT]ON 5 CAP 7 AVL 7 0 ' IHR 7 0 84t!KING 0 MSTU/H PRE<<COHH GEN 0~0 HAX SCHO E RATED 63 HIN OOI!N TINK 24 I ~ 0 ~ !t 131 TRAtIS ~ LOSS 0~0 "oooo l.OVETT 4 ooooo CAPACITY RELIABILITY <<HEAT RATE <<<<<<<<<<<<<<<<<<<<<<<<FUEL<<<<<<<<<<<<<<<<<<<<<<<<<<<< COST <<<< HV BfU/KWH TYPE Hltl% TOT%  %/YH Q COMPANY 6 PRK JAN 1984 40 FOR H 2 ' HR FAC 1 ~ 00 HANDLING 0 ~ 0 6' AREA 11 cltl JAN 1984 HAX ]97 FOR I 0>>0 AHR 1 11225 STRT UP PES 0 ~ 30 100 ~ 0 LEASING 0 0~0 UNIT TYPE F HAT JAN 1985 EHERG ]97 HOR 0' ACCTG 0 SUPP 0~0 0>>0 VAR OoH 0~0 6>>0 RESERVE 5 100 ~ 0 RET A H JAN JAN 1 ] ] 1985 1983 c4P CAP 2 ] 4o ]PQ AVL AVL 1 2 0~0 0~0 IHR IHR I 9510 2 9T'50 FUFI 2 ~ ~ ~ ~ ~ FUEL I RES 0 '0 >> ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ UNLH 0 ~ 0100 ~ 0 ~ ~ ~ ~ 0~0 0~0 fl"ED O>>H SAI.E AOD 33388 0 6 ' 0~0 CAP 3 160 AVL 3 18 ~ 2 IHR 3 10125 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ >> ~~ ~ Q,O 0.0 HAINT 0 PRIOR]TY 0 CYCLE 27 CAP 4 197 AVL 4 79 ' IHR 4 10750 FUEL 4 >> ~ ~ >> ~ ~ ~ ~ ~ ~ ~ ~ O,O 0>>0 OVERHAUL Q PENALTY 1>>00 POSITION 1 CAP 5 0 AVL 5 0~0 IHR 5 0 HEAT RATE FACTOR ] F 00 SPN '1NT 0 HATURING 0>>0 FREQUENCY 52 CAP 6 0 AVL 6 Q~0 ]HR 6 0 STR'T<<UP 122 HtlTU HUST RUN H DEVIATION 5 CAP 7 . 0 AVL 7 0~0 IHR 7 0 BANKING 0 HBTU/H PRE<<COHH GKN 0~0 HAX SCHO E RATED 197 HIN OUI!N TINE 24 I~0 ~ >>t 132 TRANS'OSS  % 0~0 I l. t Itt]EEIROOATORY ON NINE MILE PO]tIT NUCLEAR UIIIT IIO 2 Et>KRGY t'.AIIAGEteFIIT ASSOCIATESt INC 18)' ITEM NO ~ K 320 ~ 1 IV) REPT 9 OPTION I SUBREPOEET 1 3/83 aaaaoaaaaaGENEHAT ING UNITS CHAR4CTERISTICS ooaaa<<aaa oaoao I.OVETT 5 ooaoo -caPacITY- REI.]a 8 ILI T Y "HEAT RATE >>>>>>FUEL>>>>>>>>>>>>>>>>>>>>>>>>>>>> >>>>>>>>>>to>>>>COST>>>>>>>>>>>>>>>> MW BTU/KEEN TYPE I%III'iL TII7%  %/YR COMPANY 6 PRE OCT 1983 tq ltv 50 FOR M ]ol HR FAC 1 ~ 00 HANOL]NO 0~0 6 ' AREA 11 Cot> OCT 1983 MAX 202 FOR I 0 ~ 0 AHR 1 11900 STRT>>UP RES no3D 100 ~ 0 LEAS]t>G 0 0~0 UNIT TYPE MAT JAN ]985 EMERG 202 teOR 0 0 ACC78 0 SUPP o.'o O.o VAR Oep 0~0 6~0 RESERVE F S RET OCT ] 1984 cap ] 50 AVL 1 0 ~ ~ 0 IHR 1 9100 FUEL 1 RES 0 '0 ~ ~ ~ ~ ~ ~ ~ ~ UNI.M 0 ~ 0100 ~ 0 FIXED OeM 34258 6.o I, 100 ~ 0 A tr OCT 1982 CAP 2 125 AVL 2 0 ~ 0 IMR 2 9425 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0 SALE ADD 0 0~0 L-' PRIORITY 0 CYCLE 28 CAP 3 cap 4 160 202 AVL AVI. 3 4 Oeo 98e9 IHR 3 9660 IHR 4 10050 FUEL 3 FUEL 4 ~ ~ ~ ~ ~ ~ ~ o ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 0~0 0~0 MA]NT OVERHAUL 0 0 ) e ~ ~ ~ ~ PENALTY ]coo POSITION 3 CAP 5 0 AVL 5 0~ IHR 5 0 HEA7 RATE FACTOR 1 ~ 00 SPN MNT 0 HATURINO 0 ~ 0 FREOUEtocY 52 cap 6 O AVI. 6 0~o IHR 6 0 STRT>>UP 122 M87U HUST RUN M Of V]AT]ON 5 CAP 7 0 aVI. 7 o.o IHR 7 0 ttatIK ING 0 MBTU/M PRE COMH GKN 0~0 HAX SCHD E RATED 202 HIN DOWN TIME 24 I~0~ O ]33 TRANS'OSS Oeo a o" aaa HILLBI> 7 ] aaaao CAPACITY RELIABILITY HKAT RATK >>>>>>>>>>>>>>>>>>>>>>>>>> F' E L>>>>>>>>>>>>>>>>>>>>>>>>>>>> >>>>>>>>>>>>>>>>COST>>>>>>>>>>>>>>>>>>  %/YK t MH BTU/KEIH TYPF. MIN% TGT% COHPANY 6 PRE JAN 1985 HIM 20 FOR H 2] ~ 0 HR FAC 1 ~ 00 HANDLING O.O 6.0 oQ I AREA 11 CON JAN ]985 MAX 43 FOR I 0~0 AIIR ] ]7250 STRT UP DIS GILD 100 ~ 0 LEASINO 0 0~0 UNIT TYPE T EIAT JAN 1985 EMERO 43 MOR 0 ' ACCTG o SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 VAR OeM 0~0 6 ' RESERVE (I IIET JAN 1 2100 CAP ] 20 AVL I 0~0 IHR 1 10310 I UEL 1 OI5 GILD UIILII 0 ~ 0100 ~ 0 FIXED OeM 0 6 ' 100eo A tt JAN 1 ]984 CAP 2 30 AVL 2 0~0 IHR 2 11730 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 SALE AOO 0 0~0 CAP 3 43 AVI. 3 79eo IHR 3 14860 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 et AINT 0 PRIORITY 0 CYCLE 24 CAP 4 0 AVL 4 0~0 IHR 4 0 FUFL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 OVERHAUL 0 PENALTY 1 ~ 00 POSI TION I CAP 5 0 AVL 5 0~0 IEIR 5 0 MEAT RATE FACTOR 1 ~ 00 SPN MNT 0 HATURINO Oeo FREOUKtlcY 52 CAP 6 0 AVI. 6 0~0 IHR 6 0 STRT UP 18 HBTU HUST RUrt E OEV]AT]ON 5 CAP 7 0 AVL 7 0~0 IHR 7 0 ttatIKIiNO 0 HBTII/O PRE COMM GkN 0~0 MAX SCHD E RATED 43 MIN DOEtN [IME I~0 ~ tt 134 TRANS ~ I.OSS 0~0 0 ~ 0 L tlRC INTERROGATORY ON NINE HILE POItlT NUCI.EAR UNIT I'lo ~ 2 . l KtlERGY t'ANAGEtIENT ASSOCIATESt INC PAGE ]By ITEM NO ~ E 320 ~ 1 ID) REPT 9 OPTION I SUBREPORT I 05/13/83 a>>a<<>>ooaoaGENERATINO Ii 4<<af>>>>o>>oa UNITS CHARACTERISTICS 't I ooooa, ee<<FUELaaaaa<<<<a<<a<<a<<a <<a a a e a e e C Q $ '7 a a e e e a a a a a<<COST <<aoo>> SHOEHK 7 CAPACITY RELIABILITY <<HEAT RATE HW BTU/KWH TYPE MIN% TGT%  %/Yk COMPANY 6 PRE JAtt 1985 IllN 20 FOR H O.O HR FAC ] F 00 tlANDLINO o,o e,o ARKA 11 Cot> JAtl ] 1985 HAX 43 FOR I 0 ~ 0 AHR 1 172SO S'IRT<<UP DIS GILD 100 ~ 0 I.EAS ]NO 0 0~0 Utl]T. TYPE T HAT JAtl ] 1985 EHERG 43 FOR 0~0 ACCTO 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0 0 oso VAR 0>H 0 6 2 ]4 ' 2 ))820 0' 20'AP 100 ~ 0 A tI JAN 1984 2 30 AVL IHR FUEI 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 SAI.E ADD 0
                                    '-'YCLE CAP 3    43        AVL    3 85e7     IHR  3 14890      FUEL 3     ~ ~ ~ ~ ~ ~ ~ ~  ~ ~ ~ ~   0,0    0>>0    ttA INT                     0 PRIORITY                                                                                                  FUEL 4                                              OVERHAUL a<<a 0                           24  CAP 4          0   AVL    4   0~0    IHR  4         0             ~ ~ ~ ~ ~ ~ ee   ~ ~ ~ ~   0~0    0~0                                0 PENALTY F 00           POSIT]ON                 1  CAP 5          0   AVI-   5   0 '    IHR  5         0  HEAT RATE FACTOR IGLOO                              SPN HttT                    0 HATURING 0     '       FREQUENCY               52  CAP 6          0   AVL    6   oeo    IHR  6            STRT UP .          18 HBTU HUST RUN           E   OEVI AT I Otl            5  CAP 7          0   AVL    7   oeo    IHR  7            BANKINO              0   HOTU/H                     PRE COHH OEN                        0~0 HAX SCHO           E                               RATED    43                                                                                                Hltl   DOWN      T]HE                   ?

I ~ 0 ~ tl ]35 TRANS>> LOSS 0~0

<<ooo>> RUSSELL            ] >>oooo                     CAPACITY         REI. I AB ILI T Y  HEAT RkTE              aa <<<<ac<<FU KL<<a<<a<<<<a<<a<<a<<<<a                   a                       a a a  aaaa   <<a
                                                                                                                                                                                                          ~
                                                                                                                                                                                                            )

HW BTU/f<WH TYPE F'IIN% TGT%  %/Yk COMPANY 7 PRE JAN 1 1985 HIN 7 FOR H ]~6 HR FAC ))10 HANDI.I NO o.o e.o AREA 9 COtl JAN ] 1985 HAX 50 FOR I 0~0 AHR ] 13669 STRT UP OIS OILU 100 ~ 0 LEASING 0 0~0 UNIT TYPE F NAT JAN I 1985 EtlERG 50 HOR 0~0 ACCTO 0 SUPP eoo ~ ~ ~ o ~ 0~0 0~0 VAR 0>H o.o e.o RESERVE S RET JAN I 2100 CAP 1 7 AVL 1 0~0 IHR 1 8982 FUEL 1 COAL )2U UNLH 0 ~ 0]oooo FlxED 0>>H 156S7 6 ~ II

            ]oooo      A H   JAII           1 1984 CAP 2     25       AVL    2   0~0    IHR  2   9900     FUEL  2    ~ ~ ~ ~ ~ ~ ~ ~  ~ ~ ~ ~   oeo     0 '   SALE AOD                    0       0~0 CAP 3     36       AVL    3   0~0    IHR  3 1046]      FUEL  3    ~ ~ ~ ~ ~ ~ ~ ~  ~ ~ ~ ~   0~0     0~0   HA I tlT                    0 PRIOR 17Y          0   CYCLE                   33  CAP 4     45       AVI. 4 97 F 4   IHR  4 10920      FUEL  4    ~ ~ ~ ~ ~ ~ ~ ~  ~ ~ ~ ~   0~0     0~0   OVERHAUL                    0 PENALTY 1e00           POS]TION                  1 CAP 5     50       AVL    5 ]so      IHR  5 1117S      HEAT  RATE FACTOR I ~ 00                            SPN tlNT                    0 tIATURING ooo          FREOUENCY               52  CAP 6          0   AVL    e o.o      IHR  6            STRT  UP         153 HBTU MUST RUtl          E   OEVIATION                5  CAP 7          0   AVL    7 oeo      IHR  7         0  BANKINO              0   tlBTU/H                    PRk COME OEN                        0~0 HAX SCh0           E                               RATED     50                                                                                               Hltl DOWN TINE                          8 I~   DE a  136                                                                                                                                                TRANS'OSS %                         0 '

t<RC INTERROGATORY ON NINE MILE POINT NUCLEAR UNIT tfo ~ 2 ENERGY MAt>AOEtfENT ASSOCIATESt Ittc 189 ITEM NO ~ E 320 ' IU) REPT 9 OPTIOtt I SUBREPORT I 05/13/83 fo+ooooo4oGENERATING UNITS CHARACTERISTICS feooo444!fefo RUSSELL OODOO CAPACITY REL I ABILITY HEAT RATE <<<<<<<<<<<<<<<<<<<<>><<FUEL>><<<<<<<<>>>> <<>><<<<<<>> >><<<<<<>><<<<<<COST<<<<>><<>>>><<<<>> Mef BTU/K>H TYPF. f!IN% TOT%  %/YH COMPAtfY 7 PRE JAtf 1 1985 MIN 9 FOR tt 2~6 HR FAC F 08 HANDLINO 0~0 6.o AREA 9 COe'AN 1 1985 HAX 65 FOR I 0 ~ 0 AHR I 12404 STRT>>UP OIS OILU 100 ~ 0 LEASINO 0 0~0 UNIT TYPE F H4T JAti I 1985 EMEHO 65 NOR 0 ~ 0 accTG 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ o.o o.o VAH OeM 0~0 6 ' RESERVE 5 RET JAN I 2100 CAP 1 AVL I 0 ~ 0 IHR 1 8130 FUEI. 1 COAL >2U UNLtt O.'OIOn,O FIXED OeM 20340 6 ' looeo A M JAN I 1984 CAP 2 26 AVL 2 0 ~ 0 IHR 2 8655 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0 ' SALE ADD 0 0 ~ 0 CAP 3 47 AVL 3 0 ~ 0 IMR 3 9304 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 HAINT 0 PRIORITY 0 CYCLE 33 CAP 4 60 AVL 4 96 ' IHR 4 9705 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0~0 OVERHAUL 0 PENALTY leno PoS IT ION I CAP 5 65 AVL 5 I~0 IHR 5 9860 HEAT RATE FACTOR I ~ 00 SPN MNT 0 MATURING o.n FREnUENCY 52 CAP 6 0 AVL 6 0~0 IHR 6 0 STRT>>UP 179 hBTU HUST RUN E DEV IATIOII 5 CAP 7 0 AVL 7 oeo IHR 7 0 BANKINO 0 HBTU/H PRE COHH GEN 0~0 HAX SCHO E RATED 65 Mltl DOWN TIME 10 I~0~ ft 137 TRANS'.OSS 0~0 ~+e'oo RUSSELL 3 o4140 CAPACITY>> RELIABILITY -HEAT RATE >>>><<>><<<<>>>><<>>FUEL>>>>>>>>>><<<<<<>>>>>>>>>>>> COST MW BTU/KWH TYPE MIN% TOT%  %/YR COMPANY 7 PRE JAN 1 1985 HIN FOR H 3~5 HP FAC I ~ 08 HANOI. ING 0~0 6 ' AREA UNIT TYPE 9 F COH HAT JAN JAN I 1985 1985 MAX EHERG 65 65 FOR I 0~0 AHR ] 12404 o STRT UP DIS OILU 100 ' LEASINO VAR 0<M 0 0~0 6 ' HOR 0~0 ACCTG , SUPP ~ e ~ ~ ~ ~ ~ ~ 0~0 0~0 0 ~ 0 RESERVE S RET JAN 1 2100 CAP 1 9 AVL 1 0~0 IHR I 8330 FUEI. I COAL >2U UHLM 0 ~ 0100 ~ 0 FIXED OeM 20340 6 ' I One ff A M JAN 1 1984 CAP 2 26 AVL 2 0 ~ 0 IHR 2 8655 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 SALE AOD 0 oen CAP 3 47 AVL 3 0 ~ 0 IHR 3 9,304 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 HAINT 0 PRIORITY 0 CYCLE 33 CAP 4 60 AVL 4 94e5 IHR 4. 9705 FUEI. 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ oeo 0~0 OVERHAUI 0 PENALTY 1 ~ 00 POSITION 3 CAP 5 65 AVL 5 F 0 I MR 5 9860 HEAT RATE FACTOR 1 ~ 00 SPN HNT 0 MATURINO 0 ~ 0 FREOUENCY 52 CAP 6 0 AVL 6 0~0 IHR 6 STRT UP 179 HBTU HUST RUN DEVIATI)ef 5 CAP 7 0 AVL 7 oeo IHR 7 BANKING 0 HBTU/H PRE<<COMH OEN 0 ~ 0 HAX SCIID E RATED 65 MIN DOWN TIME 10 I~0 ~ 0 138 TRANS'OSS  % 0 ~ 0

NRC INTERROGATORY ON NINE HILE POIt4T NUCLEAR UNIT t40 ~ 2 ENERGY tinrtAOEMENT ASSOCIATES> INC PAGE 190 ITEet NO ~ E 320 ~ 1 (O) REPT 9 OPTION 1 SUBREPORT 05/13/83

                               <<<<<<<<<<<<<<<<<<<<GENERATINO UNITS CHARACTERISTICS <<<<<<<<<<<<<<<<<<<<
 <<<<<<<<a RUSSELL        4   <<<<<<<<<<               CAPACITY     RELIABILITY     HEAT RATE        aaaaaaaaaaaaaf        UELaaaaaaaaaaaaaa                    COST 0                                                      HW                       BTU/KWrt                               TYPE HIM% TOT%

HANDLItlo

                                                                                                                                                                   %/YM CortPAtlY      7   PRE     JAN    1 1985    HIN           FOR H   1 ~ 7 HR FAC 1 ~ 10                                                                      o.o      e.o AREA           9   COI1    JAt4     1985    MAX      80   Fott I  0 ~ 0 AHR I    13136     STR'I UP DIS 0ILU                 100 ~ 0        LEASING            0    0~0 UNIT TYPE      F   r1A t   JAN    1 1985    EMERG    BO   HOR     0 '   ACCTO           0  SUPP      ~ ~ ~ ~ ~ ~ ~ ~           0~0    0~0   VAR OeH        0~0      eeo RESERVE        S 100 ~ 0 RET     JAN JAN 1 21oo    CAP 1    IP   AVL  I  0 ~ 0 IHR 1     7470     FUEL I COAL >2U UNLH                0 ~ 0100 ~ 0 FIXED OeH   25024       6 '

A M 1984 CAP 2 47 AVL 2 0 ~ 0 IHR 2 q494 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 SALE AOO 0 0~0 0 33 CAP 3 70 AVL 3 0 ~ 0 IHR 3 9166 9312 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 MAINT 0 PRIORITY 0 CYCLE CAP 4 75 AVL 4 97 IMR 4 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ oeo 0~0 OVERHAUL 0 PENALTY F 00 posl T Iort CAP 5 80 AVL 5 I~0 IHR 5 5459 HEAT RATE fACTOR ] F 00 SPN MNT 0 HATUR IN G 0~0 FREQUENCY CAP 6 0 AVL 6 0~0 IHR 6 ', 0 STRT UP 293 MrtTU HUST etUrl E OEVIATlor4 5 CAP 7 0 AVL 7 oeo IHR 7 0 BANKINO 0 MBTU/H PREaCOMM OEN 0~0 HAX SCMO E RATED 80 MIN DOWN TIHE 8 IeOe 0 139 TRANS'OSS  % 0~0 0 <<<<<<<<<< BE=BEE 12 <<<<>><<4 CAPA CITY RELIABILITY "HEAT RATEa aaaaaaaaaaaaafUELaaaaaaaaaaaaaa aaaaaaaaCPSTaaaaaaaaa MW , BTU/KWrt TYPE MIN% TOT%  %/YR COMPANY 7 PRE JAN 1 1985 MIN 12 FOR M oe9 HR FAC 1 ~ 08 HANOLINO 0 ~ 0 6~0 AREA 9 Cort JAN 1 1985 MAX 80 FOR I 0 ~ 0 AHR 1 12944 STRT UP OIS OILU 100 ~ 0 LEASINO 0 0 ~ 0 UNIT TYPE F MAT JAN 1985 EHERO 80 ttOR 0 ~ 0 ACCTG 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 VAR OeM o,o eeo O RESERVE S RET JAN 1 21OO CAP 1 12 AVL 1 oeo IHR 1 431 t'JEL 1 COAL, i2U UNLt< oeoloo ~ 0 FIXED OeM 31448 6~0 100eo A H JAN 1 )984 CAP 2 47 AVI. 2 0~0 IHR 2 527 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 SALE AOD 0 0~0 CAP 3 70 AVL 3 0~0 IHR 3 9248 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 MAINT 0 PRIORITY 0 CYCLE 33 CAP 4 75 AVL 4 91 ~ 1 IHR 4 9405 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 OVERHAtlL 0 PENALTY 1 coo POSITION 2 CAP 5 80 AVL 5 8~0 IHR 5 9562 HEAT RATE FACTOR leoo SPN Mr4T 0 HATURINO oeo FREQUENCY 52 CAP 6 0 AVL 6 O.O IHR 6 STRTaUP 293 HBTU HUST RUN E DEVIATION 5 CAP 7 0 AVL 7 0~0 IHR 7 0 BANKINO 0 MBTU/H PRfaCOMM OEN 0~0 HAX SCHO E RATEO 80 MIt4 DOWN TIME 10 I ~ De W 140 TRANS'OSS 0 ~ 0

RC ]INTERROGATORY ON NINE NILE POINT NUCLEAR UNIT Np ~ 2 ENERGY HAt>AGEHEttT ASSOCIATES t INC 191 ITEN NO ~ E 320 ~ 1 {0) REPT 9 OPTION 1 SUBREPORT 1 0 /]3/83 ooooooooooOKNERATINO UNITS CHARACTERISTICS oooooooooo a ooooo BEEBEE 1] ooooo "CAPACITY- REL I Att ILI T Y HEAT RATE <<at UELaaaaaaaaa>>aaaa aaaaaaa CPSTaaaaaaaaa HW BTU/KWH TYPE HIN% TOTS 5/Ykt COHPANY 7 PRE JAN 1985 HIN 7 FOR H ]o0 HR FAC ]+00 HANDL]NG 0~0 6~0 AREA 9 Cpkl JAN 1985 HAX 93 FOP I 0 ' AHR 1 13001 STRT UP DIS OILU 100 ~ 0 LEASING 0 0~0 UNIT TYPE F HAT JAN 1 1985 EHERG 93 HOR 0~0 ACCTG 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0 ' VAR OoH 0~0 6 ' RESERVE S RKT HAY I 1990 CAP 1 7~ AVL 0~0 IHR 1 ))S37 FUEL 1 RES 2 'U UNLH 0 '100 ' FIXED OoH 44830 6o0

             ]00e0        A   tt   JAN        1984 CAP 2   &1   AVL   2 Sop       IHR  2 13779    fUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0        0'    SALE APP           0   0' PRIORITY            0    CYCLE                24 CAP 3 CAP 4 78 93 AVL AVL 3 62e0 4 32   '

IHR IHR 3 16219

                                                                                         ]7208 FUEL 3 FUEL 4
                                                                                                            ~ ~ ~ ~ ~ ~ ~ ~   ~ ~ ~ ~   0 ' 0'      ktA INT            0 4                    ~ ~ s ~ ~ ~ ~ ~   ~ ~ ~ ~   0~0   0~0   OVERHAUL           0 PE lALTY     1 ~ 00      POSIT]ON               1 CAP 5    0   AVL   5    0~0    IHR  5       0  MEAT RATE FACTOR 1 ~ 00                           SPN HNT            0 HATUR]ttG Oap            FREQUENCY            52  CAP 6    0   AVL   6    Oe0    IHR  6       0  STRT UP         365 HBTU HUST RUtk           H    DEVIATION              5 CAP 7    0   AVL   7    Oop    IHR  7       0  BAt>KINO            0 HBTU/H                      PRE COHH    Of N       0~0 MAX SCHD            E                             RATED   93                                                                                       HIN   DOWN Tlk1E           0 I ~ D ~ tt 141                                                                                                                                     TRANS'0SS       %     0 '

ooo>> GINNA ooooo CAPACITY RELIABILITY HEAT RATE>> aaaaaaaaaaaaaFUELaaaaaaaaaaaaaa aaaaaaaaCPSTaaaaaaaaa HW BTU/KWH TYPE HIN% TOTS  %/YH O Cpk1PANY AREA 7 9 PRE COH JAN JAN ] 1985 1985 HIN MAX 50 470 FOR H FOR I 9 0'

                                                                             '    HR FAC 1 AHR ]
                                                                                             '0 21090 HANPL ]NO        0~0   6~0 STRT UP URANIUHT                    100 ~ 0       LEASINO            0   0 UNIT TYPE        tJ      HAT      JAN        1985 EHERG  470   klOR       0~0    ACCTG     i. 0  SUPP                                  0 ' 0'      VAR OoH          0~0   6
                                                                                                                                                                             ~ 1]

Q RESERVE S RKT JAN 2]00 CAP 1 50 AVL 1 1 ~ 2 IHR 1 8311 FUEL 1 URANIUHT UNLH Oep]00 ' FIXED OoH446697 6yd 100 ~ 0 A 11 JAN 1 )984 CAP 2 225 AVL 2 4.3 IHR 2 9095 fUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0' 0' SALE ADD 0 0<0 PRIORITY CAP 3 350 AVL 3 24 ' IHR 3 9655 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0~0 4AINT 0 0 CYCLE 40 CAP 4 470 AVL 4 6] 6~ IHR 4 10193 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0~0 OVERHAUL 0 PENALTY 1 ~ 00 POSITION 5 CAP 5 0 AVL 5 0' IHR 5 0 HEAT RATE fACTOR F 00 SPN t'NT 0 HATUR]NO 0 0 fREOUENCY 52 CAP 6 0 AVL 6 0 ' IHR 6 1 0 STRTaUP 8000 HBTU HUST RUt4 HAX SCHD E E DEVI AT]ptl 5 CAP 7 RATED 0 470

                                                               -AVI 7      0~0    IHR  7 I   0  BANKINO             0 HBTU/H                      PRE COHH OKN           0 '

HIN DOWN TINE 72 I ~D~ tt 142 TRANS'OSS  % 0'

NRC INTERROGATORY ON NINE MILE POINT NUCLEAR UtllT NO 2 KtlKRGY HAtlAGKHENT ASSOCIA'TEST ItlC PAGE ITEM tIOo E 320 ~ I (D) REPT 9 OPTION I SUBREPORT I 19'5/)3/83

                                  ':aoaaoaaooGENERATI>le        UtlITS CHARACTERISTICS oaaoooooao ooaao     ROF        T 13 ooooo                  -cAPacITY-         RELIABILITY     HEAT RATE     <<a<<a<<a<<a<<a<<a<<FUEL<<<<<<a<<<<<<<<a<<a<<a<<                      <<aa<<aaaacPST<<<<aa<<<<aaa BTU/KIIH                                TYPE HIM% TOT%                              5/YH COMPANY                PRE    JAI4      1985     MIN     14         FOR tl 15+0    HP FAC I ~ 00                                                       HANDLING      0~0    6 '

AREA 9 COP JAN 1985 MAX 18 FOR I 0~0 AHR 1 15559 STRT<<UP DIS OILU 100 ~ 0 LEASING 0 0~0 UtlIT TYPK T HAT JAN 1 1985 EtIKRG 18 HOR 0~0 ACCTG 0 SUPP ~ ~ ~ ~ ~ oe ~ 0~0 0~0 VAR OfH 0~0 6 ' RESERVE Q RET JAN 1 2100 CAP 1 AVL I Ooo IHR I 12408 FUEL 1 DIS OILU UNLH 0 ~ 0100 ~ 0 FIXED OoH 1351 6~0 100 ' A II JAN 1984 2 14'AP 18 AVL 2 85 ~ 0 IHR 2 13513 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 SALE ADD 0 oeO CAP 3 0 AVL 3 0~0 IHR 3 0 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 HAINT 0 PRIORITY 0 CYCLE 24 CAP 4 0 AVL 4 0~0 IrR 4 i o FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 OVERHAUL 0 PENALTY 2eoo POSITION I CAP 5 0 AVL 5 0~0 IHR 5 I 0 HEAT HATE FACTOR I ~ 00 SPN HNT 0 MATURING oi 0 FREQUEtlcY 52 CAP 6 0 AVL 6 0~0 IHR 6

                                                                                             '     S'TRT<<<IP           10 HB7U MUST RUN           E   DEVIATION           5     CAP 7         0    AVL 7   oeo    IHR 7       0  BAtlKING              0 HBTU/H                       PRE COHH Gf.N        0~0 MAX SCHD           E                             RATED   18                                                                                            MIN DOWN TINK            1 I ~ De 0 143                                                                                                                                           TRANS. LOSS %        0~0 6 ooaoa Rof.           T. 2 aaoaa                   CAPACITY          RELIABILITY     HEAT RATE<<    <<a<<a<<<<<<<<<<<<a<<<<CRUEL<<a<<a<<a<<a<<<<<<<<<<<<                     <<aaa<<a<<<<CPS'T<<<<<<<<<<I  <<aa MW                            BTU/KIIH                                TYPE HINS TOTS                              %/YH COMPAIIY        7      PRE    JAN     I 1985     MIN     15         FOR M  15 ~ 0  HR FAC F 00                                                         HAtiDLlNG     0~0    F 9 AREA            9      COII   JAN     1 1985     HAX     18         FOR I   0~0    AHR I 15853    STRT UP DIS OILU                     100 ~ 0         LEASING         0    0~0 UNIT TYI'E      T      IIAT   JAN     1 1985     EHERG   18         HOR     0~0    ACCTG       0  SUPP       ~ ~ ~ s ~ ~ ~ ~             0~0    0~0    VAR 0>H       o.o    e.o RESERVE         0      RKT    JAN     1 2100     CAP I   15         AVL I   0~0    IHR  1 13109   FUEL 1     DIS OILU UNLM 0 ~ 0100 ~ 0                FIXED OoH     682    6 '

100 ' A II JAN I 1984 CAP 2 18 AVL 2 85eo IHR 2 14019 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ o,o n.o SALE ADD 0 ooO CAP 3 0 AVL 3 0~0 IHR 3 0 FUEL 3 ~ ~ ~ ~ ~ ~ I~ ~ ~ ~ ~ ooo 0 ~ 0 MA INT 0 PRIORITY 0 CYCLE 24 CAP 4 0 AVL 4 0 ' IHR 4 0 FUEL 4 ~ ~ ~ ~ ~ ~ ~

                                                                                                                                ~ ~ ~ ~

o,'o 0.0 OVFRHAUL 0 PENALTY 2eoo POSITION 1 CAP 5 0 AVL 5 0~0 IHR 5 HEAT RATE FACTOR F 00 SPN HNT 0 HATURING 0 ~ 0 FREQUENCY 52 CAP 6 0 AYL 6 o.o IHR 6 STRT UP 10 HBTU HUST RU'I K DEVIATION 5 CAP 7 0 AVL 7 0~0 IHR 7 0 BANKING 0 HBTU/H PRE COHH GEN 0~0 HAX SCHO E RATED 18 MIN 00'INN TIHE I D~ II 144 TRANS'OSS 0~0

RC INTERROGATORY ON NINE MILE POINT NJCLEAR UIIIT NO ~ 2 ErIERGY IIAtIAGEMENT ASSOC I ATES t IMC ]9~ ITEM NO ~ E 320e] (0) REPT 9 OPT IOIJ 1 SIIBREPORT /13/83 0 rro4orr'rort4oGENE RATING UNITS CHARACTERISTICS rroorro4rrootr orr~rrrr FITZpAT 1 ooort4 "CAPACITY RELIABILITY "MEAT RATE BTlJ/KIIH

                                                                                                                               <<<<<<FIJE L<<<<<<<<<<<<<<<<<<<<<<<<<<<<                          COST    -   <<  >>

MW TYPE MIN% 787%  %/YR COHPANy 8 PRE JArt 1 ]985 HIN 23o FOR M 18 ~ 6 HR FAC I ~ Oo MANVLING 0~0 6~0 AREA 2 COII JArt 1 1985 HAX 810 FOR I 0~0 AHR I 11518 STRT<<UP URANIUM2 ]00 ~ 0 LEASING 0 0~0 Utt]T Typf N IIAT ~ JAN ] 1985 EMERG 810 HOR 0~0 ACCTG 0 SUPP 0~0 0~0 VAR 0+M 0~0 6 ' RESERVE S 100 ~ 0 RET A rt JAN JAN 1 2100

                                              ]984 CAP ]

CAP 2 230 380 AVL ] 0 ~ 0 AVL 2 ooo IMR 1 IHR 2 9446 9579 FUEL ] URANIUM2 UNLM 0 ~ 0100 ~ 0 FIXED OtM200732 6 ' 1 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 SALE AVD 0 0~0 CAP 3 770 AVL 3 ooo IHR 3 10176 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 MAINT 0 PRIOR]TY 0 CYCLE 38 CAP 4 8]0 AVL 4 8]e4 ]HR 4 ]0339 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 OVERHAUL 0 PENALTY 1 ~ 00 POS]7 Iort 1 CAP 5 0 AVL 5 oeo IHR 5 '0 HEAT RATE FACTOR ]coo SPN MNT 0 HATUR]rle O.o FREQUE IICY 52 CAP 6 0 AVL 6 0 0 IHR e o STRT<<UP 391 HBTU HUST RIJN f OEV]ATION 5 CAP 7 0 AVL 7

                                                                                      ~

0~0 IMR 7 0 BANKII<G 0 t18TU/H PRE COHM GEN 0 HAX SCIIO f RATEO 810 Mitt DOWN TIME 0 ~

                                                                                                                                                                                                ]68 Q I ~ Oe  rt   145                                                                                                                                                     TRANS'OSS       %         0~0
                                                           )                      " "   "MULTIPLE OWNERSMIP<<

COMPANY  %<< COHPANY <<COHPANY %<< <<COHPANy  %- -COMPANY <<COMPANY 5 0 ' 0 0 4 0~0 7 0~0 0~0 6 0~0 3 0~0 2 ~ 8 100 ~ 0 0 0 ~ 0 0 0~0

            ]IIDIAN        3 oooorr                       CAPACITY        REL I AB IL IT Y     HEAT RATE        <<<<<<<<<<<<<<<<<<<<<<<<<<FUf L<<<<<<<<<<<<<<<<<<<<<<<<<<<<                      <<<<<<<<<<<<<<<<COST<<<<<<<<<<<<<<<<

MW BTU/KtrM TYPE HIN% TGT%  %/YR COMPAtIY AREA 23 8 PRE CIJ11 JAIL JArt 1 1985 1985 HIN MAX 3]4 965 FOR M 18 ~ 4 FOR I 0~0 HR FAC 1,00 . AHR 1 12997 STRT UP URANIUM2 r HANOLING LEASING 0~0 6 ' 100 ~ 0 0 0~0 UNIT TYPE N MAT JAII 1 1985 EHERG 965 HOR 0~0 ACCTG 0 SUPP 0~0 oeo VAR OoM . O.O e.O RESERVE S RET JAtt 1 2100 CAP 1 3]4 AVL 1 0~0 IMR ] 8568 FUEL 1 URANIUM2 UNII'I 0 '100 ' FIXfO OoM23606] 6~0 100 0~ A rt JAN 1 1984 CAP 2 589 AVL 2 0 ~ 0 ItrR 2 10520 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 SA].E AVO 0 0 ' CAP 3 965 AVL 3 81 ~ 6 IHR 3 ]0024 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 MAINT 0 PRIORI TY 0 CYCLE 38 CAP 4 0 AVL 4 oeo IMR 4 0 FUEL 4 ~ ~ ~ ~ ~ e ~ ~ ~ ~ ~ ~ 0~0 0~0 OVERHAUL 0 PENALTY ] F 00 POSIT IOrt 1 CAP 5 0 AVI. 5 0~0 IHR 5 =0 MEAT RATE FACTOR 1 ~ 00 SPN MNT 0 MATURING O.O FREQUEIICY 52 CAP 6 0 AVL 6 oeo IIIR 6 STRT UP 2078 MBTU HUS7 Rurt E VfV I AT I OI'I 5 CAP 7 0 AVL 7 ooo IHR 7 0 BAIIKING 0 HBTU/H PRE COMM Gf N 0~0 MAX SCMO E RATE O 965 HIN 00'rN TIME 168 I.o. rt 146 TRANS ~ LOSS 0~0

                                                                                    -   "IIULTIPLE OWNERSHIP COMPANY                  CotIPANY             COI;PANY     %"       COMPANY      %"  -COMPANY                   COMPANY 2

0 9,7 oeO 8 90 '0 0 ooo 0~0 0 0~0 0 0~o 0 0 ~ 0 0~0 0 Ooo

             <<wC     I>>'l.f I. )0'ti)IY Ut til>>f.
                              ~
                                                        ))]I.E I't)]I)7 ))IILI EAH It<<]T <<Go2                    Ei>EI:GY t)<tiwGEI)EHT ASSI)CIATESt            lt)C                 PAGE     194 If E"    i)Uo L d2s) e]        (U)                                                                  Rt.PT      9 Of'71UU 1            SUOHEPORT      1                  05/]3/f)3
                                     )'o<<ooo+oo48tr)L'))AT]t)G III      ]is  C)IAI<acTEII]ST]cs oo))o+'"+oo4
 ))ot)oR AS7Jftla            OOOOP                      CAPAClTY          RE]. 1 ')s]L17 Y    ))EAT RATE          amaewae    ~ a erwajULLwa~w~mw ww <<mw              ~a~a e~ COST~~~~~w~~e

] t))) 8 7 It/Kit H TYPE b])N Tt)7%  %/YH cot)Pa)IY 8 PRL Ja o 1 1986 )11 so ]b0 FOR )I cs ~ 0 HR FAC 1 ~ 00 HANDL]t)G 0~0 6oO Cv<<JA I Ilaa 825 ]2400 STHT>>UP OIS 011.0 AREA VIIlT TYPE 15 F I)AT JA

                                          ]
                                             ]9))5    EI)EHG      &25     t>Ot')))o00 FON 1              Afl)f ACCTG 1

SUPP 100o0 0,0 Oo0 LEASlNG VAR noH 0 0.0 0 6.0 RESERVE S HE f J+'.<

                                      )   1 1  2100     Cap ]       150    oaVL    1   0
                                                                                        ~
                                                                                        ~

0 ]HR ] 5669 FUFL 1 HES 0 '0

                                                                                                                               ~ ~ ~ ~ ~ ~ ~ ~

Ut)LH 0 '100 ' F]XEO OoH]3137] 6 ' 10)l, 0 4 I) JAII 1984 Cap 2 225 AVL 2 0 II)H 2 7505 I')F.L 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0o0 SALE, AOO 0 0 ] Cap 3 30G AVI. 3 )Io] 1HR 3 8761 FUFL 3 oooo's ~ ~ ~ ~ 0,0 0.0 HA]toT 0 PR]OR]TY 0 CYCLE 39 CAP 4 825 AVL 4 91.9 1)R 4>>4)) I'UFL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0' Oo0 OVEHHAI)I. 0 PEAIALiY ]o00 POS]7 1 0<< 1 CAP 5 0 AVL 5 0 ' 1HH 5 0 <<E47 RATE FACTOR 1 ~ 00 SPN t)t)7 0 ) HATUR]i)G 0 ' F RE 0) IE."!C 7 52 Cap 6 0 AVL 6 uo0 lHR 6 0 STRT~UP 1823 t)87U HUST Rlit) E UEV]AT]O I 5 CAP 7 0 AVL 7 Oe0 lHR 7 0 8A))KING 0 HRTU/H PRE COHH GEI< 0 ' HAX SCHI) RATEO 825 Hit) i)OhN 71HE 168 I I ~ Oo )I 147 TRANS'OSS Oi0

                                                                                     ~I <<)IULT]PLE O))NEHSH]Pee~w~aaeaae           ~+

CO))Pa) IY COHPANY '4 COHP4NY  % COHPANY  % COHPAtIY ~COHPANY 2 9o7 8 90 ' 0 0 ' 0 0 ' 0 0 ' 0 0 ' 0 Oo0 0 0~0 0 0 ' 0 0 '

i:riC It>IC.Bi< I~>~T(3HY Ui> Iiliif t'.II.E, POliiT >>it(.LEAI'iil1 r lu,2

                                                                                            ~                 F t>E>rGY   I:Al>A(IEI>EIIT I'f'Tlute          ASSOCIATE.S)        INC                    PA      COI 11f.ii tt(t. E  32M.l    IU3                                                                   t<L> T      9                   1    SIIGBEPURT         1                    05/13/83 oooo>>~~au~(EULHATIUr> I>>>ITS             CI> I ACILftISTICS 0~~+4>>~~+>>
                                                                                                 'i ~  . ~  4 QQOO>>   Srln>>Et>/eti   I   O>>Ot>rt                "CAPACITY          REL I  AUILI T'Y    HEAT RATE            <<<<aaaaaaaaaa<<FUEL<<<<a<<a<<a                       a<<a<<a<<   aaaa<<aaaCPST<<aaaaaaaa f>t.                         8TU/gtiti                                         TYPE     ftltt% TOT%                          %/Yk COrtf'AIIY        3    PHE      JAri   1  1984       tilt<       327    FOR    Ii 24 ~ II  HR FAC F     00                                                               tiANOLING      0~0     6~0 AREA             12    COlt     JAti      1984       MAX         809    F(>H   I  24 ~ 8   AIIR    11000         STRT<<UP URAL IUH3                       100 ~ 0         1.EASING           0   0~0 UNIT TYPE              iiA I'Ati          1984       EIIERG      809    f>Ott      0~0     ACCTG 1

0 SUPP I'EL 0~0 OeO VAR O>M 0 ' 6 ' RESERVE S I(ET JAIi 1 zino CAP I 327 AVL 1 2 ' ItiR 1 86>30 1 URANIUH3 UtiLH 0 ~ 0100 e 0 FIXED OtH200597 6~0 If 100> >I A M JAfl 1983 CAP 2 59a AVL 2 0 ' IHR 2 8990 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0~0 SALE AOO 0 0~0 CAP 3 675 AVL 3 0 ' IIIR 3 9200 FUEL 3 ~ ~ ~ ~ s ~ s ~ ~ ~ ~ ~ 0~0 0~0 MAINT 0 PR1OR I TY 0 CYCLf: 38 CAP 4 755 AVL 4 0' Ifik 4 95oo FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ > ~ ~ ~ 0~0 OeO OVEf(MAUL 0 PE>>AI.TY I,OO I>>3S I T1Or> 1 CAP 5 809 AVL 5 71<1 IHR 5 9710 tlEAT RATE FACTOR F 00 SPti HNT 0 l<ATURI(>G rt>33 FXE(tUEIICY 52 CAP 6 0 AVt. 6 0.0 lfiR 6 STRT<<UP 2078 HIITU IIUST Buil E t>EVIATIUit 5 CAP 7 0 r'>VL 7 0 ' Ikk 7 0 ilAt'KING 0 HHTU/H PRE<<COiik OEii 0.0 HA> Sri>U E RATEO 809 MIw OOtrN TltiE 168 leO> e low TRA(cd LOSS  % 0~0

I.KC ft'TfltP<t<ihfORY O<l <<1<<f VILE I <)Ital <lltl Ll.>H V<II 1 t<u<2 Et.'EIIGY IIA<IAGkt<FIIT ASSOCIATES< lt<C PAGk 20<-'5/ ITLi<<<O~ E J2<-' I IO) R<;PT 9 OPTIitlv 1 SU&REPOHT I I 3/ tt3 oo~oe44o~Gktift<C T 1<<G Util TS C<I-'<IAClcRISTICS < < < <<4>>" 4<< S<< I EPSE f I <<<t<<4<< I C<<I<AC I Y RLL IAHILI T 7 >>t<EAT khTk >>>>>>>>>>>> >>>>>>>>FUEL>>>>>>>>>> >>>>>>>>>>>>>> >>COST e<I RTU/givtl TYPE I<IN'4 TG<TS  %/YK CO<<PA< IY PRE <<OV I 198<< eel tv 3UO F0<I <I 9.0 HR FAC leU2 HAI'OLIN G 0 ~ 0 6~0 Akkh 5 Col<1 ilOV 198+ <<AII 625 F(<H I 13 ~ 0 AHH I 10271 STRT UP OIS OILU 100 ~ 0 LEASING 0 Oo0 Util I T YPE F It<iT <tov I 1987 EIIEKG 625 I<OH 0~0 ACCTG 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0.0 0.0 IIEET VAH OoH 2 ' 6 ' RESEf<vk S HET JA "I 2100 CAP I 300 AYL 1 7<0 IHH 1 82l<< t'UEL 1 COAL, >2U UttLtv 0 '100 ' I'XEO Ootl140133 6e 0 100<U A tl <IOv I 1983 CAP 2 I<50 AVL 2 13<V IHH 2 lt5b1 FIIEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0<0 0<0 SAI.E AOO 0 0' CAP 3 590 AVL 3 13<0 IHH 3 8865 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0,0 0 ' HA 0 PftIOI<I TY 0 CYCLE 39 CAP <I 625 AYL 4 58<0 IHR 4 89~3 FUEL <'<

                                                                                                                            ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~   0 '   0<0   OVEKHAUL             0 PE<<AL. T Y     I ~ OU  P<<SI T10<i           I     CAP 5          0     AVL    5   0 '     IHR  5         0     FIEAT RATE FACTOR I ~ 00                           SPN HIIT             0 IIATURI<<<<<te0          I f<E<t!IENCY      52       CAP 6          0     AVL    6   0<0     IHH  6         0     STRT UP        11896 t<8TU HUST R%<             E UEV I A T ION         5     CAP 7          0     AVL    7   0<0     ltlR 7               HANOI<<G                0 IIRTU/H                   PHk>>COHH Gik<<             0 '

I<AD SC<<lt E RATEO 625 lilt< DOWN TIKE 2<t lotto S IU3 TRANS'.OSS  % 0'

II.A.2 Coal Conversion Units

I(IIC'l.l nffrf) ~ SKY 0<<>>lfiE Os]I.C Pll'll'l s(UCLCAfK I'f']T (>0 ~ 2 E('tHGY l'A((A(ft>>Er'Ii ASSOC]4TCSI I('C p )9n lit:I <<Oe t '320s] III) t(CPT 9 OPT]0>> 1 SUSRCPOHT ] 05/]3/83 0404040004GkrlEHAT ING uls]TS Cr(AHACTtR)STICS 0400000444 40444 OA(lSKPtIC 00044 "CAPACITY- REL]f]osILITY -t(EAT HATC- <<<<<<<<<<<<FUEL<<<<<<<<<<<<<<<<<<<<<<<<<< " COST sill BTll/l(WH TYPE <<Ir(6 TOT% 0/YK CO(<f'Arty P(sE SEW ) )988 II]l( 90 F'( H>> 22e 0 H(s FAC ] ~ OO HANIILIrlG o,o 6,o AREA ]n Gill I S I:ss 1988 >>AX 2]6 FGH I 0~0 41 H ] ))050 STr(T llP NAT04S A 100 ' LEASING 0 0~0 VI I I l T Yf't s(4T SEf )988 tl>ERG 23] liOR G ~ 0 ACCTG 0 SU"P ~ ~ ~ ~ ~ ~ ~ ~ o,o n,o VAH Oot( 0 ~ 0 6 ' S I'ESEIIVf HET JAic JA( I 2100 CAP ] 90 AVL ] 0 ~ U II'.R ] 87UQ FUEL ] COAll ~ QO UNLH 0 ']00 ' FIXE(t OsH 0 6 '

          '(s    ]GO ~ U                  <I              ]  ]909    Cat    2  150       AVL  2   Oso      Il(K   2    8950     FukL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~         0~0    0~0    SALE AOD            0    0~0 I                                                                     CAP 3     ]9Q       AVL  3   0 '      ItiH   3    9]00     FUEL 3     ~ ~ ~ ~ o ~ ~ ~   ~ ~ ~ ~   0~0    0~0    HA INT              0 PRIORITY                        0    CYCLE                          Cll 4     2]6       AVL  4   0~0      lt(R 4      9200     FuEL 4 .oo.        <<>> >><<               0.0    OoO    OVEf(HAUL           0 PE((ALTY I ~ UU                      Pus]T    1 ore             ]   CAP 5     23]       AVL  5 78so       IHR 5       9250     ((EAT RATE FACTOR 1.0O                               SPN tl(oT           0 I HATURI(fG 0 ~ (i                     F HLioufsICY            52     CAP 6        0      AVI. 6 Oeo        It(H 6           0   STRT<<UP        1009 t18TU HUST Rll(l                      E    UEV]wT loll               5    cAP 7        o      AVL  7   0~0      IHR 7            0   rlANKING              0 118TU/H                      PRE<<COHH GkN             0~0 HA X SC>>II                      t                                   HATEO     2]6                                                                                                   HIN  DOWN   TIKE           24 I leu,      4    149                                                                                                                                                                  TRAr(So LOSS (I          0~0 I

00004 A $ ]LL )2 oooao <<CAf'ACITY<< HELIAIIILITY HEAT RATE<< ~ e<< <<<<<<<<<<<<<<<<<<<<FUEL<<<<<<<<<<<<<< <<<<<<<<<<<< <<<<<<<<<<<<<<<<COST<<<<<< <<<<\<<<<<<

                                                                                )1)(                             BTU/KWH                                     TYPE I~I>>% TOT%                                II/YK I COIIPANY                2            PtiE     JUL        ]  ]98a    HIN        69       FOR  (o ]2so      HR FAC 1 ~ 00                                                             HANol.]NG       o.o      6 '

AREA ]5 C(((l Jl(L ] 1986 l(AX 350 FOH I AU At(R ] ]2983 STRT"UP OIS OILO 100 ~ 0 LEASING 0 0~0 UNIT TYf'E F (IAT JUL ] 1986 EII ERG 350 I QH O.O ACCTG 0 SUoP ~ ~ ~ o ~ sso Oso 0~0 VAH OsH 0,0 6' RESERVE S ttf T JArl ] 2]QQ CAI ] 69 AVL ] 4so lt(R ] 829] rUEL ] COAL] ~ QO UNLtl 0 ']On,O FIXEO 04H253725 6,o

                 )Goon                    (I   JUL           1987    CAP 2     ]6]       AVL  2   0~3      IHR 2       88S7     FUEL 2     ~ ~ s ~ ~  so ~   ~ ~ ~ ~   0~0    Ooo    SALE AOO            0    0~0 CAP 3     255       AVL  3   0~3      IIIR 3      9273     FUFL 3     ss  ~ ~ ~ ~ ~ ~   ~ o ~ ~   0~0    Ooo    MAINT               0 PRIOR] l Y                      0    CYCLE                     6    CAP 4     335       AVL  4   0 ~ 8    IHR 4       9600     t'UEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ o ~ ~        Qso    Q ~ 0  OVERHAUl            0 PENALTY           ]  DUO             POSIT]or(                  4   Cafe 5    350       AVL  5  8'        IHR 5       966]     tlEAT RATE FACTOR 1,00                               SPN HNT             0 HATI(HI>>(l o,n                       FREQUE(ICY               52    CAP 6        0      AVL  6   0~0      I)IR 6           0   STRT-UP        28oo H8TU MUST RUN                             OEVIAT]0:I                5    CAP 7        0      AVL  7   Oso      IHR 7            0   8ANKING               0 H8TU/H                       PRE-COHH GEN             0~0 HAX SChlz                       E                                  HATEO      350                                                                                                   HIN  OGDEN  TIKE           24 I ~ Os    ((   150                                                                                                                                                                  TRANS'OSS       %        0 ~ 0

PAGE 19o Un>>l>>k ro>C L I r k o>e]T nO El E>IGY J>A>'aofi'>Er>T ASSOCIATkS> IIIC

~C Jr>lk>>RUGAIOHY I ]LE Pulr>T ro>

vl>PT 9 OPT IOt> I SUIi&tPl>RT nS/]3/b3 I Tor "<>.

                    >      k 32    > e I IU) oooooooooookr>kHATING      IJ> ITS CiiAHACTEHISTICS oooOoooooo oooo'CAI>aCI TY-                                           "HfAT                    aaaww maw wFUkL~+w awaamaawwa                               -   -COST         -----

<<>><<a K]LL ]3

                                                            >> lt liELltt>JILITY                RATk BTU/K>IH                                    TYPE tpi]t>% TGT%                                            %/YH r>At~DL It>G              0~0         6~0 CO:1F'>>f>Y        2   VHI'>t>v             1985   HlH      141      FOB    >'2en       >IR FAC     ] ~ OU 100.0           LEASING                       0       Oeo Ib    CO'                  ]9>>b   MAX     471       fov     I    neo    a>IH I    ))404      STRT-uP OIS OII.O VA>t Oen                  0.0         6.0 ARE>>                            >UV      1 k>>kltG  SU]       t:OH         0~0    ACCTG            0   SUPP      ~ ~ ~ ~ ~ ~ ~ ~              0.0    Oeo P]:>'eEL j Y"'I,f>U    p()$    t>ov        1985   4el                I vb   o~   e.            >. 6809      FUEL 1    COAL] ~ OD Utlktl            O~  O]On ~ O  FlxEO OeH349274 cee   >'>>>>                    0 6~0 0~0 tlATl>Hlr<G 0    ~ 0   t HEI>I>f.> ICY       52    CAP e        o     AVL 6       0~0    IHR 6            0   STAT UP        1150 HBTU IIUST Rl>>e             UfvIATlort             5    CA>> 7        0     AvL 7       0~0    IHR 7            0   BatlKING             0 MBTIJ/H                        PHE COMM I>kN                         0~0 HAX SC>>l>            E                             RATED    471                                                                                                     >e]N DUMN TIHk                          24 I ~ 0 ~ >l 151                                                                                                                                                     TRANS'OSS                 %           0 ~ Q ooooo     HAVE>>S      l3 ooooo                   -CAPACITY          REL] Alt ILI 7 Y     HEA7 RATE          aaeamawww      wmaFUE LeI~~rg~~~~aee~~~               e m a a m a a ee C >J 5 7 a a m a ~ ~ w a a ldll                              BTU/KHtl                                   TYPE llltl% TGT%                                              %/'YH COr1PA>>Y              t Hf    JUN        1 1983   MIN      386       FOR >l     12,0    HR FAC      I ~ Oo                                                         HANDLlNG                  Oeo         e.o AREA             15    C>J>:   JIJN       1 1983   >>AX     881       FOR I       0~0    AHR I     ]O843      STRT~UP ttATGASD                     ]00 ~ 0          LEASING                       0       0~0 Ur>I I TYI E F                 JUr>       1 1983   ftlkRG   928       I IOR       0~0    ACCTG            0   SUPP       ~ ~ ~ ~ ~ ~ ~ ~             0 ~ 0  0~0     VAH Oetl                  Oen         6 '

RESEHVE S HEI Jar> 1 2100 CAP ] 386 AVL I 4eO IHH 1 87o2 FUEL ] COALI ~ QD UNLH 0 ~ 0100 ~ 0 FIXED OeM 39945 e.o 100 ~ 0 I". JUf> I 1984 CAP 2 550 AVL 2 0 ' IHR 2 8803 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 SALE ADO 0 0~0 CAP 3 715 AVL 3 Qe3 IHR 3 8909 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 HAINT 0 PRIORITY 0 CYCLE 29 CAP 4 881 AVL 4 0.8 IHR 4 8909 FUEl. 4 ~ ~ e ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0 ~ 0 OVfRHAUL 0 pfr>ALTY I eon PUSI 7 10>t 3 CAP 5 928 AVL 5 82 ' IHR 5 8803 r>EAT RATE FACTOR ] F 00 SPN tlNT . 0 HATuv]HG O,o FRfauf>ICY 52 CAP 6 0 AVL 6 0~0 IHH 6 0 STRT~UP 4600 MBTU Hl>ST Rll>l UEV]AT]0>t 5 CAP 7 0 AVL 7 0~0 I IIR 7 0 BAt>KING 0 HBTU/H PRE~COI4H GEN 0 ~ 0 t>AX SC>>I> E RATED 881 >IIN DO>>N T IHE 24 leuc 4 1S2 TRANS'OSS  % 0 ~ 0 0

trvlkr<lv(ri."ToiiY Q<w tilivt. I:LI.E VOIIIT NrrCI.cc< ttl<]7 i.'0 ~ 2 kl E HGY irr ever Ctiff<T ASSriCI ATES i lttC P 19r Ili.i rlv>> C 32>>>1 IO) HEPT 9 OPTLOtl I SUBREPORT 1 05/13/e3 oo<<oo<<o>>o>>GFtiEHATL<<G urv] l S CHahaCTEHIST ICS>><<on<<oooo

        " Pl     JEFF       ]3 <<aoo>>                     <<CAPACITY>>        Ilc.l I r<tr]L17 Y <<IIEAT HATC<<   <<<<<<<<<<<<<<<<o <<F'UCL<<<<<<<<<<<<<<<<<<<<<<                                        COST        <<<<
                                                                  >><                              BTU/Kt>>H                                TYPE;    ttIN%                                    %/YH CottPCNY                   I'RE        J4ii      1988 I<'LN FvR        15 ~ n  HR FAC   ].nn                                                       HaNULLNG           0 '     6 '

ANE<< C<t<<Jai< ] ]988 166 Foil I D>>O aHR 1 13243 STRT<<UP OIS OII.O ]rip ~ 0 LEASING 0 0 ' villi rYPE F t<47 Ja<e 1 ]988 El:k RG liCP 0~0 4CCTG 0 SIIPP ~ ~ ~ ~ ~ ~ e ~ 0,0 n,n VAA O>>H 0>>0 6>>0 RESEF<VE RE.T Ja.v 1 2]oo CAP 1 35 avL 1 0~0 ltrR 1 9O87 FUEL 1 COAI.2 ~ 00 UNLti 0 ~ 0100 ~ 0 FIXkD u>>H 40909 6>>O

         'o     Lou>>0       a    i:     Jaw    1  1989   Cat'              AVL     2    0~0   ltiR 2  9569   FtJFL 2     ~ ~ ~ ~ ~ ~ ~ ~  ~ ~ ~ ~    0~0    0~0   SALC AOO               0   0 ~ 0 CAP 3   109       AVL     3    O>>0   LIIR 3  9648   FUkL 3      ~ ~ e ~ ~ ~ ~ e  ~ ~ >> ~    0 ~ 0  0~0   HAINT                  0 PA I 0'    7'r       0     CYCi.E.                  I   CAI'    ]5rt      AVI. 4    0~0   IHR 4 ]o]91    FUEL 4      ~ ~ ~ ~  >> ~ ~ ~ ~ ~ ~ ~    0~0    0~0   OVERHAUI.              0 PFti" LTY       l,on       P<lS     IT Iotl         1   CAP 5             AVL     5 85   '   IHR 5 ]O212    HEAT RATE FACTOR I ~ 00                              SPt< HNT               0 IIATUALNr>> O,u             F t< E 0 IIE tiC Y     62    cap e        n    AVL     e    o,o   ItlR 6      0  STAT<<UP            495 HBTU IIUST nini           k     OE,V I I T IOII          5   CAP 7         0   AVL     7    0>>o   IHR 7       0  BailKING               0 HHTU/H                      PRE<<COiiH GFN              0>>0 Ita X SC<lk<         E                                  RATEO   ]86                                                                                              HIN OorrN TIHE               24 I ~ 0 ~ 4'53                                                                                                                                                     TRatIS ~ LOSS %            0~0 o>>oaa y7 JEFF               ]4 <<oa<<<<                    <<C(PACITY         RkLIAblLITY        <<HEAT RATE<<    ~ v<<<<<<<<<<<<<<<<<<<<<<<<FUEL<<<<>><<<<<<<<<<<<<<<<<<<<<<                    <<<<<<<<<<<<<<<<COST<<<<<<<<<<<<<<>><<

Hil BTU/KWH TYPE HIN% TOT%  %/YK Cotrya<IY 3 PRE JAN 1989 HIN 35 FOR H 15 ~ 0 HR FAC 1 ~ 00 HANIIL I ir G 0~0 6 ' AIIEA 12 COH Jhtr ]989 Hax Lee FOR I 0~0 AHR ] ]3243 STRT<<UP OIS OILO 100 ~ 0 LEASING 0 0~0 UtllT TYI<k F iiA7 J 4>>t ] 1989 EHERG ]86 tiOR 0>>0 ACCTG 0 SUPP ~ ~ ~ e ~ ~ ~ ~ 0,0 0 ~ 0 VAR O>>H O.O 6>>0 I RES'EA VF S trET JAN 2100 CAP 1 3S AVL 1 0 ~ 0 IHR 1 9087 FUEI. I COAL2 F 00 UNLH 0 ~ 0100 ' FIXEO OWH 40909 6 '

                ]Ourn       a ti        J4il   1  1990   CAP 2    84       aVL 2        0>>O   IHR  2 9569    FUEL 2      ~ ~ ~ ~ ~ ~ ~ ~  ~ ~ ~ ~    0~0    n ~ 0 SALE AOO*              0   0~0 CAP 3   109       AVL     3    0 '   IHR  3 9848    FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~          0>>0    0>>0   HAINT OVERHAUL 0

PRIORITY 0 Cl'CLE'OS] CaP 4 ]SO AVL 4 0~0 IHR 4 10191 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 0 PEt<ALTY ]etio 7]Oil 1 CAP 5 186 AVL 5 85>>0 IHR 5 ]02]2 HEA7 HATE FACTOR 1 ~ 00 SPN MNT 0 HATIIR livu 0 ~ 0 F REIIUEtrc Y 52 Cap 6 0 AVL 6 0~0 IHR 6 0 STRT<<UP 495 HBTU HOST AUri E. I Ev I aTLON 5 CaP 7 0 AVL 7 0~0 IHR 7 0 BANKING 0 HBTU/H PRC<<COHH GEN 0 ' II/X SCNO E HATko ]ee HIN DOIIN TltiE. 24 I e V>> 4 ]54 THANS>> LOSS % 0~0

           ~  Kt    1<itCMMCGAtAI Y A I tfii tive                   tA)

I hi.*f I tlf P( It'I UCLEtt Mt ll t (',2 EeERGY ttAttpGcttVtT ASSOCloTESe IMC PAGE l9ee E 32 e ~ 1 HEPT 9 AteT ION 1 SUBHEPAHT I 05/13/tt3

                                  <<<<oooo<<op<<GENERATING UttITS CHARACTERISTICS a<<<<oooo<<op pop<<a LAVETT            ]5 a<<ooa                       >>GAPA CITY>>     RELIABILITY >>HEAT RATE>>           rara<<ra>><     a<<<<FUf Lee<<area<<rr<<ae>>                ra<<are>>rCOSTeaee<<a    rr MW                          BTU/KWM                                 TYPE HIN% TOT%                             %/YM COMPANY         6      PRE      OCT      1  1984       MIN       40    FOR M  12 ~ 0    HR FAC I ~ 00                                                        HANDLING     0~0    6 '

AREA 11 COM OCT 1 1984 MAX 179 FOR I Oe0 AHR 1 11325 STRT>>UP DIS GILD 100 ~ 0 LfAS ING 0 0 0

                                                                                                                                                                                  ~

UttlT TYPE F tlAT OCT I 1984 EMERG 196 NOR Oe0 ACCTG 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0~0 Ae0 VAR OeH 0~0 6' RESERVE S MET JAN I 2100 CAP 1 40 AVL I 4e0 IHR 1 8310 FUEL I COALl ~ OD UNLM Oe0100 ~ 0 FIXED OeM115400 6e 0 100 ~ 0 A M OCT 1 1985 CAP 2 80 AVL 2 Ge0 IHR 2 8690 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 SALE ADD 0 0~0 CAP 3 120 AVL 3 0~6 IHR 3 9060 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 HAINT 0 PRIORITY 0 CYCLE 28 CAP 4 160 eAVL 4 OeB IHH 4 9440 fUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 OVERHAUL 0 PENALTY le00 POSITION 3 CAP 5 196 AVL 5 82e6 IHR 5 9780 HEAT RATE FACTOR F 00 SPN MNT 0 MATURING 0 0 FREQufttCY 52 CAP 6 0 AVL 6 0~0 IHR 6 0 STRTrUP 122 MBTU HUST RUN E DEVIATION 5 CAP 7 0 AVL 7 0~0 IHR 7 0 BANKING 0 HBTU/H PRE>>COMM GEN 0~0 HAX SCMD E RATED 179 HIN DOWN TIME 24 I ~ D ~ <<161 TRANS'OSS  % 0~0 <<oooo DANSKAMC 3 oooo<< rCAPACITYr RELIABILITY rHEAT RATtr rierrarrrerar>>FUELrraaareerar<<>> r>>ee reeCOSTreeaaa<<r HW BTU/KWH TYPE MIN% TOTS  %/'YM COMPANY 1 PRE SEP 1 1986 HIN 60 FOR H 22 ' HR FAC I ~ 04 HANDLING 0~0 6 ' AREA 10 COH SEP 1 1986 HAX 127 FOR I 0~0 AHR 1 11904 STRTrUP NATOAS A 100 ~ 0 LEASING 0 0~0 UNIT TYPE F HAT SEP 1 1986 EMEHO 137 NOR Oe0 ACCTO 0 SUPP Oe0 Oe0 VAH OeM 0~0 6' RESERVE S HET JAN 1 2100 CAP 1 60 AVL 1 0~0 IHR 1 8450 f UEL I

                                                                                                                  ~ ~ ~ ~ ~ ~ ~ ~

COAL I ~ OD UNLH 0 ~ 01 00 ~ 0 FIXED OeM 0 6' 100 ~ 0 A H JAN I 1987 CAP 2 80 AVL 2 0 ' IHR 2 8775 FUEL 2 e ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ e 0~0 0~0 SALE ADD 0 0~0 CAP 3 100 AVL 3 0 ~ 0 IHR 3 9120 FUEL 3 eeeei ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 HAINT 0 PRIORITY 0 CYCLE 6 CAP 4 127 AVL 4 0.0 IHR 4 9554 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 OVERHAUL 0 PENALTY F 00 HATURING 4 ~ 0 POSITION fREQUENCY 52 I CAP 5 137 AVL 5 78 ' IHR 5 95?4 HEAT RATE FACTOR Ie00 SPN MNT 0 CAP 6 0 AVL 6 0~0 IHR 6 0 STRT UP 311 HBTU HUST RUN E DEVIATION 5 CAP 7 0 AVL 7 Oe0 IHR 7 0 BANKINO 0 HBTU/H PRE>>COMH GEN Oe0 MAX SCllD E RATED 127 HIN DOWN TIME 24 I ~ De tt 148 TRANS'OSS  % 0~0

h

                                                                                                                /

ll I( I.<<ui~ 'if'lKY

                           ~                   l IiN Ill>>E   KILL  PI) ]IIT Iii)CI C Ali Il!i]T i!0 ~ 2               8:c'HGY Iia<<AGEi kIIT ASSGCIATESs ]IIC                              P       i.'OU
                 ]\c<<i ii.i C 32lo I IU)
                              ~ ~                                                                                     <<CVT     9 i)t'I II)li I SII<<f:EPOR f 1                             05/]3/83 ooaoaooaaoiikiikKKfll!0 UlllfS Cn,i<<C]CH]STICS ooaoaaaaoa H]itit/Yisl oaoao      t.i) V C I I               oapoo                   CiiPAC I T 7-    I'E I.I AHlLI]Y -IIE.AT HATC-                               <<fUCL>>>>>>>>>>>>>>>>>>              >>>>>>>>>>>>>>>>COST>>>>>>>>>>>>>>>>>>

eiii 7YPE tilt)% 707%  %/YH COi" f'ANY I'KF J>il I l989 nl tl 2d FGK B,b HP. FAC ]o48 HAKOLI t)G 0 ' 6 ' AREA ]1 f Cul ~ JA el ]989 loAX 63 Fell I 0 ' At<it 1 ] 3379 STHT>>UP OIS OILU 100 ~ 0 LEASING 0 0 ' Ui I I T 7 Yt'k liAT Jilt 1 l 989 EtiEKG 63 tiGK 0 AU ACCTG 0 SUf'P ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0 ' VAH Os)I 0' 6e0 Rl.bl.f VE S Kkl Ji'lo I Blon CAP 20 >>VL I 0o0 ltlR ] 8732 FUEL 1 COAL] ~ OD UHl.ti 0 ~ 0100 ~ 0 FIXCI) OoH 10678 6'

               ] OG ~ Ii. il ii                   ]990     CAP   2      40    rvL     2   OoU     ]HR 2        89]5    Fr)EL 2   ~ ~ ~ ~ ~ s ~ ~  ~ ~ ~ ~   0 '   0 ' SALE AVO            0   0' CAt   3      63    AVL 3      9]ob     lt!H   3     9U83    FUEL 3     ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~   0 '   0 ' t)AIteT             0 PI!  ]Gt. I] Y          v     C'I CLE                26     CAP   4        0  oA VL        Oe0     1)IR 4            0  FUEL 4    ~ ~ e ~ ~ ~ ~ ~  san 0       '   0 ' OVEHIIAUL           0 f k<<CLTY          l ~ Ii0     PCS     I 7 IGII        1     CAP   5        0   AVL 5       OoU     liIH 5            0  tIEA7 RATE FACTOR 1 ~ 00                       SPW HNT             0 tiAfUHlliG Oofi               I'l.OUEI 'C Y          b?     CAP   e        0   AVL 6       Uo0     lt!R 6            0  STP7>>UP            78 Ii)ITU tiUST Ill.III           C     I)CV]AIIOrt             5     CAP   7        0   AVL, 7      0 '     It!R 7            0  BAtlKING             0   HKTU/H                PRE CGHH Gktl           0 '

IIXX SCt!ls E RATED 63 te]tt OQ)itt TIKE 24 I ~ O ~ )I 159 TRANS'.OSS 0' ooaoa LGVC]T 14 aaoao CAPACITY>> REL I Ab IL IT 7 HEAT ftATC >>>>>>>>>>>>>>>>>>>>>>>>>>f UEL>>>>>>>>>>>>>>>>>>>>>>>>>>>> >>>>>>>>>>>>>>>>COST>>>>>>>>>>>>>>>>>> IIB BTU/Ks!K TYPE tIIN% fGT%  %/YH CO<<Pl II7 PKF. JAN 1985 HIN 40 fVH tl 12 ~ 0 HR FAC lo00 HANDLING 0 ~ 0 e,0 ARCA COll JAH 1985 HA X 165 fOR I 0~0 AHk 1 109b0 STRT>>UP OIS OILO 100 ~ 0 LEASING 0 0 ' UIIIT TYPk F Ilh T JWs I ]985 ErIERG 19] rioR Oo0 ACCTG 0 SIIPP ~ ~ ~ ~ ~ ~ s ~ 0 ' 0 ' VAR 0aM 0 ' eou HFSEKVE S Hk T JAII I 2100 CAP 1 40 4VL I 4 ' IIIR I 8160 t UEL I COAL I ~ 00 UNLII 0 ~ 0 1 00 ~ 0 FIXED OeH]0]9]8 6' 100 ' A Il Fkts 1986 CAP 2 80 AVL 2 Ue0 IHR 2 8370 fUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0 ' SALE AOO 0 0 ' Pftli)H]'fY CAP 3 120 AVI. 3 Gee IHR 3 8730 fUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Oe0 0 ' HAINT 0 V CYCLE 27 CAP 4 165 AVL 4 Oe8 IHR 4 9550 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0 ' OVERHAUL 0 PENALTY ls00 POS]T loll 1 CAP 5 191 AVL 5 82 ' IHR 5 10400 HEAT RATE FACTOR I ~ 00 SPN HNT 0 tiA]UH]rii) 0 ~ 0 FIIEuuEIICY b2 CAP o 0 AVL 6 0 ' IHR 6 0 STRT UP 122 HBTU RUST Hull UEVIA flort 5 CAP 7 0 AVL 7 0' IHR 7 0 BAIIKING 0 HBTU/H PRE>>COHH GEN 0 ' KA~ SCt!U E RATEO le5 Hltl OO)!N TIHE 24 IeOe >> ]60 TRANS'OSS  % Oo0

II.A.3 Major Unit Additions 1986-1991

                    <C    tl ~  fc'I I'<rrlafr<<vg ON      <<1 <t.   <<]Lc PO)<'7 r'<:<'.Lt.c<< Ulr)T reo                          6<'!c.f GY I<"r'AGE<<E.t<T       ASSOCIATES<          ll'C                           204 1)E-<    rrr< ~      g 320 ~ ) IO)                                                                               t<c.PT      9 Dl'710t<         1     SUI<RLPORT         1                    05/13/83 aooaaoaaoaGFI<ErtaflhG                It<<ITS C<vc<v4CTL<< ]ST ICS,        oooaaooaao oooao 9-re]LQ                           aoaao                         CAPACITY-           I EL]A<< ] L I 7 7     IIEA7 RATE<<          <<>>>>>>>><<<<>>>>              FUEL<<>>>>       <<<<<<<<<<>>>>>> <<                      COST" r <'o                               RTU/Kr<r                                        TYPE      tvfllk TG<T%                         %/Yk CO<rfral lv           e~                    tov     1 198<r         <<It<      700        Fbf'i    ]6  ~ 9     r<R FAC ]e<ru                                                                   HANDLING        0~0   6~0 Af<EA                           cl::I      HO V     1 ]98u          <<AX      109n         FOR   I 16e9         4f<R   I 10293         S'f PT UP UM<<NIU<15                   ] 00 ~ 0          LEASING           0   0~0 UII17 7 YPE           I!                   I<OV     1 1909 l]00 6<I%I<0  ]09n         I'VR       OeO       ACCTG          0       SuPP                                       0~0    oeo    VAR OeM         0~0   6 '

RF;SERVE S r<CT JAN CAP 1 700 AvL I 4e] 1)IR 1 ]0239 FUEL 1 URA<IIUM5 Ut<Ltl 0 0100 ~ 0 F IXED OeM27460] 6~0

                ]OoeV          4   r)I    SEP      1 1991          CAf'       <177       AVL 2 O.B            1)IR 2    102o4        FUEL, 2      ~ e ~ ~ ~ e ~ ~   ~ ~ ~ ~    0~0     0~0    SALE ADO          0   0~0 CAP   3 1090          AVL 3 78e2           IHR 3     ]0]6]        FUEL 3       ~ ~ e ~ e ~ ~ ~   ~ e ~ ~    0~0     0~0    MA I t<7          0 PRIOR] 7 Y                      CYCLE                  25           CAP   4         0 e   avL   4    o,,o      IHR 4                  FUEL 4       ~ ~ ~ ~ ~ ~ ~ ~   ~ e ~ ~    0~0     0~0    OVERHAUL          0 PEIIALTY           ]cur<        POS]TIU<v                 1         CAP   5         0     AVL 5      O.O       IIIR 5         0       tlEAT RATE FACTOR I ~ 00                                 Spt< MNT          0

)la f UH ) <IG 0, 33 FREOUEtfcy 78 CAP 6 0 AVL 6 0 0 IHH 6 57RT UP 2416 HBTII tlUST R<ii< f1 A 4 SCt <U UEV)<<T]Ot< 5 C<rp 7 RaTED 1090 0 AVL 7 0 'I

                                                                                                      ~

I f<R 7 0 <<4<<K lt<G 0 MBTU/H PRE<<COMM <<EN I<IN DOWN TIME 0~0

                                                                                                                                                                                                                    ]68 I ~ ft ~  I<   165                                                                                                                                                                            TRANS ~   ) OSS %     0~0
                                                                                           <<<<<<<<<<>><<<<f<ULTIPLE OWNERSHIP<<>><<>><<<<<<<<<<<<<<<<
                               "CO<<PA<lY                    Cot<PA<'IY                 COMPANY       %"        COMpANY      %       <<CorlPANY                  <<COI<PANY 1        9,0               3     18 ~ 0                   18eO               5    41 ~ 0            7     14 ~ 0                0         0~0 0        0~0               0       o.o              0       oeo              0     0 ~ 0 oaaao         pf<r<TSV(,g          ] aooaa                          <<CAPACITY             REL]A6]LITY "HEAT RATE                      <<<<<<<<<<<<>><<<<<<<<FUEL<<>><<<<<<<<<<<<<<>><<<<<<                             <<<<<<<<<<<< <<COST<<>><<<<<<<<<<<<<<
                                                                                < I<v                               BTU/KWrl                                        TYPF, MIN% TOT%                                %/YH Cor<<raflY             8         PRE        SEI      ] )989          MIN        250        FOR M      2eo       HR FAC 0 ~ 0                                                                    HAr<DLING       0~0   6eO AHc.a                20         Cot<       SEP      ] 1989          MAX      1000         FOR I      0~0       AMR    ]       0       S7R'f<<UP     ~ ~ ~ ~ ~ ~ ~ ~           100 ~ 0           LEAS]NG           0   0 ~ 0 Ut<]T TYfrE           P         lra'f      SEP      1 1992          Et<ERG          0     lrOR       0e0       ACCTO          0       SUPP         ~ ~ ~ ~ ~ ~ ~ ~               0,0    0~0    VAR Oef<        0~0   6 '

RESERVE S RF'f Ja<I 1 2100 CAP 1 250 AVL ] 0~0 IHR ] FUEL 1 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0100 ~ 0 FI)<EO Oetl 0 6 '

                ]OOert         A   rl     SEP      1 1989          CAP 2    1000         AVL   2  96eo        I!IH 2         0       FUEL 2       ~ ~ e ~ ~ ~ ~ ~   ~ ~ ~ ~     0~0    n~0    SaLE, AOO         0   0~0 CAP 3           0     AVL   3    oeo        IHR   3       0       FUEL 3       ~ ~ ~ ~ ~ ~ ~ ~   ~ ~ ~ ~     0,0    0 '    tlA I NT          0 PHIU<<ITY                u      CYCLF                   24          CAP 4           0     AVL   4    Oeo       IHH    4       0       FUEL 4       ~ ~ ~ ~ ~ ~ ~ ~   ~ ~ ~ e     0~0    oeo    OVF.F<<1AUL       0 PE Ia<.TY          Oeu          POSIT]0<<                  1         CAP 5           0     AVL   5    oeo        IHR   5       0       HEAT RATE F ACTOR ] F 00                                 SPtl MHT          0 MAT<<RING 0 ~ 0                 FAEOUc.<ICY             52          CAP 6           0     AVL   6    0 ~ 0      IHH   6       0       STRT<<UP                0 ivdTU HUST       f<U<<OEVIAT)0                         I         5         CAP 7           0     AVL   7    0~0        IHR   7       0       84HK IHG               0 M<<TV/H                         PRE<<CO<<M GEM         0~0 MA<< SCHO                E                                          RATED 1000                                                                                                                 Mlrl DOWN TI<IE           0 I ~ Oe    I     18                                                                                                                                                                            TRANS ~ ).OSS   %     0~0 PU <Pirl<i Cafr4CITY fllv)                        t IOV ~           REFILL CYCLE ~ ~ ~ ~ H       ~                           INITIAL t<ET DIVERSITY                   {Girt<)          0~0 STOHAGE E<<EHGY                    f<l r<<)     1'466 f ~           MIN 'aEEKEI<U LEVEL 1%)                oe0               IIVITIAL 4VFRAGE          VALUE f%/HWH)                  oeo

<:YCLE EFF ICIE'ICY (X) 75.0 tvU<lutR OF r<EEKOAYS 5 Mll'IltlUM SPLIT SAVINGS 1%/HWH) 0~0

II.B, Hydro Unit S'ummary Report

ti.rc.

                              ~          ~ <<o..f~i<Y      <.",(  i<]lie I"1(.E f< fii ~

3 iiiC< i. r lltf t.. qr(r'v i Ar"<('rr E< ~ 7 sSS()CIAIES< P 2l 1 fr<i i<<r ~ 6 J2oil Ii') 9 iit 7 lriil t S<rof<E('pf<f l(iC'.EP( (ib /t(3 oo" oo" oo" o<<L<:l.tie] fr'(i <rr:.]Ts clif rrr cfc<rts 7 ]cs ooo<<>><<oo

                                                                                                                                                                                                                                         >><<a>><<a>>a<<

ooooo,l]A<if le<(i 1 ooooo >>Cr PACIT)>> PEE I r t< ] t. 1 f Y -(<CAT R fc a <<<<e FUEL<<>><<>> <<>>a>> a<<>>>> <<<<y>>>><<>>>>CQS f i ~ P. f <I/KWh TYPE frit(4 TOTS tt/YH Cnr(PA< ly ] t'r(r.'ail t vttb ill<i 200 Fnf, l ~ (r ~ ') HR PAC 0.0 HAti'OL ] NG 0~0 6~0 AREA ]3 Cni < ] l 985 l(AA enn f i)P I Oon At(R ] 0 STRT UP seeress'OVen n.o LEAS 1NG 0 O.n neo e,O UNIT T)PE <<AT Jar< (985 F Elen O (<<jr( 0~0 ACCTG 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0,0 VAR Oet( RESE)rvC S <(c 7 J:<N ] s!]Oil CAP ] 2vo AVL (t ~ 0 IHR 1 0 FUEL ] ~ ~ e ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0100 ~ 0 FIXEO OoH 0 6 '

       'e      t A<i ~   <r                  JA t(         dv20         cAP 2        600         AVL 2]noon                 Ir<R 2             0       FUFL 2       ~ ~ ~ ~ ~ ~ e ~    ~ ~ ~ ~    0 ~ 0  0~0           sALE Aoo            0     0~0 CAP 3           r!       AVL 3           0~0        ]fit( 3            0       FUEI 3       ~ ~ ~ ~ ~ ~ ~ ~    ~ ~ ~ ~    0 '    0   '         l(A INT             0 PR IO<t I I Y             ii     C VCLF.                                 CAP 4                    AVL 4           v~0        I I <8    ri       0       FUEL 4       eoeeee ~ ~ ~ ~ o ~            0 ~ 0  0~0           OVE.HHAUL           0 PE(<ALTV          i) ~ i)        Pi)S] 7 ln<%                            CAP 5           v       eA) L            v,n        I uf( 5            0       (<EAT RATE fACTOR 1,00                                          SPN l(t<T           n NATU<(It<<r neo                   t'(Euiji.((CY                            CAP 6          (i       jvL 6 0 ~ <r               It(H 6             0       STRT>>UP                0 tivltl HUST tt<t:r                      t<EV I A 7 IO(<                          CAP 7          0        j< Vt. 7         0~0       Ill(< 7            0       BA(<((IN(r             0 l'.(37(l/H                             PRE>>COMt4 GE((            0~0 MAX SC<(O                 6                                               RATEO       evn                                                                                                                               HIN   OO<o'N 7]HF.             0 IeOe               1 TRANS'.OSS        %       0~0
                                                                                                                    >>>>t(UL'f IPLE P<(NEf(S((IP<<a>>>><<>><<>>>>>>

0<<'ll Al (Y <<CO( < P Ate Y >>Cor<PAtr Y  % COMPAt(Y '6 <<COMPANY L>> CO(iPANY 36 ' 5 4]e7 7 2]e7 0 0~0 0 Oen o neo 0 0.0 0 oen n o.'o 0 0~0 <<<<4>> r.]AGPEAK ooooo CAPAC]TY" REL I A() ILI T Y HEAT RATE<< <<>>>>>>>>>>>><<>>>>>>>>f uf L>>>>>>>>>>>>>>>>>>>>>>>>>> >>>>ae>>>>>><<CPS7a <<a>>>>>><<e 1 BTU/KWH TYPE f(IN'h TG7% 5/YH Cot}PA>>y P<3E. JAtl 1965 HIN 0 f'R tl tron HR FAC 0.0 HANOLING 0~0 e,o AREA Cni( JA<( 1985 MAX 400 FOP. I oeo At(R ] 0 STRT<<Uf e ~ ~ ~ ~ ~ ~ ~ 100 ~ 0 LEASING 0 0~0 Utj]T TYPE h <AT JA<r ] 1965 El(ERG 0 t<OR 0 0 ACCTG 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ o,o o o VAR OeH oeo .6 ' RESE<(VE, S r<ET JA(l 1 2]00 CAP 1 0 AVL ] oen

                                                                                                                    ~

ltiR 1 0 FUEL I ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 '100 ' FIXEO not< 0 6 '

        '6    .)0'               a tr        JAil          202v          CAP 2        4on         AVL 2100 ~ 0               lf(R 2            0       fUEL 2       ~ ~ ~ ~ ~ ~ ~ ~    ~ ~ ~ ~    0~0     0~0 0~0 SALE AOO t(A INT 0

0 Oeo CAP 3 0 AVL 3 0 ~ 0 IHR 3 0 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ e ~ 0~0 PR<IOR I TY 0 CYCt.E 0 CAP 4 0 AvL 4 0' 0 IHF( 4 0 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ e 0~0 0~0 OVERHAuL 0 PENALTY 0 ~ 0 POS I 7 Ior< 0 CAP 5 0 AVL 5 0 ~ 0 IHR 5 0 HEAT RATE FACTOR leno SPN HIST 0 HAT()R li(G 0 ~ 0 F'k E< ( <)E((C Y 0 CAt 6 0 AVL 6 0 ~ 0 IHR 6 0 STRT<<UP 0 t(BTU MUST Rt(r< I)EVI <)7 ION 0 cAp 7 0 AVL 7 n.o IHR 7 0 BANKING 0 HBTU/Fl PRE<<CQHH GEN 0~0 HAX SC(<t) c. RATEO 400 HIN DOWN TIME 0 I ~ Oe o 2 TRANS'OSS oeO

                                                                                                                    -"f<ULT]PLE OWNERSHIP>>
                                 >>CO<<PAtt Y          '6          <<CoriPANY                   -Cf<s<PAF(Y           %          COMPANY         '6>>       COMPANY                     COMPANY 27  ~ 7               5       36e5                7            2oo                        le5              2     23 '                   3        6e5 le5                 6         len                0           neo                  0     0  ~ 0 h

i>i>C ].>ti iirrorir trt)vY )r > <<I;vr. >ill.C t'>>]> 1>>r-'>.'l.f .r >i.".(T i ue2 C,l)C>,GY "-l: )>C>:Er.f r)SS>'CI>)TES> It C PAOC. I f6 i> v>r, r. a?ue] (>"I bcpl' >'pl lo> 1 sUt (ic pnkT I 12>'b/]3/t>3

                                                      >)r)r)oi)>>>)OOGKi)C>>A] I'voi >il>ITS            Cr>>rr.'Cftit]ST]CS         or)r)rr">)r)>)r)o

>)r)r>>)>) >il AGRCPL -CAPACITY- >(EL IA>)]L]f Y "t>Er T HATE<< <<>> <<<<<<<<<<<<r FUC> <<<<>><<<<<<<<<<<< COST 5 Tt >/F l't> TYPE t>]tt)> TOT% >>)/YH CO>>f'"r I F I Pr>E JA "i 19>tS HI>> 240 FOR 0 ~ >r HR FAC n.n HA>iuLlr>G 0 ~ 0 6~0 ARE-" 13 C(rr> JA "> 1905 r>AX 445 FOR I Oro AHR 1 0 Sf>tf UP ~ ~ ~ ~ ~ ~ ~ ~ ]no,o LFASINO 0 Oeo l Ul'l 7 T Yt'C. > I i>ti'f JAii l9hS K>>KRG 0 > in it 0 ~ >r ACCTG 0 S>tpp ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0 ' VAR Oet> o,n e,o RC.SER Vc S RET JAv 1 <]oo cAP I 240 AVL 0~0 1>>R ] 0 FUEL ] e ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0]ooeo FIXED Oet> 0 eeo

                       ]one(r              ii     JA>i      I 2020         CAP   2    44S         AVL 2]00     '        It>rt 2             0      FUEL      2   e ~ ~ ~ ~ ~ ~ ~    ~ ~ ~ ~   0,0 oeo        SALE ADD             0     0~0 CAP   3        0       AVL 3      0 ~ >r     li>R 3              0      FUEL      3   ~ ~ ~ ~ ~ ~ ~ ~'     ~ ~ ~   Oeo     0~0    tlA IN T             0 PRIORI I Y                        0    CYCLE                                CAP   4        0       AVL        0~0                            0      FUEL      4   ~ ~ ~ ~ ~ ~ ~ e    ~ ~ ~ ~   0.0     Oen    OVEN>>AUL            0 PENALTY                   Oen          P>>5    I TIOii                      CAP   5        0       AVL 5 0 ~ 0           IHR 5               0      HEAT      l>AfE FACT OR          ]eon                     Spr> HNT             0 f>AfU>tlr O 0e0                        l REu>>E>>CY                          CAt'           0       A V l. t. 0~0        IHR 6               0      SfRT Up                 0 t>HTU HUST Ru>                               DF V]AT IO>>                         CAP 7          0       AVL 7 0 ~ 0           IHR 7               0      GAtlK 1>vo              0 te>t TU/H                       PRE<<CDHH OCN               0~0 HAK Scr>U                         E                                         RATED      445                                                                                                                    HIN DOt'tl Tli>E                0 IeJe          )>          3
                                                                                                  - <<<<<<<<<<<<Hl>LTIP].E              Ol>NKHSHIP TRAr Se   LOSS   %         0~0
                                      <<CO))PANY                      <<Cot>PANY %>>              <<COtiPAtlY      %<<<<COHPAtlY                 %>>>>CONPAI>Y                            CG>lPANY 100 ~ 0              0       0~0                 0     0~0                0         0~0             (i       0~0                  0       0~0 0         0 ~ 0            0       0~0                 0     0~0                0         0~0 Coi'>PA>IY

>) r) o r) r) r i I ie>y g K('> t ] o o P Q r> CAPAC]TY REL IA>))LI I Y HFAT RATK" <<<<<<<<<<<<<<<<<<<<<<>><<FUCL<<<<<<<<<<<<<<>><<<<<<<<<<<< ----cus I--<<--

                                                                                        >>'rl                                 8 I U/t(>>tt                                          IYPE HIN% TOT%                                   %)/'Y H 1       i'>>E       JAi>      I   l 905      tll N       140        F>>R    t) oeo       Hk FAC oeo                                                                            HANDLlt>G        0~0       6eo AREA                        13         C>)>>        JA>l          ]9dS       HAX        250         folt I     0~0        r)>)H   ]           V      STRT<<UP       ~ ~ e ~ e ~ ~ ~            ]00 ~ 0          LEASItlo             0     O,O UNIT          I YPC           H        :>AT        Jhrl JAil 19('5      E>>ERG CAP I o       ltnll      0 ~ )t    ACCTG                0      SUPP          ~ ~ ~ e ~ ~ ~ ~              0~0    0  ~ 0  VAR OeH          oeo       6  '

RESE>()tK S HC'. T 2100 ]40 AVL I Oeo It!R ] 0 FUFL I ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Oe 0100 ~ 0 FIXED Der> 0 6 ' lnoen tt JAiN 2020 CAP 2 25o AVL 2100eo I >lit 2 0 fUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 SALE ADD 0 0' CAP 3 0 AVI. 3 0~0 ltlR 3 0 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 Oeo HAINT 0 PR I OP. I T Y 0 CYCLC caP 4 0 AVL 4 0~0 IHR 4 0 FUEL 4 ~ ~ e ~ ~ ~ ~ ~ ~ ~ ~ ~ Oeo 0~0 OVERHAUL 0 PENALTY 0~n PuSIT]0 l CAP 5 0 AVL 5 0~0 ]HR 5 0 HEAT RATE FACTOR I ~ 00 SPN <<NT 0 HAfuRlt>G 0~0 Fr>EOUEr(CY CAP 6 O AVL 6 Oeo ltlR 6 0 STRT<<UP 0= t>(>TU HUST Roti DC VIAT IO>t CAP 7 0 AVL 7 0~0 IHR 7 0 t]A>>KING (i t>>>T(l/H PHC;>>CON>i GK>l 0~0 HAW Sot)u RATED 250 HIN DO>>l< T1t>C 0 I ~ >]e TRAlvS ~ LOSS  % 0 ~ (l t>ULTIPLK OhtvCRS>vip Cr:i>r)ir>T Col>i ANY -CotiPAr>Y  % <<Cot)PAtlY % COHPAi>Y <<Col >PA(lY  %>> 2l,2 5 7>t. O 0 0 ~ >r 0 an 0 Oeo 0 oeo n n,n 0 0~0 0 oio 0 Oen

l>ilk>'I 1t)at ~

                                                 )RY  vrt    i)itic Itlkc I'vi)>f        t)i>CI.c     )<  vt   l IIe  ~ 8                C>ICI i)Y     rtn>'rti)I,)lht I ASs>)CI ATES)          itic                       P        12J I TED) rIO ~         E   320 ~ I      li'I                                                                                  I'kpl         9 trT ION I SI>bi>CPOHT                    1                        05/13/83 ooooo" ooooGENL)t>t lie)G Ut)I Ts                    CH   >iacl thlsT l cs oooooooooo

<<o<<o rtlat)r'S>>Y l ooooo CAPACI T 7-18ILI TY >>EAT HATh Fi)EL>>>>>><<<<>> >>>>>>>>>>>>>>>>gals<< I <<>> <<>>>>>>>>

                                                                                                                                                                                                                     ~
                                                                                    ~ e 8TI>/>Jet)                                       TYPE >tk TGT5                                   0/YK CO>lpari Y          1       I')<k        Jar  t        I 9>>5       ~ ) lri        70        FOR I         V~   >I           FAc   0~0                                                                  Hat t>>L ING         0,0    6 '

AREA 13 Cv I ~ Jr>' 19ft5 Mar 7i)b F Gtp 1 Veu AMK I 0 STRT>>)JP ~ ~ ~ ~ ~ ~ ~ ~ luu,u LEnSINil 0 0~0 Ut>l T T'Ypc 'T Ja)I 19.")5 EticHG 0 I iota 0,,) <<CCTG Suf P ~ ~ ~ ~ ~ ~ ~ 0,0 oeo YAH Deil 0~0 6 ' RESEf'E S t.cT Ja>: ct nn Cat 1 70 AVI 1 0 ~ >I I>iit I f'UfL I ~ ~ \~~~ ~ ~ ~ ~ ~ ~ 0 ~ 0100 ~ 0 FIXE.n Oe>i O 6.0 It)oe v ~ I J;;I ~ 2V20 Cnp 2 705 AYL 2100en ltiR 2 u FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 9~ 0 SALk ADD O O.O Cn>' G .'IVL 3 Oeu IiiR 3 0 FUkL 3 0~0 G ~ 0 iiAIi>T 0 PRIOR l TY PENt)LTY vs 0 u C VCLC I)OS l 7 lvtn i) i) CAI' Cnp 5 0 avL 4 0 ~ Q

                                                                                          ~ t.v L 5       I) ~ u I I >H It>R 5            0 tuEL      4 e ~ ~ ~ ~ ~ ~ ~
                                                                                                                                                              ~ ~ ~ ~ ~ ~ ~

r>EAT ftt)TE F ACT Of> I e 00

                                                                                                                                                                              ~ e ~ ~
                                                                                                                                                                              ~ e ~ ~   0~0     0~  0  DVEHHAUI.

SPN )et>T 0 0 IIATUI>I<<>t 0,0 t'its>1>tL)>CY 0 Cap t) 0 AVL 6 O.u IHR 6 Q STHT>>UP 0 HIITI> MUST Rto> Dc'V 1 ATIQri 0 CAP 7 0 AVL 7 Oeo ItIH 7 Q >I At>K I >>6 0 HKTU/tl PHC>>COMM GC)i 0~0 MAX ScriD E. HATCH 705 tilt> t>OW>< TII)k 0 I ~ D~ c THaNSe I.OSS I OS 0

                                                                                                             >>>>t>liLTIPI.E OWNkRSHIP<<>><<
                           -cnt.pnNY                         <<COIIPANY       '>I>>       >>COMPn>>Y           >I>>      "COMPANY          %-       CO>"PANY                    co>ipnt>Y be 7                 1      leo                   2       lbe3                3       4 '            4         3 '                 5       6 7 6           lel              7       Ie4                   0        0  ~ 0             0       Oeo Sl eLA I                  ooo>>o                          >>cap>>clTY>>               RELIA81LITY >>t>EaT HATk-                         >>>>>>>>>>>>>>>>>>>> FUCL<<>>>>e>>>>>>>>>><<<<>>>>                                           COST H)'I                                      8TU/tel'H                                        TYPE ttl>tt> TOT%                                  ft)/YH CO)>par'Y           I       f'hE         J A>i         l985         Ie IN        610         FOH     Ii    0~0        HR FAC 0 ~ 0                                                                      Hat>DI. I>>G         0,0    6~0 AREA              14        COll         JA) I         1985         tl ax        887         FOR     I     0~0        AMiR 1            0     STRT UP ~ ~ ~ ~ ~ ~ ~ ~                  100  '           LEASI)rG               0   0~0 UNIT TY+k t)                Ii-'T        Jail       1  l985         EHEHG            0       >)OR          0  ~ 0     ACCTG             0     SUPP           ~ ~ ~ ~ e ~ ~ ~             0  ~ 0  0~0    VAH OtM             Qeo    6 '

RE Sf >: VE. S KET Jaii 1 21OU CAP 1 61O AVL 1 0~0 IHR 1 0 FUEL 1 ~ ~ e ~ ~ ~ ~ ~ ~ e ~ ~ 0 ~ 0100 ~ 0 F IXE.D Oe>i 0 6 ' lnn,u 4 tl JAI> 2020 CAP 2 887 AVL 210Qeo IHR 2 U FUEL. 2 ~ ~ ~ e ~ ~ e ~ ~ ~ e ~ 0 ~ 0 0~0 SALE ADO 0 0~0 CAP 3 0 AVL 3 Oeo IHH 3 0 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0~0 >>AINT 0 pRIORl I Y 0 CYCLE CAP 4 0 AVL 4 Qeo II1R 4 0 FUEL 4 ~ ~ ~ ~ ~ e ~ ~ ~ ~ ~ ~ 0 '0 0~0 OVERHAUL 0 PEt>AL 7 Y 0 ~ tt POS I T I Gi> CAP 5 0 AVL 5 0~u It>R 5 0 HEA7 RATE FAC7OR I ~ 00 SPt> MNT 0 HAT>>RII>u 0et) I'REOi>E>>CY CAP 6 0 AVL 6 0~0 IMR 6 0 STRT UP 0 Hf>TU MUST RUi ~ l I>c V I 7 I 0) I Cap 7 0 AVL 7 0~0 o BAI>KIIIG 0 MGTU/H PHE CO>>M GCN 0~0 MAX SChu k, RATED 887 tllN DOWN TIME 0 I'D' 6 TRANS'OSS % 0~0

                                                                                            >>>> <<<<<<>>>>>>>>I/jULT IPLE OUNCHSHIP<<<<>>>>>>>><<>>>>>>
                            >>CO)ipr       >IY                <<Cot)PAINTY     t>t        >>COMPAIIY %>>                 <<CO>rf)At>Y       9t>>   <<COI)PA>IY                   <<COI)PANY 4~3              5       8  '8                 8       57ev                I       12             2       20e4                  3       F 6 6           Ie2              7       I~                    0        Geo                0       0 ~ 0 e
               "HC I rIEo 8 JohfiRY inr rrlret I ILE. r'I Ierl r<<ICI.E(h
                                                              ~                    ue.'IT: io ~ 2             k rkr!GY o" !rant NI.I:1 ASSrrCIATkse lr'C                                 PAGE     ]2I>>

I 1 I'-" rr< 1: 320 ~ 1 tref

                         ~                                                                                    ref:i'7     o GI'7 l ori I         SrtGIIEPOHT        1                    05/]3/83 o<<<<<<<<oooo<<GtrekkaT]r'8     !Jh]TS Ctr<<kACTkR]ST ICS <<oo<<<<oooo oooao gk os]co                1    oooo<<             "CAP>>CITra         REL    li u]L]1 Y     f!EAT Halta                a             FUELaaaa        aaaae a                  aaCo]ST ~ a aa HI!                               OTU/H!er!                                  TYPE     HII ~ '4 TGT%                         %/Yk Coo!Pa:  Ir         o       PHt      OCT      1982   I!IN          ]    f GR    ro  ] ~ rr  Hr FAC nou                                                                 HArrul. 11'IG    0~0    beo ARk4              2?        CO'CT           I ]9I12  eIAX          3    FOI-    I   Oeo     AIIH ]          0    STHTauV ,     ~ ~ ~ ~ ~ ~ ~          ]no.o            LEAS]too           0    Oeo Ute]T Tyl'E. re             eoo]     uCT    I 1982   Ehkhre        n    teuf'         ~ 0   ACCTG           0    S I!PE      ~ ~ ~ ~ ~ ~ ~ ~             o,o     o,n   VAH Qelf         0~0    beo RESE.oIVE           S       Htl      JA ~ I I 2100   CAP I         I    avl ]       I ev    lfrR I          0    FUEL 1      ~ ~ ~ ~ ~ ~ ~ ~  ~ ~ ~ ~    O.OIOOea      FIXtft aett        0    6 '
             ]oooo         a f. IICT     1981   Car 2         3    he V I. 2 96e 0     IHH 2           0    FUEL 2      ~ ~ ~ ~ ~ ~ ~ ~  ~ ~ ~ ~    o,o oeo       sALE ano           0    Oeo C4P 3         0    AVL 3 0 ~ 0         I IIR 3              FI!EL 3 ~ ~ ~ ~ ~ e ~ ~ ~ ~ ~ ~         o,o     n.o   t14 I NT           0 PR]or]TY                    CYCLE                0   CAP 4         0    AVL 4       ooo     IIIH 4           0   FUFL o        ~ ~ ~ ~ ~ ~ ~  ~ ~ ~ ~    o.o     o.n   ovERHAUL           0 PEroALTY 0 ~ 0              POS1110re            0   CAP 5         0  ~ AVL S       o.o     IIIH S          o    hEAT HATE FACTOR 1,00                                 SPti HHT           0 MATUR]r!Ie 0 ~ 0            E IIE JUEIICY        0   CAP 6         0    aYL 6       Oen     IhR 6                STRT UP               0 touTU HUST Hurt                   Otv1c TIGtr          0   CAP 7         0    AVL 7       0 ~ 0   ]HR 7           0    BarIK lriG            0 huTII/O                       PRE>>cotIH GEN           0~0 HD x S Clou                                          RATED         3                                                                                                   HIN PI]IIII 1IHE            0 I coo e 11                                                                                                                                                             TRANS'OSS        %      0~0 oooo<< OELTA                        oo<<oo               CAPACITY         REL]afr]LITY        >>HEAT RATE>>            aaaaaaaaa       a   F UtLe aaaa       aaeea   aaa   aaaeeaaaacos'lee   aa aa
                                                                !elf                              RTU/Hook                                   TYPE 11ltr% TG1%                               %/Yk CG rkar fr          6       PKE      iIGV   I ]983   Hlrf               FOII H      I ~ ot  HR FAC 0 ~ 0                                                               HANOL ING        0~0    6 '

Af!El Cuor rIGV I 1983 IIAX 2 FOP I Oon DtlR ] 0 STHT>>UP ~ ~ ~ ~ ~ ~ ~ ~ ]Oooo LEASIwn 0 0~0 Utr1 T TYVE Ir era T IIOV 1983 EtrEIIG 0 Nok 0.0 ACCTG 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0,0 oeo VAR Oet1 0~0 6' RES] HVE S IIE T JAN I 2100 CaP I AVL I leO IHH ] 0 FUEL 1 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Q ~ 0100 ' FIXED OeII 0 ben 1 One 0 11 riOV I 1982 CAP 2 2 AVL 2 98oo IHR 2 0 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0,0 0~0 SALE ADO 0 0~0 CAI' 0 AVL 3 0 ~ 0 IHR 3 0 FUE'.L 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ oeo 0~0 IIA]teT 0 PR ]OH IT Y 0 CYCLE CAP 4 0 hVL 4 neo IHR 4 0 FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0~0 OVEHHAUI. 0 PE<<ALTY ooo Ioos]1 I OII CAP S 0 AVL 5 oeo IHR S 0 HFAT R4TE FACTOR 1 ~ 00 SPA NNT 0 HATURIWu Oon I hE uuEt! CY CAP 6 0 AVl. 6 0 ~ 0 IHR 6 0 STR'I UP 0 HHTU HUST Ruf > UEYI 'Tloff CAP 7 0 AVL 7 oen Ikr] 7 0 eaeIKIHG 0 tlBTU/H PRE>>CONH Gtrr 0,0 fIAA SCI18 E. RATED 2 Hi!I ovkN TINE 0 I eOe V 12 THAN'OSS  % 0~0

li TErl uI)AT()lrr u>>II<<L I'ILE t )>> 1>>IICI I.w<< I<<Ill I I!.2 ~ ENrr.(pY vr.l<<<bki(k'lT I,SSIIC147tS) IIIC 12( 1rC~I il:Ie r. 42ue1 Ile) <<tr)T V (IPTII>>I I S tt:REPORT 0 /13/83 444444444441.<ikHA I ll!0 I!:IITS CIIA!IACT kRI 57 ICS 4444<<4444 44444 Hlt(CKLEY 1 44444 ~I'AleAC I TY- Hk( lxulLI T Y Ilk'I VA1 c -"-"FlitL ~ &a aaamnamwCOST mwwew wee I ~ ').  !) 7 I I / H gy tr TYPF. tel!)% 767%  %/YH Coe!VAI i Y a VRI. utC I 1964 >II (e I Fbf u I eti H:I Fr C neo HAt(OLING 0~0 6 ' AREA 19 C(!ri lit.C I I >04 e'IA h 9 F)I( I 0~0 I!R I u SI!'T-IIP e ~ ~ ~ ~ ~ ~ ~ 100 ~ 0 LEASING 0 0~0 U(IIT TYI'E, !. 'e~T uKC 1964 FIIKliG 0 I ICIt 0~0 (CCT(1 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ o,o n.o VAR Oef! 0~0 6.o RESERVE S JA e nno CAP 1 I At!L 1 leo o f rrL'L 1 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ o,oloO.O F IXkO oe>> 0 6.o 100en A Il OKC I 19R3 CAP 9 AuL 2 96eo I IIR 2 0 EL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0~0 SALE AOO 0 0 ~ 0 CAI 3 0 AVL 3 0' IIIR 3 0 FIIKL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 NA TNT 0 PRI('kITY CYCLE CAP 4 Avl. 4 0 ~ u IHH 4 0 fl)EL 4 ~ ~ ~ ~ ~ ~ ~ ~ e ~ ~ 0~0 0~0 OVEftHAUL 0 PE ~ ALT Y (i ~ 0 le<>N 7 I(IE 0 I e:) .." 13 TRANS'OSS % 0~0 4444" CRLSCki(7 I 44444 CAPACITY HELIAb IL I TY <<HEAT RATk ~~>>~>> <<~~~~FUEL~~~~~~~~~~~~~~ ~ waa~e~COSTe e~ae~wee e! II BTU/Ke(t( 7'rPE NIN% 707%  %/'r H CoilPAIIY 6 I'HE JUL I 1965 NIH 1 FOI> N 1 ~ 0 tlR FAC 0 ~ 0 HANDLING 0~0 6 ' AI'EA 20 Curt JUL 19P5 tlAx 6 FOH I 0~0 AHR 1 STRT~UP ~ eee ~ ~ ~ ~ 100 ' I.EASING 0 0~0 UNlT TYPE I! Hwr JUL 1 19II5 E.I(ERG 0 t!OH 0~0 ACC7G 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ Q~ 0 0~0 VAR Oft 0~0 6 ' RESkl vE S HE 7 JAII 1 2100 CAP 1 1 AVL I l,o III!( 1 0 t'UEL 1 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0100 ~ 0 FIXEO OeN 0 6 ' Ian.o A 11 JUL I 1964 CAP 2 6 AVL 2 96 ' ltlH 2 0 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 Oeo SALK AOO 0 0~0 CAP 3 0 AVL 3 oeo IHR 3 0 FUFL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ o,o O.o t!AINT 0 Pftro!CITY 0 CYCLE CAP 4 0 AVL 4 0~0 INR 4 o FUEL 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ o.o O.o OVKHIIAUL 0 PE <<ALTY n~0 POS I 7 lore CAP 5 Q AVL 5 Oeo It!H 5 0 NEAT HATE FACTOR 1.00 SPtl NNT 0 tlA I(Olla(G 0~0 t RK!)UE,IICY CAP 6 0 AVL 6 Oeo IHR 6 0 STRT UP 0 NBTU NUS1 HI!:I OEI'I 4 T I 0 I CAP 7 0 AVL 7 Oeo IHR 7 0 BAIIKING 0 HBTU/N PHE-CONN GE,(e 0 ~ 0 tIAh SC<<O HATEO 6 tiled OOIe(v TINE 0 I ~ <) ~ 0 14 7RAIIS ~ I OSS % 0~0

                   ~ .iec t.efc.> <iiui iriIY zu       Nl.tt   t   tt.r M  leit Uiu(ct.rM    ul IT   . V,2              Ee.ee'v)      ..'>'OE  ~  Et.t ASSOCIr TtSe itic                              PAGL      ]2ee I li ee lid ~      t. 32' I tu)                                                                                 9 OPT      Ion       1     SutiftEPGttf     1                      ob/]3/U3 poopoaaoaoof. Nf:HA I ]riv tiNI TS      Ctes  f~cCftt'tST I CS ooaooaoooo poaoo;        ATEetf RU        1     aooaa                    C    feacttY      Htt. 1 ate lL] I Y    -tet,at fir Tt       a aa            aaat    OELae     a>>aaa a a          aa aaa      COS'taaaaaa Ild                   's          &tU/I Me                                      tYf:E tt]tih TGI%                               %/Yk CCl:k'au Y             a    fiht        L,t.c  1  1905      Mlie           I    FOH t        I  ~ 0   Mr FAC pen                                                                tfaNOL]tiG       o.o       e.o Af:t>>                2u     Cv>>         OEC       ]9ffb     ital           3    fof'        u,u       arlR ]         0  STLet uP       .e  ~ ~ ~ ~ ~ ~           ]00 ~ 0        LEASING              0     0 '

Util I I YPE  : it utc 19%5 E<iEHG 0 ilul! 0~V aCCTG O Suf'P ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 VAR OeH Oeo 6ep REetf<vE s RET 1 4]no I av f. ] I~0 ]HR I FUEL 1 . ~ e ~ ~ ~ ~ ~ ~ e ~ ~ ~ 0 ~ 0100 ~ 0 FIXEO OeH 0 6' h 100 ~ 0 a e ~ Utc 1964 Caf'at 2 3' AVL 2 9feeo lfR 2 0 FUEL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 SALE ADO 0 0~0 cap 3 AVL 3 Oeo IttR 3 fUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0,0 0 ~ 0 HA I tgt 0 PRIORITY 0 CYCLE CAP 4 0 AVL 4 0~0 lf'ft 4 FUEI. 4 ~ ~ ~ ~ ~ ~ ~ ~ e ~ 0 ~ 0 0~0 OVERHAUL 0 PEe(AL TY 0 ~ 0 POSITION CAP 5 0 AVL 5 Oeo IetR 5 0 HEAT RATE FACTOR ],00 SPN tfNT 0 tfatUR]N<f 0, 0 FMEQttEticY cap e 0 AVL 6 pep IHR 6 STRTaUP 0 HBTU MUST Ritu OEV Is 1]ote caP 0 AVL 7 0~0 IHR 7 0 BAttKING 0 HBTU/H PRE-COHH Gt:N P,P Has Sceio t fta TEU 3 Hltt OOMPH 'TINE , 0 I ~ tf e,e 15 TRANS ~ LOSS % p~0 V I SCHh,rt poaoo -CaPACITY- RELIAUIL]TY hE<T Ratte aa aaaaaa>> aaFUELaaaaaaaaaaapaa a aaa CQS'ta a<< i Ie Mfe BTU/Kftti TYPE fi]ff% TGT%  %/YR CO" Pat IY PHE OCI 1905 H]N 1 FGR tl I~0 HP FAC 0.0 HANOI. ING 0 ~ 0 eep AREa 20 Co" reC T ]905 teAK 6 Foft I 0~0 AHR ] 0 STRTaUP ~ ~ ~ e ~ ~ ~ ~ ]poco LEAS]NG 0 0~0 Urtl T I Yf'E eihT OCT 1 19B5 Et)ERG 0 I iGII 0~0 accTG 0 SUPP ' ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 Oep VAR Oetf 0~0 6 ' ~ RI.SERVE S NET Jatt I 8]00 CAP avL I I ~ 0 IHR 1 FUEL I e ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Oeolooep FlttEO OeH o e,o

                  ]Op     n   a tf       OCI       1984      CAP 2          6    avf. 2 98 ~ 0         IHR   2        0  FUFL 2             ~ ~ ~ ~ ~ ~   ~ ~ ~ ~   Oeo    Oep   SAI.E AOO            0     0 ~ 0 CAP 3          0    AVL     3   Oeo       IHR   3        0  FUEL 3         e ~ ~ ~ ~ ~ ~ ~   ~ ~ ~ ~   0,0    Oep   HAINT                0 PRIORITY                     CYCLE                          CAP 4          0    AVL     4   Oep       IHR   4           FUEL 4         ~ ~ ~ ~ ~ ~ ~ ~   ~ ~ ~ ~   Oep    0~0   OVERHAUL             0 PE.tALTY oeG                 POSITION                       CAP 5          0    AVL     5   Oeo       IHR   5        0  feEAT RATE FactoR ],00                                  SPN HNT              0 MATURING 0 ~ 0               FttEOUEfICY                    CAP 6          0    AVL     6   0~0       Ii.ft e        0  STRTaUP                  0 teBTU MUSt RUet                    OEV]$ T lOll                   cap 7          0    AVI. 7   Oeo       lftR  7        0  Bottle]eeG               0 tlBTU/H                      PREacoMH QtN               0 ~ 0 HAA      Scil'                                              RATEO          6                                                                                                    Hltt   OOPN TINE               0 I ~ O  ~  ee     ]6                                                                                                                                                             TRat<S ~ LOSS %            0~0

(C ]!!let< '.(!vo)O(IY ur! Illt<E t<ll.t POI!Il

                                   ~                                                      l(IICLE.SH !I!      IT rett<2                         tt:EfeGY <<<AI.AGE!(Ettt ASSOCIATESe Il!C                                                       20b Ir'E,      <<! . E 3Pn,] Io)                                                                                                    REI(T        9 OPTION          1     SUUHEPOHT            I                           Ob  3/II3 4<<0004o>>GEhf HAT]trn U!.ITS                        CH! IIACTC HIST ICS              oao004>>00 04ooa 0SIIOKAI.'                    aoaao                            C r(f'r(C ] I Y-       Hc.l  lru]L]1Y -I EAT                 IIATC           - --- ---F!!CL-<<-                    WP  &   W         we    ace w  aCOSTawmwe a        I<<<

I"'1 I(T I!/!;(:11 TY>>E I!It!'4 Teil> '0/YH Cnr<PA IY PHC A!!v ] 9f(2  ! Ilh F'OH I' ~ Ir !1H FPC 0 ~ 0 l1AI!Ol 1tIG 0 ~ 0 6 ' Af!EA 8 cu~! AI<!i I 1992  !!AX 5 F'GR I n ~ (l hl iH ] u Slief"!!I' ~ ~ ~ ~ ~ ~ ~ 100 0 LEAS I!vG 0 Oen UNIT TY!<F. reF I F I'G I 1982 Cf 'El(G 0  !;Or u en r(CCTG u S! If'P e ~ ~ ~ ~ ~ ~ ~

                                                                                                                                                                                                ~

0,0 n.n VAI( Oe!! 0 0 6en RFSER¹c S <E I Jr< I~ ] 2)00 CFP I I AVL ] ] tv ]I!Ft ] 0 FUEL I ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ O,ninny 0 FIXED Dere

                                                                                                                                                                                                                                    ~

0 6 ' lnneu A\!u ) ]981 CAP 2 5 >:VL 2 981 ~ u Il(M 2 0 FUEI. 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0,0 Oen SALE ADO 0 0~0 CAP 3 0 AVL 3 u.n IIR3 0 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0 ~ 0 ttA IHT 0 r PB]ORITY PE!!ALTY 0.0 0 CYCLE P(!Sr TIO(< CAP 0 AvL 4 u.u ltR4 0 Fuf'L 4 ~ e ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0~0 OV f. HI!AUI. 0 CAP 5 n AVL b vs J I~ ;R 5 IVEiT HATE f'ACTOH ] F 00 SPtl t'IVT 0 HATI!Hl'!G 0 ~ 0 FRE(l!!EI!CY CAP 6 0 Avf. 6 n,n IH(I 6 0 STHT~UP I!HTU HUST Rut I DEv I A T IOII CAP 7 0 A(IL 7 GAG ll(R 7 u OA"!K I!!G 0 HIITU/tt PRE-COMM Gk!1 Qen HAA SCI!O t RATED 5 HIN ooeett I]Mt 0 leo< ¹ ]0 TRAI!ST LOSS ff 0~0 04000 v]LVO> 00000 -CAPACITY RF.L I Aft IL I 7 Y )IEAT HATC mamma awwwmaeFUEL~ wwaww ario$ Fww mrna ea I'I" IITU/K>>H TYPE Hl!V!t( TOT% fr/YH CO!(P~<!Y (I P!IE JArl I 1985 Hite 250 FOB H AU HR FAC nen HAt!OLI!'IG 0~0 6 ' ARE. 4 CO! I JAN ] ]uhb t<AA 1000 F Gle I 0~0 t(HR ] 0 STHT UP ~ ~ ~ e ~ ~ ~ ~ ]00 ~ 0 LE.AS ING 0 Oen Ut! IT 1YI'E P  !'!~T JAr! ]985 C(VCHG 0 loni< 0<G ACCTG 0 SUPP e ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 VAH 0e(4 0 ~ 0 6en RE SEI'VE S f!ET Jnr< ] (-']00 CAP I 250 A V!. I uen ]t!R I 0 FUEL ] ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0100 ~ 0 FIXCO OeH 0 6 '

                ]G<) ~ u      A!; JA!               ] 1924         cAt'         ]QQu         AVL 2 9!ten              IHR 2                0       FUEL. 2     e ~ ~ ~ ~ ~ ~ ~    ~ ~ ~ ~     0~0     0~0   SALt      ADO             0    Oen CAP 3             0   ~   AVL 3        Oen         II!R 3               G       F'UEL 3     e ~ ~ ~ ~ ~ ~ ~    ~ ~ ~ ~     0~0     0~0   HA]tvT                    0 PF   ](rft]I Y,              C YCL.E                     24       cAP 4             n       A¹L    4     0~0         ]HR 4                0       FUEL 4      ~ ~ ~ ~ ~ ~ ~ ~    ~ ~ ~ ~     0~0     Oen   OVEf(HAUL                 0 PErr:.LTY 0 s 0              PvS I T]C(       <                   CAP 5             0       AIL    5     0~0         I!!H 5               u       HEAT RA'IE FACTOH I ~ Qn                                 SPN HIIT                  0 I tr rt iRI r,n Ir e 0       I t<Elit(Et(CY              52       CAP 6             0       AVL 6        0~0         I!IR 6               0       ST RT UP              0 !!8TII HOST      Furl               OEV I AT IO;!                 5      CAP 7             0       AVL 7        0 au        lf!R 7               0       GA!IKIFIG             0 t!bTU/H                          PRE COMM Gt.t!                 0 ~ 0 HAi SCro                E                                         RATED 1000                                                                                                                               t(IN    OVID!V   I ]ME.            0 I~0   ~  >>    17                                                                                                                                                                                          TRAIIS ~ LOSS        %         0~0 PU'(PI(IG Cr(PACI'I Y I;rr;I                     I luu ~          Htl'LL.        CYCI C ~ ~ ~ ~ M                                       IIVITIAL t!ET DIVERS]TY                   IG(rttt)          0~0 ST(rr(~GE E(IE!e(e Y            I! 0(t)         157]% ~           tll!I    <<FE.KEIIO LEVEL I'l)                  0~0                    livITIAL AVERAGE          VALUE         {>/Hl'H)           0~0 CYCLE f.FF IC]c.reCY                I%)            7!r ~ 0        Ietrtrf!EII OF teEEKOAYS                 5                            HI!lit!UH SPI.]T SAVINGS LS/eIIIH)                         0~0
                                                                                                       <<--~SHUL TIP! E Of!fit!(SHIP~>>

Crr<rrer! r< Y CnllPAI(Y 4 -Cnt Pkt!Y 5 COI!PA(VY Ib COMPot!Y % Cnt!PANT Sben 4 dnen 7 15en ] Inen 8 0~0 2 Oen l,n 0 G.n n n,u 0 0 ~ 0

II.C Transaction Input Summary (Includes Monthly Hydro Energy Allocations)

TRANSACTION INPUT

SUMMARY

(Includes Monthly Hydro. Energy Allocations) The following section indicates the monthly energy associated with each hydro unit listed in Section II.B and the monthly energy,-capacity, cost and company ownership for each fixed energy transaction. There are three (3) transactions for which no energy or capacity are included. These are the PASNY, OHECONl and OHECON2 purchases. The PASNY transactions represent PASNY upstate surplus power. The relevant figures for the PASNY purchase are the displacement cost and fixed cost increase. For example,'or 1986 the transaction is modeled with a. OX displacement cost and 5 mill'ixed cost increase. This means 5 mills per KWH is the cost of this power. It is distributed to the companies based on the company ownership percentages shown on the reports. The available surplus energy is determined on an hourly basis during the PROMOD III run. The OHECONl and. OHECON2 are dispatchable economy transactions. Hence the energy is determined during the PROMOD III run. Details on this trans-action are presented in Section II.D.- The pricing for the transaction is illustrated in this section. For example, for 1986 the OHECONl energy is priced at 50K of the displaced cost with a 12.6 mil.l/KWH increment. Further details on the OH economy transactions are provided in Section II.D.

1986 C

               >  i~ I I>!Tcl>f>')> f'trY 0>i <.I I
                                   ~ ~                       ll.l; Pi>l' ~

in>el ci t~ ut I I .>0 ~ 2 ~ t> f > G>Y I:<<Isocl>EII f ASSOC I>>TEST It>C 36V I fc" 0>>> ~ E d2> ~ 1 l ! I l.c.PI 9 VPI lt>~ 3 Sli!IREI>OIIT 2 05/13/83

                                                >>>>>>4>> llii't>f r>Yl.i 0 El           F> 0Y >'-Llul     > TIOII rCk IV>>t>>444>>

Util TS f>>>>i) Il T JI'L

                                                                                                                                                                         '93 '7'91 PLAI>T t>nf!8            u                     YEI f>                        FEIST         t>4>t                     ol;,Y      JI>sl                   AUG           SEP       OCT         I>OV   UEC
>tll G>f lf'>>
>01>lt>PE~II 3443
                                                   'A>!
                                                   '370 i'.95 0 3Yo 273 3'>
                                                                                ~
                                                                                ~

3>>2 37

                                                                                                ~      2ll7, 36 ~

296 ~ 37 ~ 2 ">a, 3( ~ 219 ~ 37 ~ 280, 37 278

                                                                                                                                                                         '70
                                                                                                                                                                         '15 '04 '1S0      360    37
                                                                                                                                                                                                       '6 IIIPG>NEf'L r I I "GC >>:'te 37050 le>11 4188.
                                                   ~

315 137

                                                                     ~
                                                                     ~

2li4 ~ 1240 307 137> 407

                                                                                               '15
                                                                                               ~       3>>4 132  '37 0      315 ~

329 ~ 3>l>> ~ 132> 34Y ~ 315 ~ 137 357 e 137

                                                                                                                                                          '150 132
                                                                                                                                                                         '67 '32
                                                                                                                                                                         '37              468
                                                                                                                                                                                               '37 520
                                                                                                                                                                                                       '04 tlIPGPSt>Y                                                    41
                                                                                                                                                                                   '590
                                                                                                                                                          '09
                                                                  >I ~                                      ~
                                                                                                                        'l>2                                                                           '83 ST>Ll>4 Otl F 1 >I>>

AS>> 3>I 0> > 6.> 5 ~ 32>>ts 25e

                                                   ~

491. 2'loo P ~ 2690 2~

                                                                                '6>I 0

29!> 0 2

                                                                                               'i.'4
                                                                                               ~
                                                                                                ~

54d ~ 266> 2 ~ 579 ~ 298> 20

                                                                                                                        ~

bt 2hoe t>o 2> 29ee 2~

                                                                                                                                                 '020 2960 20
                                                                                                                                                          'Il
                                                                                                                                                          ~

288 ~ 2~ 577 298 2~

                                                                                                                                                                                   '68       2~
                                                                                                                                                                                               ~

5390 0 2~

                                                                                                                                                                                                      '810
                                                                                                                                                                                                      ~

hE>>5 1CI> 22 ~ 2~ 2~ 2 ~ 2 ~ 2 ~ 2~ 2~ 2~ 20 2~ 2~ 2~ OE.l. TA Ido lo lo le lo 1 ~ 1 ~ 1 ~ 10. 1 ~ 1 ~ I~ 1 ~ IIIt" Cy,LE Y 31 ~ 3~ 2~ 3~ 30 3~ 30 3~ 3 ~ 3~ 3 ~ 3~ 3~ Cf?ESCE.tef c2 ~ 2~ 2~ 2~ 2~ 2~ 2~ 2~ 2~ 2~ 2 ~ 2 ~ 2 ~ tlAfiktHO 160 1 ~ le 1 ~ le I~ I~ I~ le 10 1 ~ I~ lo VISC>>t:k 24 20 2~ 2~ 2~ 2~ 2~ 2~ 2~ 2~ 2~ 2~ 2~ 44>>4" It>PUT uf>IT PART ICIPATIOll SALES PEfICENTAGES SOLO FOR 1986 44I>44 PLat>T t!Af:E util T>> Jf>tt FEB >IAR APR t>AY Jfftt JUL aue SEP OCT ttOV OEC OS I EGI! O.n O,O O.O O.O O.O 0.O O>O 0,O 0.O O.O O,O O.O OS>"EGG F 0 0~0 F 0 0~0 0 ' 0 ~ 0 0~0 0 ~ 0 0~0 0 ~ 0 0~0 0 ~ 0

I IF ~ s I.IT>ls isi,.i,'. Ii's ~ "I V<< I I ~ I. g2< ~ I ('ll

                              ~~
                                                                     ! ItsIIII iri'LLL>     '"      i  '  ~

I Lpt

                                                                                                                                                                   .'s.<>L<

I i PTIU<< Li.i 3 sba<sL I ~ I r.a sllnlILfolil s I Ob/I 3/r>d oooaoaoooo I<<  %<>S:CI I J< S II I Iii OllfC0 I I I I><ii>I'.s<<.bp I'Lr I't'> :G PHt F LI<I'LL SUI I'( i'I(siO I ESC;.L;.TIOII HATLSI CAPACITY COST Oee %/YH CG 'r~ "i<Y HLSEI yf rt f ( I 'll v Etlf HGY COST Oe0 I f OHCLL')UT 'Gif. I<ATL.I 0 ~ % JA II f El JvL AUG OCT OEC YL-I'AP;ClrY 0 ~ II ~ 0, 0, 0~ 0 ~ 0, 0 ~ 0 ~ 0~ 0 ~ 0 ~ Q~ 0 O>O 0 ~ Q 0~0 0~0 I) ~ 0 G>0 Oee 0~0 0~0 0~0 0 ' EtlERIiY Gi rl (> ~ V Q~ 0 0~0 0~0 nrn v>0 0 ~ I> Os& 0~0 0 ' 0 ' 0 ' 0~0 I l!s..n Q ~ O il ~ il 0 ' 0 ' 0~0 0 ' Oe0 Q~ 0 ltlTIHCil:;iiGE AC(:(rur: I I iG I ~ I'I'ICI<!G OP110:I I C <I'P OEPShiP C("i P 0>ll ENSFIIP COIIP 0>itic.FISIIIP CO>IP OWIIERSIIIP COIIP OWtlEHSFIIP i'llSVL><CI<IL!<I COST SQ ~ C FlxEO COST Ir<CREASL I IP>6 2/i is< rt SAVI;IS FIXEO SPLIT I 100>0 HEPOR T lrle OPT I!ltl

                                                'AH PI!IGNI TY (IHI<EII                                I     7                                              I           ACCOUNTItIG OPTIO<4 I           I otlFcvl z                                    Pot(CIIASE PEAK SIIAVIrIG                               PREFEHRf0 SUVPEHIOOI NONE                                ESCALATION RATESI CAPACITY COST                         0 ~ 0 %/YH CO< iPAIIY        Q                                     RESERVE CHEVITEO                                                                              ENERGY COST        OeO APEA I          I                                       FORCEU OUTAGE, HATEI 0,%

Yf APR MAY JUN JUL AUG SEP OCT NOV OEC CAP AC I I Y s Iii Oe 0~ 0~ Oe Oe 0 ~ 0~ 0, 0 ~ 0 ~ 0 ~ 0~ I /i is Q ~ Q 0 ~ It Os I> 0 ' 0 ' 0 ' 0~0 0 ~0 Os0 Oee Oeit 0~0 FtlEHG> Y i> r<l 0r 0> 0 ~ (s 0>O 0~0 0~0 0 ' Osn 0 ' 0 ' Oee 0 ~ 0 0~0 0~0 A/I's 0 0>0 U ~ (p O>0 0~0 Oe0 Oe0 0~0 0 ~ 0 IIITL'PCh>sl uf <<CCOUIITI:I<i I PH I 0 lr Vl>T 10>r v COIIP Ol.t'LRSIIIP CORP OWttEHSIIIP COMP OWNEHSIIIP COMP OW>IEFISIIIP COMP OWNEHSIIIP 0 I SPLACL<eF (IT COST I SO ~ 0 F IXLO COST I IC<IL'aSE I -IA>S S/IIWn 5 "iy I IGS r 11LO SPL]T l00>II<  % PRIG!(IT T CI<l<E<< I b REPORT Itic OPTION I ACCOUtlTING OPTION

NRC INTERROGATORY ON NINE tIILE PoltIT NUCLEAR UNIT tto ~ 2 ENiKRGY MANAGEMENT ASSOCIATESe INC. 371 ITEM NO ~ E 320el (D) REPT 9 OPTION 3 SUBREPORT' oo/13/83 oee4oeeooo4 TRANSACTIONS INPUT SUteHARY FOR 1986 NVRSK MY STORIGE hYDRO PREFERRED SUBPERIODI WEEKDAY ESCALATION RATES I CAPACITY COST 0~0 I/YR COt>PANY 1 RESERVE CREDITED ENERGY COST 0~0 APEAI 10 FORCED OUTAGE RATEI tie'? QADI YEAR JAII MAR APR NAY JUN JUL AUG SEP OCT NOV DEC CAPACITY ~ 27 27 ' 2? ~ 27 ' 27 ' 27 ~ , 27e 2? ~ 27 ' 27 ~ 27 ~ 0 1/Met 0 'eo 0 0~0 0 ~ 0 0~0 0~0 0 ' ~ 0 0 ~ 0 0

                                                                                                                                                                                         '00
                                                                                                                                                                                             ~  0 8 '00
                                                                     ~                      ~

ENERGY Gott 60 ' 3 '00 ~ F 500 3eooo 2 '00 4 '00 F 500 7 F 000 8 ~ 100 e.4oo F 800 4 15eoo 6/p'iH 15 ~ 00 15 F 00 15 F 00 15eoo 15 F 00 15eoo 15 ~ 00 15 ~ 00 15 F 00 15 F 00 15 ~ 00 0 MISC ttY HYDRO RUN OF RIVER PREFERRED SUBPERIODI NONE. ESCALATION RATESI CAPACITY COST 0 ' I/YR COMPANY 1 RESERVE CREDITED ENERGY COST 0~0 ARFAI 10 FORCED OUTAGE RA?Et 0 ~% YEAR JAN FER APR MAY JUN JUL AUG SEP OCT NOV OEC CAPACITY Na 4e 4e 4 4~ 3~ 3~ 3~ 3~ 3~ 3~ 4 ~ 4 ~ oeo e ENERGY

            $ /N'rt G>'tt         16 '      1 F 0~0 500      1   ~

0~0 700 0~0 F 800 2 0~0

                                                                            '00       1 ~

0~0 800 0 ~ 0~0 600 0~0 oe400 0 F 0 ~ 500 0 0 F 0~0 500 0 0~0 F 800 1 ~ 0 400

                                                                                                                                                                                ~  0 leeOO I/tti.h                       deO           0~0         oeo       0~0         0~0          0~0          oeo         0~0           0~0              oeo           0~0           0~0 STURGEON                   STORAGE     ttYDRO                   PREFERRED SUBPERIODI ItEEKDAY                  ESCALATION RATES I CAPACITY COST                    0 ~ 0 %/YR COMPANY     1                        RESERVE CREDITED                                                             ENERGY COST           0~0 AREAI    10                          FORCED OUTAGE RATEI          0~%

YEAR 1 FEB MAR APR MAY JUN JUL AUG SEP OCT NOV OEC CAPACITY t et 15e 15e 15e 15 ' 15e 15 ~ 15 ~ 15 ~ 15 ' 15 ~ 15 ' 15 ~ oeo 0 e ENERGY k/I'hei Gi 6 51 ~ 8 0,0 4e9QQ Oen 5 ~ BOO 0~0 9 ~ 100 Be300

                                                                               ~ 0        0 5 'QO
                                                                                            ~ 0        0 0 1.8oo        1 ~

0~0 200 1 F 0 ~ 800 0 l,eoo

                                                                                                                                                 ~ 0 2 '00         4  '00
                                                                                                                                                                                 ~ 0 5

0

                                                                                                                                                                                          '00
                                                                                                                                                                                              ~

I /tet'h 0 ~ 0 0~0 0~0 0~0 Q.o Oeo 0 ~ 0 0~0 0~0 0' 0 ~ 0 0~0 0 aj

tIHC IteTERPGOl TORY ON ttINE MILE. POINT NUCLEAR Ul'IT t.'0 ~ 2 EtlERGY tlAIcAOEtIENT ASSOCIATES) INC PAGE 372 ITEM NO, E 320el (U) REPT 9 OPTIUN 3 SUBREPORT I 05/13/83 ohio" oooooii TRAtISACT IONS Il"PUT SUtitlAHY FOR 1986 OLR-HYU2 STUPAGE e!YDHO PREfERRED SUBPERIODI tIONL ESCAI.ATlotl HATESI CAPACITY COST 0~0 /YH CO'IP AilY b RESERVE CFIEOI TED ENERGY COST 0 ' AREA I II FORCED OUTAGE RATEI 0 ' FEB MAR APR MAY JUtt JUL AUO SEP OCT NOV DEC CAPACITY tito 34 ' 34 ' 34 34 ~ 34 ~ 34 ' 34 ' 34 ' 34 ' 34 ' 34 ' 34e

            $ /ti~                        0,0         ~  0          'oo 0 '                  0 '             '            '           ~ 0           '                0            '            0~0 EtlERGY     -Gete     100  '       13  'b0     11.680     13 '60           10 '00              10 '60           8 '00       5 F 460     2 '60         I ~ 800         7 '60         To000          7 '60 W/r's'iitt                  2 ~ 90      2e9il      2e90             2 '0                 2 '0           2e90        2 '0        2 '0          2 '0            2e90 ACCOST           2 '0           2 '0 ROMYO                  tIYDRO         HUtl OF RIVER          PREFEPiRED SUBPERIOOI NONE                                     EscALATIDN RATES I cAPAGITY cosT                   7.0   %/YH COMPAIIY       7                      RESERVE CREDITEO ALL                                                                         ENERGY               7 '

ARE AI 9 FORCED OUTAGE RATEI Oe> YE AP. JAN FEB MAR APH MAY JUN JUL AUO SEP OCT NOV DEC CAPACI TY tlirt 15 ~ 5~ 20 20 10e 5~ 3~ 3~ 5~ 10 ~ 20 10 6 I /I:ii 1461,9 4856 ' '096,6 1

                                                                                     '133e 2193    ~ 1     4532e5      7310 ~ 4    7310e4        4532 ~ 5        2193 ~ I             ~ 1
                                                                                                                                                                                             '133
                                                                                                                                                                                                          ' '193 ENEPGY        G4tI      92 '       11 ~  160    3 '60     14e880           14 ~ 400              7 '40          3 '00       2 ~ 232     2 '32         3 '00           7 '40        14e400          7 '40 5/eo o! I i                 I ~ 34      1 e34      le34             1o34                 lo34           le34        le34        I o34         I ~ 34          1 ~ 34        I ~ 34         1 ~ 34 RGHYD PS                STOP~BE       tIYORO                 PREFERRED SUBPERIODI ttnNE                                     ESCALATION RATESI CAPACITY COST                    0 '   %/YR a                         COIIPatlY     7                      RESERVE CREUITEO ALL                                                                         ENERGY- COST         7 '

AREA I 9 FORCED OUTAGE RATEI 0 ' YEAR JAN FER MAR APR MAY JUN JUL AUG SEP OCT NoV DEC CAPACITY IIrr 20 ' 45 ' 30 ' 30 ' 41 30 30 ' 22 ~ 45 40 ' 30e 40e 0 ' ~ 0 ' ' 'eo 'eo

                                                                                                                                   '         0 '               'eo 0          0~0            0 '

ENERGY G<tt 143 ' 9 '17 15 '30 12 '33 8 '78 17 '22 10 ~ 793 Bo297 4 '68 10,963 14 ~ 452 15 ~ 601 14 ~ 691 S/tI~H I ~ 34 le 34 I ~ 34 I ~ 34 1 ~ 34 I o34 I ~ 34 I ~ 34 le34 1 ~ 34 I ~ 34 1 ~ 34

NRC INTERROGATORY QH NINE HILE POINT NUCLEAR UNIT NO ~ 2 EIIERGY HANAGEHEtIT ASSIICIATES ~ INC GE 374 ITEN WO ~ E 320 ~ 1 {UI REPT 9 Ot TION 3 SIIBREPORT I 05/13/83 o1144oo4oee4 TRANSACTIOIIS IttPUT SUHtIARY FOR 1986 oeeoo40ooetee NHHYD nl HYDRO HUts-OF"RIVE R PREFERRED SVBPERIODI tIONK ESCALATIOII RATES I CAPACITY COST 0 ~ 0 %/YR COt'FteHY 5 t<0 SPINNING RESERVE CREDIT ENERGY COST 0~0 AREA I I FORCED OUTAGE RA'tEI 0 ' YEAR FEII ttAR APR HAY JUN JUL AUG SF.P OCT NOV DEC CAPACITY 3~ 3e 3~ 3~ 3 ~ 3~ 3~ 3~ 3~ 3e 3~ 3~ 6 N/Hn 0~0

                                              '32 0~0         0
                                                                      '32
                                                                          ~ 0        0~0           0,0          0~0          Oen
                                                                                                                           '32 0~0       0~0          0~0            0~0        0~0 EtIERGY        GteH        26 '            2           2 ~ 016     2            2 ~ 160       2 '32         F 160       2          2 '32     F 160        2 '32          2 ~ 160    2e232 I/Hr H                        -

3 '8 3e78 3e78 3 '8 3 '8 F 78 3 '8 3 '8 3e78 3 '8 F 78 F 78 0 NHHYD Cl HYDRO RUN<<OF<<RIVER PRE FERIIED SUBPERIODI HONK ESCAI ATION RATES I CAPACITY COST 0 ~ 0 %/YR COHPatIY 6 NO SPINNING RESERVE CREDIT ENERGY COST 0~0

                                                   '2 AREA I          2                         FORCED OUTAGE RATEI             0 YEAR                 JAN         FEB         HAR          APR           HAY          JUH          JUL        AUG       SEP          OCT            NOV        OEC CAPACITY                                       32             '        32 ~         32 '          32           32 ~         32 '       32 ~      32  '        32 ~           32 ~       32e e              5/Bee
                                                 ~ 0        0~0
                                                          '04 0~0 23 '40
                                                                                      ~ 0             'en 0 ~ 0         ~ 0       0~0         ~ 0        0 ~ 0          0~0
                                                                                                                                                                            '40 0 '

ENERGY Guet 280 23 F 808 21 23 F 808 23 F 808 23 '40 23e808 23 F 808 23 F 040 23 F 808 23 23 F 808

            $ /tehtI                          3 '8        3e78        3 '8         3 '8          3 '8          3e78        3 '8       3e78      3e78         3e78           F 78       F 78 NHHYD   El                 HYDRO             RUN OF   RIVER          PREFERRED SUBPERIODI HONK                          ESCALATION RATESI CAPACITY COST             0 ~ 0 %/YR COte Patt  Y      5                       NO    SPINNING RESERVE CREDIT                                               ENfRGY COST        0~0 ARED I          3                         FORCED OUTAGE RATE I            0 e%

YEAR JAtI FEB ~ HAR APR HAY JUN JUL AUG SEP OCT NOV DEC CAPACITY vi 76 ' 76 ' 76 76 ' 76 ' 76. Te. 76 ' 76 ' 76e 76 ' Tee ~ fNEPGY 0/1Ih

                                                 ~ 0         ~ 0            '.0 54 '20
                                                                                      '             '           0~0          0~0         ~ 0        ~ 0        0~0             ~ 0       0~0
                                                                                                                                                                                       '44 Gi,tt      665           se.s44        51 ~ 072  56e544                     56   '44        54 '20      56 '44     56 '44    54 '20       56 '44         54 ~ 720   56 S/Ie>H                            3e78        F 78        F 78         3e78          3e78          3e78        F 78       3 '8      3e78         F 78           3e78       3e7e

tiRC INTERROGATORY ON NINE tIILE POltlT NUCLEAR UIIIT NO ~ 2 ~ EtIERGY HAIIAGFttEtlT ASSDCIATESI ItIC PAGE 374 ITEte NO ~ E 320 ~ I tul REPT 9 OPTION 3 SUBREPORT 1 05/13/83

                                   ">>>>>>4>>4>>>>>>        TRA eSACTIOIIS INPUT Suti'IARY FOR               1)86>>>>>>>>>>>>>>>>>>>>

SUBPERIODI NONE ESCALATIOtt HATESI CAPACITY COS'I i) ~ 0 %/YH NHHYD Fl HYOPO Rui~l~OF RIVER PREFERRED 0 cocpaNY AREAI NO SPIi.'NING RESERVE CREDIT FORCED OUTAGE RATEI 0' ENERGY COST 0~0 YEAR JAN FEB APR MAY JUN JUL AUG OCT NDV DEC CAPAC I T Y litt 42 42e 42e 42e 42 ' 42e 42 ' 42 ' 42 ' 42 42 ' 42 '

                 /tl>>                                                                                                                                              '.n 0            0 6                                         '48
                                                'sn 0~0
                                                        '24    31e248 Oen 30 0
                                                                                  '40
                                                                                      ~ 0 31s248
                                                                                                    ~ 0 30 Oen
                                                                                                               '40       31 ~ 248
                                                                                                                                 ~ 0 31 '48
                                                                                                                                           ~ 0 30,240
                                                                                                                                                     ~ 0 31 '48           30 '40
                                                                                                                                                                                  ~
                                                                                                                                                                                           '48 ~

ENERGY Gott S/tte'H 367e9 31 3 '8 28 3e78 3 '8 3e78 3 '8 3s78 3 '8 3 '8 3e78 3 '8 3s78 31 F 78 NHHYO C2 STORAGE tlYDRO PRKFKRRED SUBPERIOOI ttnt<E ESCALATIOtl RATFSI CAPACITY COST Oen %/YR cotIpaNY 5 NO SPINNING RESERVE CREDIT ENERGY COST 0~0

                                                                                        '2 '2 AREAI      2                            FORCED OUTAGE RATEI                0 HAR            APR            HAY           JUN           JUL        AUG      SEP          DCT             NOV           OEC YEAR             JAN           FEB CAPACiTY          IItt                     12e          12e         12 ~           12                                ~         12 '      12 ~     12  '        12e             12 ~          12 ~

0 0~0 6 ENERGY S/H'.e GIIH 42 ' 3 0,0

                                         '71          3 0~0
                                                        '26      3 0~0
                                                                   '71          3 0~0
                                                                                  '56          3 Oen
                                                                                                 '71         3 Oen
                                                                                                               '56         3 '71
                                                                                                                                 ~ 0      0~0 3 ~ 571   3 '56
                                                                                                                                                     ~ 0        0~0 3s571           3 0
                                                                                                                                                                               '56
                                                                                                                                                                                  ~

3 ~ 571 Oen 0~0 0~0 Oen 0~0 0~0 0~0 S/I%it H eely0 ~ 0 0~0 Oen 0 ~ 0 0~0 0 NHHYU K2 STORAGE HYDRO PREFERRED SUBPERIODI NONE EscALATIDN HATEsI cAPAGITY cosT 0 ~ 0 %/YR ENERGY COST 0~0 0 CPtIPAIIY

                           )REAI      2 5                         NO    SPINNING RESERVE CREDIT FORCED OuTaGE RATEI                0,%

FEB HAR APtt JUN JuL AUG SKP OCT NOV DEC YEAR JAN CAPACITY Hie 223 ~ 223 ' 223 ' 223 ~ 223 ~ 223 ~ 223 ~ 223 ~ 223e 223 ~ 223 ~ 223 ~ e S/t 'i 0 0~0 0~0 0~0 0~0 0~0 Osn 0~0 0~0 Osn ENERGY O'AH 781 ' 0~0 365 59 '42

                                                           ~ 0 ee.3e5
                                                                       ~

64 '24 66 '65 64e224 66 '65 66 '65 64 '24 66 '65 64 '24 66 '65 S/Hsu 0 0~0 0~0 0~0 0~0 0 0 0~0 0~0 Oen 0~0 0~0 0~0

                                            ~ 0                                                                   ~

Q" IIRC INTERROGATORY Oft IIINE NILE POII'IT NUCLKAR UNIT "I0 ~ 2 ENERGY t'ANAGENENT ASSOCIATES g It<C E 375 ITEN NOe E 320el IU) RKPT 9 OPTION 3 SUBREPORT 05/13/83 oooooooooO TRANSACTIONS INPUT SUI>IIARY FOR 1986 oooooooooo ttHIIYD F2 STORAGE <IYORO PREFERRED SUBPERIOOI NONE ESCALATION RATES I CAPACITY COST 0~0  %/Y" COt'PAIIY NO SPINNING RESERVE CREDIT ENERGY COST 0 ' AREA I FORCED OUTAGE RATEI 0 % YEAR FEB APR NAY JUN JUL AUG SEP OCT NOV OEC CAPACITY ~ Ii 93 ' 93 93 ' 93e 93 93 ' 93 ' 93 ' 93 ' 93 ' 93 ' 93 '

              $ /H'o 0

27 '77

                                                       '98
                                                             'eG
                                                                        '          0 '           'e0
                                                                                                        '84 ENERGY         Gkd         325                     24           27e677       26 F 784   27 '77      26          27 '77     27 '77     26 F 784      27 '77          26 F 784    27 '7T i/N>. ee                     0 ~ 0         0 '          0 '          Oen        0 '         0 '         0'         0 '        0 '            0 '            0 '         0' GRNBY                       O'YDRO      RUN OF~RIVER               PREFERRED      SUBPERIODI NONE                ESCCLATIOtt HATESI CAPACITY COST               0 ~ 0 %/YH 0                             COHPAWY 5                              NO    SPINNING RESERVE CREDIT                                           ENERGY COST          0 '

AREA I 2 FORCED OUTAGE RATEI 0(% YEAR JAN FEB MAR APR HAY JUN JUL AUG SEP OCT NOV OEC CAPACITY (Ii 10e 10 ~ 10e 10e 10 ~ 10e 10 ' 10e 10 ~ 10e 10e 10 ~ C '5/II 0 ' Oep 0 ' Oe0 Oe0 0 ' ' 0~0 Oe0 0 ' 0 ' Oe0 ~

                                                                                                                                                                                                )

G'eNi'NERGY 35e0 2 '76 2 '88 2 '76 2e880 2e976 F 880 2 '76 2 '76 F 880 2e976 F 880 F 976 6/HVN 3 F 78 3e78 3e78 F 78 F 78 3e78 3e78 3 '8 3e78 F 78 3 'S 3e78 UNION STORAGE tlYCRO PREFERRED SUBPFRIODI NONE ESCALATION RATESI CAPACITY COST 0 ~ 0 %/YR COr<PANY 5 tIO SPItINING RESERVE CREDIT ENERGY COST 0 ' ARKAI 3 FORCED OUTAGE RATEI 0,% YEAH JAN FER BAR APR IIAY I JUN JUL AUG . SKP OCT NOV DEC CAPACITY 0 0 0 0 kg 0 0 0~ Oe 0 0 0~ a $ /tI>> Oe0

                                               ~

0 '

                                                              ~

0,0

                                                                          ~

Oe0

                                                                                       ~

0 'e ' 0 '

                                                                                                              ~

0 '

                                                                                                                          ~

0 ' 0 ' 0 '

                                                                                                                                                               ~

0 '

                                                                                                                                                                              ~

0 ' ENERGY 0'itt Oe0 0 0 ' ' 0 ' Oep 0 ' 0 ' ' ' ' 0 '

            %/girl                       3 '8         '3 'R 0

3 '8 F 78 3 '8 3 '8 0 3 'B 3 '8 0 3 '8 0 3 '8 0 3 '8 3 '8 0 3

t<RC INTERROGATORY OH HINE MlLE POINT NUCLEAR UtoIT IIO ~ 2 ENERGY MAt)AGEHENT ASSOCIATESo ItlC pAGE 3?to ITEoo NO ~ E 320e1 (Ul REPT 9 OPTION 3 SUBREPORT I 05/13/83 aaaaaaaaao TRANSACTIONS INPUT SUMttARY FOR 1986 TRENT STOR4GE HYDRO PREFERRED SUBPERIODI NONE ESCALATION RATESI CAPACITY COST 0~0 0/YR CO<FAtlY NO SPINNIHG RESERVE CREDIT ENERGY COST 0 ' AREAI 3 FORCED OUTAGE RATEI 0$ %

                                                                                                       !             llew                                       llew                        llew YEAR             JAN           FEP.         HAR            APR         MAYj            JUtf         JUL          AUG           SEP             OCT             NQV         OEC CAPACITY                               24            24           24 '           24e         24  '                        24           24  '         24e             24e             24 '        24e 0 ' '/p>>          'o0
                                                                     '            0 '          '              0 '              'eO
                                                                                                                                          '           Oe0             0 '              '          Oe0 11 ~ 428      10e322          '28        11 ~ 059      I   428',78'4o Ill 059           428     11 ~ 428      Ill3e78              428             059         428 ENERGY        G>>to
           $ /H'xM 134 o 6 3 '8          3o?8 11 F 78           3 '8    1   ~

3 '8 3e78 3 ~ ?8 059 F 78 11 F 3 '8 F 78 GLNPK HYDRO RUN OF RIVER PRFFERRED SUBPERIODI NONE ESCALATION HATESI CAPACITY COST 0 ~ 0 %/YR COMP At'IY 5 NO SPIHHIHG RESEPVE CREDIT ENERGY COST 0.0 AREA I 3 FORCED OUTAGE RATEI Oi% YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT HOV DEC CAPACITY F>> 0 ~ 0, 0 ~ Oo Oo I' 0 ~ 0 ~ Oo 0 ~ 0 ~ 0~ 0 ~ 0/H'>> 0,0 Oe0 0 ' 0 ' Oe 0 ' 0 ' 0 ' Oo0 0 ' 0~0 0 '

                                                                                               ~

Et?ERGY GVrt h/H'orl 0 0~0 3 'B 0 3e78 Oo0 3 '8 0 3e78 0 3e78 0 3 '8 0 3 '8 0 3 'B Oo0 3 '8 0 3 '8 0 3 '8 0 3 '8 OS?IGT IE HYDRO I?UN OF RIVER PREFERRED SUBPERIODI NOH'O ESCALATION RATESI CAPACITY COST 0 ~ 0  %/YR COMPANY 5 Splt<HIt<G RESERVE CREDIT Et?ERGY COST Oo0 AREAI 3 FORCED OUTAGE RATEI Oy> o YEAR JAN FEB MAR APR HAY'UN JUL AUG SEP OCT HOV DEC CAPACITY t"o 0 ~ 0 ~ 0 ~ 0e 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0~ I,/I>>> Oe0 0 ' 0,0 Oe0 Oe0 0 ' Oe0 0,0 0 ' 0 ' Oo0 0 ' Go 'rl '74 ' '4? Oo274 '65 '74 0 '65 '74 '74 '65 0 '74 '65 '74 ENERGY 3~2 0 0 0 0 0 0 4/O' 3 '8 ~ 78 F 78 3o?8 0 3 '8 3 '8 0 3 '8 3 '8 0 3 '8 F 78 3 '8 3 AD ?8 0

NRC INTERROGATORY ON NINE H]LK POINT NUCLEAR Ur>]T NO,2 EtrERGY trAttAGEtrENT ASSOCIATESt 1NC 377 ITEN r40 ~ E 320 ~ 1 {D) REPT 9 OPTIOrr 3 SUGREPORT 1 05/13/83 aaaooooaaa TRANSACTIONS INPUT SUHHARY FOR 1986 aooaaaoaaa HUOFLS STORAGE trYDRO PREFERPED SUBPERIODI NONE ESCALATION RATESI CAPACITY COST QeO  %/YR COrePAf4Y 6 NO SPIHHINO RESERVE Cf?EOIT ErrERGY COST 0 ' AHKAI 4 FORCED OUTAGE RATEI 0 ' YEAR JAN FED HAR APR HAY JUN JUL AUO SKP OCT NOV OEC CAPACITY rr v, 2~ 2~ 2~ 2~ 2~ 2~ 2~ 2~ 2~ ~ 2~ 2~ 0 5/too 0~0

                                       ']0            0~0
                                                    '5]        OoQ         0 '        0~0         0 '           0~0        0 '      0 '          0 '            0   0       0 '

ENERGY G~tr 5/tr <<N To2 0 3e78 0 3 '8 0 ~ 610 3e78 0 '90 3o78 0e 610 3o78 0 '90 3 '8 0 ~ 610 3 ~ 78 0 ']0 3 '8 0 '90 3o78' 0 '10 0 '90 3e78

                                                                                                                                                                  ~

0o 610 3e 78 F 78 0 HECIIYL HYDRO RUN OF RIVER PREFERRED SUBPERIODI HONE ESCALATION RATESI CAPACITY COST 0 ~ 0 %/YR COMPAtr Y 5 NO SPINNING RESERVE CRED]T ENERGY COST 0 ' ARFAI 4 FORCED OUTAGE RATEI Qo'% YEAR JAN FER HAR APR HAY 'UN JUL AUO SEP OCT NOV DKC CAPACITY Hrr 3~ 3~ 3~ 3~ 3~ 3~ 3~ 3~ 3~ 3~ 3~ 3~ 0 5/tlN G":tr 0~0 683 QoQ 0 ' QeQ QoQ 0 ' 0 ' 0 ' 0~0 0 ' QoQ 0 ' ENERGY 19e 8 520 683 le629 lo683 629 683 ]o683 1,629 683 ] ~ 629 683

             $ /H<4H 1 ~

3 '8 1 ~ 3s78 1 ~ F 78 3o78 3o78 1 ~ 3 '8 1 ~ 3 '8 3 '8 3 ~ 78 1 ~ F 78 3 '8 1 ~ 3e78 SUGAR STORAGE trYDRO PREFERRED SUGPERIODI NONE ESCALATION RATESI CAPACITY COST 0 '  %/YR COHPANY 5 NO SPINNINO RESERVK CREDIT ENERGY COST 0 ' AREA I 3 FORCED OUTAGE RATEI 0,% YEAR JAN FE'8 HAR APR HAY JUN JUL AUG SEP OCT NOV DEC CAPAC I T Y tt.t 4 ~ 4~ 4~ 4~ 4~ 4~ 4 ~ 4~ 4~ 4~ 4~ 4~ e $ /tr'ot 0 0 0 ' 0 ' 0 ' QeQ QsO 0 ' 0~0 QoQ 0 ' 0 ' 0 ' ENERGY G'~tr 25 ~ 4 2 ~ ]56

                                           ~

1 ~ 947 2 ~ 156 2 '87 2 ~ 156 F 087 '56 2 ~ 156 2 '87 2 ~ 156 F 087 2 ~ 156 G 5/H'rtr 3 ~ 78 3 F 78 3 ~ 78 3o78 3 '8 3 '8 2 3 '8 3 '8 3 '8 3 '8 F 78 F 78

ttRC INTERROGAT)RY ON NINE SILE PO)t~T NUCLEAR UtilT NO.2 ENERGY NAftAGEHEtlT ASSOCIATESt INC PAGE 37tt ITEH AU ~ E 320 ~ ) )D) REPT 9 OPTION 3 SUBREPORT 05/)3/83 ooo<<ooo<<oo TRAttsACTIONS IttPUT SUoeHARY F'R )986 Ooooaoaao<< SGLEtiF HYDRO ttUtt OF "RIVER PRFFERRED SUBPEttIGD) NONE FSCALATIOtt RATESI CAPACITY COST 0 ~ 0 %/YR COtopANY NO SPINHIteG RESERVE CREDIT Et)ERGY COST Oen AREA) FOPCED OUTAGE RaTE) 0 % YEAR JAN FEB teAY JUN JUL AUG SEP OCT NOV OEC CAPACITY I"ot 4~ 4e 4~ 4e 4~ 4 ~ 4~ 4~ 4~ 4~ 4~ 4 ~ 0~0 0 ' Oo0 Oon 0~0 0~0 0~0 0~0 0~0 0~0 0~0 0~0 823 )e646 823 764 823 764 823 ) ~ 823 764 1 ~ 823 764 ) F 823 S/No'NERGY G~r 21 ~ 5 S/eeet tt 1 ~ 3 '8 F 78 1 ~ 3 '8 1 ~ F 78 1 ~ F 78 1 ~ 3o78 1 o 3e78 3 '8 1 ~ F 78 F 78 1 ~ F 78 3 '8 HAOLEY HYDRO RUt< OF RI VER PREFERRED SUBPERIODt NONE ESCALATION RATESI CAPACITY COST 0 ~ 0 %/YH CORP At> Y 5 NO SPINNING RESERVE CREDIT ENERGY COST 0.0 APEA) FORCED OUTAGE RATE) 0 ' YEAR JAN FEB HAR APR teAY JUN JUL AUG SEP OCT NOV DEC CAPACITY Nii 0~ 0 ~ 0 ~ 0 ~ 0~ 0 ~ 0~ 0~ 0 ~ 0~ 0~ 0 ~ 9 $ /NW 0~0 Oon Ooo 0 ' 0~0 Oe0 .Oon 0~0 Oon 0~0 0~0 Oen ENERGY Gt:H 0~0 ' ' Oen 0 ' 0~0 0~0 Oen Oon 0~0 0~0 0~0 0~0 S/N/H 0 3e78 0 3i78 3 '8 3e78 3 ~ 78 i~ 3 '8 3 '8 3 '8 3 '8 3e78 3 '8 3 '8 FLTNLS HYURO RUN-OF RIVER PREFERRED SUBPERIODI NONE ESCALATION RATES I CAPACITY COST 0 ~ 0 %/YR COtoFAttY 5 NO SPItiNIttG RESERVE CREDIT ENERGY cosT 0.0 AREA! 3 FORCED OUTAGE RATE) Oe% YEAR JAN HAR APR l4AY JUN JUL AUG SEP OCT NOV OEG CAPACITY t>l 0 ~ 0 ~ 0 ~ 0~ 0 ~ . 0 ~ 0~ 0, 0~ 0~ 0~ 0 ~ .0 S/t lt 0 ' Oon 0~0 Oon 0 ~ 0' 0 ~ 0 0 ' 0~0 0 ' 0~0 0~0 Oen EtlERGY Goh ' nen 0 ' 0,0 ' 0~0 0~0 S/te'e H 0 3 '8 3 '8 3.78 0~0 3 '8 ~ 0 F 78 0 ~ 0

                                                                                                                ',78 0

F 78 3 '8 0~0 3o78 0 ~ 0 F 78 0~0 3e78 3 '8 LQ

lRC INTERROGATORY oN NlhE MILE POINT NUCLEAR UIIIT tl0,2 EtlEROY ttnttAOEMKNT ASSOCIATESI INC 379 ITftl Noe K 320o1 IO) REPT 9 OPTIOte 3 SUBREPORT 1 05/13/83 4O444oooooo TRANSACTIONS INPUT SUtel ARY FOR 1986 ooooooooooeoo4 SHRetl SL STORAGE HYDRO PREFERRED SUBPKRIODI NONE ESCALATION HATES I CAPACITY COST 0 0 I/Ytt CotepnteY 5 tlo SPINMItlO RESEleVE CREDIT ENERGY COST O.O AREA I 4 FORCED OUTAGE RATEI 0~ I YEAH JAN FEB MAR APR HAY 'UN JUL AUO SEP OCT NOV OEC CAPACITY S/Hot 29

                                          'eo 29
                                                    ~

0 29

                                                                 'oo 29
                                                                           ~

0 29o 0~0

                                                                                            '9e Iii      0 ~ 0 29e 0 '

29

                                                                                                                             ~

0 29

                                                                                                                                       ~

0 29 ' 0 29

                                                                                                                                                                    '       29
                                                                                                                                                                              ~

0 ENERGY O h 152e4 12 '46 11 693

                                                 ~      12 '46       12 '28      12 '46:"'2e528            12e946     12  '46    12 '28      12 '46
                                                                                                                                                   ~

12 ~ 528 12 '46 S/et'Ktt 3o78 3e78 F 78 3e78 F 78 3 '8 3e78 3 '8 F 78 F 78 F 78 3o78 HIDAM STORAGE HYDRO PREFERRED SUBPERIODI NONE FSCALATION HATKSI CAPACITY COST 0 ~ 0 %/YR CO<<PnMY NO SPINNINO RKSERVE CREDIT ENERGY COST 0~0 AREAI 2 FORCED OUTAGE RATEI 0~% YEAR JAN FEB HAR APR MAY JUN JttL AUO SEP OCT teOV DEC CAPACITY 6e 6~ 6~ 6~ 6~ 6e 6~ 6~ 6e 6~ 6~ e. 6 S/Hw Oeo 0~0 0 ~ 0 Oeo 0~0 0~0 0 ~ 0 0~0 0~0 0~0 0~0 0~0 ENERGY O:Srl 26 ~ 3 2 '32 2 '16 2 '32 2 '60 2 '32 -F 160 2 '32 '32 2 ~ 160 '32 2.leo '32

           $ /ttÃH                   3 '8        3 '8      3 '8         3 '8        F 78         F 78         3 '8      2 3o78      3 '8      2 3o78          3  '8     2 3e78 0

VARICK STORAGE HYDRO PREFERRED SUBPERIOD I NONE ESCALATION RATES I CAPACITY COST 0~0 I/YR 0 COMPANY AREAI 5 NO SPINNINO RESERVE CREDIT ENERGY COST O.O 2 FORCED OUTAGE RATEI oe> YEAR JAN FEB HAR APR HAY JUN JUL AUO SEP OCT NOV OEC CAPACITY tiet 5~ Se 5~ 5~ 5~ 5~ 5~ 5~ 5~ 5~ 5e 5~ e S/hot ooo 0~0 0~0 0~0 0~0 0~0 0 ~ 0 n,o 0~0 0~0 0~0 0 ~ U EtlERGY Oeh 21o9 le860 1 ~ 680 1,8eo 800 860 800 '60 860 800 I ~ 860 I ~ 800 860 S/t~.ih 3o78 F 78 F 78 1 ~ F 78 1 ~ 3 '8 1 F 3e78 1 3 'B 1 ~ 3 '8 1 ~ 3e78 3 '8 3 '8 1 ~ 3 '8

NRC INTERROGATORY ON NINE NILE POINT NUCLEAR UNIT NO,2 ENERGY HAIIAGEHENT ASSOCIATKSI INC PAGE 380 ITEN NO ~ E 320 ~ I {0) REPT 9 OPTION 3 SUBREPORT I 05/13/83

                                               >>>>>>>>>>>>>>44>>    TRANSACTIONS lttPUT SUHHARY FOR 1986               4<<>>4>>>>4>>>>

HlrtKTO STORAGE .'IYDRO PRFFERRED SUBPERIODI t<ONK ESCALATION RATESI CAPACITY COST 0 '  %/YR COrePANY r!0 SPINtoING RESERVE CREDIT ENERGY COST 0 ' aRF.A I FOPCED OUTAGE RA7EI 0 5 YEAR JAN FEB HAR APR HAY JUN JUL AUG SEP OCT NOV OEC CAPAC I T Y t'it 8~ 8~ 8~ 8~ 8~ 8~ 8~ 8~ Be 8~ 8~ 8~ e $ />'pit Oe0 0 ' 0~0 0~0 Oe0 0 ' 0 ' 0 ' 0 ' 0 ' 0 ' 0 ' EttERGY GMrt 32 ' 2 '90 2o520 2 '90 2 '00 2 '90 2o700 2 '90 2 '90 2e700 2 '90 2 '00 2 '90 I!/8'w tt Je78 3 '8 3 '8 F 78 3o78 F 78 F 78 3 '8 3 '8 3 '8 F 78 3 '> 0 FULTOt~ STORAGE tlYDRO PREFERRED SUBPERIODI NONE ESCALATION RATESI CAPACITY COST Oe0 %/YR e COMPANY 5 NO SPINNING RESERVE CREDIT ENERGY COST 0 ' AREAI 2 FORCED OUTAGE RATKI Oe5 YEAR JAN FEB HAR APR HAY JUN JUL AUG SEP OCT NOV DEC 1 ll CAPACITY !itt le lo le le le j; 1 ~ le le I~ le 1 ~ 1 ~ 0 5/rt et OoO 0~0 0 ' Oe0 0 ~ 0 ",I 0 ' 0 ' 0~0 0 ' Oe0 OeU 0 ' ENERGY Gi:tt 0 '72 0 '36 0 '72 0 '60 '72 '60 0 '72 '72 0 '60 '72 '60 '72 5/H!tg 3 '8 3 '8 3 '8 3 '8 0 F 78

                                                                                                          >a    0 3e78        F 78 0

3 '8 3 '8 0 3~ '78 0 3 '8 0 3e78 FEEDER STORAGE HYDRO PREFERRED SUBPKRIOD! NONE ESCALATIOti RATESI CAPACITY COST 0 ~ 0 %/YR COt<PANY 5 NO SPINNING RESERVE CREDIT KNERGY COST Oe0

               /Haiti                 AREAI      q                       FORCED OUTAGE RATEI          0~   I YEAR             JAN        F EII     HAR                    HAY               JUN         JUL         AUO      SEP        OCT            NOV         DEC CAPACITY                                              5~          5~        5~          5~         5~                5e                      5~       5~         5~             5~          5~

~ 0,0 0~0 0 ' Oe0 Oo0 .- 0 ' 5e'o0 Go0 0 ' 0 ' 0 ' 0~0 5/Nr,'NERGY Ge! ei 20el 711 546 711 656 le711 i! I ~ 656 le711 711 656 711 1,656 I ~ 711 1 ~ 3 '8 1 ~ 3e78 1 ~ 3 '8 1 ~ 3 '8 3~ 78; '; 3e78 3 '8 1 e 3e78 1 ~ 3 '8 1 ~ F 78 3 '8 F 78 I e

IRC INTERRCOA!ORY ON NINE HILE POINT NUCLEAR UNIT t!0 ~ 2 ENERGY t'.AIIAGEHEtlT ASSOCIATES I INC 381 ITEH toO ~ E 320 ~ 1 (U) REPT 9 OPTION 3 SUBREPORT 1 05/]3/fI3 4444444~+4 TRANSACTIONS IIIPUT SUteHARY FOR ]986 4444444444 OS If'-8 STORAGE HYDRO PREFERRED SUBPERIODI NONE ESCALATION RATESI CAPACITY COST 0 ~ 0 %/YR COHPANY AREAI 4 5 NO SPINNINO RESERVE CREDIT ENERGY COS7 0 ' FORCED OUTAGE RaTE> 0.% YEAR JAN FEB HAR APR HAY ! JUN JUL AUG SEP OCT NOV OEC Ho' lo lo CAPACITY 1 ~ 1 ~ ]~ 1 ~ 1 ~ 1 ~ 1 ~ 1 ~ 1 ~ 1 ~ S/H8 0 ' 0 ' 0 ' 0 ' Oo0 0e0 Oo0 Oeo 0 ' 0 ' 0 ' 0 ' ENERGY O>H 2e 2 0 186

                                            '8       0 ~ 168      0   186
                                                                      '8       0   180        ]86      0 '80       0   186     0   186      '80        0   186        Oe]80       0   186
                                                                                   '8                                  '8
                                         ~

S/HHH 3 F 78

                                                                    ~

3 F 3 OS 3e78 3 F 78

                                                                                                                     ~

3

                                                                                                                                 ~

F 78 0 3 '8 ~ 3 ~ 78 3e78

                                                                                                                                                                                    ~

F 78 VERHONT SALE UNSCHEDULED PREFERRED ]SORYSUBPERIODI tlONE ESCALATION RATES I CAPaclTY GOST 0 ~ 0 %/YR COHPA!IY 8 RESERVE DEBITED ENKROY COST 0 ' AREAl 20 FORCED OUTAGE RATEI 0,% YEAR JAN FEB HAR APR HAY JUN JUL AUO SEP OCT NOV DEC ~

                                                                                                                                                                                                ) \

CAPACITY H>> 150o 150 ~ 150 ~ 150o 150e 150 e ]50 ~ 150 ~ 150 ~ 150 ~ 150 ~ a S/Hd 0 ' 0 ' 0 ' 0 ' Oo0 0 ' 0 ' 0 ' 0 ' 0 ' 0 ' 0 ' ENERGY G~H 845,0 71.767 64e821 71 ~ 767 69 '51 71 ~ '767 69 '5] 71 '67 7]eT67 69 '5] 71 ~ 767 69e451 71 ~ 767 0/t'YAH !I ~ 0 0 0~0 Oe0 0 ' 0 0 0 Oi0 0 ' Oe0 0 0 AHP OHIO SALE UNSCHEDULED PREFERRED SUBPERIODI, NONE ESCALATIOtl RaTESI CAPACITY COST 0 ~ 0 %/YR COHPAtl Y 8 RESERVE DEBITED Et<ERGY COST 0 ' aREAI 13 FORCED OUTAGE RATEI 0 ' YEAR JAN FEB HAR APR HAY JUN JUL AUG SEP OCT HOV DEC CAPACITY i 23 ~ 23 23 ~ 23 ~ 23 ~ 23 ~ 23 ' 23 ~ 23 ~ 23 ~ 23 ~ 23 ~ S/t Oo0 'o0 0 ' 0 ' 0 ' 0 ' ' O,n 0 ' 0 ' Oo0 0 ' ENERGY O4H 147 ~ 1 ]2 492

                                         ~          ]1 ~ 283     ]F   492     12 ~ 089   12 ~ 492     12 ~ 089    ]2o492      ]2 '92     12 ~ 089     12 ~ 492       12 ~ 089    ]2 ~ 492 S/Ho! H                        PE 0
                                                      '0 ~ 0        0 '          0 '        0 '          0 '         0 '         0 '        0 '          Oe0            0 '         0 '

I t Q i

tRC INTEPPOG-TORY Or'llis. tiILE POIrit ~UCLt.wR UNIT t 0,2 ENERGY t tat AGEr Eh I ASSOC I A TES t Ir~c PAGE 38f it( 'Or E. 32V ~ I IO) REPt 9 OPTIOtt 3 SUGREPORT 1 05/13/53
                                 <<<<<<<<oo       TRA   <<ACtlOttS I;.Pt.'T   SL~t4ARY FOR Ict86 o444o444+0 ttl 8>'F ALL            rf YL'- 0     <v;-Oi -rl Yti               f PRE LRRLt ~ SuRPF.P IOOr         rtOt'L            EscALATlott RATEsr cAPAcl'IY cosT             0 ~ 0 %/YH RESERVE. CRE(iITEO                                                             EriERGY COSt      Oo0
                       ~~'c~   r  Iv                       FGPcf.u o<<l>GE PATEr             0 '

1 E: ". FE'i 1'} H zPR Jijr~ JUL AUG SEP OCT i<OV OEC CAPACITY 2~ 4~ Sr 5~ 3~ I~ Ie 0 ~ Io I~ 2~ 3~ 1/( ~ 0 ' Oi0 0,0 0 ' 0 ' Oe0 0~0 0~0 Oo0 0~0 0 ' EtlERGY IJo2 VS 0 I.dVV Ge>0' 2g700 3 '00 2 ~ rt00 0 'VV 0.300 0.100 0 '00 0 ~ 100 0 '00 1 ~ 600 g/ss ir VS 0 ~ V rt Vov 0 ~ rt v~0 VS 0 0 ' VS 0 Oo0 VS 0 0 '

~C Ill]CI?ROG'OW't rtl>t ~ ILE PO]ttT ?rUCLCAW ultlT "IO,2 ENEi?GY NtaNAUEllErlT ASSOCIaTESt ltlC PAGE. 38V I TE" t"r.'. E 3? r. 1 IU) REPT 9 OPl'IOtl 3 SUBREPOI?I 1 05/]3/83 ooooooOooo Tttlt SACT]ultS ]lop!IT St t>>tAt?y FOR ]986 oooooooooo
                                                                                                    ~

et I TCtlELL. p tt'C~ tgF >cwW 5' AVI ni PAL? EH>>cfr SuttrEI?I;pl efEtCUAT ESC>L>TION I?ATESI CAPACITY COS'T 0 ' 0/YI? C,t.,oc, IT RESLP VE C>>r.tt I TEO EtlERGY COST 0 ' vqtcl ]2 I Ot CEtr OIt)rIGL Rc Tc I 0 ~ Ie Yf 't<<" lid t? AVH l? AY JtlL AUGt OCT NOV OEC CA>ACITY 3 32. 32 3? 32 ~ 32<< 32<< 32e 32 ~ 32 ~ 32 ~ l /I' tl ~ Ir  :) ~ 0 3'.0 'S v 0 ~ tt

                                                                                                                      ~

0 ~ G AU 0<<0 0<<0 0 ' 0 ' 0~0 Et)ERGT It:Yeti 15 ~ VS] 14 o 4<<)R 15<<95] ]5<<437 15<<95] 15<<437 15 ~ Vb] 15<<95] ]5 ~ 437 15 ~ 951 15 ~ 437 15<<951 s /" ~ l- e A J~4 n ~ II 0 ' 1 ~ 0 V,0 0 ~ 0 0<<0 0 ' 0~0 0 ' 0 ' t?ECda-.] C teT:>>rtr rU"-t)i-RI<<Ct'. PRFFEraCT'UBVERIOCI rlGNE CSCcLATIOtc RATESI CAPACITY COST o ~ o 4/YR Cl' ttt~ T f?ESER<<E CREDITEO ENERGY COST 0 '

                                      ~; 5:. I                                     FORCEO I>!ITAGE RATEI             0  ~ %

YE r.e. J te f c.ll teA<<? APP, <<IAY JU<<t JUL AUG SEP OCT NOV OEC CAPACIT<<  :~: ].o 17 ~ 17 ]7o 17e 17 17 ~ 17 ~ 17 ~ 17 ~ 17 ~ 5/r van 0 ~ ll 0 '

                                                                                          ~

0 ~ ll n,0 0 '

                                                                                                                                      ~

0 ~0 0~0 0 ' 0 ' ' 0]GAL 0 ' G .rt

                     't'?lERGY YS ~     I       F 010          PE 260     11 ~ 940     12 ~ 50IG    ] ]oR]0            6 '0v         F 000       4 '00        4 '00          5<<360           6 '50        9 '50 I,/l. Cro                                  I ~ 82         1<<63        1 ~ 84       I ~ 85       ]o87              I ~ 88        ]<<TED       i<<76         1 ~ 77         ] ~ 78          1 ~  79      1<<81 OLt?-nYtr]                            et YO~U            r.'" -OF-R I VE<<           PREFEV<<EO SUPPERIOOI              rtGrtC                ESCALATION RATFSI CAPACITY COST                   0 ~ 0 %/YH C 0   "P r!t)Y                                RESERvE CPEOITEO                                                                     ENERGY COST          0<<0 A~. Al                                        FORCEO vUTAGE. RATE)              O.S YFAi                                 ?  El)                                                  Jllto         JUL         AUG          SEP            OCT             NOV          OEC CAPACITY                                                                  I lr'            '       ]Ve           ] t<< ~           ]Go           ]0 ~        10o          10  ~          10 ~                         10  ~

ENERGY c/"w

             <</>>;

8't

                   ~       f
                                     <<7 en            7 o e!
                                                            )o0 rort?t
                                                            <<9v b<<721 2~

9I'0'40'n rr ~ n 7 2

                                                                                       ~  tt      0  '
7. 20'.)

2 '0 0 7,44n 2 ~ 90 7 Ir

                                                                                                                               '00 2on0
                                                                                                                                    ~ 0        0 7<<440 2 ~ 9lt     2 0

7<<440

                                                                                                                                                           '0 2

0~0 7.200

                                                                                                                                                                        '0         7 2

0

                                                                                                                                                                                     '40
                                                                                                                                                                                       '0 7 '00 2

0

                                                                                                                                                                                                        '0
                                                                                                                                                                                                          '         0<<0 7 ~ 44?]

2 ~ 90

l ~o ~ t<RC INTEteRQGATVHY ON NIotK teILE t'OINT NUCLR.AR ut>IT NO ~ 2 ENERGY NANAGEHENT ASSOCIATES> INC PAGE 39y IIKc< fiOo E 32V ~ 1 {0) REPT 9 Oi TION 3 SUBREPORT 1 05/13/83

                                       <<<<<<<<<<<<<<<<>> TRAi.SACTIO>>S               INPUT SUHNARY FOR 1986 <<4<<<<<<<<<<4<<<<

RF PSI: P',>BI .iAS<< PEAK SHAVliiG PREFFRREO SUB>ERIOPI tiKEKOAY ESCALATIOtt RATES I CAPACITY COST 0 '  %/Ytt 1 COiipAei'Y RESERYE CRKOITEO ENERGY COST 0 ' APE~I 26 FURCEO OUTAGE, RATEI 0 ' YK<R JAN FEB BAR APR tiAY Juti JUL AUG SEP OCT NOV OEC CAPACI f Y 10e 10o 10o 10o 10 ~ lV ~ ln. 10o 10e 10e 10 ~ 10e

                /Iel                           Q,n          0 '          0 '         Ii ~ 0        0~0             0~0          0~0        0   0      0~0             0 '            0   0       Oe0 EIIERGY 1

G~'rl Sc e7 4 '/5 4 '02 4 '85 F 824 4 '85 4 '24 4 '85 4e985

                                                                                                                                             ~

4 '24 4 '85 4 '24

                                                                                                                                                                                       ~

4 '85 SI /R et ti v~0 OoO Oen n,n 0 ' 0~0 0~0 Van Oen 0~0 0~0 0 SOL IOUS T PURCt.ASt, +4'<K SN<vlitG PHFFKRRKO SUBPERIOOI I EEKUAY ESCALATION RATESI CAPACITY COST 0 '  %/YR COBPAti Y 2 RESERVE CREOITEO ENERGY COST 0~0 AREA I 25 FORCEO OUTAGE RAYEI Qe% YEAR JAN FEB ttAR APR HAY JUN JUL AUG SKP OCT NOV OEC CAPACITY Soe 50 50 ' 50 50 50o 50 ~ 50 ' 50 ' 50 ' 50 ' 50 ' 6 /';<Tr VS 0

                                                                '.0
                                                                           '              'eO           'oO an           0 ~ V        ~ 0        ~ 0             ~ 0            ~ 0         ~ 0 Et!KRGY          Go  ti      293o5        2~ A 924      22eb12       2<<o924       24e120       24 '24          24 F 120     24e924     24.924     24 ~ 120        24 '24         24 ~ 120    24 ~ 924-e,/tei                            'Z ~

I'i 0 ' n.n 0~V 0.0 0 ~ 0 0~0 QeO 0 ~ 0 0~0 0~0 0~0 INDWRPitS HYDnti RUN-OF RIVER PREFERRED SURPERIOOI NONE ESCALATION RATESI CAPACITY COST 0 '  %/YR COi~fe NY 4 RESERVE CREOITEO ENERGY COST 0~0 iiREA I 19 FoORCEO OUTAGE RATE I 0 ' YK R JAN FEB NAR APR tiAY Jutt JUL AUG OCT NOV OEC CAPAC1TY 7 ~ 7 ~ Te 7 ~ 7 ~ 7 ~ 7 ~ 7 ~ 7~ 7 7~

             $ /o:>>                            Oon          0 '          0,0         Oo0           0~0             Oeb          0 '        0   0      0 '             0~0            0 '         0~0 34 ~ 2       2e774         2 ~ 529        '56        4o]IIB       4 '68             '63        2 '41      2 '53
                                                                                                                                             ~
                                                                                                                                                    '16           2 '76          2 '21       2 '65 ENERGY           Gi
          $ /i..e te r                       2  '4         2 '6       3 2 '7        2 '9          2e31 2

2 '2 2 '4 2 '5 1 2 '7 2 '8 2 '2 2 '3

1987

V ll ~ ~ l1>>>>>>OVV h NRC INTERROGATORY ON NINE HILE POINT NUCLEAR UNIT NO. 2 ENERGY $ 5AGEHENT ASSOCIATES, INC. ITEH NO. E 320.1 (D) REPT 9 OPTION 3 SUBREPORT 2

                                   *****INPUT          HYDRO ENERGY ALLOCATION FOR       1987  *****

UNITS (GWH) PLANT NAHE UNIT 8 YEAR JAN FEB HAR APR INY JUN JUL AUG SEP QCT NOV DEC NIAGF IRH BYLAW NIAGPEAK 3443e 437 37 '4 '87e

                                                         '73e              302
                                                                               '6,           296 37
                                                                                                    '7 283e 36 279 37e
                                                                                                                                        ~   288
                                                                                                                                                 '7e 278   '93
                                                                                                                                                              '37 37e  '6, 278
                                                                                                                                                                                       '7
                                                                                                                                                                                       '91
                                                                                                                                                                                       '1S
                                                                                                                                                                                              '6 NIAGPEPL
                                     '95                     284                   304,      315 ~                               315e       315         304        315
                                                                                                    '15                                                                                       '04
                                      '705 e
                                                                   '15
                                                                   ~           e
                                                                                                                       '04e
                                                                                                                                                              ~           ~                   ~

NIAGEAPN NIAGPSNY ST 4i88. 6645.

                                      ~
                                      '611 137. ~

491 e

                                                         ~

124 307e 468

                                                                  '10
                                                                   ~

137 e 407e 132 ~

                                                                               '48 '79 '

182 ~ 137 329

                                                                                                   ~
                                                                                                   '24 132
                                                                                                                      '49
                                                                                                                      '66e 137 602
                                                                                                                                       '57e
                                                                                                                                                '37
                                                                                                                                                '09
                                                                                                                                                '11.

132

                                                                                                                                                              '67  577
                                                                                                                                                                         '83
                                                                                                                                                                         '81, 132e 468  '20 137e
                                                                                                                                                                                       '39    '59
                                                                                                                                                                                              ~

ASNOKAN 25e 2~ 2~ ~ 2~ 2~ 2e ~ 2~ 2~ 'e 2~ 2~ KENSICO 22 2~ 2~ 2~ 2~ 2~ 2~ 2~ 2~ 2~ 2~ 2~ 2~ DELTA 'ne 1 ~ le 1 ~ 1 ~ 1 ~ 1 ~ 1 ~ le 1 ~ 1 ~ 1 ~ 1 ~ HINCKLEY 31 ~ 3~ 2~ 3 ~ 3~ 3~ 3~ 3~ 3~ 3~ 3~ 3~ 3~ CRESCENT 22 2~ 2~ 2~ 2~ 2~ 2~ 2~ 2~ 2~ 2~ 2~ 2~ WATERFRD '6e le le 1 ~ 1 ~ 1 ~ 1 ~ 1 ~ 1 ~ 1 ~ 1 ~ le 1 ~ V I SCHER 24 2~ 2~ 2~ 2~ 2~ 2~ 2~ 2~ 2~ 2~ 2~ 2~ INPUT UNIT PARTICIPATION SALES PERCENTAGES SOLD FOR 1987 4ee+4 PLANT NAHE UNIT 4 JAee FEB NAR APR NAY JUN JUL AUG SEP OCT NOV DEC OSWEGO 0~0 0 ~ 0 0~0 0 ~ 0 0~0 0~0 0 ~ 0 0 ~ 0 0~0 0~0 0~0 0 ~ 0 OSWEGO n,O O,o O.O O,O O.O O.O O,O O.O O.O O.O O,O O,O

NRC INTERROGATORY ON NINE'ILE POINT NUCLEAR UNIT NO ~ 2 ENKRGY MANAGEMENT ASSOCIATESt INC PAGE 43> ITEM BIO ~ E 320 ~ 1 {O) REPT 9 OPTiON 3 SUBREPORT I 05/13/83 rt<rtrtrto<<tttt TRANSACTIONS INPUT

SUMMARY

FOR 1987 OHKCONI PURChASE PEaK SH4YING PREFERRED SUBPERIOOI NONE FSCALATION RATESI CAPACITY COST OeO %/YR COrrPANY 0 RESERVE CREDITEO ENERGY COST 0~0 4REAI 1 FORCKD OUTAGE RATEI 0~5 YEAR JAN FEB HAR APR HAY JUN JUL SEP OCT NOV OEC CAPACITY Hrt 0 0 0 ~ 0 0~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~

          $ /HW                             0
                                                ~

0 0 '

                                                              ~

0 ' 0 '

                                                                                      ~

0 ' 0 ' 0 ' 0 ' 0 ' 0 ' 0 ' 0 ' ENERGY GWH 0 ' 0 '

                                              ~

0 ' OeO 0 ~ 0 OrO OrO 0 0 0 0 ' 0,0 OeO 0 '

        $ /MWH                            0 '           0~0          0.0        0 '            0 '          0 '             0.0        0             OrO          0 ~ 0          0 ~ 0       0 ~ 0 INTERCHANGE ACCQUttT lia6 I PRICING OPTION                    I     B                     COMP OWNERSHIP         COMP OWNERSHIP             CO:1P   OriNERSHIP     COtIP OWNERSHIP        COMP OWNERSHIP OISPLACKHENT COST                       50 ~ 0 FIXED COST INCREASE. I -13 ~ 3 $ /t<WH SAYINGS FIXED SPLIT I 100 ~ 0 PRIORITY ORDER                          7        REPORTING OPTION I                 4CCOUNTING OPTION I             I 4

OHKCON2 PURChASE PERK SHAY IIIG PREFERRED SUBPKRIOOI NONE ESCALATION RATESI CAPACITY COST 0 ~ 0 %/YR COMPatIY 0 RESERVE CREOITEO ENERGY COST 0 ' APEAI 1 FORCEO OUT4GE RATE'I 0 ' YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV OEC CAPACITY 0 0 0 Qe 0 0 0~ Oe 0 ~ 0 ~ 0 ~ 0 ~

           $ /HW                            0 ~
                                                ~

0 0.0

                                                              ~

0 ~

                                                                           ~

0 0 ' 0 '

                                                                                                     ~

0 '

                                                                                                                  ~

0~0 0 ' 0 ' .OeO 0 ' 0 ' ENERGY Gwh 0~0 0 ~ Q. 0 ' 0~0 0 ' 0 ' 0 ' 0 ' 0 ' 0 ' OrO 0 ' 0 ~ 0

        $ /telr ti                        0~0           0 ~ 0        0 '        0 '            0 '          Qe0             OeO        0 '           0 '          0 '            0 '         0 '

INTERCHANGE ACCOUNTING I PRICING OPTION 8 COMP OtiNERSHIP COMP OWNERSHIP COMP OWNERSHIP COMP OWNERSHIP CQHP OWNERSHIP OISPL4CEHKtIT COST I 50 ~ 0 FIXEO COST INCREASE 15 ' $ /MWtI 54VINGS FIXEO SPLIT 100 ' PRIORITY ORDER I 6 REPORTItiG OPTION ACCOUNTING OPTION

0 ttRC INTERROGATORY ON NINE ttILE POItkT NL'CLEAR UNIT NO ~ 2 ENERGY ttAtthGEt<ENT ASSOCIATES> INC PAGE 43te ITFt" t<oo E 320 ~ I (D) REPT 9 OPTION 3 SUBREPORT 05/13/83 leoeet'oeeooo4 TRANSACTIOtlS INPUT SUtiNARY FOR 1987 oooo>oeeeeo4 NVRSK H'Y STORAGE t YORO PREFERRED SUBPERIODt 'WEEKDAY ESCALATIOtt RATESt CAPACITY COST 0~0 I/YR COHPANY I RESERVE CREDITKD ENERGY COST OeO AREAt 10 FOPCED OUTAGE RATEI 0 ' YEaR JAN APR NAY JUN JUL AUG OCT NOV OEC CAPACITY tilt 27 ' 27e 27e 27e 27 27e 27 ' 27e 27 ' 27 ' 27 ~ 27e 0 5/Nd 0 ,OeO 0~0 0 ' 'eo 0 ~ 0 ~ 0 Q.o ~ 0 ~ 0 0~0 0 ~ 0 ENERGY GÃH 60e7 3 '00

                                                  ~

3 '00 F 000 2 '00 4i300 4 '00 7.OOO 8.1OO 8 ~ 600 6e400 F 800 4 '00 5/vv'H 15e 00 15o00 15 F 00 15 ~ 00 15 F 00 15eoo 15.oo 15e 00 15 F 00 15 ~ 00 15 F 00 15 ~ 00 I i >ISC"HY HYDRO RUN OF RIVER PREFERRED SUBPFRIGDt NONE ESCALATION RaTES> CAPACITY COST O.O %/YR

 .Q                            COMPANY                              RESERVE CREDITED                                                           ENERGY COST        0~0 AREAI      10                        FORCED OUTAGE RATEt          0    'll YEAR              JAN        FEB        HAR         APR        NAY              JUN         JUL         AUG      SEP          OCT             NOV         DEC CAPACITY                                    4~         4~         4~          4~         3~               3~          3e          3~      3~            3~              4~          4~

Q 5/Net 0~0 0~0 0~0 0~0 Ooo Oeo 0~0 0~0 0~0 0~0 0 ~ 0 0~0 ENERGY GNH 16e2 1 ~ SQO 1 ~ 700 2 ~ BQO 2 '00 I F 800 0 '00 0 '00 0 F 500 0 ~ SOO 0 '00 1 ~ 400 I ~ 600 S/l4ÃH 0~0 0~0 0 ~ 0 0 ' Ooo Oeo 0 ~ 0 0 ' 0~0 0 ' Ooo 0 ~ 0 ,'e STURGEOtt STORAGE HYgRO PREFERRED SUBPERIODt ttEEKDAY ESCALATION RATESI CAPACITY COST  %/YR

;I                             Cot"'PAttY AREAt      10 1                     RESERVE CREDITED FORCED OUTAGE RATEl          0    '

ENERGY COST 0 0

                                                                                                                                                                    ~

0 YEAR FEB HAR APR ttAY JUN JUL AUG SEP OCT NOV OKC

l CAPAC I TY Nlt 15e 15 ~ 15 ~ 15o 15 ' 15 ~ 15 ' 15 ~ 15 ~ 15 ~ 15 ~ 15 ~
    ~             S/Hee                         0 '        0~0        0~0         Ooo          ~ 0            0~0           ~ 0       Oeo      Oeo          0~0             0~0         0~0 I

EttERGY GltH 51oB 4e900 F 800 F 100 8 '00 5 '00 1 F 800 1 '00 1 ~ 800 1 ~ 600 2 '00 4 '00 5 ~ 2QO 5/tiltH 0~0 0 ' 0~0 0~0 0,0 0~0 0~0 0~0 0~0 0~0 0~0 0~0 Iy

NRC INTERROGATORY ON NINE HILE POINT NUCLEAR UNIT tiO ~ 2 ENEetGY 'lANAGEthENT ASSOCIATES t INC PAGE 437 ITEH NOe E 320el tO) RFPT 9 OPTION 3 SUBREPORT 1 05/13/83

                               <<>>>><<>>>>>>>>>>>>       TRANSACTIONS It>PUT SUMHAttY FOR 1987 DIER HYD2             STORAGE     HYDRO                   PREFERRED SUBPERIODt               ttOttE               ESCALATION RATESI CAPACITY COST                  0 '    W/YR COIIPANY    6                       RESERVE CREDITED                                                                     ENERGY COST         0~0 AREAl    ]I                         FORCED OUTAGE RATEt                0  ~
                                                                                                 !1 I

CAPACITY ENERGY MR

                /tltt Gl!H YEAR 100 ~ 5 JAN 3ho OoO 13 ~ 760 FEB 34 '

11 ~ 680 HAR 34

                                                                ~

13 ~ 460

                                                                  '4o 0

APR

                                                                            .0 ~ 0 10 ~ 900 MAY' 34 0~0
                                                                                       ]0 ~ 060
                                                                                               ' I 8

JUI'1 34o 0~0

                                                                                                         '00        5 JUL 34
                                                                                                                      '60
                                                                                                                          ~

0 AUG 34 2.7eo

                                                                                                                                     ~

0 I SEP 34

                                                                                                                                                   ~

800 0 7 OCT 34

                                                                                                                                                             '60
                                                                                                                                                                 ~

0 7 NOV 34

                                                                                                                                                                                ~

000 0 DEC 34 7 '60

                                                                                                                                                                                               ~

0

           $ /M'WH                  2 '0          2 '0      2 '0            2o90          2i90           2 '0         2 '0       2 '0          F 2 ~ 9O        2 '0           F 2  '0          2 '0 RGHYD RR              HYDRO       RUtt"OF"RIVER           PREFERRED SUBPKRIODt NONE                               ESCALATION RATESI CAPACITY COST                  7~0    I/YR COMPAttY    7                       RESERVE CREDITED ALL                                                                 ENERGY COST         7.0 AREAl     9                         FORCED OUTAGE RATEt                0~   I YEAR            JAN           FEB       thAR            APR           MAY            JUI't        JUL        AUG           SEP           OCT            t4OV           DEC CAPACITY        ttH                 15 ~   .        5e      20              20            ]0 ~             5~           3~         3~            5~          Ioo            20             10  ~

a $ /tilt 1564 ~ 3 5196 ~ 2 4 2346 ' 4849 ' 7822o I 7822 ' 4849 ' 2346 ' 4 2346 F 6 ll ~

                                                                                  '212
                                                                                                                                                                                ~
                                                                                                                                                                                  '212
                                                                  '173>4 ENERGY        GleH    92 '          160       3 'eO    ]F   880        14 ~ 400       7 '40          3 '00        2o232      2 '32         3 '00         7 '40         14e4OO          7 '40
           $ /HHH                   ] ~ 43        li43      1 ~ 43          I ~ 43        lo43           1 ~ 43       le43       I ~ 43        I ~ 43        ]e43           I ~ 43         I ~ 43
 'RGHYD PS              STORAGE     HYDRO                   PREFERRED SUBPKRIODt ttONK                              KSCALATIOtt RATKSt CAPACITY COST                 0 ~ 0 %/YR COMPANY     7                       RESERVE CREDITEO ALL                                                                 EttERGY COST        7 '

AREAI 9 FORCED OUTAGE RATKI 0 ~ 5 YEAR JAN FEB HAR APR MA'Y JUN JUL AUG SEP OCT NOV DKC CAPACITY Mlt 20o 45e 30 ' 30 ' 41 ~ 30o 30 ' 22 ~ 45o 40 ' 30 ' 40 '

              $ /tlet                 0~0           0 '         ~ 0             '           Oio            0 ~ 0          ~ 0      0~0           0~0             ~ 0            ~ 0            '

EttERG'Y 81H 143 ~ 8 9e817 15i930 12o333 Bo278 17i922 10 ~ 793 8 '97 4 '68 10 ~ 963 ]4'452 15 ~ 601 14 ~ 691

            $ /M<tH                 1 ~ 43     . ]o43       I ~ 43          Ii43          li43           1 o43        1 ~ 43     I 43
                                                                                                                                   ~           ] ~ 43        ] ~ 43         I ~ 43         ] ~ 43

NRC ItITERROGATORY ON NINE MILE POINT NltcLEAR UhtIT ttO ~ 2 ENEPOY ttANAGEMEtlT ASSOCIATES I INC PAGE 435 ITEM NOe E 320 ~ 1 {D) REPT 9 OPTION 3 SUBREPORT 1 05/13/83

                               <<<<<<<<<<<<<<>><<TRANSACTIONS IhlPUT               

SUMMARY

FOR 1987 <<<<<<<<<<<<<<<<<<<< NHHYD Al HYDRO htUtI OF~RIVER PREFERRED SUBPERIODI Not<E ESCtLLATIOet RATESI CAPACITY COST oeo %/YR 0 C011PAhlY 5 NO SPINNINO RKSEPVE CREDIT ENERGY COST 0~0 AREA I I FORCED. OUTAGE RATEI 0 ~5 YEI'.R JAN FEB tlAR APR HAY JUN Jul. AUG SKP OCT NOV OEC CAPACITY Mk 3~ 3~ 3~ 3e 3~ 3~ 3~ 3e 3~ 3~ 3e 3~ 0 S/tp.A oeo 0~0 0~0 0~0 0~0 oeo 0~0 oeo 0~0 ENERGY OetH 26 ' 2 '32 2 ~ 016 2 '32 2 ~ 160 '32 2e160 '32 0

                                                                                                                                                     '32
                                                                                                                                                         ~ 0          0~0        0~0
                                                                                                                                                                               '32 0

S/MHH 3 '8 3 '8 3 '8 3 '8 2 3 '8 3e78 2 3 '8 2 ~ 232 F 78 2 ~ 160 F 78 2 F 78 2 ~ 160 3 '8 2 F 78 NHHYD Cl HYDRO RUN OF RIVER PREFERRED SUBPERIODI NONE ESCALATION RATKSI CAPACITY COST 0 '  %/Yht COMPANY AREAI 2 NO SPINNIhtO RKSEPVE CREDIT FORCED OUTAGE RATEI j0 A % ENERGY COST 0 ' l YEAR JAN t<AR APR HA JUI. AUO SEP OCT NOV OEC a CAPACITY S/Met 32e 0~0 32 ~ 0~0 32r 32 ' ~ 32 ~ 32 ~ 32 ~ 32 ' 32 ~ 32 i 32 ' o o o o ogo 0 ~ tt 0~0 oro 0 0 0 0~0 0 23 '40

                                                                                                                                           ~

ENERGY GhtH 280.3 23eBOB 21e504 23 F 808 23 F 808 23 '40 23 F 808 23 F 808 23 '40

                                                                                                                                                         ~

23 F 808 23 '40

                                                                                                                                                                                   ~

23 F 808 S/MXH 3 ~ 78 3 ~ 78 3e78 3i78 3 '8 3e78 3 '8 ~ 3 '8 3 '8 3 '8 3 '8 F 78 NMHYD E1 HYDRO IIUW OF~RIVER PREFERRED SUBPERIODI t<ONE ESCALATIOtt RATES I CAPACITY COST 0 ~ 0 %/YR COI)PANY S NO SPINNINO RESEPVE CREDIT ENERGY COST 0~0 AREA I 3 FORCED OUTAGE RATEI 0~% YEAR JAN FEB HAR PPR MAY JUN JUL AUO SEP OCT NOV OEC CAPACITY 76e 7be 76 ' 76e 76 i 76 ~ lb. 76 ' 76. 76 ' 76. 76 '

            $ /hek 665 '         '44 0~0          0~0         ~ 0         0 '         n.o           0 ~ 0        0~0          '        0~0               0          oro         '

ENERGY OhtH 56 51 ~ 072 sb.s44 54 '20 54 '20 56r544 '44 '20 56 '44

                                                                                                                                                         ~
                                                                                                                                                                    '20        '44 S/H'HH                   3  '8        3  '8     3e78          F 78 F)6 ~ 544 3 '8          3 F 78       3 '8    56 F 78 54 3  '8         3 '8        54 3 '8    56 3 '8 0

t!RC INTERROGATORY Ott ttIIOE HILE POlttT NUCLEAR UtrIT trO ~ 2 EluERGY rrAtrAGErrKNT ASSOC I ATES t INC PAGE 439 ITEN NO ~ E 320 ~ I (O) REPT 9 OPTION 3 SUBREPORT I 05/13/83 r>>rrrrrrrrr>>rrr>>4rr TRANSACTIONS ltrpUT SUH>>rARY FOR 1987 reer rr4>>rr>>4rrrr NHHYD Fl HYDPO RUN OF RIVEP, PHEFKRREO SUBr ErtlOOI HONE ESCALATION RATESr CAPACITY COST 0>>0 S/YR coHpAtrY NU SPIhrNINO RESKRvE CREDIT EtrERGY COST 0 ' ArtKAt 4 FORCED OUTAGE RATKt 0 ~ I JAN FEH HAR APR HAY JUN JUL AUO SKP OCT tr0v OEC CAPACITY Ht'r 42>> 42 ~ 42 ' 42 ' 42 ~ 42 ' 42 42 ' 42 ~ 42>> 42 42 ~ e E/H<<! 0 ' 0~0 ' ' 0>>0 ' '>>0

' 0~0 0 ' '>>0 0>>0 ENERGY G"H 367 ' 31 ~ 248 28 '24 31 ~ 248 30 F 240 31 ~ 248 30 '40 31 '48 31>>248 30 '40 31 '48 30 '40 31 ~ 248 S/>>'>78 3>>78 3>>78 3>>78 F 78 3 '8 3 '8 3 '8 3>>78 F 78 0 NHHYO C2 STORAGE HYDRO PREFERRED SUBPERIODI NONE EscALATIort RATEsl GAPAGITY cosT 0 ~ 0 %/YR 4 COtrPANY AREAI 2 5 NO SPINNltlG RESERVE CREDIT FORCED OUTAGE RATKt 0 'rI ENERGY COST 0>>0 YEAR JAN FER HAR APR HAY JUN JUL AUG SEP OCT NOV OEC Ct'/trit CAPACITY ENERGY Hrt GreH 42 ' 12 ~ 0 3 '71 3 12>> 0 '26 12>> 0~0 3>>571 3 12 ~ 0,0 '56 12 3>>571 3 12>> 0 '56 12 0 F 571 ~ 12 ~ 0 3>>5'7l 12 3>>456 '>>0 12>> 0>>0 3e571 3 '56 12 0>>0 ~ 3 12>> 0 '71 $ /r 1>>H 0' 0>>0 0 ' 0 ' 0 ' 0' 0 ' 0 ~ 0 n>>0 0 ' 0 ' 0>>0 4 NHHYO K2 STORAGE HYDRO PREFKRPED SUBPERIODt NONE. ESCALATION RATESl CAPACITY COST 0 '  %/YR 0 COHPANY 5 NO SPItiNINO RESERVE CREDIT EtlEROY COST 0 ' AREAI 2 FORCED OUTAGK RATEI OiS e CAPACITY s/aN H<< YEAR JAN 223 ' '65 FEB 223 59 '42 HAR 223 '23' APR 0 'i0 HAY 223>> 0 ' '223>> '4 '24 JUN 0 ' JUL 223 ' '65 AUG 223>> 0 ' SKP 223 '>>0 OCT 223 ~ 0 ' NOV 223 '24 OEC 223 '65 ENERGY G'<<rr 781 ' 66 66>>365 64>>224 66>>36S 66 66 '65 64 '24 66 '65 64 66 5/He'H 0 ' 0 ' 0 ' 0 ' 0 ' 0 ' 0 ' 0 ' 0>>0 0 ' 0 ' 0 ~ .0 0 NRC INTERROGATORY ON NINE MILE POINT NUCLEAR UNIT tlO ~ 2 EtlERGY t<AhtAOEMENT ASSOCIATES>> INC PAGE 440 ITEN NO ~ K 320 ~ 1 IUI REPT 9 OPTION 3 SUBREPORT I 05/13/83 aoooaaoooo TRAtlSACTIONS INPUT

SUMMARY

F'R 1987 oaooaoaaoa NHHYD F2 STORAGE HYDRO PREFEPRED SUBPERIOOI tlONE ESCALATION RATKSI CAPACITY COST 0 ~ 0 %/YR COHPAttY 5 hlO SPINNING RESERVE CREDiT EtlEROY COST 0 ' AREAI

                                                                                                                                  '3 '3 2                         FORCED OUTAGE RATEI         Oi%

0 YEAR JAW FEB HAR APR HAY JUN JUL AUO SEP OCT NOV OEC CAPACITY ht~ 93 ' 93 ~ 93 93 ' 93 ' 93 ' 93>> 93 ' 93 ' 93 '

            'I/ht s                       0  '         0~0           '>>0
                                                                                '         '             '          0 '          '          '             '              '           '

ENERGY Oeltt

          $ /hlliH 325 '       27 677 0  '

24>>998 0 ' 27 '77 0 ' 26 '84 0 ' 27>>677 0,0 26 '84 0 ' 27 '77 0 ' 27 '77 0 ' 0 26>>784 0.0 0' 0 27 '7T 26 '84 0 ' 27 '7f 0 ' ORNBY HYDRO RUN OF~RIVER PREFERRED SUBPERIOOI NONE. ESCALATION RATESI CAPACITY COST 0 '  %/YR COHPANY AREAI 5 NO SPINNINO RESERVE CREDIT ENERGY COST 0 ' 2 FORCED OUTAGE RATEI 0>>% YEAR JAN FEB HAR APR MAY JUN JUI. AUG SEP OCT NOV DEC CAPACITY H~ 10 ~ 10 ~ 10 ~ 10i 10>> 10 ' 10i 10 ' 10 ~ 10 ~ 10 ' 10i e S/htel 0 ' 0 ' 0~0 0 ' 0 ' ' 0>>0 ' 0 ~ 0 0 ' ' 0~0 ENERGY O>H 35>>0 2i976 2i688 2 '76 F 880 2 '76 2>>880 '76 2>>'gb '76 2>>976 S/HITCH 3 '8 3>>78 3 '8 3.78 F 78 3>>78 2 3 '8 3 '8 F 880 F 78 2 F 78 F 880 F 78 F 78 UNION STORAGE HYDRO PREFERRED SUBPKRIODI NONE ESCALATION RATESI CAPACITY COST 0 ~ 0 %/YR a COMPANY 5 NO SPINNINO RESERVE CREDIT KNFROY COST 0>>0 AREAI 3 FORCED OUTAGE RATKI 0 ' YEAR JAN FEB HAR APR HAY JUN JUL AUO SEP OCT NOV DEC CAPACITY Htt 0>> 0 ~ .0 ~ 0 ~ 0 ~ 0>> Oi 0~ 0 ~ 0~ 0 ~ 0~ 5/ht tt 0~0 0>>0 0>>0 0 ' 0>>0 0 ' 0~0 0 ' 0 ' 0 ' 0 ' 0~0 ENERGY GetH 0.0 0.0 0>>0 ' ' 0>>0 ' ' ' ' ' ' 9/getH 3 '8 3 '8 0 3i78 0 F 78 3>>78 0~0 F 78 0 3i78 0 3 '8 0 F 78 0 F 78 0 F 78 0 3>>78 0

NRC ltlTERROGATORY ON NINF HILE PQltlT NUCLEAR UNIT NO ~ 2 ENKIIGY ttANAOEHENT ASSOCIATESI ltlC PAGE 441 ITEN NOe E 320el (D) REPT 9 OPTION 3 SllBREPORT 1 05/i3/83 ee40etleeeteeetee TRANSACTIONS INPUT SUHHARY FOR 1987 eeetetetetPeteeee4 TRENT STORAGE HYDRO PRFFERRED SUBPERIODI NONE ESCAI.ATION RATESI CAPACITY COST Qe0 %/YR CQHPANY AREAI 5 NO SPINNINO RESERVE CREDIT Et>EROY COST 0 ' 3 FORCED OUTAGE RATEI Oe% ling YEAR JAN FEB HAR APR HAY JUN JUL AUG SEP OCT NOV DEC CAPACITY !Iit 24 ~ 24 ' '24 24 ' 24 Z4 ~ 24 24, 24 ' 24e 24 24 '

           $ /HR                              0 '              ~ 0         'eQ
                                                                                      '                'e0 0  '                  'e0 0 '          '            0 '               'e0 ENERGY         GWH             134,6     lli428          10 '22     lli428      lle059        lli428            lle059                  428    11,428        ~ 059          '28              059        '28
         $ /H'etH                          3e78            3 '8       3 '8        F 78           3 '8             3 '8               F 78        3 '8    11 3e78 11 3 '8        11 ~

3 '8 11 F 78 GLNPI( HYDRO RUN"OF RIVER PREFERRED SUBPERIODI NONE ESCALATION RATESI CAPACITY COST 0~0 >/YR coHPANY 5 NO SPINNING RESERVE CREDIT ENERGY COST Qeo AREAI 3 FORCED OUTAGE RATEI 0 ' YEAR JAN FEB HAR APR HAY JUFI JUL 4UO SEP QCT NOV DEC CAPACITY Het 0 ~ 0 ~ Oi 0 ~ Oe Oe 0~ 0 0 ~ 0 ~ Oi Qe

                                                                                                                                                       ~
           $                                  Qo0            0 '        Qe0         Oe0            0 '              0~0                0~0         0 '        0 '            QeO            Qe0          0~0 GlM
             /Hei'tlERGY 0~0      0 '             0 '        0 '         0 '            OeQ              0~0                0 '         0 '        0 '            0 '            0~0          0 '
         $ /HetH                           F 78            3e78       3 '8        3i78         . 3 '8             3o78               3o78        3e78       3i78           F 78           3e78         F 78 OSIIGT IE                       HYDRO       RUN OF~RIVER               PREFERRED     SUBPERIODI NQNE                                ESCALATION RATESI CAPACITY COST                 0 ~ 0 %/YR CQtIPANY AREAl     3 5                          NO   SPINNING RESERVE CREDiT                                                            ENERGY COST          0 '

FORCED OUTAGE RATEI Qe% YEAR JAN FEB HAR APR HAY JUtl JUL AUG SEP OCT NOV OEC CAPACITY Hei Oi 0~ 0 ~ 0 ~ 0 ~ ~ 0~ 0 ~ 0 ~ 0 ~ 0~ 0 ~

           $ /tlee                            QeO            0~0        OiQ         0 '            Qe0,             Oe0                0~0         0 '        Qe0            0 '            0~0          0~0 ENERGY        GNH                3 '      0 '74           0 '47      0 '74       0 '65            '74            Qi265                  274     0 '74        '65          Oe274          Oe265          '74
         $ /HPH                            F 78            3e78       3 '8        F 78 0

3 ~ 78,' 3e78 0 ~ 3 'B 3 '8 0 3 '8 F 78 3 '8 0 3 '8

t<RC INTERROGATORY ON NINE HILE POINT NUCLEAR UNIT WO ~ 2 ENERGY t'lAIIAGEMENT ASSOCIATESe INC PAGE l44C ITKeI NO ~ K 320 ~ 1 (Ot RFPT 9 OPTION 3 SUBREPORT I 05/13/83

                                     <<e++~4Ie0~0e>> TRANSACTIONS INPUT SUHHARY FOR 1987 +4ooeeooooo HUDFLS                    STORAGE        HYDRO                PREFERRED       SUBPERIODI NONE                   ESCALATIOte RATESI CAPACITY COST              0 ~ 0 %/YR COMPANY AREAI 5                    NO    SPINNING RESERVE CREDIT                                                ENERGY COST        0 '

4 FORCED OUTAGE RATEI 0 5 YEAR JAN FEB HAR APR HAY JUN JUL AUG SEP OCT NOV OEC CAPACI T Y eel 2i 2~ 2~ 2~ 2~ 2~ 2~ 2~ 2~ 2~ 2~ 2~ 0 S/Met 0,0

                                          '10 0

0 '51

                                                         '       Oe0           Oi0           Oi0         0 '         Oe0        0 '         0 '          0 '             0 '        0 ~ 0
                               '                                                                                              '10       0 '90                        0 '90 ENERGY         O'AH         7          0                        610      Oe590          Oi610       Oi590       Oi610 0                                                                                           610                        610 S/M~H                         F 78       F 78
                                                               ~

3 '8 F 78 3 '8 3 '8 3 '8 0 3 '8 3 '8 0 ~ 3 '8 3 '8 0 ~ 3 '8 HECHVL HYDRO RUN OF RIVER PREFERRED SUBPERIODI NONE ESCALATION RATESI CAPACITY COST 0 ~ 0 %/YR COMPANY 4 NO SPINNING RESERVE CREDiT ENERGY COST 0 ' AREA I FORCED OUTAGE RATEI 0~5 YEAR FEB HAR APR HAY JUN JUL AUG SKP OCT NOV OEC CAPACITY t'lt 3~ 3~ 3~ 3i 3e 3~ 3~ 3~ 3~ 3~ 3~ 3~ e $ /HW 0 ' 0 ' 0 ' Oi0 Oe0 0 ' 0 ' 0 ' 0 ' 0 ' 0~0 0~0 ENERGY GetH 19 ' I ~ 683 le520 '83 1 ~ 629 683 629 683 683 I ~ 629 683 '29 I ~ 683

            $ /MbH                        3 ~ 78     3 '8    1 3 '8          F 78 1 ~

3 '8 1 ~ F 78 1 ~ 3 '8 1 ~ F 78 F 78 1 ~ F 78 1 3 '8 F 78 SUGAR STORAGE HYDRO PREFERRED SUBPERIOOI NONE ESCALATION RATESI CAPACITY COST 0 ~ 0 5/YR COMPANY 5 NO SPINNING RESERVE CREDIT ENERGY COST 0 ' AREAI 3 FORCED OUTAGE RATEI 0 ' YEAR JAN FEB HAR APR HAY JUN JUI. AUG SEP OCT NOV OEC CAPACITY Met 4 ~ 4~ 4~ 4~ 4 ~ 4~ 4 ~ 4i 4 ~ 4~ 4~ S/H'H 0~0

                                          '56 Oi0       0 '           0 '           0 '         0~0         0~0        0 '         Oe0          0~0             0 '        0 '

ENERGY GetH 25i4 2 1i947 2 ~ 156 F 087 2e156 F 087 '56 2 '56 2 '87 2 ~ 156 2 '87 '56

            $ /t'VH                       3 '8      '3 ~ 78    3 '8          3e78          3 '8        F 78 2

3 '8 3 '8 - F 78 3 '8 F 78 2 F 78

'0 NRC ltlTERROGATORY ON NltIE NILE POINT NUCLEAR UNIT NO,2 ENEPOY NANAGENENT ASSOCIATESt INC paoE 443 ITEH NO ~ E 320 ~ I (O) REPT 9 OPTION 3 SUBREPORT 05/13/83 4444444444 TRANSACTIONS INPUT SUHHARY FOR 1987 4444444444 SGLKNF HYDRO RUN OF~RIVER PREFERRED SUBPERIODI NONE ESCALATION RATES I CAPACITY COST 0 ~ 0 %/YR coHpatIY s NO SPINNING RESERVE, CREDIT ENERGY COST 0 ' APEAI 4 FORCED OUTAGE RATEI 0 '

-e                       YEAR              JAN           FER       HAR        APR       PAY        JUN         JUL       AUG       SEP         OCT            NOV          DEC CAPACITY      HW                         4i            4 ~      4~          4~       4~          4~          4e        4        4~           4~             4~           4~
              $ /lM                    . 0 '           0 '       0~0        0 '       Qqo        0~0         0~0       0 '
                                                                                                                             ~

0~0 0 ' 0~0 0 ' EtIERGY G~H 21 ' I ~ 823 646 '23 I ~ 764 1>823 Ii764 '23 I ~ 823 I ~ 764 '23 '64 '23

            $ />r:H                      3 '8        1 ~

F 78 1 3 '8 3 '8 3 '8 F 78 1 3 '8 3 '8 F 78 1 F 78 1 F 78 1 F 78 e HADLEY HYDRO RUtt OF~RIVER PREFERRED SUBPERIODI NONE ESCALATION "ATESI CAPACITY COST 0 ~ 0 %/YR e coHpaNY 5 NO SPINNINO RESERVE CREDIT ENERGY COST 0 ' AREAI 4 FORCED OUTAGE RATEI 0 ' YEAR JAN HAR APR MAY JUN JUL auo SEP OCT NOV OEC CAPACITY Mw Qo Qg Qi 0~ 0, 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 8 $ /Hg 0 ~ Q 0 ~ Q 0~0 0~0 Qoo Qin 0 ~ 0 0~0 Qon 0,0 0 ' 0 ' ENERGY GqH 0~0 0!0 Qin 0 ' 0 ' 0~0 0 0 0~0 0~0 ' Qeo '

            $ /HXH                      3e78            3o78     F 78       3 '8      3i78
                                                                                                 ~

3 '8 3 '8 3178 0 3 '8 F 78 0 3 '8 0~0 3 '8 FLTHLS HYDR~ RUN OF"RIVER PREFERRED SURPERIODI NONE ESCALATION RATESI CAPACITY COST Qeo %/YR coHpaNY 5 No SPINNINO RESERVE CREDIT ENERGY COST 0~0 AREAI 3 fORCED OUTAGE RATEI 0 ' te YEAR FEB MAR APR NAY JUN JUL auo SEP OCT NOV OEC 'e CAPACITY

              $ /the Qi 0~0 0~

0~0 0~ 0~0 0 0~0

                                                                                  ~      0~

0~0 Qe 0~0 0~ 0~0 Qe 0~0 0~ 0~0 0~ 0~0 Qe 0~0 0~ 0~0 EttERGY OWH 0~0 0 ' Qin 0 ' Qyo 0~0 0~0 0~0 0~0 Qio ' e

            $ /NIIH                     F 78          ~

3! 78 3 78 3 '8 3 '8 3 '8 F 78 3i78 3 '8 0~0 F 78 0~0 3 '8 0 3s78

~

)

  ~

l I

  ~

I I e

I NRC INTERROGATORY ON NINE HILE POINT NUCLEAR UNIT Noo2 -', ENERGY HANAGEMENT ASSOCIATESi INC PAGE 444 0 ITFH NO ~ E 320 ~ 1 (0)  ;.1 REPT 9 OPTION 3 SUBREPORT 1 05/13/83 ooooee>> ooet TRANSACTIOt)S INPUT SUHHARY FOR 1987 oooooteeoeeo 1 SHRHI SL STORAGE HYDRO PREFERRED SUBPERIOOI NONE ESCALATION RATES I CAPACITY COST 0~0 I/YR COMPANY 5 NO SPINNINO RESERVE CREDIT ENERGY COST 0~0 AREAI 4 FORCED OUTAGE RATEI 0~ I YEAR JAN FEB HAR APR HAY JUN JUL AUG SEP OCT NOV DEC CAPACITY t<W 33o 33 ~ 33i 33 ' 33i 33 33 ~ 33 ~ 33i 33 33 ' 33 ' 0 S/VW 0

                                    '31
                                        ~ 0         oeo      0 ~ 0
                                                                        '56
                                                                           ~ 0        oeo                     'eo oeo       0 ~ 0      0 ~ 0            'eO
                                                                                                                                                                           ~ 0        ~ 0 Et>EROY     GWH     173e4     14              13 '06   14 '31      14          i4.731               14e256      14 ~ 731     '31     14i256        14 '31          14 ~ 256   14 '31 5/toWH                   3 '8           3e78     F 78        3 '8        F 78                3e78         3e78 14 3 '8       3 '8          F 78            3 '8       F 78 HIOAM                STORAGE      HYDRO                   PREFERRED     SUBPERIODI NOIIE                         ESCALATION RATES! CAPACITY COST               O~ O   0/YR COMPANY      5                       NO   SPINNING RESERVE CREDiT                                                    ENERGY COST          0 ~0 AREAI      2                         FORCED OUTAGE RATEI           oe%

( YEAR JAN FEB HAR APR HAY 'i JUN JUL AUO SEP OCT NOV OEC CAPACITY MW 6~ 6~ 6o 6~ 6i 6i ei 6~ 6~ 6~ e, 6~ Ct 5/Hot oeo 0~0 0~0 oio oio oio 0~0 ooo Ooo 0~0 0~0 0~0 ENERGY OXH 26i3 I 2 '32 2i 016 2 '32 2o160 2 '32 F 160 '32 2 '32 2,160 2 '32 2. leo '32 S/MWH 3 '8 3e78 3i78 3 '8 3 '8 3o78 2 3 '8 3.'rB F 78 3 '8 3 '8 2 3 '8 VARICK STORAGE HYDRO PREFERRED SUBPERIODI NONE ESCAI.ATION RATESI CAPACITY COST 0 ~ 0 %/YR COMPANY 5 NO SPINNINO RESERVE CREDIT ENERGY COST 0~0 ARKAI 2 FORCED OUTAGE RAtEI O,II YEAR JAN FEB HAR APR HAY I JUN JUL AUG SEP OCT NOV OEC CAPACITY Hw 5/te'ri So 0~0 Se 0~0 5~ oio 0~0

                                                                             ~

0 5

                                                                                        ~
                                                                                          ~;'Si 0  '.           0 ~ 0 5~

0~0 5~ oio 5~ 0~0 Si 0~0 5o 0~0 5~ 0~0 ENERGY GWH 21i9 le860 Iie80 le860 le800 ie860 ., le800 860 860 800 860 li800 looeo S/HWrl F 78 F 78 F 78 F 78 3i78

                                                                                            )I          F 78 1 ~

3 '8 1 ~ 3 '8 1 ~ F 78 1 ~ 3 '8 3e78 3 '8 4 I 0

NRC INTERROGATORY ON NINE HII.E POIIIT NUCLEAR UNIT NO 2 ENERGY MANAGEMENT ASSOCIATESt INC PAGE ITEM NO ~ E 320 ~ 1 ID) REPT 9 OPTION 3 SUBREPORT 1 44'5/13/83 4+oo+oooooooooooo TRANSACT IOtlS INpUT

SUMMARY

FOR 1987 oooooooooooooooooo+ HINETO STORAGE HYDRO PREFERRED SUSPERIODI NONE ESCALATION RATESI CAPACITY COST 0 ~ 0 %/YR COMPANY NO SPINNING RESERVE CREDIT ENERGY COST 0 ' AREAI 2 FORCED OUTAGE RATEI 0 ' YEAR JAN FEB HAR APR HAY JUN JUL AUG SKP .OCT NOV OEC CAPACITY Hw Bi Se 8~ 8~ 8~ Si 8~ 8~ 8~ So 8~ 8~

e ENERGY S/Hw OwH 2 Oe0
                                       '90         2 0
                                                     '20 2

Oe0

                                                               '90 Oo0 2o700 Oo0 2i790 0~0 F 700              2 0
                                                                                                                        '90 2

Oi0

                                                                                                                                  '90 0~0 F 700 0

2e790

                                                                                                                                                                 '            0 2 '00 2

0~0

                                                                                                                                                                                       '90 S/HIIH 32 AS 3  '8         3i78      3 'S        F 78          3 '8        ITS                3 '8      3o78         3 '8          F 78           F 78       3 '8           .

FULTON STORAGE HYDRO PREFERRED SUBPERIODI HONK ESCALATION RATESI CAPACITY COST 0 ~ 0 %/YR COMPANY 8 NO SPINNINO RESERVE CREDIT ENERGY COST 0 ' AREAI 2 FORCED OUTAGE RATEI Oo% YEAR JAN HAR APR oIAY JUN JUL AUO SKP OCT DEC CAPACITY Hot le lo I~ 1 ~ le 1 ~ li le 1 ~ le le 1 ~ 6 S/HW 0~0 0

                                                     '36
                                                         '       0
                                                               '72
                                                                   '          Oo0          Oe0         0
                                                                                                     '60
                                                                                                         '                0~0       0 '          Oe0
                                                                                                                                               '60 0 ~ 0          Oe0
                                                                                                                                                                            '60 0
                                                                                                                                                                                       '72 ENERGY      OHH       4i4        0 i 372
                                          '8       0         0            Oi360        Oi372       0                  Oe372     0 '72                      0 '72                     0 S/H'8H                    3             3 '8      3 '8         F 78         F 78        3 '8               F 78      F 78 0

F 78 3 '8 0 F 78 3e78 FEEDER STORAGE HYDRO PREFKRRED SUBPERIODI NONK ESCALATION RATESI CAPACITY COST 0 ~ 0 %/YR COMPANY 5 NO SPINNING RESERVK CREDIT ENERGY COST 0 ' AREAI 4 FORCED OUTAGE RATEI 0 ' YEAR JAN FEB MAR APR HAY JUL AUG SKP OCT NOV OEC CAPACITY Mw 5~ 5~ So 5~ Se 5~ 5~ So 5~ 5~ 5~ 5~

  ~           $ /Htl                     0 '           F 0       0 '          0 '          Oo0         0 '                0 '       0 '            '           0~0            0 '        0~0 ENERGY      GwH S/HIIH 20.1        1 3

711

                                          '8       1   546
                                                    '3i78 l.rll 3 '8       1.656 3 '8       lo711       io656 3e78 1 e711 3e78 1 e 711 3e78 0

lo656

                                                                                                                                                 '8        1 ~ 711
                                                                                                                                                               '8         1 ~ 656 3e78 1 e711 3 '8 F 78                                                  3             3 I

g

;p G

I p I 0 0

NRC INTERROGATORY ON NINE NILE POIIIT NUCLEAR UNIT NO ~ 2 ENERGY HANAGEHENT ASSOCIATESI INC PAGE 440 ITEN Neo E 320 ' (D) REPT 9 OPTION 3 SUBRKPORT I 05/13/83 oooo<<aao>> TRANSACTIONS INPUT SUHHARY FOR ]987 oaaiaooa>>o 0 OSWF STORAGE HYDRO PREFERRED SUBPERIODI NONE KSCALATION RATES I CAPACITY COST 0 ~ 0 %/YR COMPANY 5 NO SPINNING RESERVE CREDIT ENERGY COST 0 ' AREAI 4 FORCED OUTAGE RATEI 0,% YEAR JAN HAR APR HAY JUN JUL AUG SEP OCT NOV DKC CAPACITY HW li I~ li Ie li li Ii Ie le 1 ~ Ie 1 ~ 0 $ /HW OIO 0 ' Oie 0 ' 0~0 0 ' 0 ' 0 ' 0~0 0 ' 0 ' 0 ' ENERGY GWH 2 ' 0 186 0 168 Oi186 0 180 0 186 0 180 0 186 0.186 0 ~ 180 0 '86 180 0 ~ 186 3 '8 0 O

           $ /HWH
                                                 ~

F 78 3i78 F F 78

                                                                                       ~

3i78

                                                                                                      ~

3478 F F 78 3 '8 3 '8 3 '8 F F 78 F 78 VER"ONT SALE , UNSCHEDULED PREFERRED SUBPERIODI NONE ESCALATION RATESI CAPACITY COST 0 ~ 0 %/YR COHPANY 8 RESERVE DEBITED ENERGY COST 0 ' AREAI 20 FORCED OUTAGE RATEI Oy% I YEAR JAN FEB HAR APR HAY ) JUN JUL AUG SEP OCT NOV DEC CAPACITY HW

             $ /Hd 150)

Oee 150 0 '

                                                       ~    1'50 ~

0~0 150 0 ' i 150 0 '

                                                                                             ~ .'50' i I

0 150 0 '

                                                                                                                         ~    150 0 '
                                                                                                                                    ~    150 0 '
                                                                                                                                               ~       150 0 '
                                                                                                                                                             ~        150 0 '
                                                                                                                                                                            ~     150   '

0 ENEReY ewH '4S.O 71 i 767 64 '21 71>>767 69 451 71'767 t <9 45i 71 '67 71 o 767 69 '51 71 ~ T67 69 '51 71 ~

                                                                                                                                                                                      ~

Tbf S/HWH 0~0 Oee 0~0 Oie 0~0 0~0 0 ' O.TI 0~0 0 ' Oee 0~0 AHP-'OHIO SALK UNSCHEDULED PREFERRED SUBPERIODI N ESCALATION RATESI CAPACITY COST 0 '  %/YR CPHPANY 8 RESERVE DEBITED ENERGY COST 0 ' AREA I 13 'FORCED OUTAGE RATE! 0 YEAR JAN FEB HAR APR tiA'Y JUN JUL Aue SKP OCT NOV VKC CAPACITY HH 23 ~ 23 ~ 23 ~ 23 ~ 23i 23 23 ' 23 ~ 23 ' 23 ~ 23 ~ 23 '

                                                                                                 '2i089'               '          '          '             '              '
             $ /NW                       0.0       0          0~0         0                             0   'i0 0                        0              0 ENERGY        ewH    147 ~ 1       12 '92    11 ~ 283   12o492      12 '89        12i492                       12 '92     12 ~ 492   12 '89        12 ~ 492       12 F 089    12 ~ 492
           $ /HWH                      Oie       0 '        0~0         Oie            0 '            0 '          Oo0        0 '        0~0           0 '            0 '         0 '

NRC INTERROGATORY ON NINE MILE POINT NUCLEAR UNIT No ~ 2 ENERGY MANAGEMENT ASSOCIATESI INC PAGE 44 t ITEH tto ~ E 320 ~ 1 ID) REPT 9 OPTION 3 sUBREPDRT I 05/13/83 ooo<<oatto TRANSACTIot<S INPUT

SUMMARY

FOR ]987 ttooo4oooott PASNY PURCHASE PEAK SHAVItlG PREFERRED SUBPERIODI NONE ESCALATION IIATEsl C4PACITY COST 0 ~ 0 %/YR 0 CotiPAttY AREAI 0 RESERVE CREDITED FORCED OUTAGE RATKI 0 ~ % ENERGY COST Ovo YEAR JAN FEB HAR APR . HAY JUN JUL AUO SKP OCT ttOV OEC CAPACITY MW 0~ 0 ~ 0~ 0 ~ 0 ~ 0~ 0 ~ 0~ oe 0~ 0 ~ 0~ 5/Mvl 0~0 0~0 0~0 oe0 oeo 0~0 0~0 0~0 0 ~ 0 0~0 0~0 0~0 ENEReY e tt o.o ooo oio 0~0 oiO 0~0 0~0 0~0 0~0 0 ~ 0 0~0 oeo 0~0 6/Hvt H INTERCHANGE ACCOUNTING I ooO 0!0 0.-0 0;0 0 ' 0~0 0~0 0!0 ooo 0~0 0 ~ 0 0~0 PRICINO OPTION I COHP OWttERSHIP coMP ottNERsHIP coMP owttERBHIP coMP owNERBHIP coMP o<ttKRBHIP DISPLACEMEIIT COST I oio 2 48 '  % 13 ~ 0 4 loio 5 19 ~ 0 1 3~0 FIXED COST INCREASE I 5eO S/MIIH .6 3 ' 7 4io SAVINGS fIXED SPLlT I 0~0 PRIORITY ORDER lory I 0 REPORTINO OPTION I ACCOUNTINO OPTION I Q ALLHYDRl HYDRO RUN OF'RIVKR PREFERRED SUBPKRIODI NONE ESCALATION RATKSI CAPACITY COST 0 '  %/YR COMPANY. 4 RESERVE CREDITED ENERGY COST 0~0 AREA'I 7 FORCED OUTAGE RATEI 0 % Q CAPACI TY ENERGY

              $ /MW e~vt YEAR 27 ~ 2 JAN 10 0~0 3<176
                                               ~

FEO 10 ~ 0 Zi 172

                                                           ~ 0 HAR 1 o.

oio 2 ~ 703 APR 1 o.' 0~0 4 ~ 12Z itAY o oio 2 ~ 837 i 0 JUN loi oio i 817 0 JUL 10 343

                                                                                                                                          'io AUe los 0~0 636 SEP 10 ~

oio I ~ 408 2 OCT

                                                                                                                                                                                '43
                                                                                                                                                                                    ~ 0
                                                                                                                                                                                         '0  3 NOV 0~0
                                                                                                                                                                                               '23 3

DEC 10 0~0

                                                                                                                                                                                                           '44
                                                                                                                                                                                                                 ~

0 S/HvtH 6i70 F 74 6i79 6 '4 F 88 6i93

                                                                                                                                    ~

6 '7 0 ~ 7 '2 7ioT Tell Til6 Te21 Q ALLHYDtIZ HYDRO RUN OF"RIVER PREFKRPED SUBPERIODI NONE ESCALATION RATESI CAPACITY COST 0 '  %/YR COHPANY 4 RESERVE CREDITED ENERGY COST 0~0 AREA I 19 FORCED OUTAGE RATEI 0~5 YEAR JAN FEB MAR APR HAY JUN JUL aue SEP OCT NOV DEC

 ~ CAPACITY      Mvt
                /t tv 19v           19 ~           19<              19v           19  '           19e            19v              19 ~        19 ~           19e            19v         19 ~
              $                            oio           0~0            0 ~ 0            oio             ~ 0 . ~

0 ~ 0 oio oeo 0~0 0 ~ 0 0~0 0 ~ 0 ENERGY ewH 101 ' 6 ~ 919 5v928 8 ~ 532 lli550 10i884 I', Bv396 5 ~ 051 6 ~ 138 8i341 9 '65 10 '34 9oBZZ S/tlv H li83 1 ~ 84 '1 ~ 86 F 87 1.88, t F 89 I ~ 91 1 ~ 92 1 ~ 93 1 ~ 94 1 ~ 96 1 ~ 97 I l

NRC INTERROGATORY Otl NINE MILE POINT NUCLEAR UNIT t!0 ~ 2 ENERGY Iaht>AGEIIEIIT ASSOCIATES I INC PAGE 448 ITEM NO ~ E 320 ~ 1 Ib) REPT 9 OPTION 3 SUBREPORT 1 05/13/83 aoooaooooo TRANSACTIOtIS INPUT

SUMMARY

FOR 1987 ooooaoaaaa ALLHYOR3 HYDRO RUN OF RIVER PREFERRED SUBPERIODI NONE ESCALATION RATESI CAPACITY COST 0 ~ 0 %/YR 0 Co~< ANY APEAI 19 4 RESERVE CREDITEO FORCED OUTAGE- RATEI ENERGY COST Oio Oe> YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV OEC CAPACITY 18 ~ 18 ~ 18e 18e 18i 18e 18 ~ 18 ~ 18 ~ 18 ~ 18e 18 ~ 0 5/Hi 0~0 0 ~ 0 0 ~ 0 0 ~ 0 Oeo 0 ~ 0 0~0 0~0 0 ~ 0 Oeo 0 ~ 0 0~0 ENERGY GIH 102e2 8 ~ 460 le176 loe641 i 843 11 ~ 745 Bi283 6e289 6 '39 6 '82 '47 7 ~ 978 8 ~ 958 S/MNH 3 '8 F 70 3 '2 1 1 3 '5 F 77 3e80 3e02 3 '5 F 88 7 3 '0 3 '3 3 '5 0 NEUTIL PURCHASE PEAK SHAVItIG PREFERRED SUBPERIOOI NONE ESCALATION RATES I CAPACITY COST 0 ~ 0 %/YR 0 COMPANY 4 RESERVE CREOITEO ENERGY COST 9il AREAI 8 FDRCED oUTAGE RATEI 0~ I 0 YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV OEC ' CAPACITY MIi Oi 0 ~ Oe 0 ~ Oi Oi 0~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ ENERGY GaH 67 ' 67 ' 67 ' 67 ' 67i6 ~ 67 ' 67 ~ 6 67 ' 67 F 6 67 ' 67 ' 67,6 0~0 0~0 Qio o,o

           $ /MqH               115  '9      0~0 115 F 19 0~0 115 19    115.19 0~0 115.19 t

0~0 II5ei9 0~0 115el9 0 ~ 115!19 0 115 ~ 19 0~0 115 '9 Qeo 115!19 0~0 115 ~ 19 . ~

NRC INTERROGATORY ON NINE HILE POINT NUCLEAR UNIT NO ~ 2 ENERGY HANAGEHENT ASSOCIATESe INC PAGE %52 ITEN NO ~ E 320 ~ 1 IOI " REPT 9 OPTION 3 SURREPORT I. 05/13/83 44++~0~~e~ TRANSACTIONS INPUT SUHHARY FOR 1987 0+eeoeeaooa HI GHF ALL HYDRO PUN OF RIVER PREFERRED SUBPERIOOI NONE ESCALATION RATES! CAPACITY COST oeo %/YR COHPANY RESERVE CREDITED ENERGY COST oeo AREA> 10 FORCED OUTAGE RATE) 0 ' YEAR JAN FEa HAR APR HAY JUN JUL AUG SEP OCT NOV OEC CAPACITY Hli 2~ 3~ 5~ 5~ 3~ le le 0 ~ 1 ~ le 2~ 3~ S/Hli 0~0 0 ~ 0 0~0 oeo oeo 0 ~ 0 Oeo oeo 0 ~ 0 0 ~ 0 0 ~ 0 0 ~ 0 ENERGY GetH 13e2 I ~ 600 0 ~ 800 F 700 3 '00 F 000 0 ~ 300 0 ~ 300 0.1OO 0 ~ ?00 0 ~ 100 0 ~ 300 I ~ 600 5/HL'H 0 ~ 0 oeo 0 ~ 0 0~0 0~0 0 ' 0 ~ 0 0~0 0 ~ 0 0~0 0 ~ 0 0~0

NRC INTERROGATORY ON NINE MILE POINT NUCLEAR UN]T NO ~ 2 ENERGY MANAGEMENT ASSOCIATESt INC PAGE 454 ITEM NO ~ E 320 ~ 1 (b) REPT 9 OPTION 3 SUBREPORT 1 05/13/83

                                  <<<<<<<<<<<<<<<<TRANSACTIONS INPUT                SUHMARY FOR          ]987 <<<<<<<<<<<<<<<<<<<<

MITCHELL PURCHASE PEAK SHAVING PREFERRED SUBPERIODl >EEKbaY ESCALATION RATE'Sl CAPACITY COST 0~0 I/YR COMPANY RESERVE CREDITED ENERGY COST 0~0 AREAl ]2 FORCED OUTAGE RATEI 0 '

                        'YfAR             JAN         FEB        MAR         PPR            MAY            JUN           JUL        AUG            SEP            OCT             NOV         OEC CAPACITY      MH
            $ /H~

32 ~ 32 ~ 32 ' 32 ' 32 ~ 32 ~ 32 ' 32 ~ 32 ~ 32<< 32 ~ 32 ' Oeo o~0 ~ 0 ~ 0 Oeo 0~0 ~ 0 0 0 0~0 0 0 0~0 ~ 0 ENERGY GllH 187 8 15 ~ 951 14 '08 15I951 15 ~ 437 15e95] 15 ~ 437 15 ~ '951 15.95]

                                                                                                                                       ~

15 ~ 437

                                                                                                                                                                    ~

15 ~ 951 15 ~ 437 15 ~ 95] S/MiH 0~0 0+0 Oeo 0~0 0 ~ 0 0 ~ 0 0~0 0 ~ 0 0 ~ 0 0 ~ 0 0 ~ 0 0 ~ 0 HECHANIC HYDRO RUN-OF-RIVER PREFERRED SURPERIODl NONE. ESCALATION RATESl CAPACITY COST 0 ~ 0 /YR COMPANY RESERVE CREDITED ENERGY COST 0 ~ 0 aPEAl 21 FORCED OUTAGE RATEl 0 ' YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV OEC CAPACITY HM 17 ~ 17 ~ 17 ~ 17 ~ ]7 ~ 17 ~ 17 ' 17ir 17 ~ 17 ~ 17. ]7 ~

           $ /H ll                       0~0          0 ~ 0      0 ~ 0       0~0            0~0           0    0           ~ 0      0    0         0    0         0   0           0~0         0~0 95 '
                                                                                                             ~                         ~              ~             ~

ENERGY G'HH F 010 8 F 280 11 ~ 940 12 ~ 500 ]1 ~ 8]0 F 700 F 000 4 '00 F 500 5 '60 6 '50 F 256 S/MkH 1 '2 1 ~ 83 1 '4 1 ~ 85 1 ~ 87 1 ~ 88 1 ~ 75 1 ~ 76 1 ~ 77 ] ~ 78 1 '9 1 ~ Bl OLR~HYD] HYDRO <UN OF~RIVER PREFERRED SUBPERIODl NONE ESCALATION RATESI CAPACITY COST 0 ~ 0 %/YR coMpaNY 6 RESERVE CREDITED ENERGY COST 0 ~ 0 AREAl 11 FORCED OUTAGE RATEl 0 YEAR JAN MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ! CAPACITY 10<< ]o. ]oe ]os 10 ~ 10 ~ 10 ~ 10 ~ 10 ~ 10 ~ 10 ~ lo ~

           $ /MW                         0~0          o.n        0~0         Oio            Oeo           0  ~ 0         0~0        0~0            0  ~ 0         0 ~ 0           0~0         0~0 ENERGY      GWh         87.6        7.440        6 '20      7 '40       7 F 200         '40          7.200            '40        '40            '00          7 '40           7 F 200       '40
         $ /MllH                       2 '0         2 '0       2 '0        2 '0        7 2  '0         2  '0        7 Z ~ 90 7

2 '0 7 2 '0 2 '0 2 '0 7 2 '0

NPC I'eTE+ROGAT JRY PN NINE HILE POINT NUCLEAR U>l T HO ~ 2 E> ERGY IANAGKHENT ASSOC IATKS I I< C PAGE ITEeI NO ~ E 320 ~ 1 IOI REPY 9 OPTION 3 SUBREPORT I 45'5/13/83 aaa"aaaaaa TRANSACTIONS IIIPUT SUHHARY FOR 1987 aaaaaaaaaa RF PSN 1 PURCHASE, PEAIC SHAVING PREFERRED SUBPERIOOI WEEKDAY ESCALATION RATESI CAPACITY COST 0 ~ 0 %/YR COHPANY 8 RESEPVE CREDITEO ENERGY COST 0 ' AREAI 26 FORCED OUTAGE RATEI Oe% YEAR JAN FEB HAR APR HAY JUN JUL AUG SEP OCT NOV OEC CAPACITY HW 10 ~ 10 ~ 10 ~ 10 ~ 10 ' 10e 10e 10 ' 10e 10e IO ~ 10 ~

                                                          '                        '           '             '            '             '           '            '                      '85' S/Hr                           OeQ          0           0~0          0                        0             0                         0            0              OeO         0 ENERGY      G>H          58 '        4   985      4 ~ 502   -4 ~ 985     .4 ~ 824    .4.e985       4  '?4        4e985        4 '85        4  '24       4 '85          4  '24      4 S/H~H                         J~0          0.0         0 '          0 '         0 '          0'           'Oe0          DE  0        0~0          0 '            0'          0' SOLIDWST                 PURCHASE >EAijl SHAVING                PREFERRED SUBPERIOOI wEEIIOAY                     ESCAI.ATION RATESI CAPACITY COST                 0 '    0/YR 0                           COMPANY 2                              RESERVE CREDITEO                                                                ENERGY COST        0 '

ARKAI ?5 FORCED OUTAGE RATE) Oe> .3 CAPACITY KNERGY HM S/NiI GWH YEAR 293 ' JAN 50 24 '24

                                               'eO FEB 5ne OeO 22e512     24 HAR 5
                                                                  '24     24 APR 50
                                                                               '20 24  e HAY 50 ~

0~0 924 JUN 50 24 ~ 120 24 JUL 50 0

                                                                                                                      '24
                                                                                                                            'Q  24 AUG 0
                                                                                                                                   '24
                                                                                                                                          ~

SEP 50 24 ~ 120 OCT 50 24i924 NOV 50 24 ~ 120 24 OEC 50

                                                                                                                                                                                        '24
                                                                                                                                                                                              'eP S/HeIII                       0 '         0  '         0 '          0 '         0~0          0~0           0'      ~

0 ' 0~0 0 ' 0 ' 0 ' 3 INDNRPOS IIYORO HUN>>OF~RIVER PREFERRED SUBPERIODI NONE ESCALATION RATESI CAPACITY COST 0 '  %/YR COHPANY 4 RESERVE CREDITED ENERGY COST 0 ' AREAl 19 FORCED OUTAGE RATEI 0 ' YEAR JAN FEB HAR APR HAY JUN JUL AUG SEP OCT NOV OEC CAPACITY 7~ 7~ 7~ 7~ 7~ 7~ 7 ~ 7e 7~ 7~ 7~ 7~ Q S/Mee OeO

                                         '74 0 ~ 0       0 '          0 '         0 '          0 '          0  '          0 ~  0       0~0          0 '            0 '         0
                                                                                                                                                                                        '65 ENERGY      Ge'H         34 '        2            2e529       3e456        4   188     4 '68        2 '63        2  '41        2 '53            916        '76          2 '21       2 S/H'4h                        2 '4        2  '6        2 '7         ~

2 '9 2e31 2 '2 2 '4 2 '5 1 ~ 2 ~ 37 2 2e38 2 '2 2 '3 3 ~ yW

1988

P e NRC INTERROGATORY ON NINE NILE POINT NUCLEAR UNIT:NO. 2 ENERGY HANAGEHENT ASSOCIATES, INC. ITEH NO. E 320.1 (0) 'EPT 9 OPTION 3 SUBREPORT 2

                                  *****INPUT          HYDRO ENERGY ALLOCATION FOR        1988   ***~*

UNITS (GWH) PLANT NAHE UNIT f YEAR JAN FEB HAR APR HAY JUN JUL AUG SEP OCT NOV DEC N]g GF]R>l 3443 295 '73 302e 287 '96 '7'7

                                                                                              '7                283 '79 '88                              293       278  '9]
                                                                                              ']5 '15 '15
                                                                                                                                                                              ~

27'6 NIAGPEAK NIAGREPL 3T05 ~

                                              '37e
                                                              ~

34 284 ~

                                                                       '7e
                                                                      '15 37
                                                                                  ']5e
                                                                                                        '6
                                                                                                        '04
                                                                                                        ~
                                                                                                                                       '6
                                                                                                                                      '04          '04
                                                                                                                                                             '7
                                                                                                                                                             '15
                                                                                                                                                             ~

36e

                                                                                                                                                                        '1537
                                                                                                                                                                              '04 Nl AGEXPti NIAGPSNY ST ~ LAtt 16] le 4188e 6645.
                                                         ]37 ~

4]Q ~ 491

                                                                  ]24 ~
                                                              '68 '

307 ~ 137 ~ 407e 524 ' 132 ~ 548 '79 '

                                                                                              ~

137 329e '82

                                                                                                                    '57e
                                                                                                                    ~     137 ~

602 '1],

                                                                                                                                  ]37 309
                                                                                                                                       '32
                                                                                                                                      '49
                                                                                                                                      ~
                                                                                                                                      '66e 283
                                                                                                                                                   '32
                                                                                                                                                   ~
                                                                                                                                                   '81 137 ~

267 ~ 577 ' 468 '20 '

                                                                                                                                                                        ~
                                                                                                                                                                        ~

137 539

                                                                                                                                                                              ~
                                                                                                                                                                              '32
                                                                                                                                                                              '59 ASNOKAN                              25e                  ~     2~            ~           ~       2~          2~        2~       2~            ~         ~          ~   2~

KENSI CO 22 2~ 2~ 2~ 2~ 2~ Ze 2~ 2~ 2~ 2~ 2~ DELTA '0e 1 ~ ]e 1 ~ le 1 ~ 1 ~ 1 ~ ]~ 1 ~ 1 ~ 1 ~ 1 ~ HINCKLEY 3] ~ 3~ 2~ 3~ 3~ 3~ 3~ 3~ 3~ 3~ 3~ 3~ 3~ CRESCEttT 22 2~ 2~ 2~ 2~ 2~ 2~ 2~ 2~ 2~ 2~ 2~ 2~

    'WATERFRU                               '6
                                            ~                       I~         1  ~         le        I~          1 ~       1 ~      ]~          1 ~       I~         le    ]~

VIS CWER 24e 2~ 2~ 2~ 2~ 2~ 2~ 2~ 2~ 2 ~ 2~ o<<eeeee4 ltiPUT UNIT PARTICIPATION SALES PERCENTAGES SOLO FOR 1988 PLANT NAME UNIT 4 JAt> FE8 HAR APR HAY JUN JUL AUG SEP OCT NOV OEC OS>EGU OSe EGO 5 6 0 0 0 0 0 0 0 0 0 QeQ

                                                                                       '      0 0

0 0 0 0 0 0 0 0

                                                                                                                                           '       0   '

0 0

tlRC INTERROGATORY Otl NINE HILE POINT NUCLFAR UNIT NO ~ 2 ENERGY HANAOEHKNT ASSOCIATESt INC . PAGE 49tt ITEM NO ~ E 320 ~ 1 JO) REPT 9 OPTION 3 SUBREPORT 1 05/l3/83 4++'~+e+4+0 TRANSACTIONS II'tPUT

SUMMARY

FOR 1988 ~40+4o000+

  =COWl               PURCHASE PEAK SHAVlt4G                 PREFERRED SVBPKRIODt NONE                        ESCALATIOte RATESI CAPACITY COST             0 '    %/YR CO<Par>Y     y                         RESERVE CREDITEO                                                           ENERGY COST        0 '

AREAt 1 FORCED OUTAGE RATEJ Oe% YEAR JAN FEB HAR APR JUN JUL AUG SEP OCT NOV OKC. PACITY HW 0~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0~ 0e 0 ~ S!Hw 0 ' 0 ' 0 ' 0 ' 0 ' an F 0 0~0 0 ' 0~0 0~0 Oe0 "KRGY Gwh 0 0 0 ' o.e 0 ' 0.0 0e0 0 ' F 0 0~0 0,0 0 0 ' Oen s/HwH F 0 F 0 0 ' 0 ' 0 ' 0 ' o.n Oen 0.0 0 0 ' 0

~ TERCHANOK ACCOUttTING PRICING OPTION                  8                   COHP    0>NQSHIP        COHP 0)fNERSHIP         CORP   OwNERSHIP     COHP OMNERSHIP       COHP OwNERSHIP OISPLACEHKeeT COST        I     50  '

FIXED COST INCREASE <<14 ~ 0 S/HwH SAVINGS FIXED SPLIT t 100 ~ 0 PRIORITY ORDER I 7 REPORT INO OPTION t ACCOUNTING OPTION RECON2 PURCHASE PEAK SHAVING PREFERRED SUBPERIODf NONE ESCALATION RATESt CAPACITY COST 0 ~ 0 %/YR COHPANY RKSERVE CREDITED ENERGY COST 0 ' RREAt 1 FORCED OUTAGE RATEt 0 ' YEAR JAN FEB HAR APR MAY JUN JUL AUO SEP OCT NOV OEC 'PACITY Hw 0 ~ 0 ~ 0 ~ 0 ~ 0~ 0~ 0 ~ 0~ 0 ~ 0 ~ 0~ 0~ S/tete oe0 0 ' 0 ' 0 ' Oen 0~0 0 ' 0 ' 0 ' 0 ' Oe0 0~0

.ERGY        Gwh       0.0       0              F 0        0 '        0 '          0 '         0 '            0         0 '         0 '          Oe0            0            0 '
         $ /H'WH                   Oe0           an          0 '        0 '          0 '         0 '            0 '       0 '         F 0          0 '            0 '          0 '

-TERCHANGE ACCOUNTING PRICINO OPTION t B COHP OhNERSHIP COHP OWNERSHIP CORP OWNERSHIP COMP OWNERSHIP COMP OWNERSHIP DISPLACEHENT COST 50 '  % FIXED COST INCREASE t -Ise2 $ /HWH SAVINGS FIXED SPLIT t 100 ' PRIORITY ORDER 6 RKPORTINO OPTION ACCOUNTING OPTION

;0                                                                                                          EtlEPGY HANAGEHFtrT AssocIATEsr                Itic                              PAGE         49>

NRC INTERReGATORY ON NINE tlILE POItrT NUCLEAR UNIT ero,2 I0 ITEN NO ~ K 320 ~ 1 (D) REPT 9 OPTION 3 SUBREPORT 1 05/13/83

                                     >>aaaoooaoa      TIIArlSACTIONS ItjPUT SUNHARy FOR       1988>>a>>>>oooo>>a NVRSK HY                STORAGE      HYDRO                   PREFERRED SUBPERIODI IIEKIIDAY                   ESCALATION RATESI CAPACITY COST                           0 ~ 0 %/YR COMPANY      1                       RESERVE CREDITED                                                                 ENERGY COST               0~0 AREAI    10                          FOPCED OUTAGE RATEI        0  '

JUL SEP OCT IIOV OKC

'; 0                       YEAR              JArr                  MAR         APR       MAY              JUN                        AUO Hrr                    27e         27         27 '       27e       27 ~             27o           27   '       27    '       27   '           27 ~               27 ~         27    '

0 CAPACITY 0~0 0 ' 0 ' 0 0 0 0~0 ' ENERGY

                  $ /Hw Gr H     6o.7       3 '00 0~0 3  '00
                                                            '.o 3eooo
                                                                     ~ 0 2 '00     4 0~0
                                                                                       '00           F 500         7oooo
                                                                                                                          ~

8 ~ 100 8 '00

                                                                                                                                                     ~

6 '00

                                                                                                                                                                       ~

F 800 4 '00

                $ /trolH                15 ~ 00       15eoo      1'0       15 ~ 00   15 F 00         15eoo         15eoo        15 ~ 00       15 F 00           15 ~ 00           15 ~ 00      15 ~ 00 0

i RIVER pREFERRED SUBPERIODI NONE ESCALATION RATKSI CAPACITY COST 0~0  %/'fR MISC-H'f HYDRO RUN OF I RESERVE CREDITED ENERGY COST 0~0 COMPANY AREAl 10 FORCED OUTAOK RATE! 0 ~% APR MAY JUN JUL AUO SEP OCT NOV OEC YEAR JAN FEB HAR 4~ 4~ CAPACITY He' 4~ 4e 4i 4~ 3~ 3~ 3~ 3~ 3~ 3~ 0~0 0 0

                  $ /HW                       0~0        0~0        0~0         0~0      0~0              Oeo           Ooo          0~0           0~0              0  ~  0                             ~

ENERGY GrrH 16 ' 1 ~ SOO leTOO F 800 2 '00 1 F 800 0 ~ 600 0 ~ 400 0 F 500 0 ~ Soo 0 ~ 800 1 ~ 0~0 400 1 ~ 0~0 600

                $ /HhH                    Oeo           0~0       0~0        0~0       0~0             0~0            0~0          0~0           0~0              0~0 STURGEON                STORAGK      HYDRO                   PREFERRED SUPPERIODI        IIEEI~OAY            ESCALATION RATKSI CAPACITY COST                            0 '    %/YR COHP4NY                              RESERVE CREDITED                                                                 ENERGY COST                0~0 1

AREAI 10 FORCED OUTAGE RATEI Oi% JUN JUL AUG SEP OCT NOV OEC YEAR JAN FEB MAR APR MAY CAPAC I T Y Hrt 15 ~ 15e 15o 15o 15i 15e 15 ' 15 ' 15 ' 15o 15 ~ 15 ~

                   $ /rtrr                    Oeo        0~0        4,o         0 '      Ooo               Oeo
                                                                                                                      '00
                                                                                                                           ~ 0           ~  0         ~ 0            0  ~  0
                                                                                                                                                                                     '00 0~0          0~0
                                                                                                                                                                                                   '00 ENERGY          O<H      51 ~ 8    4  '00        F 800      9iloo     Bi300     5  '00           1 F  800      1            1 F 800 1 ~  600         F 500              4            5 0'                                   '                       0~0           0~0          0             Oeo               0~0               0~0           0
                 $ /Hl:H                                0~0        0~0        0        0  ~ 0

tlRC INTERROGATORY ON NINE HILE POINT NUCLEAR UNIT 110 2 ENERGY HANAOEMFNT ASSOCIATESI INC PAGE: 500 ITEH NO ~ E 320 ~ 1 {OI RKPT 9 OPTION 3 SUBREPORT I 05/]3/83 4444444444 TRANSACTIONS INPUT

SUMMARY

FOR 1988 4444444444 06R>>HY02 STORAGE HYDRO PREFERRED SUOPKRIODI HONE. ESCALATION Ra TES I CAPACItY COST 0 e 0 %/YR CO(ePAelY RESERVE CRELIITED ENERGY COST 0 ' AREAI 11 FORCED OUTAGE RATEI Oi%

                                                                      '4o         APR                                JUN          JUL         AUG         SE.P            OCT              to 0 V           OEC YEAR             JAN                   HAR                                 HAY CAPACITY      Net                        34 ~       34  '      34                                  34    '        34   '       34  '       34  '       34e             34e              3< ~             34   '

e 0/tlet 0 ' ' ' Oi0 0 ' I

                                                                                                                        '           '           '         0 '             0 '              0  '

7 '60 13 '60 13 ~ 460 10 ~ 900 060-' 8.400 5 '60 2 '60 ] F 800 7 '60 7 000 ENERGY G1IH S/Ht((H 100 ~ 5 2 '0 11 ~ 680 2 '0 '0 2e90 10 ~ 2 '01 2 '0 2 '0 2 '0 2 '0 2 '0 F 2 '0 2e90 I

 ~

RGHYD RR HYDRO RUN OF~RIVER PREFERRED SUBPERIODI NONE ESCALATION RATESI CAPACITY COST 7 ~ 0 %/YR COMPANY 7 RESERVE CREDITED ALL ENERGY COST 7 ' AREAI 9 FORCED OUTAGE RATEI 0,% OEC 4 YEAR JAN FER HAR APR MAY JUN JUL auG SEP OCT NOV CAPACITY Hh 15e 5~ 20 20 10 ~ 5e 3~ 3~ 5~ 10 ~ 20 10 ~ 5559(9 5189e2 8369 ' 8369 ' 5189 ~ 2 25]0 ' 2 25]0 ' 0 S/1(e( 1673 ~ 8 2510 ~ 9

                                                                                                                                                                                                 '297
                                                                                                                                                                                              ~
                                                                                                                                                                                                           '40
                                                                                      '297e2
                                                                                                                                                                        '40
                                                                      '255e5 3i480     14i880          14 '00               Te440          3 '00          '32       2 '32       3 '00           7               14 ~ 400           7 ENERGY      G(H S/M((H 92e3       11 ~ 160
                                          ]e53       ]e53       I ~ 53          1 ~ 53              1 ~ 53         1 ~  53 2

1 '3 fe53 ]e53 1 ~ 53 1 ~ 53 1 ~ 53 ROHYD PS STORAGE HYDRO PREF ERRED SUBPERIOD I NONE ESCALATION RATESI CAPACITY COST 0 ~ 0 %/YR COMPANY 7 RESERVE CREDITKO ALL ENERGY COST 7 ' AREAI 9 FORCED OUTAGE RATEI Oe% JAN FEB HAR APR MAY JUN JUL AUO SKP OCT NOV OEC YEAR CAPACITY t>tt 20 ' 45e 30 ~ 30 ' 41 ~ 30 ~ 30 ' 22 ' 45 40 ' 30 ~ 40 ' 0 S/t 1 H ' .0 ' 0 ' ' 0 ' 0 ' ~ 0 ' 'e0

                                                                                                                                                                             '              0  '               '

ENERGY G"'H 143 e 8 F 817 ]5e930 12e 333 Be278 ]7 ~ 922 10 ~ 793 Be297 4 '68 ]0 '63 ]4 ~ 452 15 ~ 601 14 ~ 691 S/t1'cH ]e53 1 ~ 53 1 ~ 53 liS3 1 ~ 53 1 ~ 53 1 ~ 53 1 ~ 53 I ~ 53 I ~ 53 1 e53 1 ~ 53 0

NRC INTERROGATORY ON NINE NILE POINT NUCLEAR UNIT NO ~ 2 KtIEPGY HAHAOENENT ASSOCIATESt INC PAGE 501 IO ITEN NO ~ E 320 ~ 1 IOI RKPl 9 OPTION 3 SUBRKPORT I 05/13/83 oaaaooaaoa TRAtISACTIONS INPUT SUHNARY FOR ]988 aaoooooaoa 0 NIIHYD Al HYUPO RUtI-OF~RIVER PREFERRED SUBPERIODI NONE ESCALATION RATESI CAPACITY COST 0 ~ 0 Ie CorIPat'r 5 NO SPINNING PESERVE CREDiT ENERGY COST 0~0 AREA! ) FORCED OUTAGE RATEI 0~5 YEAR FKB APR HAY JUN 'UL AUO SEP OCT NOV OEC CAPACITY tltt 3~ 3~ 3~ 3~ 3~ 3e 3~ 3~ 3 ~ 3~ 3~ 3~

                $ /tIW                         oeo          0~0        oeO           0~0           0~0           0   0        0~0         0~0       0~0          0   0          0~0        0 ~ 0 ENERGY        GWH          26 '        2 '32        F 088      2 '32         2 '60         2 '32         F 160
                                                                                                                   ~

2 '32 2 '32 2 ~ 160 2 '32

                                                                                                                                                                   ~

2.1eO 2 '32

               %/NWH                         3 '8         3 '8       F 78          3 '8          3 '8          F 78         F 78        3e78      3 ~ 78       3 '8           F 78       3 'B
6 NHHYO Cl HYDRO HUtt OF~RIVER PREFERRED SUBPERIODI NONE ESCALATION RATESI CAPACITY COST 0 ~ 0 %/YR iC COHPANY AREAI 2 5 NO SPItINING RESERVE CREDIT FORCED OUTAGE RATEI oe%

EtIEROY COST 0 ~ 0 YEAR JAN FKB ttAR APR JUN JUI. AUG SEP OCT NOV OKC CAPAC I T'f tIII 32i 32 ' 32 ~ 32 ~ 32 II 32 32 32 ~ 32 ~ 32 ' 32 ~ 32 ~ 6 5/ItW ' 0 ' oeo 0~0 'io 'io 'eo oio 0~0 ~ 0 0~0 0 ~ 0

                                  '       23 F 808     22i272     23i808        23 '40                     (23 '40       23 F 808    23 F 808  23 '40       23 F 808       23 F 040   23 'OB ENERGY        OWH S/HÃH 281 F 78         3e78       3 '8          ITS 23 F 808 3i78          3e78         3eTS        F 78      F 78         3e78           3 '8       3 '8 CI NtIHYD El                  HYDRO         HUN OF~RIVER            PREFERRED       SUBPERIODI NONE                      ESCALATION RATES I CAPACITY COST             0~0    I/YR CONPANY       5                       NO    SPINNINO RESERVE CREDIT                                                  ENERGY COST        0~0 ARKAI       3                         FORCED OUTAGE RATKI 0 ~ %

YEAR JAN FEB HAR APR NAY JUN JUL AUO SKP OCT NOV OKC CAPACITY Hel 76 ~ 76 ' 76e 76e Tei 76 ' 76 ' 76 ~ 76 ' 76 ' 76 ~ 76 ' 0 $ /HW oeO ~ 0 0 ' 0 ' 0~0 ' ~ 0 0~0

                                                                                                                                                  '20 o
                                                                                                                                                               '44
                                                                                                                                                                   ~ 0          0~0
                                                                                                                                                                                         '44
                                                                                                                                                                                             ~ 0 EIIERGY       GIIH        667 '       56 '44       52 '96     56e544        54e720       56  '44        54 F 720     56 '44      56 '44    54           56             54i720
                                                                                                                                                                                '8    56
                                                                                                                                                                                           '8 5/NWH                         3 '8         3e78       3  '8         F 78          F 78          3 '8         3 '8        3 '8      3 '8         3 '8           3          3

HRC INTERROGATORY ON NINF. HILE PO]AT NUCLEAR Utl]T HO ~ 2 ENERGY Hht.'AGEHENT ASSOCIATES) IHC PAGE SOel ITEH NO ~ E 320 ~ 1 tO] REPT 9 OPT IOtk 3 SUBPEPORT I 05/13/83 aaaaaa<<a>> TRANSACTIONS INPUT SUtet<ARY FOR ]eIBB aaa>>aaaaaa I NHHYO Fl HYOPO teUW OF RIVER PREFERRED SUBPERIODI NohE ESCALAT]ot> RATESl CAPACITY COST oeo %/YR COHPAtt Y 5 t<O SPItlHING RESERVE CREDIT EttERGY COST 0~0 AREhl 4 FORCED OUTAGE RATEl 0~% CAPACITY ENERGY Hn'2

             $ /H~

G'eH YEAR 368 ' JAN 0 31 248

                                             ~

0 29 FEB 42

                                                    '32
                                                        ~

0 HAR 42e 0~0 3]i248

                                                                        '2 30 APR 0~0
                                                                            '40 i

HAY 42i oeo 31 ~ 248 30 JUN 42r 0~0

                                                                                                           '40     31 JUL 42
                                                                                                                      '48
                                                                                                                         ~

0 AUG 42e 0~0 3]e248 30 SEP 42

                                                                                                                                              '40
                                                                                                                                                  ~

0 OCT 42

                                                                                                                                                                ~

31 ~ 248 0 30 42 ~ 0~0

                                                                                                                                                                           '40 OEC 42 ~

0 ~ 31 ~ 248 0

           $ /H'WH                       3 ~ 78     3 '8       3 '8         3 '8             3 '8          F 78       F 78       3 '8         F 78          3 ~ 78         F 78        3 '8 NHHYD C2                  STORAGE       etYDRO                PREFERRED      SURPERIODt NONE                       ESCAI.ATION RATESl CAPACITY COST                0 '    %/YH 0                           COHPANY AREAl 5                     NO   SPINNItto RESEPVE CREDIT                                                    ENERGY COST         0~0 2                       FORCED OUTAGE RATEI                Oe%

YEAR JAN HAR APR HAY JUN JUL AUG SEP OCT NOV DEC c CAPACITY 12e 12 ~ 12 ~ 12e ]2 ~ 12 ~ ]2 ~ ]2 ' 12 ~ 12e 12e 12 ~ 6 $ /HW 0~0 O 0 oeo 0 ' oeo 0 ~ 0 ~ 0 0~0 0 0 0~0 0 0 0 ~ 0 ENERGY GWH 42e2 3e571 3 ~ 34] 3 '71 3 '56 F 571 3 '56 3.571 3.57] 3 '56

                                                                                                                                                  ~

3e571 3.456

                                                                                                                                                                               ~

F 571

           $ /Hl.'H                      Oeo        oeo        0~0          0~0              oeo           oeo        0~0        0 ~ 0        0 ~ 0         oeo            0 ~ 0       0 ~ 0 NHHYD E2                  STORAGE       HYDRO 5

PREFERRED SUBPFRIODl NONE ESCALATION RATESt CAPACITY COST 0 '  %/YR COHPANY NO SPIIPNIt(G RESERVE CREDIT ENERGY COST 0 ~ 0 AREAl 2 FORCED OUTAGE RATEt 0~% YEAR JAN FEB HAR APR HAY JUN JUL AUG SEP OCT NOV OEC I CAPACITY ENERGY HLt

             $ /HW O'AH       783 '       66 223 ~

o,o

                                         '65 223 62 '83
                                                        ~

0 223 ~ oeo 664365 223 64i224

                                                                                  'eo P23 66 '6S
                                                                                                ~
                                                                                                  ~

0

                                                                                                      ; 64 223 '

oeo

                                                                                                           '24     66 223 ~

0~0

                                                                                                                      '65     66 223
                                                                                                                                 '65
                                                                                                                                       'eo 64 223 0~0
                                                                                                                                              '24
                                                                                                                                                    ~

66 223 0~0

                                                                                                                                                            '65
                                                                                                                                                                  ~

64 223 0

                                                                                                                                                                           '24
                                                                                                                                                                               ~
                                                                                                                                                                                 ~

0 66 223 '

                                                                                                                                                                                       '65
                                                                                                                                                                                           ~ 0
           $ /HwH                        deO        0                       oeo                                       0'         0'           oeo
                                                      ~ 0      0~0                           0~0    tI     0~0                                              0 ~ 0          0 ~ 0       0 ~ 0

NRC INTERROGATORY OW NINE HII.E POINT NUCLEAR UNIT tlO ~ 2 ENERGY ttAttAGEt>ENT ASSOCIATES) INC PAGE 503 ITEN NO ~ E 320 ~ 1 lDl REPT 9 OPT IOtl 3 SUBREPORT 1 05/13/83 aaaaaaaaaa TRANSACTIONS INPUT SUHHARY FOR 1988 a>>aaaaaaa NHHYD F2 STORAGE HYDRO PREFERRED SUBPERIODi NONE ESCALATION RATESI CAPACITY COST Qe0 0 COHFANY 4REAt 5 NO SPINNING HESERVE CREDiT Et>ERGY COST 0 ' 2 FORCED OUTAGE RATEl Qo% 0 YEAR JAN FKR HAR APR HAY JUN JUL AUG SEP OCT NOV DEC CAPACITY ENERGY

               <</to 6 GHtl   326 '     27 0
                                     '77 93e
                                            . 25 93e 0~0
                                                 '9]

93

                                                           '77
                                                                'oQ 93 26 '84 93i QoO
                                                                                  '77
                                                                                             . 93 ~

Qo0 26 '84 93

                                                                                                            '77
                                                                                                                  'o0 93 ~

0~0

                                                                                                                         '77 93
                                                                                                                                    '84
                                                                                                                                          '         93 ~

Qe0

                                                                                                                                                  '77 93 ~

0 ' 93

                                                                                                                                                                             '77
                                                                                                                                                                                 ~

0

             $ /HffH                 0 '         0 '

27 0 ' 0 ' 27 0 ' 'eQ 27 0 ' 27 0~0 26 0 ' 27 0 ' 26 F 784 0 ' 27 0 ' GRNBY HYDRO RUtl<<OF<<RIVER PREFERRED SUBPERIODt NO9E ESCALATION RATESI CAPACITY COST 0 ~ 0 %/YH COVPAnY 5 NO SPINNItlG RESERVE CREDIT ENERGY COST 0 ' AREA! 2 FORCED OUTAGE RATKl 0 ' YEAR JAN FEB HAR APR HAY JUN JUL AUG SEP OCT NOV DKC I CAPACITY ENERGY HM S/tarot GttH 35 ' 2 loo 0~0

                                     '?6 10, 0

2i784 10e 0~0 2o976 1'e0 2i880 10 2 '76

                                                                                        '         10 QeQ F 880
                                                                                                     ~        1Q 0

2i976

                                                                                                                  ~        10 ~

QeQ

                                                                                                                         '76 10 0 '

2 F 880

                                                                                                                                          ~         10o 0
                                                                                                                                                  '76 10 0~0 F 880
                                                                                                                                                                       ~       10 ~

0~0

                                                                                                                                                                             '76
             $ /H'AH                 3 '8        3o78      F 78        F 78       3 '8          3 '8        3 '8       2 3 '8       3 '8        2 3 '8           F 78 2

F 78 UNION STORAGE HYDRO PREFERRED SUBPERIODl tlONE ESCALATION RATESt CAPACITY COST 0~0 <</YR COHPAtlY 5 NO SPINNING RESERVE CREDIT ENERGY COST 0 ' AREA I 3 FORCED OUTAGE RATKI Oe% YEAR JAW FEB HAR APR JUN JUL AUG SEP OCT NOV DEC CAPACITY O'K Qi 0~ Qi 0 ~ Qi 0~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~

     .         5/HK                    0,0         0 '       Qi0         Qi0        Qe0           0~0         0 '          0 '        QeQ           0 '            0 '         0 '

ENERGY G<H 0~0 0 ' 0 ' ' QiQ Qi0 Qi0 ' ' ' S/HMH 3 '8 3i78 0 3 '8 3o78 3 '8 3 '8 0 3 '8 0 3 '8 QiO 3 '8 QiQ F 78 0~0 F 78 0 3 '8 a

, 0

IIRC INTERROGATORY ON Nlt<E HILE POINT t<UCLEAR utt]T NO 2 ENERGY HAtIAOEHENT ASSOCIATESt INC PAGE SQ4 ITEtl NO ~ E 320 ~ 1 lul REPT 9 OPTION 3 SUBREPORT 1 05/13/83

                                   >>>>>>" >>>>>>>>>>>> TRANSACTIOt>>>>>>>>>>>>>>>>>>>

TRENT STORAGE HYDRO PREFERRED SUBPERIODI NONE ESCALATION RATKSI CAPACITY COST 0 ~ 0 %/YR 0 COHPAI'IY AREAl 5 NO SPINNINO RESERVE CREDIT ENERGY COST 0 ' 3 FORCED OUTAGE PATEI 0.% YEAR JAN FEB MAR APR HAY JUN JUL AUG SKP OCT NOV UEC CAPACITY Hir 30 ~ 30 30 ' 30 30 ' 30 ' 30e 30e 30 ' 30 30 30 ' e $ /HW 0~0 'e0

                                                                      '              'eO
                                                                                                  '              '        0 '        Qeo         '               'eQ             'eQ EttERGY      OHH       168 F 7      ]4 ~ 285   13 ~ 363       14 ~ 285     ]F   824       1'8S           13i824     ]4 '85     14 ~ 285  13 ~ 824      14e285           13 ~ 824     ]4 '85
          $ /MeIH                       3i78       3 F 78         F 78         3 '8           3 '8           3e78       3e78       3 '8      F 78          F 78             3e78         3 '8 a

GLNPK HYDRO Rutl-OF~RI VER - PREFERRED SUBPKRIOD l NOt<E ESCALATION RATESI CAPACITY COST 0 '  %/YH COHPAtlY S NO SPINNINO RESERVE CREDIT ENERGY COST 0~0 AREAl 3 FORCED OUTAGE RATEl Qe% YEAR JAN FEII HAR APR HAY JUN JUL Auo SEP OCT NOV UEC CAPACITY ]ee 16 ~ 16 ~ 16 ~ 16e ]e. 16 ~ 16e ]bi 16 ~ lb. le. 8 $ /eIW 0 ' 0~0 0~0 0 ' 0 ' Qe0 QeQ 0 ' QiQ 0~0 0~0 0 ' ENERGY OWH ]oe.2 8.995 8 ~ 415 Bi995 8 '05 6 ~ 995 Bi705 8 '9S 8 '95 6 ~ 70S '95 8 F 705 8 '95

          $ /ttttM                      3 '8       F 76           3  '8        3 '8           3 '8           3 '8       F 78       3i 78     3 '8        8 F 78             3e78         F 78 OSWGT IE                HYDRO          RUN OF  RIVER             PREFERRED      SUBPERIODI NONE                      ESCALATION RATESI CAPACITY COST                0 ~ 0 %/YR COHPAtIY       5                         NO    SPINNINO RESERVE CREDIT                                                ENERGY COST           0 '

AREAl 3 FORCED OUTAGE RA7El 0 ' YEAR JAtl APR HAY JUN JUL AUO SEP OCT NOV OEC CAPACITY HW 0 ~ 0 ~ 0 ~ Qe 0 Qs 0 ~ 0~ 0 ~ 0 0~ 0 ~

            $ /HW                         0 '        0 '            0 '          0 '            QeQ
                                                                                                    ~
                                                                                                       'I      QeQ        0 '        QeQ       0 '           0 '
                                                                                                                                                                 ~

QeQ 0 ' ENERGY Ot:et 3 ' 0 '74 0 '56 0 '74 0.265 '74 0 '65 '74 '74 0 '65 '74 '65 0 '74

          $ /HWM                        3e78       3i78           3  '8        3 '8           3 '8           F 78 0

3 '8 0 3 '8 F 78 0 3 '8 0 F 78 3 '8

NRC INTERROGATORY ON NINE NILE POINT NUCLEAR UNIT NO ~ 2 EtiERGY HANAOEHENT ASSOCIATES t It(C PAGE 505 ITEH NO ~ E 320 ~ 1 lo) REPT 9 OPTION 3 SURREPORT I 05/13/83

                                            <<oooo<<a<<a TRANSACTIONS INPUT SUHHARY FOR 1988 oaoooaoaoo II t'TORAG[

HUDFLS HYDRO PREFERRED SUBPERIODI tlOHE ESCALATION RATKSI CAPACITY COST 0 ~ 0 %/YR Q COHPANY 5 No SPINNINO RESERVE CREDIT ENERGY COST 0 ' AREAI - 4 FORCED OUTAGE RATKt 0 ' YEAR JAN FEB HAR APR HAY JUN JUL AUO SKP OCT NOV OEC. CAPACITY HM 2~ 2~ 2~ 2i 2i 2i 2~ 2~ 2 ~ 2~ 2~ 2~ 0 $ /HW 0 ' 0 ' 0 ' 0 ' Oio Oio 0~0 0 ' 0 ' F 0 0 ' F 0 ENERGY OWH 7 0 '10 0 '71 0 ~ 610 0 '90 0 ~ 610 0 '90 610 0 610 '90 Oeelo 0 '90 ooeIO I $ /MWH 3 '8 F 78 3o78 3 '8 3o78 F 78 0 ~ 3 '8 ~ F 78 0 3i78 F 78 F 78 3 '8 = 0 HECHVL HYDRO RUN'F RIVER PREFERRED SUBPKRIOOI NONE ESCALATION RATESI CAPACITY COST 0 ~ 0 %/YR

0 COHPANY AREA) 5 NO SPINNINO RESERVK CREDiT ENERGY COST 0 '

4 FORCED OUTAGE RATE! Og% h 0 YEAR JAN FEB HAR APR HAY If JUN JUL AUO SEP OCT NOV DEC 0 CAPACITY ENERGY HH

             $ /HW OHH       19  '

0 li683

                                                 '8 3~
                                                   '      0 li574 3~

3l Oeo 683 0 1.629

                                                                                 '8 3~
                                                                                   '           0 3i
                                                                                                 '   I'io
                                                                                                     'I 1,683 '" li629 3~

0 Ii683 3~ 3~ oeo I ~ 683 3~ 0~0 I i629 3~ 0~0 683 0 Ia629 3~

                                                                                                                                                                       ~ 0 3~

0~0 I i 683 a

           $ /H<<H                              3        3e78 1 ~

F 78 3 3 '8 F 78 3i78 F 78 F 78 1 ~ F 78 F 78 3178 SUGAR STORAGE HYDRO PREFERRED SUBPKRIODf NONE ESCALATION RATESI CAPACITY COST Oio %/YR 0 COMPANY 5 NO SPINNINO RESERVK CREDIT ENERGY COST 0 ' ARKAI 3 FORCED OUTAGE RATE! Oi% YEAR JAN FEB HAR APR HAY JUN JUL AUO SEP OCT NOV OEC CAPACITY H'W 4~ 4 ~ 4~ 4~ 4~ 4~ 4~ 4~ 4e 4~ 4o 4~

             $ /HW                               F 0      0 '       0 '          0 '           0 '           0~0         Ooo       0,0      0~0         F 0          0~0         0 '

ENERGY GWH 25 ~ 5 2o156 F 017 2 ~ 156 F 087 F 156 F 087 2 '56 2 ~ 156 F 087 2.156 F 087 2i156

 ~
           $ /MWH                              5 ~ 78  '3 ~ 78    F 78         3 '8          3 '8          3 '8        3e78      F 78     3 '8        3 '8         3 F 78      3e78

NRC INTERROGATORY ON NINE NILE POINT NUCLEAR UNIT NO ~ 2 ENERGY HANAOEt1ENT ASSOCIATES I INC PAGE ITEN Noe E 320 ~ 1 (Ot REPT 9 OPTION 3 SUBREPORT 1 50'5/13/83 TRAtISACTIONS IttPUT SUHHARY FOR 1988 SGLENF HYDRO HUt>"OF RIVER PREFERRED SUBPERIODi ttotiE ESCALATION RATES I CAPACITY COST oeo %/Ytt CotIPatI Y 5 NO SPINNING RESERVE CREDIT ENKPGY COST 0 ~ 0 AREA! 4 FORCED OUTAGE RATEI 0 % YEAR JAN FEB HAR APR HAY JUN JUL AUG SEP OCT NOV OEC CAPACITY 12 ~ 12e 12 ~ 12e 12 12 ' 12 ~ 12e 12 ~ 12e 12 ' 12 ' S/t1W 0~0

                                   '50 0~0       oeo         0 ~ 0             'eo
                                                                                                       ~ 0      0~0       0~0       0~0        0~0             0~0          '

ENERGY OWH . 73e8 6 5e846 6 '50 6 '48 6 '50 6 '48 6 '50 6 '50 '48 '50 '48 6 '50 S/HWH 3 '8 F 78 F 78 3e78 3 '8 3 '8 F 78 3e78 6 F 78 6 F 78 6 F 78 3e78 HADLEY HYDRO RUtt OF~RIVER PREFERRED SUBPERIODI NONE ESCALATION RATESI CAPACITY COST Oio %/YR COHPAtlY 5 NO SPINNING RESERVE CREDIT ENERGY COST 0~0 AREA I 4 FORCED OUTAGE RATEI oem' YEAR JAN FEB HAR HAY JUN JUL AUO SKP OCT NOV OEC CAPACITY eIW 0~ 0~ ~ 0~ 0~ 0~ 0~ 0 ~ 0~ 0~ 0~ 0~

           $ /HW                     0~0         0~0       oeo         0~0            0~0            0~0        0~0       oeo       0~0        0~0             0~0        0~0 ENERGY      GWH        oio      OeO         0~0       0~0         oeo            0~0            0~0        0~0       0~0                                               '

S/HWH 3 '8 3 '8 3 '8 3e78 3e78 ' 78 F 78 3'e 78 0~0 3 '8 0 ~ 0 F 78 0~0 F 78 0 ITS a FLTHLS HYDRO RUN>>OF RIVER PREFERRED SUBPERIODI HONK ESCALATIOtI RATESI CAPACITY COST 0~0 1/YR COHP eNY 5 NO SPINNINO RESEPVE CREDiT ENERGY COST 0~0 AREA-' FORCED OUTAGE RATEI 0 ~

                                                                                             '5 YEAR            JAN         FEB       HAR         APR            HAY            JUN        JUL       AUO       SEP        OCT             NOV        OEC CAPACITY     HW                      0 ~          0 ~      0~           Oi            0~             Oe         oi         0~       0 ~         0~             0 ~         0 ~

5/H'H oeo 0 ~ 0 0~0 0~0 0~0 0~0 0~0 0~0 0~0 0 ~ 0 0~0 0 ' ENERGY OWH oeo 0~0

                                     '8      0~0       oeo         oio            0 '            0~0 S/HWH                    3         ~

3e78 F 78 3 '8 3 '8 3,78 0~0 3 '8 0~0 3 '8 0~0 3 '8 0~0 ITS Oeo 3 'S 0~0 ITS 0

.0 NRC INTERROGATORY ON              NINE MILE POINT NUCLEAR UNIT           NO ~ 2                    ENERGY MANAGEMENT ASSOCIATESi       INC                        PAGE      50f ITEM    NO ~  E 320  ~ 1  {D)                                                                      REPT    9 OPTION 3 SUBREPORT                                   05/l 3/83
                                      >4oooeeo+Ie+    TRAIISACTIOtiS INPUT SUHMAR'Y FOR 1988 ooooolo4oet SHRHISL                 STORAGE       tlYDRO                  PRFFERRED       SUBPERIOPI NONE                      ESCALATION RATESI CAPACITY COST            0 ~ 0 %/YR COHPAttY                              NO    SPINNING RESERVE CREDIT                                                ENERGY COST        0 '
                                                                                       '3 '3 AREA I                                FORCED OUTAGE RATEI               0 YEAR             JAN          FEB        HAR           APR           HAY            JUN         JUL       AUG       SEP           OCT           NQV        DEC CAPACITY      Met                       33 ~         33  '          '         33                                       33 ~      33 ~      33  '         33e           33 ~       33  '
                                                                                                                    '3
,  0           $ /Met                        0 '

14 '31

                                                                       ~ 0     . 0             0 '            0
                                                                                                              '56 '         Oe0       0~0
                                                                                                                                              '56
                                                                                                                                                  '           0             0
                                                                                                                                                                          '56 '
                                                                                                                                                                                     '31
                                                                                                                                                                                         ~ 0 ENERGY      G>H        173e9       14 ~ ?31     13 F 781                14e256        14e731
                                                                                                         )

14 14e731 14 e 731 14 14 '31 14 14 le

'1
             $ /HIGH                       3 ~ 78       F 78       3 '8          3 '8     =

3 '8 m 3 '8 F 78 3 '8 3 '8 F 78 3e78 F 78 HIOAH STORAGE tiYORO PREFERRED SUBPERIOOI NOtlE ESCALATION RATESI CAPACITY COST 0~0 >/YR COMPANY 5 NO SPINNING RESERVE CRFOIT ENERGY COST 0 ' AREA' FORCED OUTAGE RATEI 0 % YEAR JAN FEB HAR APR HAY JUN JUL AUG SEP OCT NOV OEC CAPACITY Het 6~ 6e 6e e. 6~ 6~ 6e 6~ 6~ e. 6~ 6~

- 0 $ /tN 0 ' 0~0 0~0 0 ' oe0 Oe0 0 ' 0 ' 0~0 0 ' 0 ' 0 '

ENERGY GIIH 2be4 2 '32 F 088 2 '32 21160 '32 2 ~ 160 2 '32 2 '32 2, leo 2 '32 2.leo 2 '32

             $ /HYH                        3 '8         3e78       3e78          F 78 2

F 78 F 78 F 78 3 '8 3 '8 F 78 3 '8 3e78 e VARICK STORAGE HYDRO PREFERRED SUBPERIODI NONE ESCAI.ATION RATES! CAPACITY COST Oe0 %/YR COMPANY 5 NO SPINNING RESERVE CREDIT ENERGY COST 0 ' AREAI 2 FORCED OUTAGE RATEI 0 % YEAR JAN FEB HAR APR MAY JUN JUL AUG SEP OCT NOV OEC CAPACITY Htt 5 ~' ~ 5~ 5~ 5~ 5~ 5~ 5~ 5~ Se 5~ 5~

               $ /Hee                        0 '          0 '        0 '           0 '           Oi0            0 '         0 '       0 '       0 '           0 '           0 '        0 '

860 ENERGY GWH 22e0 860 740 f 860 le800 860 800 860 1.860 800 860 800

             $ /HIIH 1 ~

3 '8 1 ~

                                                       'F 78       3 '8          3178 1

3 '8 1 F 3 '8 1 ~ 3e78 F 78 1 ~ 3 '8 1 ~ 3 '8 1 F 3 'B 1 ~ 3 '8 j 0 lo

I NINE ttILE POINT NUCLEAR UNIT lo NRC INTERROGATORY ON ITEtl NOo E 320 ~ 1 [OI NO ~ 2 EtlEROY MANAGEMENT ASSCCIATKSt INC REPT 9 OPTION 3 SUBREPOttT 1 PAOK 05/13/83 50tt etoto~~tt>>~4 TRANSACTIONS ItlPUT

SUMMARY

FOR ]988>>ttettt>>toot ttlo MINETO S'TORAOE HYDRO PREFERRED SUBPERIODI NONE ESCALATION RATESI CAPACITY COST 0 ~ 0 %/YR COttPANY 5 tlO SP INNING RESERVE CREDIT ENERGY COST 0 ' AREA! FORCED OUTAGE RATEI 0 % YEAR JAN FEB MAR APR MAY JUN 'UL AUG SKP OCT NOV OEC CAPACITY ttet 8~ 8~ 8~ 8~ 8~ 8~ 8~ Be 8~ 8~ ge 8.

            $ /Met                   0 '           0 '      0 '           0~0           Oe0            0~0            0 '       0 '          0~0         0 '            0 '        0 '

ENERGY OttH 32 ' 2 '90 2 ~ 610 2e790 2 F 700 2 '90 F 700 2o790 2 '90 '00 2e790 2 '00 2 '90

          $ /HWH                   3 '8          3i78     3 '8          3e78          F 78           3 '8           3e78      3 '8       2 3 '8        3e78           F 78       3e78 FULTOti             STORAGE      HYDRO                  PREFERRED       SUtIPERIOD! tlONE                      ESCALATION RATESI CAPACITY COST               0 ~ 0 $ /YR

' COMPANY 5 NO SPltlNINO RESERVE CREDIT ENERGY COST 0 ' AREAI 2 FORCED OUTAGE RATEI 0 ' YEAR JAN FKB MAR APR MAY . JUN JUL AUO SEP OCT NOV OEC ~ CAPACITY HN le li li li lo i le le le I~ 1 ~ le 1 ~ ' $ /HW 0 0 0 ' 0 Oe0;' 0 ' 0 ' 0~0 0 ' 0 ' 0~0 0 ' ENERGY GotH 4 ~4 0 '72 Oi348 '72 '60 '72 '," Oe360 '72 '72 0 '60 '72 '60 '72

          $ /M'rlH                 3o78          3 '8   0 3 '8 0

3 '8 0 3 '8:i '8 I 3 0 3 '8 0 3'e 78 F 78 0 3 '8 0 3 '8 0 3 '8 FEEDER STORAGE HYDRO PREFERRED SUBPKRIOPI NONE ESCALATION RATESI CAPACITY COST 0 ~ 0 $ /YR COotPANY 5 NO SPINNINO RESERVE CREDIT KtlEROY COST 0 ' AREAI FORCED OUTAGE RATE I 0 ~ 5 YEAR JAN FEB MAR APR MAY JUN JUL AUO SKP OCT NOV OEC CAPACITY Hit Si 5~ Si 5~ 5~ Se 5e 5~ 5~ 5e 5~ 5~

            $ /tti                   0 '           0 '      0~0           Oi0           0~0            Oo0            0 '       0 '          Oi0         0~0            0~0        0 '

ENERGY OttH 20 ' 711 601 lo711 1i656 1.711 l.eSe 711 le711 1 ~ 656 I ~ 656 I ~ 711

          $ /HFH 1 ~

3 '8 1 ~ 3o78 3 '8 F 78 F 78 3i78 1 ~ 3o78 3 '8 F 78 1 o711 3o78 3 '8 3e78 I l l s

NRC INTERROGA1ORY ON NINE MILE POINT NUCLEAR UNIT NO ~ 2 ENERGY toAttAGKIIENT ASSOCIATESI INC PAGE 509 ITEM NO ~ E 320 ~ 1 (U) REPT 9 OPTION 3 SUBREPORT I 05/13/83

                                   <<<<<<<<<<<<<<<<<<>>      TRANSACTIONS IttPUT 

SUMMARY

FOR 1988 <<<<<<<<<<<<<<<<<<<< OSWF-tt STORAGE HYDRO PREFERRED SUBPERIODI NONE ESCALATIOt'I RATKSI CAPACITY COST 0 '  %/YR COMPANY 5 NO SPINNING RKSERVE CREDIT EtoEAGY COST 0 ' AREAI 4 FORCED OUTAGE RATEI 0 ' YEAR JAN FEG HAR APR oIAY- JUN JUL AUG SKP OCT NOV OEC I CAPACITY HW 6~ 6o 6i 6e 6~ ' ~ 6~ 6~ 6~ 6~ 6. 6. 0 S/t4tt 0e0 Qi 0 0 ' OoO OiO 0 ' OoO

                                                                                                                         '46 0 ~ 0      QiQ            0~0            0 '         Oe0 ENERGY       G'>>'tt      24 ~ 2      2 ~ 046      1 ~ 914   F 046            980        2i046                 980     2           ZF 046        980        2 '46              980     Zo046 S/HWtt                        3i78         3i78      F 78 1 ~

3 '8 3i78 1 ~ 3 '8 F 78 3 '8 1 ~ F 78 F 78 1 ~ F 78 3 '8 0 VKRHONT SALE UNSCHEDULED PREFERRED SUBPFRIODI HONE ESCALATION RATES I CAPACITY COST 0 ~ 0 %/YR COMPANY RESERVE DEBITED ENERGY COST 0 ' AREAI 20 FORCED OUTAGE RATEI 0,% YEAR JAN FEB HAR APR HAY JUN JUL AUG SEP OCT ttOV OEC CAPACITY Mtt 150i 150 ~ 150o 150i 150 150 ' 150 ~ 150 ~ 150 ~ 150 ~ 150 ~ 150 ~

            $ /HW                         0 '          OiO       0 '          0 '                'o0
                                                                                                                 '         0~0        OoO        Oe0            0 '            0 '         0 '

ENERGY GwH 847i3 7li767 67e136 71 ~ 767 69 '51 71i 767 69 '51 71o 767 71 o,767 69 ~ 451 71 '67 69 ~ 451 71 ~ 767

          $ /tott H                     QoO          0 '       0 '          0'             0 '               0 '         OeO        0 '        0 '            0 '            0 '         0 '

AMP OHIO SALE UNSCHEDULED PREFERRED SUBPERIODI NONE ESCALATION RATESI CAPACITY COST 0 ~ 0 %/YR COMPANY 8 RESERVE DEBITED ENERGY COST 0 ' AREAI 13 FORCED OUTAGE RATEI Oi% YEAR JAN FEB HAR APR HAY JUt'I JUL AUG SEP OCT NQV DEC CAPACITY 23 ~ 23 ~ 23 ~ 23 ' 23 ' 23 ~ 23 ' 23 ~ 23 23 ~ 23 ' Z3 ~

            $ /Mg                         0~0          0 lli686
                                                         '       0 '            '              '               OiO          ~ 0       0~0           'iO 0 '              '         0 '

Et/ERGY G'WH 147 ~ 5 12 ~ 492 12 ~ 492 12o089 12 ~ 492 12 ~ 089 12 ~ 492 12 ~ 492 12 F 089 12 F 492 12i 089 12 ~ 492

          $ /MWH                        0 '         .0 ~ 0     0 '          Oi0            OiO               0 ~ 0       OiO        0 '        0 '            0 '            0 '         0 '

0

NRC INTEfIROGATORY ON NINE HILE POINT NUCLEAR UtJIT tJO 2 ENERGY tlAtJAOEt'KNT ASSOCIATKSt INC PAGE 510 ITKH NO ~ E 320il fo) REPT 9 OPTION 3 SUBRKPORT 1 05/13/83 aaaaaaaaaa TRANsAGTIDNs INpUT sUHHAf?Y FDR 1988 aaaaaaaaaa o PASNY PURCHASE PEAK SHAVING PREFERRED SUBPERIODI NONE ESCALAT I ON ftaTKS I CAPACI TY COST 0 ~ 0 %/YR 0 COHPANY 0 AREAI 1 RESERVE CREDITED FORCED OUTAGE RATEI oi% ENERGY COST 0~0 YEAR JAN FEB HAR APR MAY JUN JUL AUG SEP OCT NOV DEC CAPACITY 0~ 0~ 0~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0~ 0~ 0~

             $                              0~0           0~0          0~0             oio              oeo             oio            Oio                010         oeo          0~0           0~0         0~0 OeH                                    0~0                                                                          oeo                                                                   0~0
               /He'NERGY 0 ~ 0     0~0                        OeO             OeO              0~0             0~0                               0 ~ 0       0~0          0~0           0~0
          $ /HWH                          0~0           0~0          O.n             O,O              0~0             010            0~0                0 '         010          0~0           0~0         0 '

INTERCHANGE ACCOUNTINO I PRICING OPTION I COHP OWtJERSHIP COHP OWNERSHIP COHP OleNKRSHIP COMP OWtlERSHIP COMP OltNERSHIP DISPLACEHENT COST I 0~0 2 48 ~ 0% 3 13 ~ 0 4 10 ~ 0 5 1910 1 3~0 FIXED COST INCREASE I 5 ' $ /HelH 6 3 ' 7 4 ' SaVINGS FIXED SPLIT I Oeo PRIORITY ORDER I 0 REPORT ING OPTION I ACCOUNTINO OPTION I ALLHYDR1 HYDRO RUN OF~RIVER PREFERRED SUBPERIODi NONE KSCALATION RATFSI CAPACITY COST 0 '  %/YR COHPANY RESERVE CREDITED ENERGY COST oeo AREAI 7 FORCED OUTAGE RATEI 0 ~% YEAR JAN FEB HAR APR HAY JUN JUL AUO SKP OCT NOV UEC ~ CAPACITY Hit loi 10 ~ loe 10 ~ 10 ~ 10 ~ 10 ~ loe 101 101 10 ~ 10 ~

             $ /tlW                         oeo           0~0          oeO             0 ~ 0-           oeo             0 ~ 0          0~0                0~0         0~0          010           0 ~ 0       0~0 ENERGY        GwH           27i2       3 ~ 176       2 ~ 172      2 '03           4 '22            2 '37           0   817        oi343              0 '36       I ~ 408      2e343         3 '23       3 '44 0          $ /Hte H                        6 ~ 70        6 '4         6i79            6 '4             6 '8
                                                                                                                      ~

6 '3 6 '7 7 '2 7 F 07 7 ~ 11 7 ~ 16 7 '1 ~ ALLHYDR2 HYDRO RUN~OF~RIVER PREFERRED SUBPERIODI NONE KSCALATION RATESI CAPACITY COST 0 '  %/YR COHPANY 4 RESERVE CREDITED KNEROY COST 0~0

                                                                          '9 '9 AREA I   19                             FORCED OUTAGE RATEI                   0 ~%

YEAR JAN FEB HAR APR HAY JUN JUL AUG SKP OCT NOV DKC ~ CAPACITY 19i 191 19 ~ 19 ' 19 19 ~ 19 ' 191 19 ~ 19 ~

             $ /NW                          0~0           oio          0~0             0~0              oeo               ~ 0              'io 0~0           ~ 0        0~0           0~0         0~0 ENERGY         OWH         101 ~ 6     6 ~ 919       51928        8 ~ 532             550        1 0 ~ 884         Bi396          5 ~ 051            6 ~ 138     8i341        9 '65        10 '34       9 '22
           $ /Hi'H                        1 ~ 83        1184         I ~ 86 1 1 ~

F 87 F 88 F 89 I ~ 91 I ~ 92 I ~ 93 1 '4 I ~ 96 I ~ 97 0

NRC INTERROGATORY ON 320 NINE MILE POINT NUCLEAR UNIT ~O!2 I ENERGY HANAGEMENT ASSOCIATESt INC PAGE Sll ITEH NO ~ E ~ 1 tO1 I I REPT 9 OPTION 3 SUBREPORT 1 05/13/83 I oaooaooooa TRANSACTIONS INPUT SUHMARY FOR 1988 aooooaoaaa '0 ALLHYDR3 HYDRO COHPANY RUN"OF RIVER 4 PREFERRED SUBPKRIODt NONE. RESERVE CREDITED ESCALATION RATESt CAPACITY COST ENKRGY COST 0 ~ 0 %/YR 0 0 AREAI 19 FORCED OUTAGE RATEI 0 ' 0 YEAR JAW FEB HAR APR JUN JUL SEP OCT NOV OEC CAPACITY HN 18i 18! 18 ~ 18 ~ 18 ~ 18! 18! 18 ~ 18 ~ 18 ~ 18! 18 ' 0 $ /H< 0~0 0!0

                                                    '76 0 '        Oe0      0~0            0~0        0~0       0~0      0~0          0   0          0 '          '

ENERGY GhH 102 8 ~ 460 7 10!641 11 ~ 843 '45 Bi283 '89 '39 '82 7.547

                                                                                                                                                ~
                                                                                                                                                           '78       8 '58 I           $ /Htt H                     3 '8        3!70      3 ~ 72     3!75 11 F 77          F 80 6

F 02 6 F 85 6 F 88 3 '0 7 3 '3 3 '5 0 NKUTIL PURCHASE PEAK SHAVING PREFERRED SUBPERIODt NONE ESCALATION RATESt CAPACITY COST 0 ~ 0 %/YR COMPANY 6 RESERVE CREDITEO ENERGY COST 9!T AREAt 8 FORCED OUTAGE RATEI Oe% 0 YEAR JAN FEB HAR APR MAY JUN JUL AUG SEP OCT NOV DEC CAPACITY HK Oi 0 0 ~ 0 .Oi 0 0 0 0! ,0 $ /HH 67!6 67

                                                         ~

67 ~ 6 67 '

                                                                              ~

67 ' '67

                                                                                                    ~
                                                                                                      ~

6 67.6

                                                                                                                 ~

67 0

                                                                                                                           ~

67!6

                                                                                                                                    ~

67 ~ 6 0 67 ~ 6

                                                                                                                                                                 ~        0 67!6
                                                                                                                                                                            ~

ENERGY GtfH Oi0 0~0

                                          '6      0         0          0   0,    Oi0           0
                                                                                                   '6     0         0 '       Oi0           '            0!0         0 '

0

           $ /MWH                    126         126 ~ 36  126,'36
                                                                         ~

126 ~ 36 126 ~ 36 126 126 '6 126!o36 126 '6 0 126 '6 f26 ~ 36 126 ~ 36

i"RC lttTERROGATOHY Vh Nlt E ttILE POIrlT RUCLEAH UNIT I'tO ~ 2 ENERGY t~ANAGEHENT ASSOCIATES) IHC PAGE 516 IT'tt ttO ~ E 32u<1 {t>I RE>T 9 OPTION 3 Slt8REPOPT I 05/13/83 444" 444444 Ttt>>><SACT IOtlS I'tPttT SttN>tARY FOR 1988 4444444444 tt I Gttl: 'tLL <YVttO ttVN OF-HI'tFtt PREFEHt-Et'UPPERIGDt 'lOht ESCALATIOtt RATES! CAPACITY COST 0~0 I/YH COttPARY I RESEPVE CREDITED EttERGY COST 0~0 AHEAt 10 FORCED OUTA E RATE! 0 YF JAIL f Elt NAFt tiAY JUti JUL AUG SEP OCT HOV OEC A4'3 CAPACITY 2 ~ 3 ~ 5e 5~ 3~ I~ I~ 0~ I~ I~ 2~ 3~ pjt 4 0 0 0 0 0~0 n ~ 0 Own 0 ~ 0 0~0 0 ~ 0 0~0 0~0 0 ~ 0 0 ~ 0 EttERGY 0 tr. ' I ~ 600

                                               ~

n,co<

                                                            ~

2.TOO 3.2vn 2,0OO 0 ~ 3ttn 0 '00 0 ~ 100 0 '00 OeIOO 0 '00 I ~ 600

              >/t'                        0~0            0~0         0 ~ it          0 ~ 0      tt ~ 0         0 ~ 0       0 ~ n     0 ~ 0     0 ~ 0       Own         0 '         0 ~ 0

I~RC INTERROGATORY ON NINE M]LE POINT ttUCLEAR UIIIT IIO ~ 2 EtlEtIGY tIAttAOEMKNT ASSOCIATESI INC PAGE 51 f ITEM ttOi E 320 ~ 1 {Ut REPT 9 OPTION 3 SttBREPORT 1 05/13/83 rI TRANSACTIONS INPUT SUttMARY FOR ]tt88 ttl TCHELI. PURCHASE PEAK SHAVIIIG PREFERRED SUIIPFRIODI ttEEKDAY ESCALATION RATES I CAPACI TY COST Et4EROY COST Oe0 %/YR 0 ' COMPANY RESERVK CREOITEO AREet I 12

                                          ]SAN FORCED OUTAGE RATEI
                                                                                        ]SAN 0  '

JAN FEB MAR APR HAY  : JUN AUO SEP OCT hOV OEC YEAR 6 CAPAC I T Y ENERGY . Mtt

                $ /Ma G~tt       ]88 '

32 951 0 14 ~ 922 1'5] 32

                                                                           ]Se437 32 ~

0 ' 32 951

                                                                                                 ',)    IS 437 32 0  '
                                                                                                                       '       32 15.951
                                                                                                                                   '      32 ~

0

                                                                                                                                     ]5 ~ 951 32 ~

0 15e437 32 ~ Oe0 15 ~ 951 32 15 ~ 437

                                                                                                                                                                                             '        32 ~

Oe0

                                                                                                                                                                                                 ]5 ~ 951
             $ /Me'H                         0 '         0 '       0 '         0 '          0 '       .      0 '           0 '        0 '           Oe0            Oe0             0  '           0 '

MKCHAWIC HYDRO RUN OF RIVER PREFERRED SUBPKRIODI NONE ESCALATION RATESI CAPACITY COST Oeo %/YR COttPANY 4 RESERVE CREDITEO ENERGY COST 0 ' AREAI 21 FORCED OUTAGE RATEI 0~5 APR JUN JUI. AUO SEP OCT HOV OEC YEAR JAN CAPACITY 17 ~ 17e 17i 17 ~ 17e 17 17 ~ 17 ~ ]7 ~ 17 ~ 17i 0 17 ~

                                                 '           '         '         0 '                             0  '          0 '
                                                                                                                                   ~

0 ' 0 ' 0 ' 0 ' 0 ' Et>ERGY

                $ /Mte Oettt       95 ~ 3 0

9 010

                                             ~        8 '80 0         0 11 940
                                                                   ~       12 F 500      11 ~

Oe0 810 6 F 700 5i000 4e500 4 '00 5 '60 6 '50 9 '50

                                                      'ie83                                                    le88              75     fe76           I ~ 77         ] ~ 78              79            81
             $ /Mek                          ] ~ 82                I ~ 84      1 ~ 85       I ~ 87                           1                                                        1 ~           1 ~

RUN OF~RIVER PREFERRED SUBPERIODI NONE ESCALATION RATFSI CAPACITY COST 0 ~ 0 %/YR O&M HYD] HYDRO COIIPANY 6 RESERVE CREDITED ENERGY COST 0 ' AREAI 11 FORCED OUTAGE RATEI 0~5 APR HAY JUN JUL AUO SEP OCT HOV DEC YEAR JAN FEB MAR Ittt ]0 ~ 10e 10 ~ 10e 10 ~ 10 ~ 10 ]0 ' 10 ~ ]0 ~ 10 ~ CAPACITY

                $ /Ittl                         Oe0 10 ~

0 ' 0~0 0~0 0 ' 0 ' 0 ' 0 '

                                                                                                                                                ~
                                                                                                                                                            '           0 '             0  '          0 '
                                                          '60       '40         '00                             '00        7 '40      7 '40            '00            '40           7 '00             440 ENERGY,          GHH         87 '         F 440      6         7           7
                                                                                  '0       Te440
                                                                                               '0 7
                                                                                                                                '0         '0        7
                                                                                                                                                         '0         7
                                                                                                                                                                        '0               '0            '0
              $ /MetH                        2  '0    '
                                                            '0     2  '0       2            2                  2e90          2          2              2              2               2             2

NRC 1NTKRROGATORY ON ttINE NILE POINT NUCLEAR UNIT NO ~ 2 ENERGY t1ANAGEHKttT ASSOCIATES I INC PAGE. 5]tt ITEN t>O ~ E 320 ~ 1 (O) RFPT 9 OPTION 3 SUBREPORT 05/]3/83 TRANSACTIONS INPUT SUMHARY FOR ]98), <<aaaaaaaaa RF PSN 1 PURCHASE PEAK SHAVING PREFERPED SUBPERIODt VEK DAY ESCALATION RATESl CAPACITY COST 0 ~ 0 %/YR 0 COHPANY 8 AREAl 26 RESERVE CREDITED FORCED OUTAGE RATE] Oe% ENERGY COST 0~0 YEAR JAN FEB HAR APR HAY JUN JUL AUG SEP OCT NOV OEC CAPACI TY Het lne ]pe ]0 ~ lpe ]pe ]p ~ 10 ~ 10 ~ lpe lpe lp ~ lpe

               $ /Nit                          0~0          0~0       0~0        0~0            p,p              0~0         0~0       0~0       0~0         0~0            0~0         0~0 ENERGY        GkH           58 '        4 '85        4 '63     4 '85      4  '24         4e985            4e824       4 '85     4 '85     4 '24       4 '85          4 ~ 824     4 '85 I

6/Hie H 0~0 0~0 0 ' 0~0 0,0 ~ I

                                                                                                           ~   O,p         0~0       0~0       0~0         0~0            Oin         0~0

( J SOLIDWS7 PURCHASE PEAK SHAVING PREFERRED SUBPKRIODt ttEEgDAY ESCALATION RATESI CAPACITY COST 0 ~ 0 %/YR

0 COtIPANY 2 AREAI 25 RESERVE CREDITED FORCED OUTAGE RATKt Peg EtIERGY COST 0~0 CAPAC IT Y ENERG'Y tt<
               $ /t't'4 G'~H YEAR 294 '

JAN 50 24 '24

                                                ~

0 FEB 50 23 ~ 316 NAR 50 ~ Oep 24i924 APR 50e 0 ~ 24 ~ 120 0 HAY 50 0 24 ~ 924

                                                                                                  ~

0

                                                                                                       ',24    ~

JUN 50e

                                                                                                                   ~

120 0 JUL 50 24 '24

                                                                                                                              ~

0 F4 AUG 50e 0.0

                                                                                                                                     '24    24 ~

SEP 50

                                                                                                                                                  ~

1ZO 0 24 OCT 50

                                                                                                                                                           '24
                                                                                                                                                               ~

0 NOV 50

                                                                                                                                                                              ~

24 ~ 120 0 DEC 50 24 '24

                                                                                                                                                                                         ~

0 3/HIIH 0~0 0~0 0~0 0~0 0~0  ; 0~0 0~0 Oep Pep 0 ~ 0 0 ~ 0 pop INONRPDS HYDRO RUN OF~RIVER PREFERRED SUBPKRIOOt NOttE ESCALATION RATESt CAPACITY COST 0 ~ 0 %/YR COHPANY 4 RESERVE CREDITED ENERGY COST 0~0 AREAl 19 FORCED OUTAGE RATE] 0 ~5 YEAR JAN FEB MAR APR HAY JUN JUL AUG SKP OCT NOV DEC CAPACITY 7~ 7~ re 7~ r. 7. 7~ 7~ 7~ 7~ -7 ~ 7 ~ 0  %/tI<< 0~0

                                             '74 0~0       0~0        0~0
                                                                               '88              0~0              0
                                                                                                               '63
                                                                                                                   ~ 0       0~0       0~0
                                                                                                                                     '53 0~0         0
                                                                                                                                                           '76
                                                                                                                                                               ~ 0          0~0         Oep
                                                                                                                                                                                      '65 KNKRGY        GVH           34          2            2.<529    3 '56                     4 '68            2           ?e341     2         ] ~ 916     2              2e621       2 5/HWH                          2 '4         2 '6      F 27 4

2 '9 2 '1 2 '2 2 '4 2 '5 2 '7 2+38 2022 Ze23

                     't<<C I':Tie'!tO!oATORY t!ot ftlhE l,lLE POI"lT tttlCLE; H U!"-IT t40 ~ 2           'NEftGY ttAttAGEetEttT3 ASSOCIA'fESe                INC                            PAGE      51>

I IE ~ t!0 ~ E 32! ~ I (<)

                             >                                                                        ~

REF I 9 OPTION StlBREPORT I 05/13/83

                                           <<>>>><<<<>><<>><<>> TttAi>>SACTIOUS INPUT SVt ttARY        FOR    1988 <<<<<<<<>><<<<<<>><<

HF PS!l 2 PtlitCNASE PEAK SaaYIllG PREFEttPED SUBPEPIODt WEKKOAY ESCALATION RATESl CAPACITY COST 0 ~ 0 %/YR COAPPlitY 8 RESERVE CHEDITFD ENERGY COST 0~0 ARFAl 27 FORCBD OUTAGE t!DTEt 0 ' ' YEAft JAN FEB NAR PPR t!AY JUN JUL AUG SKP OCT NOV DEC

      . CAPACITY Y                                 0~       !t ~        0 ~          0 ~         0 ~  !       20  '         20  '      20  '          20o           20               20  '       20  '

Ci S/t:t. 0~0 0~0 0 ~ 0 0 ' ~ Oil 0~V 0 ' 0 ~ 0 'op

                                                                                                                                                                                       '           ~ 0 EtlEHGY         G~h        6B.B       neo      0~0        0~0         0~0           Oop            9 '48         9 '70
                                                                                                                              ~

9o970 9 '48 9o970 9 '48 9 '70 S/g e.'to Qop 0~0 0~0 0 ~0 0~0 0~0 0~0 0~0 0~0 0~0 0 ' 0~0

6 RF PS!l 3 PURCttASE PE>K SHAVItIG PHEFFRPED SUBPERIODt WEEKDAY ESCALATION RATESt CAPACITY COST 0 ~ 0 %/YR COt!PANY tt RKSERVE CREDITED ENERGY COST 0~0 CREAl 26 FORCED OUTAGE RATEt Oe%

YEAR JAN FEB ttAR APR MAY JUN JUL AUG SEP OCT NOV DEC CA>ACITY t "r Qe Qo 0~ 0 ~ Oe 40 ' 40 ' 40o 40e 40 ' 40 ' 40 ' p/t!h 0~0 Oop 0~0 Oop Oep ~ 0 ~ 0 0~0 0 ~ 0 ' ~ 0 ~ 0 EttERGY 0!'tt 137 ' 0~0 0~0 Oon 0 ' 0~0 19o296 19 '39 19o939 19 '96 19 '39 19 '96 19 '39 tt.p Q,P 0,0 0,0 0.0 0~0 0' 0 ~0 Oep 0 ' 0~0 0~0 RF PSl4 PUftCttASE PEAK SttAVING PRFFERRED SUBPERIOOt WEKKOAY ESCALATION RATESI CAPACITY COST 0 ~ 0 %/YR CONPAtlY 8 RESERVE CREDITED ENERGY COST 0~0 ARFAt 17 FORCED OUTAGE RATEt 0 ' YEAR JAN FEB NDR APR HAY JUN JUL AUG SEP OCT NOV OEC CAPACITY 0~ Oo 0~ 0~ 0~ 40 40o 40 ~ 40 ' 40 ' 4Q ~ 40 ' Qe 'I/t'e 0~0 0~0 0~0 0~0 0~0

                                                                                                                  'ep 0~0        0~0              ~ 0           ~ 0            Oep           ~ 0 19 '39
    ~

Et!KR!eY G' 137 ~ 6 0~0 0~0 0~0 0~0 Oon 19o 296 19 '39 19 '39 19 '96 19 '39 19 '96

                   $  /t    n                   0~0      0~0       0  ~ 0        0~0          0~0            Oep           0~0       0 '             Oop          0 '              0 ~ 0       0 ~ 0

1989 I say K

       )

e Jg

                                     ~~ii         ,~
                                                                                                          ~,

HRC It]TERROGATORY ON NINE HILE POINT t]UCLEAR UNIT NO. 2 ENERGY HAHAGEHENT ASSOCIATES. INC. ITEH HO. E 320.1 (D) RElvl-" 9 OPTIOt] 3 SUBREPORT 2

                                               **"**INPUT      HYDRO E      GY    ALLOCATION FOR 1989     i+~**

UNITS (GWH) PLAiHT NAHE UNIT i YEAR JAN FEB HAR ~R' HAY JUt] JUL AUG SEP OCT HOV OEC hI AGF ]R'< h]AGPE,AK 8]~GREPL ($ 14ljEP,P> 1 1 1 344 3 437.; 3705>> led ]i

                                                   ~,~9537,
                                                      =      315>>
                                                              ]3V>>
                                                                   ~
                                                                     ~-

27 3 ~

                                                                        ~34, ZB>>4
                                                                         ]24,-
                                                                              ~
                                                                                    -jGZ ~

315>>

                                                                                     ]37>>
                                                                                          ~

287 36, 304,

                                                                                                   'T
                                                                                                          ?96>>

37

                                                                                                               '15>>

283 304

                                                                                                                          'oe
                                                                                                                          ~
                                                                                                                                  ?79 315
                                                                                                                                       '88
                                                                                                                                       '7>>
                                                                                                                                       '15
                                                                                                                                               '7 27B ~

36

                                                                                                                                                            '04 293 315
                                                                                                                                                                         '7
                                                                                                                                                                         ~
                                                                                                                                                                         ~

ZTG ~ 36 '729]e

                                                                                                                                                                                   '15    '04 1                                                                    13Z>>        137 ~    132>>
                                                                                                                                       '09>>                         137 46'20  137  '32
                                                                                                                                               ~
                                                                                                                                               '3'37        '32>>
                                                                                                                                                                                   ~      ~

(4]4GPShY STeLAa 45(>>OKA'r4 l,~ I ~

                                           " 168 ~
                                      .,<rr>>;

25 ~

                                                            ~a 1 0>>
                                                            ~a>>i.,.=

2>>

                                                                        -397, 2~

407>> 524 '49 102 ~ 2~

                                                                                                   ~

329

                                                                                                               '79 349, 56e, 2~

357 ecz. Ze ell. 2>> Z83, 5R]e 2~ 267 ~ 577>> 2~

                                                                                                                                                                                   '39 '2~
                                                                                                                                                                                          '59 l
                                                                                                               ~                                                                   ~

KEOS]CO X 22 ~ . 2~ 2~  ? 2>> 2~ 2~ 2~ 2  ? 2~

                                        ~ Ii+                                                                C ~

1 ~ ~

                                                                                                                                                                         ~

OELTA - e ~ le I~ 1 ~ 1>> 1 ~ ]~ le 1 ~ (1] i>CULEX 1 ~ l] ~ 3~ 3~ 3 ~ 3~ 3~ 3>> 3>> 3 ~ 3 ~ 3~ 3>> CRESCIT.<~7 1 , ZZ.~ p. 2~ ( i'- ~ 2~ 2>> 2>> 2~ r(r'~(' O ~~t 1' le PARTICIPANT ]~ le ]~

                                                                                                               ~

1>> 1 ~ ]~ 1 ~ le 1 ~ le - vISC>><h.d 2~ 2~ a ~ Z~ 2~ 2 ~ 2~ 2~ 2~ 2~ 2~ aaaaa I<<VO>>T UWI 7 [Ot> SALES PENCEhT>GES SOLO FQR 1909 aaaaa pLAh I:iAHF V(:] 7 ( Ja > FEb <<AH APP ".'4Y JUN JUL AUG SEP OCT hQ'V OEC OS%EGO 0~0 n.c ac 0~0 0 ' G~ 0 0 ~ 0 0~0 0 ' ~ ~ 0' ~ OSe'EGO 0>>G cec u.C 0.0 O,n oec C.ii 0.0 C,C n.c n.o

4!RC INTERROGPTORY O"l NINE HILE POINT NUCLEAR UNIT tlO ~ 2 ENKROY I!ANAGEt!ENT ASSOCIATES I INC PAGE 56ot ITEN tlO ~ E 320 ~ I (U) . REPT 9 OPTION 3 SUBREPORT I 05/13/83 7RA!ISACTIONS INPUT SUHt'ARY FOR 1989 ooeoooooooo OHECOl!1 PUHCH4SE PEAK SHAVIteG PREFERRED SUBPERIODI NONE ESCALATION HATESI CAPACITY COST 0e0 %/YR COMPANY RESERVE CREOITEO ENEPGY COST an AREAI 1 FORCED OUTAGE RATEt Oe% YEAH JAN MAR APP. teAY JUL AUG SEP OCT OEC CAPACITY t!W 0 ~ 0 ~ no 0 ~ ns 0 ~ 0~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 5/H>> nen 0~0 0 ~ 0 an 0 ~ 0 an 0~0 0 ' 0 ~ 0 an an an ENERGY GWH 0 ' 0 ' an an Oon Gin 0 ' 0~0 n.n 0 ' 0~0 0~0 0 ~ 0 f/M>>H 0 ~ 0 0 ' O.n 0~0 0~0 non 0,0 0 ' 0 ~ 0 0~0 non 0 ~ 0 INTERCHANGE ACCOUNTlt!G I PRICING OPTION I B coMp ooet>ERsHIp cnHp owNEHsltlp cnMp oA!!ERsHlp cOHp owt!ERsHIp coMp owt<EHsHIp OISPLACEMEI>7 COST t 50 an FIXED COST INCREASE I 14 ~ 8 S/HWH SAVINGS FIXED SPLIT I 100 ~ 0 PRIORITY ORDER t 7 REPOR71!'!G OPTION I ACCOUNTING OPTION I I OHECO!42 PURCHASE PEAK SHAVIt!G PREFERRED SUBPERIODI NONE ESC4LATION RATESI CAPACITY COST 0 '  %/YR COMPANY 0 RESERVE CREDITED Et!EHGY COST 0~0 ARE AI 1 FORCED OUTAGE PATE! 0,% YEAR JAN FEB NAR >PR HAY JUN JUL AUG SEP OC7 NOV OEC CAP js:ITY n, 0 ~ 0~ 0~ 0 ~ 0~ ne 0 ~ 0, 0 ~ 0 ~ 0 ~ an an an an 0.0 4/6g

                                  /       0   0                                 0~0                          0~0         Oon                    0~0                     non        0 ~ 0
                        ~0         ~0 ~ 0
                                            ~
                                                      '                      an                          0.0                    an                      an            '          '
    ~

KtlERGY .OWH yi 0 0 0 0 0 0 0~0 0~0 0 0

                              ~                                    ~                          ~

5/Mntt Q non non an an an an n,n 0~0 0~0 nsn 0~0 Osn INTERCtohNGE ACCOUNTICIO- I 0 PRICING OPT'!Ote~., DI SPLACEQEtW CO. I 8 t 50 ~ 0 % COMP OoeNERSHIP Cnt!P OWNERSHIP COMP OWNERSHIP COMP OWNERSHIP COHP OWNERSHIP F IXEU (COST~I ttt')AF, SE~I-<<17 ~ I S/HWH SAVINGS FIXED St!LIT I~100 ~ 0 % PRIORITY ORDER I 6. REPOPTINO OPTION ACCOUNTIIIO OPTION I I

                                                                                           '1 v                                        f 9

0

rP tIRC INTERROGATOR'Y UN NINE NILE POItIT NUCLEAR U IT IO ~ 2 FtIEPGY NAttAGEtIENT ASSOCIATES t INC PAGE ITEN NO ~ E: 20 ~ 1 (U) REPT 9 OPTION 3 SUBREPORT I 56'5/13/83 aaaaaaaaaa TRANSACTIONS INPUT SUHttARY Fot 1989 aaaaaaaaaa NVRSK HY STORAGE HYDRO PBEFKIIREO SUBPKRIOOI hKEVOAY KSCALATIQtt RATKSI CAPACITY COST 0 n >>IYR 0 COHPhtiY htlEA I 1 ~ttESERVE CRKDITFD ENEIIGY COST 0~0

                                                                                         '7'7 1 0                            FORCED OUTAGE RATKI 0 '

boer I YEAH JAN .FE'I HAR APR "thY JUN JUL AUG SEP OCT NOV OEC CAPACITY HW 27e Zr ~ 27 ' 27 ' 27 ' ZT ~ 27 ' 27 ~ 27 27. 0 g/t'ti 0' '

                                                                                                                                                                                                   '00'
                                                 ~              ~ 0                 0~0              Oeo           0~0            ~ 0       Oeo               0       o,n                 'ro 0

ENERGY GwH S/t ttiH 7 F 400 F 500 F 000 2 '00 4 '00 44500 7 F 000 ion Be600

                                                                                                                                                            ~

6 '00 F 800 4 15 F 00 ~ 15eon 15 F 00 15 F 00 15 F 00 lS F 00 15 F 00 15 ~ 00 15 F 00. 15 F 00 15ron 15 ~ 00 HISC HY HYDRO RUN OF RIVER PREFERPED SUBPERIODI NONE ESCALATIOtt HATESI CAPACITY COST 0 0>>/YR 0 COHPANY RESERVE CREDITED ENERGY COST 0

                                                                                                                                                                              ~
                                                                                                                                                                              ~ 0 AREAI       10                             FORCED OUTAGE RATKI 0 '

YEAP JAN FEB NAR APR NAY JUN JUL AUG SEP OCT NOV OEC CAPACITY 4~ 4~ 4 ~ 3~ 3e 3~ 3~ 3~ 3~ 4 4~ a Ti/tI ei 0~0 0 ~ 0 0~0 0~0 0~0 0~0 0 ~ 0 0 0 Oio 0 0 0

                                                                                                                                                                                          ~

0 0~0 ENERGY G~H 16.2 1 ~ 500 1 F 700 2 ~ BCO 2 '00 1 ~ 800 n.eon oe400 0 '00

                                                                                                                                              ~

0 '00 0 F

                                                                                                                                                                        ~

800 1 ~

                                                                                                                                                                                        ~

400 1 ~ 600 S/HWH o' 0~0 0 ' 0 ~ 0 0~0 0 ' 0 ~ 0 0~0 0 0 0 ' 0~0 0~0 a ~ STURGEO I STORAGE tIYDRO PREFERRED SUBPERIODI WEEKDAY ESCALATION RATESI CAPACITY COST 0~ 0>>/YR 0 COHPAIIY 1 RKSEPVE CREDITED ENKItGY COST 0~0 AREAI 10 FORCED OUTAGE RATEI Oe>> YEAR JAN FEB MAR APR HAY JUN JUL AUG SKP OCT NOV OEC CAPACITY IItt

             $ /teW 15e 0~0 15  '      15 ~       15               15            15 ~         15          15  '         15e         15 ~            15e           15
                                                                ~ n      0~0            'eo             ',n Oeo              'en 0         Oeo         0   0           Oro               'eo ENERGY     - GNH           Sl eB         4 '00          F 800      9i ion      Be300           5  '00         le800        1 ~ 200
                                                                                                                                              ~

I F 800 l,eoo 2 '00

                                                                                                                                                                        ~

4 '00 5 '00 S/N'a H 0 ' ~ 0~0 0 ~ 0 0 ' 0 ' 0~0 0~0 0~0 0~0 0 ~ 0 0 ~ 0 0 '

14RC INTERROGATORY UN NINE HII.E POINT NUCLEAR UtlIT NO ~ Z ENERGY NAtlAGEHENT ASSOCIATES) ItlC PAGE 56> REPT 9 OPTION 3 SUBREreORT 1 05/13/83 ooaaooaaaa TRANSACTIOllS ltlPUT SUlet'ANY FOR 1989" aoaooooaoa OER HYOZ STORAGE l"YCRO PREFERPED SUBPERIODI ttgttEl ESCALATION RATESI CAPACITY COST Oe0 %/YR CORP AllY 6 ttESERVE, CRKOI TKD I ENERGY COST 0.0 AREA I I 1 FORCED OUTAGE RATEI 0 ' I YEAR JAN FEB HAR APR NAY . JUN JUL AUG SEP OCT NOV OEC CAPACITY rtlt 34 ' 34e 34e 34 ' 34i 34 ' 34 ' 34e 34 ~ 34 ' 34e 34 '

          $ /Hb                               0        0~0        0 '               '              '                '          '        0 '       Oe0              '             0~0              '

EtlERGY G'elH lone5 13.760

                                            ~

ll2 680

                                                       '0    13 '60
                                                                  '0         10 ~ 900
                                                                                  '0       10 0
                                                                                               '60            8 '00       5e460
                                                                                                                              '0    2 '60         800
                                                                                                                                                  '0         7e560
                                                                                                                                                                 '0         7    000
                                                                                                                                                                                 '0         Te660
                                                                                                                                                                                                '0
        $ /trertt                      Z ~ 90
                                                     ~

2 2 2 '0 2e90 2 Ze90 1 F 2 2 2 F 2 RGHYD Rl'YDRO CONPAltY 7 RUN OF~RIVER PREFERRED SUBPERIODI NOtlE RESERVE CREDITKD ALL ESCALATION rtATKSI CAPACITY COST ENERGY COST Te0 5/YR Te0 AREA I 9 FORCED OUTAGE RATEI 0~5 YEAR JAN FEB NAR APR NAY JUN JUL AUG SEP OCT NOV OEC CAPACITY lrer 15 ~ 5~ 20 20e 10e Se 3~ 3~ 5~ 10e 20 10 ~

          $ /Hd                    1790e9         5949 ~ 1                   1388   '      2686 '          5552e4        8955  '   8955   '  5552 '         2686e6                 '       2686   '

lle16064

                                                                                                                                                                                     '388
                                                                      '343e4 ENERGY       OeeH         92 ~ 2                    3 '60     14 F 880        14 ~ 400        7e440            3 '00       2 '32,    2 '32     3e600          7.440         14. ~ 400        7 '40
        $ /HVH                          1 ~          1 e64      1 ~ 64          1 ~ 64         1 ~ 64           1 ~ 64      li64      1 ~ 64    1 ~ 64         Ie64            1 e64          1 ~ 64 RGHYD PS                  STORAGE       HYDRO.                   PREFERRED SUBPERIODI tlONE                                ESCALATION RATESI CAPACITY COST              0 ~ 0 %/YH COHPAtlY 7                             RESFRVE CREDITED ALL                                                              ENERGY COST          7.0 AREA I      9                          FORCED OUTAGE RATEI                  0~

YEAR JAN HAR APR tlAY JUL AUG SEP OCT NOV OEC CAPACITY Het 20 45 ~, 30 30 ~ 41 ' 30 ' 30 ' 22 ~ 45 ' 40 ~ 30 ' 40

          $ /tth                              ',0 0~0            'e0 0~0              '                ~ 0        ~ 0      0~0         ~ 0          0~0               '                'e0 ENERGY       G'rrtr      143e8        F 817        15e930     12e333           8 ~ 278      17 '22            10e793       Be297     4 '68    10 '63         14 '52         15,601          14 ~ 691
        $ /NMH                         Ie64          le64       1 ~ 64          le64           1 e64            1 ~ %4      le64      1 ~ 64    1 ~ 64         1 ~ 64          1 ~ 64         1 ~ 64

t'Rc INTERROGATORY ott NINE NILE Poit?T NUCLEAR UNIT HO,2 ENERGY t;ANAGEttKNT ASSOCIATES't"C PAGk 56t REpT v opTIDN 3 suSRFpoRT 1 05/13/83 tttt+ttttttttttt4 TRANSACTIONS INPUT

SUMMARY

FOR 1989 tttt+ttttotttttt4 NtlHYD Al HYDRO t?Utl"OF~RIVKt? PREFERPEO SUBPERIOOt NONE ESCALATION RATES I CAPACITY COST 0 ~ 0 %/Yt? COHPhNY 5 tlo SPINNING RESERVE CREDIT EttERGY COST 0 ~ 0 AREAI 1 Fot?CKO OUTAGE RATEt 0 ~% YEAR FEt: APR tthY JUN JUL AUG SEP OCT NOV DEC CAPACITY Htt 3~ 3~ 3~ 3I 3~ ~ 3I 3~ 3~ 3~ 3~ 3 ~ 0 ENERGY

              $ /t~i'lt GKH      26 '

0~0

                                      '32 0
2. ole
                                                        ~ fl      o.n
                                                                '32 0~0 2 ~ 160 0
                                                                                        '32
                                                                                            ~ 0          0 F 160
                                                                                                           ~ 0 2

Oeo

                                                                                                                     '32      2 0~0
                                                                                                                                '32 0

F 160

                                                                                                                                                   ~ 0 2

0

                                                                                                                                                             '32
                                                                                                                                                                 ~ 0 2

0~0

                                                                                                                                                                             '60      2 0~0
                                                                                                                                                                                        '32
            $ /HkH 2

3 '8 3 '8 2 3 '8 F 78 2 3 '8 ' 3 '8 F 78 F 78 3 '8 3 '8 F 78 3 '8 NHHYD Cl HYDRO RUN OF~RIVER PREFERRED SUGPERIOPt NONE ESCALATION RATESt CAPACITY COST 0 ~ 0 %/YR COMPANY 5 NO SPINNING RKSERVE CREDIT ENERGY COS'f 0 ~ 0 AREA! 2 FORCED OUTAGE RATEI Oy% YEAR JAN APR MAY JUN JUL AUG SEP OCT NOV OEC CAPACI 7 Y Htt 32c 32 ' 32 ~ 32 ~ 32 ' 32 ' 32 ~ 32 ~ 32 ' 32 ' 32 ' 32 ~ 0 $ /NN 0~0 ~ 0 . 0~0 0~0 ~ Ott Oio 0~0 0~0 ~ 0 ~ 0 ' 0~0 ENERGY GttH 280 ' 23 F 808 21< 5o4 23i808 23o040 '3I040 23 F 808 23s808 23~040 23 F 808 23 '40 23 F 808

            $ /H'ttH              Sent3 '8          3 '8        3 '8         3o78 23i808 ~

3 '8 3e78 F 78 F 78 F 78 SentF 78 3 '8 3 '8 t?HHYD El HYDRO HUH OF RIVER PREFERRED SUBPERIODt NONE ESCALATION RATESI CAPACITY COST Oeo %/YR Cot?FANY 5 NO SPINNING RESKf?VE CREDIT ENERGY COST 0 ~ 0

                                                                                  '6 '6 AREAt      3                           FORCED OUTAGE RATKt           0 0                                        JAN           FEO         HAR          APR        HAY            JUN           Juk        AUG            SEP           OCT             NOV        OEC I

CAP AC I Y Htt 76e 76 ' 76+ 76 ' 7e. 76 ' 76e Tee 76 ' 76 ' 9 $ /Htl Qoo ' 0 ' ' Oeo 0~0 0~0 0 0 ~ 0 0~0 ~ 0 ~ 0 56 '44

                                                                                                                                    ~

ENERGY GlfH 665 ' 544 51 ~ 072 56i544 54e720 -56 '44 54 ~ 720 56 '44 Se.544 54 '20 544 54 '20

            $ /ttuH                   3 '8          3 '8        3<78         3i78       3 '8.          F 78          3 '8       3 '8           3 '8          3 '8            3 '8       3o78

r!Rc INTERROGATGRY GN NINE MILE PGI.IT NUCLEAR UNIT tlo.2 ENERGY 11ANAGEMENT ASSOCIATES1 INC PAGE 5611 ITEM NO ~ E 320 ~ 1 (D) REPT 9 OPTION 3 SUBREPORT 1 05/l3/83

                                  >>>>>>>>cc>>>>>>>>>>   TRANSACTIOtlS INPUT SUH IARY fOR              1989>>>>~>>>>>>>>>>>>>>

NMHYD Fl HYDRO Ruti'F~RI VER PREFERRED SUGPERIODI NONE ESCALATION RATEST CAPACITY COST 0 ~ 0 %/YR COMPANY NO SPINNING RESERVE CREDIT ENERGY COST 0 '

                                                                                                                                                 '2 AREAI     4                        FORCED OUTAGE RATET             0  %

YEAR JAN FEU APR HAY JUN JUL AUG SEP OCT NOV DEC CAPACITY tie 42c 42c . 42 ' 42c 42c 42 ' 42s 42c 42 ' 42 42 ' 3/t1'I< 0 ' 0 ' 0 ' 0 ' Ocn ' 0 ' Oon ' 0 ' 'cn ENERGY GccH 367 ' 31 248 28o224 31 248 30 '40 31 ~ 248 30 '40 31 '48 31c248 30 '40 31 F 248 30 '40 31 ~ 248 S/MWH 3 '8 " 3 '8 3 '8 F 78 3 '8 3 '8 3 '8 F 78 F 78 F 78 F 78 3 ~ 78 NHHYD C2 STORAGE HYDRO PREFERRED SUBPERIODT NONE ESCALATION RATESI CAPACIT'Y COST 0 '  %/YR COtcP WY 5 NO SPINNING RESERVE CREDIT ENERGY COST 0~0 AREAR' FORCED OUTAGE RATEI 0 %

                         'YEAR           JAN        FEB         MAR         APR           MAY             JUN         JUL       AUG          SEP           OCT            NOV           OEC CAPACITY         M!c                    12e        12 ~        12 ~        12  '         12i             12  '       12 ~      12 ~         12 ~          12c            12 ~          12  '

5/tl 4 0 ' 0 ' Oc0 ' 0 ' ' Own 0c0 0 ' 0 ' 0~0

                                                                                                                                                                        '56 ENERGY         GWH        42c0      3s57c      3 '26       3i571        3 '56        3i571           3 '56       3 '71     3 '71        3 '56         3c571          3             3 ~ 571
            $ /MWH                     os 0       Oo0         0~0          0,0          Oin             0 '         0 '       0 ~ 0        F 0           0~0            0~0           0 '
                                                                                                                                                                                             'MHYD E2                STORAGE     HYDRO                  PREFERRED SUBPERIODT NONE                           ESCALATION RATESI CAPACITY COST                0 ~ 0 %/YR COwPAtiY                           NO SPINNING RESEPVE CREDIT                                                     ENERGY COST         Ocn AREAI     2                        fORCED OUTAGE RATET 0,%

YEAR JAN MAR APR MAY JUN AUG SEP OCT ttOV DEC

                                                                    '23c'
                                                                                                !'UL CAPACITY         I'1W                 Z23 ~      223 ~       223                       223 '           223   '     223 ~     223          223   ~       223   '        223    ~      223 '

3/l11t 0 ' 0 ' ~ 0 0 0 ' ) 0 ' 0 ' 'on 0~0 ' 0 ' ~ 0

                              '        '65                    '65          'Z4                       64 '24         '65       '65                                       '24 EtlERGY        GwH
            $ /RWH 781        66 Oin 59c942 0 '

66 0' 64 0' 66 365 Oin ,'cn I a 66 0 ' 66 0 ' 64,224 0 ' eec365 0co 64 0 ' ee.365 Ocn 0 0

0' tIRC IIITERROGATORY ON NINE MILE POINT NUCLEAR Ut>IT t10 ~ 2 ENERGY tthtlAGKHEtIT ASSOCIATES I INC PAGE 56m ITEM NO ~ K 320 ~ I IUI REPT 9 OPT IOtI 3 SUBREPORT I 05/13/83

                                     <<ooo<<ooo<<o  TRANSACTIONS INPUT 

SUMMARY

FOP 1989 <<oooo<<oooo NMHYO F2 STORAGE etYDRO PREFERRED SUBPKRIODI HONE ESCALATIOtt RATES I CAPACITY COST 0 ~ 0 '5/YR COI",P ANY 5 t(0 SPINNING RESERVE CREDIT ENERGY cosT 0 ~ 0 AREA: 2 FORCED OUTAGE RATEI 0 ' YEaR JAN FEB MAR APR HAY JUN JUL AUG SKP OCT NVV OKC CAPACITY

                  /!

93o 93 ' 93 ' 93 ' 93i . 93 93 ~ 93 93 ' 93 ' 93 ' 93 '

                $    >'!e                  0~0       0~0           ~ 0         '                   "

Oen 'en Oin ',0

                                                                                                                                                  '           ~ 0            ~ 0         ~ 0 KNEPGY         Gi,H    325.9       27.677                27 '77       26 '84     27 '77         . 26 '84       27 '77     27  '77       26 '84     27.677        26   '84    27 '77
              $ /to~ et                  0 ~ 0     0~0         0 ~ 0        0~0        0 ~ 0              0 ~ 0        0 ~ 0       0 ~ 0        0~0        0~0            0~0        0~0
0 Ines GRNHY HYDRO RUN OF RIVER PREFERRED SUIIPKRIODI HONK ESCALATION RATES I CAPACITY COST 0 '  %/YR COMPANY 5 tIO SPINNIIIG RESEIIVK CREDIT ENERGY COST 0~0 AREAI 2 FORCED OUTAGE RATEI Oo YEAR JAN FKB HAR APR HAY JUN JUL AUG SKP OCT NOV OEC CAPACITY t1< .10i 10 10e 10o 10 ~ lni 10 ~ 10e 10 ~ 10 ' 10 ~

0 $ /e!0 0~0

                                         '76
                                                        '.0 0 ~ 0        0~0        Oen                0~0          0~0         n.n         0~0        n.n              '         0 ~ 0 ENERGY         GwH       35 '       2         2 '88       2 '76        F 880      2o976              F 880        2 '76       2e976                   2 '76          2 '80      2 ~ 97 to
              $ /HeH                     3e78      3 '8        3 '8         F 78       F 78               F 78         F 78        3e7A F 880 F 78       3e78           F 78       3 '8 UNION                    STORAGE      HYDRO               >PREFERRED       SUBPERIODI NONE                        ESCALATION RATESI CAPACITY COST              0 ~ 0 %/YR COt!PANY     5                     NO    SPINNING RESERVE CREDIT                                                     ENERGY COST      Oen AREAI      3                       FORCED OUTAGE RA'TK I         0   ~  %

la YEAR JAN FEB HAR APR HAY JUN JUL AUG SEP OCT NOV DKC 'a CAPAC IT Y Hit

                $ /tW 3~

0~0 3~ 0~0 3~ 0~0 3~ 0~0 3~ O,n 3~ 0~0 3~ 0~0 0 3~

                                                                                                                                       ~ 0 3~

Oon 0 3~

                                                                                                                                                              ~ 0 3~

0~0 3~ 0~0 ENERGY Gt H 10 ' '30 Oo840 '30 0 '00 '30 0 '00 '30 '30 '00 '30 '00 0 '30

              $ /tt'Wtt 0

3 '8 '3 ~ 78 0 3 '8 3 '8 0 3e78 3o78 0 F 78 0 F 78 0 F 78 0 F 78 0 3 '8 3e78 ! ~ 0

NRC ItITEHROGATORY ON NINE MILE POINT NUCLEAR UNIT NO ~ 2 EtiERGY MANAGEHENT AssocIATEsr INc PAGE 57V ITEH NO ~ E 320 ~ 1 (OI REPT 9 OPTION 3 SUBREPORT 1 05/13/83 oo4oooo4O+ TRANSACT10MS INPUT

SUMMARY

FOR 1989 ooooer+rroore TRENT STORAGE HYDRO PREFERRED SUBPERIODI NONE ESCALATIOte RATESI CAPACITY COST 0~0 S/YR 0 COr PANY tlo SPINNINO RESERVE. CREDIT ENERGY COST 0~0

                                                                                                                                            '0'0'0 AREAI     3                       FORCED OUTAGE RATE!             0 ~%
                      'YEAR           JAN         FEB       MAR          APR           HAY          JUN     'UI.           AUG          SEP            OCT            r4OV        DEC CAPACITY       Her                   3g ~        30 '      30  '        30 '          30i          30o          30 '      30 '         30                                            ~

6 S/Mar 0~0

                                    '85
                                                   ~ 0        '           ~ 0          0~0          0 '           '         ~ 0         0 ~ 0.         0 ~ 0          0~0         0~0 ENERGY       GerH     168e2     14          12 ~ 902  14i285       13o 82<      14.285        13 ~ 824     14 '85    14 '85       13 '24         14 '85         13 F 824    14 F 285 S/tee'H                  F 78        F 78      3 '8         3o78          3 '8         3 '8         F 78      F 78         3 '8           3 '8           F 78        3 '8 OLNPI(                 HYDRO       RUII OF~RIVER         PREFERRED      SUBPERIODI tlONE                    ESCALATION RATESI CAPACITY COST                 0 ~ 0 %/YR 0                        CotrPAIIY 5 AREAI     3 r40   SPINNING RESERVE CREDIT                                                 ENERGY COST          OS O FORCED OUTAGE RATEI             0 %

YEAR JAN FEB HAR APR MAY JUN JUL AUG SEP OCT NOV DEC cAPAcITY rlrr 16e 16 ~ 16o 16o 16 16o 16 ' 16 ~ 16 ~ 16 ~ 16 ' 16 ~ 0 s/Hrr 0~0

                                    '95 oio       0~0          0~0              'oo 0 ~ 0         ~ 0      ooo          0~0            0~0              ~ 0       0 ~ 0 ENERGY       GrrH    105         8           8 ~ 124   8 '95        Be705         Be995        8 F 705      8 '95     8 '95        8 '05          8 '95          Be705       8 '95 S/HAH                    F 78        Pi78      3 '8         3o78          3e78         F 78         3i78      3 '8         3 '8           F 78           F 78        3 '8 OserGT IE              HYDRO       RUN OF~RIVER          PREFERRED      SUBPERIODI NotlE                    ESCALATION RATESI CAPACITY COST                 0 ~ 0 %/YR CorePArtY 5                       NO SP   INNING RESERVE CREDIT                                                 ENERGY COST          0~0 AREA I    3                       FORCED OUTAGE RATEI             0 ~%

YEAR FEB HAR MAY JUN JUL AUO SEP OCT NOV DEC CAPACITY Mer 0 ~ oe 0 ~ oi 0 ~ 0 ~ oo 0 ~ 0 ~ 0 ~ 0 ~ 0~ 0 ENERGY S/H> 0~0 274 0~0 247 ooO 274 0~0 268 ooo 0 ~ 0 ooo oeo 0 ~ 0 Oeo 0~0 0~0 3 0 0 0 0 oe274 ~ 265 0 ~ 274 0 ~ 274 265 274 265 F 274 GIRTH S/H'eH F F 78 '3

                                                ~
                                                  '8      ~

F 78

                                                                       ~

F 78 3e78 0 3e78 F 78 F 78 0 ~ F 78 0 ~ F 78 0 ~ 3 '8 0 3o78 0

tkRC ltlTERROOATORY OM NINE HILE POINT NUClEAR UNIT NO ~ 2 ENERGY othttAGENEt<T ASSOC I ATES I INC PAGE 571 ITEM MO ~ E 320ol IV) REPT 9 OPTION 3 SUBREPORT I 05/13/83

                                    <<<<>><<>><<<<>>>>      TRANSACTIONS INPUT 

SUMMARY

FOR 1989>>>><<<<<<<<<<<< HUDFLS STORAGE HYDRO PREFERRED SUBPERIODI NONE ESCALATlotk RATES I CAPACITY COST 0 ~ 0 %/YR e COMPANY 5 toO SPINNING RESERVE CREDIT ENERGY COST 0 ' AREAI 4 FORCED OUTAGE RATEI 0 ' YEAR FEB MAR APR MAY I' JUN JUL AUO SEP OCT NOV DEC CAPACITY 2i 2~ 2~ ~ Zo! 2~ 2~ 2~ ~ 2~ 2~ 2~

            $ /pp 0 '         Oo0        Oo0          0~0
                                                                            '90 Oo0,'      Oi0        0~0         0 '        0~0         0 '           0 '        ad ENERGY       O'KH            7       0 '10        0o 551   0    610                     0 '10       Oi590     0   610     0r610      Oi590       0   610       0 '90      0   610
         $ /MWH                         3 '8        3 ~ 78
                                                               ~

3i78 3 'B 3r78 3i78

                                                                                                                 ~

3 ~ TB 3 ~ 78' 3 '8 ~ F 78 3 '8 ~ F 78 HECHVL HYDRO MUN OF RIVER PREFERRED SUBPERIODI NONE ESCALATIOt~ RATESI CAPACITY COST 0 ~ 0 %/YR COMPANY 5 NO SPINNING RESERVE CREDIT ENERGY COST OiO AREAI 4 FORCED OUTAGE RATEI Oi% YEAR JAN FEB HAR APR MAY JUN JUL AUG SEP OCT NUV OEC CAPACITY Hit 3~ 3~ 3~ 3~ 3~ 3~ 3~ 3~ 3~ 3~ 3o 3~ 0 $ /M'ot 0

                                        '83
                                            '         0 '        0 '          0 '            0 '        Oo0        Or0         0~0        0 '         0 '           0 '        0 '

ENERGY OMH 19 ' li520 li683 i'29'8 '83 lo629 o683 $ 83 '29 'S3 629 683

          $ /MBH 1

F 78 3 '8 3 '8 3 1 3 '8 3.78 1 3iTB 1 ~ F 78 1 3 '8 1 F 78 1 ~ F 78 1 ~ 3o78 0 SUGAR STORAGE HYDRO PRKFERRKD SUBPERIODI MONK ESCALATIOtI RATESI CAPACITY COST 0 ~ 0 %/YR C COWPaNY S NO SPINMINO RESERVE CREDIT ENERGY COST 0 ' AREAI 3 FORCED OUTAGE RATKI Oi% 0 YEAR JAN FES HAR APR MAY JUM JUl AUG SEP OCT NOV OEC CAPACITY MM 4~ 4o 4~ 4o 4~ 4~ 4i 4~ 4 ~ 4~ 4~ 4~ 0 $ /Mrt Oo0 0 ' 0 ' 0 ' 0 ' 0~0 0 ' 0 ' Oo0 0 ' 0 ' 0 ' ENERGY 04H 25 ' 2 '56 1i947 2i156 F 087 2 ~ 156 F 087 2 '56 2 ~ 156 F 087 2 ~ 156 2 '87 2,156

          $ /MMH                        3 '8        3i78      F 78          3 '8           3o78       3 '8       F 78        F 78       3 '8        3i78          F 78       F 78 0

0

I<RC INTERROGATORY ON NiNE MILE POINT NUCLEAR UNIT tl0,2 ENERGY HANAeEHENT ASSOCIATESt INC PAGE 572 0 ITEM tie ~ E 320e 1 IO) HEPT 9 OPTION 3 SUBRKPORT 1 05/13/83

                                >>ooooo~a44    tRANSACTIONS ltlPUT 

SUMMARY

FOR 1989 +~octo~"oe+ SGLENF HYDRO RUN OF~RIVER PREFERRED SUBPERIOOI NONF- ESCALATION RATES) CAPACITY COST 0 ~ 0 %/YR CotiPAt< Y t!0 SPINNING RESERVE CREDIT ENERGY COST 0~0 AREAt 4 FORCED OUTAGE RATEI 0 ~ I JAN FEB eIAR APR MAY JUN JUI. Aue OCT NOV DEC CAPACITY rw 12 ~ 12 ~ 12 ~ 12 ~ 12 ~ 12 ~ 12 ' 12e 12 ~ 12 ' 12 ~ 12 ~ 0 $ /ti~ 0~0 0 ~ 0 0~0 0~0 Oee 0~0 ~ 0 0 ' 0~0 ~ 0 0~0 0~0 ENERGY GVH 73 F 6 6 '50 5 '45 6 '50 F 048 6.250 6 '48 6 '50 F 250 6 '48 6 '50 6 '48 F 250

          $ /Mwn                    3 '8        3 'R      F 78      F 78           F 78           F 78       3 '8      3e78          F 78           F 78         F 78       3e78 I:

e HADLEY HYDRO RUN OF RIVER PREFERRED SUBPFRIODt NONE ESCALATION RATFSt CAPACITY COST 0 ~ 0 %/YR COMPANY NO SPINtlING RESERVE CREDIT EtlERGY COST 0~0 AREAt 4 FORCED OUTAGE RATEI 0 4 YEAR JA14 FEB HAR APR HAY JUI4 JUL Aue SEP OCT NOV OEC CAPACITY Hw 0~ 0~ 0~ Qi 0~ Qo 0 ~ 0 ~ 0~ 0~ 0 ~ 0~ e ENERGY

            $ /HW 0~0 0~0
                                    ~ 0       0~0 0~0 0 '

0~0 Oie Oie Oie 0~0 0~0 0~0 0~0 0~0 0~0 0 ~ 0 0~0 0~0 0~0 0~0 0~0 0~0 0~0 0~0 GWH

          $ /HWH Q

3 '8 3 '8 F 78 F 78 3e78 3 '8 3o78 3 '8 3e78 F 78 3e78 3 '8 FLTMI.S HYDRO RUN OF~RIVER PREFERRED SUBPFRIODt NONE ESCALATION RATESt CAPACITY COST 0 ' I/YR COHPAtlY NO SPINNING RESERVE CREDiT ENERGY COST 0~0 AREAI 3 FORCED OUTAGE RATEI 0~ I YEAR JAN FEB HAR APR MAY JUN JUL AUG SEP OCT NOV OEC ~

                                                                                                                                                                                         )

CAPACITY Mw ll~ lii ll ~ ll ~ Iii ll e lie ll ~ lie lie ll ~ lid 0 ENEReY

            $ /tlw GwH      75i7 Oee 6.428 0

5e806 6 Oee

                                                           '28 0 ~

6 ~ 221 0 0 6 '28

                                                                                       ~ 0          Oie 6i 221     6 0~0
                                                                                                             '28 0

6 '28

                                                                                                                           ~ 0         0~0 6 ~ 221        6 0~0
                                                                                                                                                    '28 0~0 6 221      6 0~0
                                                                                                                                                                            '28 3 '8                    '8                     3 '8           3 '8                 3 '8            '8                        3 '8         '8
                                                                                                                                                                 ~
          $ /HWH                                F 78      3          F 78                                    3e78                    3      .       F 78                    3
                                                                                                                                                                                     'Ql 0

0

NRC INTERROGATORY OW NINE HILE POINT NUCLEAR UtelT NO ~ 2 ENERGY HattAGEI!EttT ASSOCIATES t INC PAGE 573 ITKH NO ~ E 32 0 ~ 1 (0) REPT 9 OPTIOtt 3 SUBRKPORT I OS/i3/83 aaaaaaaaaa TRANSACTIONS INPUT SUHHARY FOR 1989 aaaaaaaaaa SHRIII SL STORAGE ttYDRO PREFERRED SUBPERIODI NONE ESCALATION RATES I CAPACITY COST 0 ~ 0 %/YR CotePANY NO SP INNING RESERVE CREDIT ENERGY COST 0~0 AREnt FORCED OUTAGE RATEI 0~% YEAR FEB HAR APR HAY JUN JUL AUO SEP OCT NOV OKC CAPACITY H>t 33 ~ 33 ~ 33 ~ 33 ' 33e 334 33 ~ 33 33 ~ 33 ' 33 ' 33 ' 0 S/tlat oeo 0~0 0,O ' 0~0 0 ' oeo 'en 0 ~ 0 ~ 0 ~ 0 ~ 0 ENERGY GMH 173 ' 14e731 13.3ob 14 ~ 731 14 '56 14e 731 14 ~ 256 14 '31 14 ~ 731 14 '56 14 ~ 731 14e256 14 ~ 731 5/HltH 3 '8 3e78 F 78 3 '8 3e78 3 '8 F 78 F 78 F 78 F 78 F 78 3 '8 8 HI DAN STORAGE HYDRO PREFERRED SUBPERIODI NONE EscaLATIDN RATEsI cApACITY cosT 0 ~ 0 %/YR COHPANY 5 NO SPINNINO RESERVE CREDIT ENERGY COST 0~0 AREAI 2 FORCED OUTAGE RATEI 0~% YEAR JAN FEB HAR APR HAY JUN JUL AUO SEP OCT NOV OKL CAPACITY Hlt 9~ 9~ 9e 9~ 9i 9~ 9~ 9~ 9~ 9~ 9~ 9~ 0 ENERGY S/t1~ OIIH 41 ' 3 0~0

                                     '78 oeo dei42    3 0~0
                                                          '78        3 0~0
                                                                       '66 oeo 3i478        3 0
                                                                                                  '66
                                                                                                      ~ 0 3

0~0

                                                                                                              '78       3 0~0
                                                                                                                          '78        3 Oio
                                                                                                                                       '66        3 0~0
                                                                                                                                                    '78         3 0~0
                                                                                                                                                                  '66      3 0~0
                                                                                                                                                                             '78 S/HkH                    3e78        F 78     3e78         F 78          3e78         3e78        3i78        3 '8         3 '8         3 '8          3 '8       3 '8 0

VARICK STORAGE HYDRO PREFERRED SUBPERIODI NONE ESCaLATION RATESI CAPACITY COST 0 ~ 0 %/YR 0 COHPANY APEAI 2 5 NO SPINNING RESERVE CREDIT FORCED OUTAGE RATE! Oe% ENERGY COST Oeo YEAR JAN FEB HAR APR tcAY JUN JUL AUO OCT NOV OEC CAPACITY ttI 5e 5~ 5~ 5~ 5~ Se 5i 5~ 5~ Si 5~ S ~ ~ ~ENERGY $ /teg 0~0 0 ' 0~0 oeo 0 ~ 0 0 ~ 0 0~0 0 ~ 0 oeo 0~0 oeO 0 ~ 0 GltH 21.9 Ie860 1.68O 1.860 1 F 800' 860 800 '60 860 1 F 800 ie860 800 I 860 5/HWH F 78

                                                'F 78     F 78         F 78
                                                                                     ~

3 '8 1 ~ F 78 1 3e78 1 ~ F 78 F 78 3e78 1 F 3 '8 ~ F 78 0

NRC INTERROGATORY ON NINE MILE POINT NUCLEAR UNIT NO ~ 2 EtIKROY MANAGEMENT ASSOCIATKSI ItIC PAGE 574 ITEM NO ~ E 320 ~ 1 {U) REPT 9 OPTION 3 SUBREPORT 1 05/i3/83 TRANSACTIONS INPUT

SUMMARY

FOR 1989 MINETO STORAGE IIYDRO PREFERRED SUBPERIODi NONE KSCALATION RATESI CAPACI'fY COST oe0 %/YR 6 COHPAtIY NO SPINNING RESERVE CREDit ENERGY COST 0 ' AREA I 2 FORCED OUTAGE RATEI 0 ' YEAR JAN FEB MAR APR MAY JUtt JUL AUO SEP OCT NOV OEC CAPACI T Y tIW 9~ 9~ 9~ 9e 9i 9~ 9i 9~ 9~ 9e 9~ 9~ 0 $ /HH 0 ' 0 ' Oo0 0 ' 0 ' 0 ' 0 ' 0~0 0 ' Oo0 0 ' Oed 40 ' 3 '60 3 ~ 125 3e460 3 '48 3e460 3 '48 3o460 3 '60 3 '48 3 '60 3 '48 3 '60 ENERGY OWH

             $ /HWH                  3 ~ 78       3o78      F 78         F 78           3 '8     -'
                                                                                                        '8          3 '8      F 78      F 78           F 78          3 '8        3 'B FULTOtI                 STORAOK     tIYDRO                 PREFERRED      SUBPERIODI NONE                        ESCALATION RATES I CAPACITY COST            0 ~ 0 %/YR COMPANY     5                      NO    SPINNINO RKSERVE CREDIT                                                 ENERGY COST         0 '

AREAI 2 FORCED OUTAGE RATEI 0 ' YEAR JAN MAR APR HAY JUN JUL AUG SKP OCT DKC CAPACITY

               $ /tIW 1 ~

0~0 0 1 ~ li OIO

                                                                           , 1 ~

0 ' le 0~0 1 ~ Oi0 1 ~ Oe0 1 ~ 0~0 0 1 ~

                                                                                                                                            '            0 le
                                                                                                                                                           '           0 1 ~
                                                                                                                                                                         '         0 1 ~

ENERGY 4 ' '72 Oo336 Oe372 Oi360 0 '72 0 '60 0 '72 0 '72 '60 0 '72 0 '60 Oi372 OWH

             $ /HWH 0

3i78 3 'B F 78 F 78 3 '8 F 78 F 78 3 '8 0 3 '8 3 '8 3eTB 3 'B 1 FEEDER STORAGE HYDRO PREFERRED SUBPKRIODI N$ NE ESCALATION RATESI CAPACITY COST 0 '  %/YR COMPANY 6 NO SPINNINO RESERVE CREDIT ENERGY COST 0 ' AREAI 4 FORCED OUTAGE RATEI Oe% YEAR JAN FEB MAR APR JUN JUL AUO SKP OCT NOV OEC CAPAC I T't HW Si 5~ 5~ 5~ 5~ 5~ So 5~ 5~ 5~ 5~ 5~

               $ /ht W                 Oo0          0 '       0 '          0 '            0~0           Oi0           0 '       0 '       Oe0            0 '           0 '         0 '

ENERGY 20 ' 711 o546 e'7 lo656 o711 1 ~ 656 '1 ~ 711 711 656 711 656 711 OWH

             $ /MWH 1 ~

3 '8 1 3 '8 1 3 '81 1 3 'B 1 3e78, 3e78 F 78 1 ~ 3 '8 1 ~ F 78 1 o 3 ~ 78 1 e F 78 1 ~ 3oTB 0 I

I NRC INTERROGATORY ON NINE'ILE POIIIT NUCLEAR UNIT NO ~ 2 ENERGY HAtIAOEHENT ASSOCIATESI INC PAGE 575 ITEH NO ~ E 320il (U) I'EPT 9 OPTION 3 SUBRKPORT 1 05/13/83 oaoaoaoaa". TRANSACTIONS INPUT SUHHARY FOR 1989 aooaoooaao OSttF~W STORAGE HYDRO PREFERRED SUBPERIODI NONE ESCALATION RATESI CAPACITY COST 0 ~ 0 %/YR COMPANY 5 NO SPINNINO RESERVE CREDIT ENERGY COST Oj0 AREAI 4 FORCED OUTAGE RATEI 0 ' YEAR JAN FEB MAR APR HAY! JUN JUL AUO SEP OCT NOV DEC CAPACITY HW 6~ 6~ 6j ej ej 6j bj 6~ e, 6~ e, 6~ 0 $ /HW 0 ' 0~0 Oj0 Oi0 Oj0 Oi0 0 ' 0 ' 0 ' 0 ' 0 ' 0

                                                                                                                                                                                         '46 '

ENERGY GWH 24jl 2 '46 848 2 '46 1 ~ 980 2i 046 1.980 2 '46 2 '46 980 2 '46 980 2

           $ /HWH                       3 '8      1 ~

F 78 3 '8 F 78 3j78 . 3j78 F 78 F 78 1 ~ F 78 F 78 1 ~ F 78 3 '8 VERHOtlT SA!E UNSCHEDULED PREFERRED SUBPERIODI NO E ESCALATION RATES I CAPACITY COST 0~0 I/YR COMPANY 8 RESERVE DEBITED ENERGY COST 0 ' AREA! 20 FORCED OUTAGE RATEI 0~ YEAR JAN FEB HAR APR HAY JUN JUL AUO SEP OCT NOV DEC, 0 CAPACITY HW 150 ~ 150 j 150

                                                                         ~    150 0'

i 1SO

                                                                                                   ~    '50         ~     150
                                                                                                                                ~    150
                                                                                                                                           '    150
                                                                                                                                                      ~       150
                                                                                                                                                                    '        150   ~     150
                                                                                                                                                                                               ~
                                                                                                                                                                                                 /

ENERGY

              $ /HW OWH        845 '

Oj0 71 ~ 767 0 64i821 Tli767 0 69 '51 71 0

                                                                                             '67          '9 '51OjO         0 71 ~ 767   71 '67     69 0
                                                                                                                                                '51        71 ~ 767       69 0~0
                                                                                                                                                                             '51      71 ~

0 Tel

            $ /MWH                      0           0 '            0 '        0'             0 '              0 '         Oj0        0'j 0      0'            0 '            0'          0
  'LHP OHIO                 SALE        UNSCHEDULED                PREFERRKD SUBPERIODI NONE                            ESCALATION RATESI CAPACITY COST               0 ~ 0 %/YR COMPANY 8                              RESERVE DEBITED                                                                ENERGY COST         0 '

AREA I 13 FORCED OUTAGE RATEI 0~5 YEAR JAN FEB MAR APR JUN JUL AUO SKP OCT NOV UEC "APAC I TY H jt 23j 23 ~ 23j 23 ~ 23 ' 23 ' 23 ' 23 ~ 23 ' 23 ' 23 ' 23 ~ 0 $ /M!I 0

                                        '92 '         0 '            Oj0        0 '              '                '           '       0  '          '             '              '         0~0
                                                                                                                                                                                         '92 IINKRGY        OWH        147 ~ 1   12          11 ~ 283       12 '92     12 F 089      12 '92            12 '89      12 '92     12 '92     12 ~ 089      12 ~ 492       12 F 089    12
           $ /IIWH                      Oi0         0 '            0'         0 '            OjO              Oj0         0'         0'         Oi0           0 '            0 '         0 '

tlRC INTERROGATORY ON NINE tlILE POltlT NUCLEAR UNIT NO ~ 2 ENERGY MANAGEMENT ASSOCIATESI INC PAGE 576 ITKH NO ~ E 320 ' IO) REPT 9 OPTIOti 3 SUBREPORT 1 05/13/83 ooo"o+ooo4 TRANSACTIONS INPUT SUHHARY FOR 19 9 eASNY PURCHASE PEAK SHAVING PREFERRED SUBPERIODI NONE ESCALATION RATES) CAPACITY COST Oe 0  %/YR COMPANY 0 RESERVE CREDITED ENERGY COST Oe0 ARK@I 1 FORCED OUTAGE RATEI Oe% YEAR JAN FEB MAR APR HAY JUN JUI. AUO SKP OCT NOV DEC IAPACITY HW 0 ~ 0 ~ Oe 0 ~ ne Oe Oe 0 ~ 0 ~ 0 ~ 0 ~ 0~ S/tlW 0 ' 0 ' 0 ' 0 ' Oi0 Oe0 OeO 0 ' 0 ' 0 ' 0 ' 0~0 INEROY OWH 0 0 0 ' 0 ' OIO Oi0 Oe0 Oi0 0 ' 0 ' 0,0 oe0 0 ' 0~0

           $ /te le H                     den          0 '              0 0              0 '          0 '                  0 '            0 '            0 '         0 '            0 '            0 '         0 '

INTERCHANGE ACCOUNTING I I PRIG ItlO OPTION I COHP OWNERSHIP COHP OWNERSHIP COMP OWNERSHIP COMP OWNERSHIP COHP OWNERSHIP DISPLACEHEtlT COST I 0~0 % 2 48 '  % 3 13e0 4 10 ' 5 19 ~ 0 1 3 ' FIXED COST INCREASE I 5 ' S/HWH 6 3 ' 7 4 ' SAVINGS FIXED SPLIT I Oeo % PRIORITY ORDER I 0 REPORT ItlO OPTION I ACCOUNTI G OPTION I 4LLHYDR1 HYDRO RUtl OF<<RIVER PREFERRED suePERIODI NONF- ESCALATION RATKSI CAPACITY COST 0 '  %/YR COMPANY 4 RESERVE CREDITED EtlEROY COST 0 ' AREAI 7 FORCED OUTAGE RATEI 0 ' YEAR JAN FES MAR APR HAY JUN JUL AUO SEP OCT NOV OEC CAPACITY HW 10e loe 10i 10e 10 ~ 10e 10e 10e 10e 10 ~ 10 ~ 10 ~

            $ /HW                           Oe0          Oe0              0~0         llew 0 '          0~0                  0 '            0~0            0 '         0 '            0~0            0 '         0 '

ENERGY O'AH 27 ' 3 ~ 176 2i172 2 '03 F 122 2 '37 0 817 Oe343 0 '36 408 2 '43 3 '23 3 '44 S/HWH 6 '0 6 '4 6 '9 6,84 6i88 F 6i93 6 '7 7 '2 1 ~ 7e07 7~ ll 7 ~ 16 7 ~ 21 ~ ALLHYDR2 HYDRO Cot<> ANY HUN OF RIVER 4 PREFERRED SUBPERIODI NONE RESERVE CREUI TKD ESCALATION RATES I CAPACITY COST EtlEROY COST 0 0

                                                                                                                                                                                              ~

0 %/YR AREAI 19 FORCED OUTAGE RATEI 0 ' YEAR JAN FEB MAR APR HAY JUN JUL AUO SKP OCT NOV DEC

                                                                                                                '9 O CAPACl TY       HW                         19e          19e                  ~            19 ~         19i                  19  '          19  ~          19 ~        19 ~           19  '          19 ~        19
             $ /tlW                         0,0          0.0              0,0              oeo          0,0                    '            0 '            0 '         Oe0              '            0~0           '

ENERGY Ge'H 101 6 6 919 5 928 8 '32 550 10 '84 8 '96 5 F 051 6 '38 8 '41 9 '65 10 '34 9 '22 0 S/HAH 1 ~ 83 le84 leS6 1 ~ 87 li88 li89 li91 1 ~ 92 I ~ 93 1 ~ 94 1 ~ 96 1 e97 0 0

t1RC INTKRROGA'ORY ON NINE MILE POINT NUCLEAR UNIT tl0,2 EetERGY MANAGEt<ENT ASSOCIATESt INC PAGE 57] 0 ITEM NO ~ E 320il tD) REPT 9 OPTION 3 SUBREPORT 1 05/13/83 t

                                    <<4<<4<<<<<<4     TRANSACTIONS INPUT SUt(t1ARY fOR 19tt9 <<<<<<<<<<<<tee<<<<

ALLHYDR3 HYDRO RUll"OF RIVER PREFKRPED SUBPERIODt MO tK ESCALATION RATESt CAPACITY COST 0~0 0/YR . 0 COMPANY AREA! 19 4 RESERVE CREDITEO ENERGY COST 0 ' FORCED OUTAGE RATEt Oe% k 0 YEAR JAN MAR APR MAY JUN JUL AUG SEP OCT NOV DEC CAPACITY tttt 18e 18e 18 ~ 18 ' 18 ~ 18i 18 ' 18 ~ 18 ' 18i 18 ' 18 '

              $ /HY
  • 0 ' 0~0 Qe0 ' Oe0 0 ' ' Oe0 ' 0 ' ' '

ENERGY GetH i02e2 8 '60 7 ~ 176 10 ~ 641 Iie843 11 e745 8<283 6 ~ 289 6 '39 6 '82 7 '47 '78 8 '58

            $ /H'H H                    3 '8       F 70     3 '2       3e75         3e77           F 80         3 '2      F 85         F 88         3 '0        7 3 '3       3 '5 0

NEUT IL PURCHASE PEAK SHAVING PRKFERRKO SUBPERIODl NONE ESCALATION RATESI CAPACITY COST 0 '  %/YR 0 COttPAttY 4 RESERVE CREDITEO ENERGY COST 9i7 AREAI 8 FORCED OUTAGE RATEl 0)% YKAR JAN FEB MAR APR MAY JUN JUL AUG SKP DCT NOV DEC CAPACISX t1V l~ l ie ENERG'Y

              $ /t tt 1

Glt H 0 ' 67 0 67 t~

                                                      '     67 t~

t~ 67e6 Oi0 67

                                                                                      .te
                                                                                       '           elec t~

67e6 67 t~

                                                                                                                             '         67 t~
                                                                                                                                          '         67 t~
                                                                                                                                                                       ~

67 ~ 6 t e7.e

                                                                                                                                                                                  ~
            $ /MWH 0

138 '2 138 i 62 0 138.62 138 '2 0 138 ~ 62 Ge0 138 ~ 62 0 138 '2 0 138462 0 138 '2 0 138 ~ 62 Oe0 138 ~ 62 0 138 '2

 ~

I i

 ~
 ~

I

 ~

NRC- INTERROGATORY ON NINE= MILE POINT NUCLEAR UNIT NP ~ 2 ENERGY MANAGEMENT ASSOCIATESt INC PAGE 581 ITEM NO ~ E 320el IO} REPT 9 OPTIOIt 3 SUBREPORT 1 05/13/83

                          )))))))))))))))))))) TRANSACTIONS IIIPUT 

SUMMARY

FOP 1989 ))4))))))))))aoo HI GHF ALL kYORU <UtI-OF RIVER PREFFRREO SUBPERIOOt NONE ESCALATION RATES) CAPACITY COST 0 ~ 0 %/YR CQNPANY 1 RESEHvE CRCOITEO ENERGY COST 0 ' aREAt 10 FORCKO OUTAGE RATEI 0 ' YEAR JAN FEB APR HAY JUN JUL AUG SKP OCT NOV OEC 2~ 3~ 5~ 5~ 3~ 1 ~ 0 1 ~ 1 ~ 2~ 3~ CAPACITY HH 1 ~ ~ 5/IUIw 0 ' 0~0 0 ' 0 ' OeO 0~0 0 ' 0 ' 0 ' 0~0 0 ~0

                                                                                                                                                       '00 0~0 ENERGY       Gt)tt    13 '     1 ~ 600          Oe800    F 700     3 '00     F 000       0 '00       0 '00      0 ~ 100   Oe200        0 F 100        0          1 ~ 600 5/tt VH                0 '             0 '      0 '        0 '       0 '         0 '         0 '        0 '      0 '           0 '            0 ~ 0      0

NRC- INTERROGATORY ON NINE MILE POINT NUCLEAR UNIT ttO ~ 2 ENERGY HANAGEIIENT ASSOCIATES) INC PAGE 583 ITEH NO ~ E 320 ~ 1 IQ) REPT 9 OPTION 3 SUBRKPORT 1 05/13/83 (<rr~erre4e4 TRANSACTIONS lt'PUT SUHMARY FOR 1989 ++>>++~~++ MITCHELL PURCtrASK PEAK SHAY I<~G PREFERRED SUBPERIODI hEEKOAY ESCALATION RATKSI CAPACITY COST 0 ~ 0 %/YR CQMPANY RESERVE CREDITED ENERGY COST 0 ~ 0

                                      '2 ARKA I  12                         FORCED OUTAGE RATEI         0   ~ %

YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NQV OKC CAPACITY 32 ~ 32 ~ 32 ~ 32 ' 32 ' 32 ~ 32 ~ 32 ~ 32 ' 32 ' 32 '

          $ /MW                   0~0          0 ~ 0      0   0      0 ~ 0          0              ~ 0       0 ~ 0      0   0      0 ~ 0          ~ 0             ~ 0         ~ 0 15 '37
                                                            ~                     ~                                       ~

ENERGY GWH 187 ' 15 '51 14 '08 15 '51 15 '37 15 '51 15 '37 15 '51 15 ~ 951 15 ~ 437 15 ~ 951 15 ~ 951

        $ /HWH                  0 '          0~0        0~0        0~0        0 ~ 0            0 ~ 0       0~0        0 ~ 0      0 ~ 0        0~0            0~0          0 ~ 0 HECHANIC              HYDRO      RUN OF    RIVER         PREFERRED SUBPKRIOPI NONE                        ESCALATION RATFSI CAPACITY COST              0 ~ 0 %/YR CQHPAHY 4                          RESERVE CREDITED                                                           ENERGY COST        0~0 AREA I  21                         FORCED OUTAGE RATEI         0~%

YEAR JAN FKB MAR APR HAY JUN JUL AUG SEP OCT NOV OEC CAPACITY HW 17 ~ 17 ~ 17 ~ 17 17 ~ 17 ' 17 lory

                                                                                                                 '      IZe        17 ~         17 ~            17  ~       17 ~

0~0

          $ /HW                   0   0        0   0      0   0      0   0      0~0                  0         ~ 0      0   0      0~0          0   0           0~0 95 '
                                    ~

8 '80

                                                 ~

11.94o

                                                            ~

12rSOO

                                                                       ~

11 ~ 810 6 '00

                                                                                                   ~

F 000 4r500

                                                                                                                          ~

4 '00 5 '60

                                                                                                                                                  ~

F 450 9 '50 ENERGY GWH

        $ /HitH F 010 1 ~ 82       1 ~ 83     1 ~ 84     1 ~ 85     F 87             1 ~ 88      1 '5       1 ~ 76     1 ~ 77       I ~ 78          1 ~ 79      1 ~ 81 O&R HYO1              HYDRO      RUN OF~RIVER            PREFERRED SUBPKRIOOI NONE                        ESCALATION RATES I CAPACITY COST             0 ~ 0 %/YR COMPANY    6                       RESEPVE CREDITED                                                           ENERGY COST        0~0 ll
                                                              '0'0 AREAI                              FORCED OUTAGE RATEI         Oe
                                      'oe YEAR           JAN          FEB        MAR        APR        HAY              JUN         JUL        AUG        SEP          OCT             NOV         OEC CAPACITY       HW                  10                      10                                     10  '                  loe        10  ~        10  ~           10  '       10 ~
          $ /HW                                o.o        o.o        a.o        o,o ',o
                                                                                                   ~ 0       0 '        0~0        0~0          0 ~ 0 7 '00
                                                                                                                                                                  ~ 0       0~0
                        '                    '20                   '00        '40            7 '00       7 '40        '40        '00        7 '40                       re440
                                                                                                                                                                            '0 ENERGY       GWH
        $ /MWH 87       7 F 2

440

                                  '0       6 2 '0     Te440 2 '0     7 2 '0     7 2 '0             2 '0        2 '0     7 2 '0     7 2 '0         2 '0            2 '0        2

NRC INTERROGATORY ON NINE teILE POlttT NUCLEAR UNIT NO ~ 2 ENERGY MANAGEMENT ASSOCIATESe lttC PAyE Sah ITE'I NC ~ E 320e 1 (O) REPT 9 OPTION 3 SUBREPORT 1 05/l3/83.

                                 <<a<<<<<<<<<<<<<<<<TRANSACTIONS              INPUT 

SUMMARY

FOR 1989 <<<<<<<<<<<<<<<<<<<< PURCrtASE PEAK SeIAVIrIG PREFERRED SUBPERIODI IIEKKDAY ESCALATION RATESI CAr ACITY COST 0 ~ 0 %/YR RF PSN 1 COI1PDNY 8 RESERVF. CREDITED ENERGY COST 0~0

                                                                     '0 '0.

AREAI 26 FORCED OUTAGE RATEI 0 ~% YEAR Jaw FER eIAR APR ttAY JUte JUL AUG SEP OCT NOV OEC CAPACITY 10 ~ 10, 10 10 ' 10 ~ 10 ~ 10 ~ loe loe 10 ~ S/Mw 0 0 0 0~0 0~0 0 0 0 0,0 Oeo 0 0 0 ~ 0 0~0 ENERGY G. AH 58 ' 4 '85

                                           ~ 0 4

0

                                                    '02
                                                       ~ 0 4 '8S
                                                                   ~

4 'Z4 4 985 4 'Z4

                                                                                                                ~

4 '85

                                                                                                                            ~

4 '85 he824 4 '85

                                                                                                                                                                 ~

he824 4 '85 S / te'i tt tt ~ 0 Oen Oeo Qeo Oeo 0 ~ 0 0 ~ 0 0 ~ 0 0 ~ 0 0 ~ 0 0 ~ 0 0 ~ 0 ESCALATION RATESI 'CAPACITY COST 0 ~ 0 %/YR SOL IDIO S 7 PURCttASE PEAK SHAVIttG PREFERRED SUBPERIOOI teEEKDAY COMP AriY 2 RESERVE CREDITED ENERGY COST 0~0 AREAI 25 FORCED OUTAGE RATEI 0 ' JAN FEB MAR APR MAY JUN AUG SEP OCT NOV OEC YEAR CAPACITY Soe 50, 50 ' 50 50 50 ' 0 Soe 0~0 Soe Oeo 50

                                                                                                                                                    '          5'  0 50  '

0 50

                                                                                                                                                                                            ~

0 S/PW 0~0 0~0 0 'eo 'eo

                                                                                                                                                                 ~              ~

24 '24

                                                                                                                ~
                                                                                                                                                             '24         24 '20
                                                                   ~

ENERGY GtiH 293 ' 24 '24 22e S12 Z4 ~ 924 24 F 120 24e924 24el20 24 '24 24 '24 24e12O 24 0 0~0 S/ttb H 0 ~ 0 Oeo 0 ~ 0 0 ~ 0 Oeo 0 ~ 0 0 ~ 0 0 ~ 0 0~0 0 ~ 0 0 ~ HYDRO RUN OF RIVER PREFERRED SUBPERIODI NONE E'SCALATION RATESI CAPACITY COST 0 ~ 0 %/YR INONRPDS COt4PANY 4 RESERVE CREDITED ENERGY COST 0~0 APEAI 19 FORCED OUTAGE RATEI 0 ~ I YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV OEC CAPACI 7 Y Mtt 7~ 7 ~ 7~ 7 7~ 7~ 7~ 7~ 7~ 7~ 7~ 7e S jt<et o,o 0 ' 0~0 0~0 Oeo Oeo 0 ~ 0 Oeo 0 ~ 0 0

                                                                                                                                                             '76
                                                                                                                                                                 ~ 0          0~0         Oeo
                                                                                                                                                                                        '65
                            '         '74           '29        '56          '88              '68          2 '63       2e341      2 '53          916        2              2 ~ 621     2
                                                                                                                                                                                          '3 KNEPGY           GwH 0/ttWII 34         2 2.24 2

2.26 3 2 27 4 2.29 4 2.31 2 '2 2 '4 2 '5 1 ~ 2 '7 2 '8 3 ~ Ol 3

NRC INTERROGATORY ON NINE HILC POINT NUCLEAR UNIT NO ~ 2 ENERGY HANAGKHENT ASSOCIATESs INC PAGE 585 ITEH NOe E 320 ~ 1 (Ol REPT 9 OPTION 3 SUBREPORT I 05/13/83'F oaaooaaaao TRANSACTIONS INPUT SUHHAPY FOR 1989 PSN 2 PURCHASE PEAK SHAVING PREFERRED SUBPERIOO1 WEEKDAY ESCALATION RATESI CAPACITY COST 0 ~ 0 >/YR COHPANY RESERVE CREDITED ENERGY COST Qe0 AREAI 27 FORCED OUTAGE RATEI 0 ~% YEAR JAN FEB APR NAY JUN JUL AUG SEP OCT NOV DEC CAPACITY .Htf 20 ' 20 ' 20 ' 20 ~ 20 20e 20 ' 20 ' 20 ' 20 ' 20e 20 '

            $ /Ne1                      0          '            0        0 '                  'eQ QeQ           '          ~ 0           ~ 0           ~ 0          0 '                     '

9 '48 9 '70

                                      ~                       ~

ENERGY GMH 117 ' 9 '7Q 9 '05 9 '70 9,648 9e970 9 '46 9 '70 9e970 9 '48 9 '70 I

          $ /HyH                  0,0          Qe0        0.0          0 '              Qe0             0 '         0 '        0 ~ 0         0 '           0 ~ 0           QeQ                  0~0 RF PSM 3             PURCHASE PEAK SHAVING               PREFERRED SUBPKRIOO1                e'EEKDAY            ESCALATION RATES I CAPACITY COST                 0 ~ 0 %/YR COHPANY     6                       RESERVE CREDITEO                                                                     ENERGY COST         0 ~ 0 AREA!    26                         FORCED OUTAGE RATE!                 0~%

YEAR JAN FEB APR HAY JUN JUL AUG SEP OCT NOV OEC CAPACITY 40 ' 40 ~ 40 40e 40 ' 40 ~ 40 ' 44 ~ 40 ' 40 ' 40 ' 40 '

            $ /Hi/                      0        QeQ            'eO 0 '                ~ 0           0 ~ 0         '        QeQ             ~ 0           '       19 '96
                                                                                                                                                                              ~ 0 19 '39
                                                                                                                                                                                                    ~ 0 19 '39                   19 '96        19 '39
                                      ~

ENERGY GhH 234 ' 19 '39 18 ~ 010 19 '39 19 '96 19 '39 19 '96 19 '39

          $ /HitH                 0 ~ 0        0 ~ 0      0 '          0 '              Qe0             Qe0         0 ~ 0      0~0           0'            0'              0~0                  0 ~ 0 RF PSN 4             PURCHASE PEAK SHAVING               PREFERRED SUBPKRIODI WEEKDAY                            KSCAl.ATION    RATES'APACITY           COST      0 '     %/YR COt PANY 8                          RESERVE CREDITED                                                                     ENKRGY COST         0 '

AREAR'7 FORCED OUTAGE RATEl 0 A% YEAR JAN FEB HAR APR HAY JUN JUL AUG SKP OCT NOV DEC CAPACITY eeee 40 ' 40 ~ 40 ' 40 40 ' 40 ' 40 ' 40 ' 40 ' 40 ' 40 ' 40 '

            $ /Hw                       0        0~0            0
                                                                             e 0              '               '             0        '             ~ 0           ~ 0            '                     ~ 0 ENERGY       G<H    234 '     19 '39
                                      ~

18.010 19e939

                                                              ~

19 '96 19 ~ 939 19 ~ 296 19e939

                                                                                                                        ~

19 '39 19 '96 19 '39 19 '96 19e939

          $ /H'AH                 0 '          0~0        0 ~ 0        0 '              0 '             0 ~ 0       0 ~ 0      0~0           0'            0'              0~0                  0 ~ 0

1990

tO +4 HRQ INTERROGATORY ON NINE ITEN HO. E 320.1 (D) te 0 ...'J 4L~ ~W'~ J4~ NILE POINT NUCLEAR UNIT NO. 2

                                                                                 't,      1J     0 ~     R     ~   IA   ),         ~        >>

ENERGY SNAGENENT ASSOCIATES. REPT -9 OPTION 3 SUBREPORT IHC.

                                                                                                                                                            ..2 4        ~a 14fS'   =i e**** INPUT               HYDRO ENERGY ALLOCATION FOR      1990    *****

UNITS (GMH) UNIT t YEl0] JAN

                                                                   "   FEB       NAR     APR         HAY          JUN        JUL       AUG         SEP          OGT'OV                  DES PLANT HAHE NIAGF]Rrr NIAopEAK 3043
                                        '37   .

295 '73 34 'Te 302 '7

                                                                                     ~

Z87 296 37e'6, 283 '79

                                                                                                                      '15 '15e37e
                                                                                                                                 ~     288 37e '6e 278e 36 293e 37e 278 ~

36 '7

                                                                                                                                                                                     ']5291  ~
                                                                                                                      '57 '37 NI AGREPL                        3705                            e     284  '15 315e     304 ~       315 ~      304                                     '04 3]S ~                        '04
                                                                                                                                                                                             ~
                                                                                                                                 '09 e
                                                                                ]37 ~                            132 ~       ]37                                137             132e    137
                                                                                                                                 '1]

NIAOEXPN 137e 124e 132 ~ 137 ~ ~

                                                                                                                                                       '32e
                                                                                                                                                                     ~                       ~
                                                                                                                                                                                      '39 '
                                        'elle NIAGPsNY ST ~ LAP ASNOKAN                             25
                                        '645,
                                                '188 4]Oe 49'68 '
                                                                 ~

307e 2~ 407

                                                                                     '24
                                                                                      ~

182 ~

                                                                                               '79 '
                                                                                               ~

329

                                                                                                        ?~
                                                                                                           '48 349 2 ~

602 2~ 2~

                                                                                                                                            ~
                                                                                                                                            '6be
                                                                                                                                                 ,283e 581 2~
                                                                                                                                                         ~

267

                                                                                                                                                                     '77
                                                                                                                                                                      ~

46' 559

                                                                                                                                                                                      ~

SZQ 2~

                                                                                                                                                                                             ~

KENS]CO

                                        '2 2 ~       2~        2   ~     2~         2~          2 ~        2 ~        2~         2~           2~               2~      2   ~

DELTA '0e 1 ~ ]~ 1 ~ 1 ~ 1 ~ 1 ~ le 1 ~ le 1 ~ le le HINCKLEY 31 3~ 3e 3~ 3~ 3~ 3~ 3e 3~ 3~ 3~ CRESCENT

                                        '2 2~        2~         2~          2~         2~         2  ~       2~           2~               2~     2~

I(ATERFRD '6e 1 ~ 1 ~ 1 ~ ]e 1 ~ 1 ~ 1 ~ 1 ~ le 1 ~ 1 ~ 1 ~ VISCHER 24 ~, 2~ 2~ 2~ 2~ 2~ 2~ 2~ 2~ 2~ 2~ 2~ 2~ rroer44 INPUT UNIT PARTICIPATION SALES PERCENTAGES SOLO FOR 1990 PLANT NAWE UNIT rr JAN FE8 NaR APR eraY JUN JUL aUO SEP OCT NOV OEC osMEoo 5 0~0 0 ~ 0 0 ~ 0 0~0 Q~Q 0~0 0~0 0 ~ 0 0 ~ 0 0 ~0 0 ~0 0 ~0 OSrrEoo 6 O.O O,O O,O O.C O.O O.O O.O O,O O.O O.O 0,0 OS 0

llRC IN'IERROGATORY Ot< NINE MILK POINT NUCLEAR UNIT tl0,2 E<<ERGY MA"'AGEIIErlT AssoclATEsl Itic PAGE 629 ITKll llO ~ E 32u el \0) REPT 9 OPTIO<< 3 SUBRKPORT I 05/13/83

                                     <<a<<<<<<aa<<<<>>        TRANSACTIOhlS INPUT 

SUMMARY

FPg ]990 >>>>>>a>>>>>><<>>a I OHKCONl PURCHASE PEAK SHAVI."lG PREFERRED SUBPERIODI elONE ESCALATIO<< RATESI CAPACITY COST O.O rl/YM COMPa<<Y RESERVE CREOITKD EtlKRGY COST 0 ' AREAI 1 FORCED OUTAGE RATEI' ~5 YEAR JAN FEB MAR APR MAY JUhr JUL AUG SEP OCT NOV OEC CAPACITY tttt 0~ 0 ~ 0 ~ oe 0 ~ 0 ~ 0 ~ 0~ 0 ~ 0 ~ oe 0 ~ 0~0 0~0 0 ~ 0 0 ~ 0 0~0 oeo oio 0~0 O.o 0~0 0~0 Oeo W/tie'NERGY GeH )~0 0~0 0~0 0~0 oeO OeO . 0 ~ 0 0~0 0 ' 0 ' oeo oeO 0 '

          $ /Mr. H                         0~0          ueo        0~0        0 '                0          o.o            n,o        0 ~ 0       0.0           0 ~ O          0~0        0~0 INTERCHANGE ACCOUNTING I PRICING OPTION                   I     8                  coMp olwNERsHI~         cAMp OwMKRsHIp              coMp owrlErtsHI P     COMP OWNKRSHIP        COMP OWNERSHIP DISPLACEIIErrT COST              I     50iO   %

FIXKD COST INCREASE t -'15.6 S/tlwtt SAYIttGS FIXED SPLIT I 100 ~ 0% PRIORI> Y ORDER, I 7 RKPORT ING OPTION I ACCOU TIITG OPTION I I OHECOtl2 PURCHASE PEAK SHAVIrlG PREFERRED SUBPERTODI NONE ESCAI.ATION RATESI CAPACITY COST 0 ~ 0 %/YM COMPANY 0 RESERVE CREDITED ENERGY COST 0~0 AREAI 1 FORCED OUTAGE RATEI 0 ~ I YEAR JAN FE8 HAR APR MAY JUN JUL AUG SKP OCT NOV OEC CAPACITY 0 ~ 0 ~ 0 ~ 0 ~ Oi 0 ~ 0 ~ 0 ~ 0 ~ 0~ 0 ~ 0 ~

             $ /Ytr                          0 ~ 0        oeo        0 ~ 0      oeo           0 ~0            oeo            0~0        0~0         0~0           0~0            0~0        0~0 ENERGY                 GÃH     0~0      0.0           0~0        0~0       0 ~ 0         0 ~ 0           o.n            0 '        0 '         0~0            0~0           0 '        0 ~ 0
          $ /M'l.H                         0 '          0 '        0 '        Qeo           0 ~  0          0~0            0~0        0 ~ 0       oeo           0~0            0 ~0       oeo INTERCtlotlGK ACCOUNT ItlG I PRICING OPTION                   I     B                  COMP OWNERSHIP          COMP OWtlERSHIP             COMP Oer<<KRSHIP       COMP OWNERSHIP        COMP OWNERSHIP DISPLACEMErlT COST               I SojO FIXED COST INCREASE                    15 ~ 6 S/t<<H SAVltlGS FIXED SPLIT                 100 ~ 0 PRIORITY ORDER                   I     6        REPORTING OPTION I              ACCOUNT ltlo OPTION I 0

tiRC IIITERROGATORY ON NirtE ttILE POINT NUCLEAR U'IIT NO ~ 2 ENERGY HANAGEliENT ASSOCIATESI INC PAGE 630 ITEN NOe E 320 ~ 1 IO) REPT 9 OPTION 3 SUBREPORT 1 05/13/83

                                         +ttir"+4+ir+ir TRANSACTIONS INPUT      SUHttARY FttR 1990 NVRSK-IIY                   STORAGE       ttYORO                 PREFERRED SUBPERIODI WEEKDAY                   ESCALATION HATESI CAPACITY COST            0 '     %/YR 0                              COHPAtlY 1                           PESERVE CREOITEO                                                      KttERGY COST        0~0 AREA I     10                        FORCED OUTAGE RATEI           0  '

YEAR JAN FEB HAR APR t]AY JUN JUL AUG SEP OCT NOV DEC CAPACITY itri

                  $ /0<W 27 ~

0~0 27

                                                               ~

0 27 ' 0 27

                                                                                     '         27'7r 0   0,       0   0 27 ~

0 ~ 0 27 O,n 27

                                                                                                                                             ~

0 27 ' 0 27

                                                                                                                                                                             'en 27
                                                                                                                                                                                         ~

0 ENERGY GWtt 60 F 7 3 '00 F 500 F 000

                                                                        ~

2r200 4.3no

                                                                                                 ~

4e500

                                                                                                              ~

7 F 000 8 ~ 100 8 '00 6 '00

                                                                                                                                                           ~

F 800 4 '00 S/rt;<I H Ibe00 15.nn 15 ~ 00 15 F 00 15e00 15 ~ OV 15.00 15 F 00 15 F 00 15 ~ 00 15 F 00 Ibenn HISC tlY HYDRO HUN OF RIVER PREFERPED SUBPE,RIODI NONE ESCALATIOtt HATESI ChPACITY COST 0 ~ 0 %/YR COMPANY 1 RESERvE CREOITKO  ! EtiERGY COST Oen APEAI 10 FOPCED OUTAGE PATEI 0,% YEAR JAN FER HAR APR HA) JUN JUL AUG SEP OCT ttOV DEC CAPACITY:1W 4e 4~ 4 ~ 4~ 3~ 3~ 3~ 3~ 3~ 3~ 4e 4~ J/e ~ Oen 0~0 0~0 0~0 Oen Orn 0 ~ 0 Oen 0 ~ 0 0 ~ 0 0~0 0 ~ 0 i I ENERGY GWH 16 ' 1 F 500 1 ~ 700 F 800 2 '00 le800 n 600 0 '00 Oe500 0 F 500 0 F 800 1 ~ 400 1 ~ 600

                $ /ttWH                       0~0          0~0       0~0        Oen           Oen         Oen         0~0      P~0       0 ~ 0         0 ~ 0           0~0           0~0 (4

STURGEO"I STORAGE ttYDRO PREFERRED SUBPERIODI WEEKDAY ESCALATION RATESI CAPACITY COST 0 ~ o %/YR COtrPANY 1 RESERVE CREDITEO ENERGY COST 0 ~ 0 AREAI 10 FORCED OUTAGE RATKI 0 ' YEAis JAN FEB NAR APR JUL AUG SEP OCT NOV OEC

                                                                                               <<<<t CAPAC I I T        HW                        15e         15  '    15 ~       15e            15          15  '       15  '     15 ~     15 ~          15  '           15   '        15 ~

I/tl'<t 0 0 ~ 0 0~0 0~0 0~0 0 ~ 0 0~0 0 ~ 0 ' ' 0

                                                                                                                                                                                     '00
                                                                                                                                                                                         ~ 0 ENERGY           G.H        51 '        4  '00
                                                   ~

F 800 9 '00 8 '00 5 '00 1 F

                                                                                                              ~

800 1 ~ 200 1 F 800 1 ~ 600 F 500 4 '00 5 5/te Wtt 0~0 0 ' 0~0 0~0 0~0 0~0 Qen 0~0 0 ~ 0 0 ' 0~0 0 '

NRC ltITERROGATOIIY ON NINE t'IILE POIIIT NUCLEAR VIII7 IIO ~ 2 ENERGY teAMAGE"IEtIT ASSOCIATES< INC PAGE 631 ITEM NQ E 320 ~ 1 tU) IIEPT 9 OPTION 3 SUBREPORT 1 05/13/83

                               <<<<<<<<<<<<>><<<<>>      TRANSACTIONS INPUT SUNMAf:Y FOR 1990 >><<<<>><<>><<<<<<<<

06R HYOZ STORAGE eIYDRO PREFFRREO SLiBPERIOD I NONE ESCALATION IIATES I CAPACITY COST 0 ~ 0 %/YR CoeiP4tlY 6 RESERVE CREDITFD EtIERGY COS'I 0 ~ 0 AREAI 11 FORCED OUTAGE RA'TEl Oe% llew YEAP. JAN NAR APR MAY JUN JUL <UG SF.P OCT NOV OEC CAPACI TY HI: 34 ' 34 34 ' 34 ' 34 34e 34 34 ' 34 ' 34 ' 34 ' 34 ' 4/IP OeO 'eo

                                                                 ~ 0           '            'e0.       0 ~  0           'eo
                                                                                                                                    '          ~ 0           ~ 0            '               '

ENERGY Q>:H 100 ~ 5 13 ~ 760 680 13e460 10 '00 lo.o60' 8.400 5.46o 2 '60 le800 7 '60 F 000 Teeeo f/HsH 2 '0 2 '0 2 '0 Ze90 '0 2 '0 2 '0 2 '0 2 '0 2 '0 2e90 2 '0 RGHYO RR MYORO llewRUtt OF RIVFR PREFERRED SUBPERIODi NONE ESCALATION RATESI CAPACITY COST 7 ~ 0 %/YR COMPAIIY 7 RESERVE'REDITED ALI; Et'ERGY COST 7 ' AREA I 9 FORCED OUTAGE RATEI Oe% JAN FEB IMPAR APR NAY JUtI JUL AUG SEP OCT NOV OEC CAPACITY 15e 5~ 20 Zoe 10 5~ 3~ 3e 5e 10 ~ 20 10. a I/I'lA 1916 ' 6365 ' ' '437 1485 ' ' '874 5941 ~ 1 9582 ' 9582 ' 5941e 1 2874 ' ~ 2

                                                                                                                                                                              '485 2874    ~ I ENERGY       Gt!H     92 '           160      3 '60      14 ~ 880      14e<<OO      7 '40          F 600        2 '32       ' 2 '32      3e600         7 '40         14 ~ 400         7 '40 S/Ie".H                  1 ~ 75       F 75        1 ~ 75        1 ~ 75     le75           le75         I ~ 75          '5       le75          F 75           1 ~ 75          1 e75 RGHYD PS              STORAGE      HYDRO                    PREFERRED SUBPERIOOI NONE                          ESCALATIOII RATESI CAPACITY COST                 0 ~ 0 %/YR 0                       COMPANY AREA!      9 7                        RESERVE CREDITED ALL FORCED OUTAGE RATEI; 0,%

EIIERGY COST Teo YEAR JAN FEB HAR APR tfAY JUN JUL AUG OCT NOV OEC i CAPACITY M< ?0 ~ 45 ~ 30 30 ~ 41< 30 ' 30 ' 'ZZ ~ 45 ~ 40 ~ 30 ' 40e e 5/Hi Oio 0~0 'io 0~0 Oeo ' ~ 0 0 ~ 0 0 ~ 0 0 ~ 0 ~ 0 0 ' ENERGY G4'K 143 e8 9 ~ 817 15 ~ 930 12 ~ 333 8 F 278 17e922 10 '93 8 '97 4 '68 10 '63 14 ~ 452 15 '01 14 ~ 691 s/eAH 1 ~ 75 F 75 I ~ 75 I ~ 75 le75 le75 1 ~ 75 1 ~ 75 1 ~ 75 le75 leT5 1 ~ 7$

r!RC I!lTFRROGATORY Otl NINE HILE POItlT NUCLEAR UN)T t40 ~ 2 EIIERGY HAI4AGEMENT ASSOCIATESI INC PAGE 63d 0 ITEH tie E 320 ' {0) REPT 9 OPTION 3 SUBREPORT 1 05/13/83 ooooooo>>o TRANSACTIOtlS INPUT SUIIMARY FOP )990 oooooooooo NHHYO A) HYDRO RUh!"C'F RIVER PREFERRED SUBPFR IOD I t!0!IE ESCALATIOtl RATESI CAPACITY COST 0~0 II/YR COMPANY APEAI 5 tlO SPItlNING RESERVE CREDIT FORCED OUTAGE RATE! Et!ERGY COST 0 ' QADI YEAR JAN FEB HAR APR HAY JUN JUL AUO SEP OCT NOV OEC CAPACITY ) 3~ 3~ 3~ 3~ 3~ 3~ 3~ 3~ 3~ 3~ 3~ 3~ 0 S/N>> '

                                                                                                                                                                                    '32' QeQ         neQ       Qe0         0~0             0~0           0~0          QeQ        0         Qe0           QeQ            0   0       0 ENERGY        G'e>>H      26 '       2 '32       2i016     2  '32       2.160          2 '32         2.160        2e232        '32                     '3Z           2,160
                                                                                                                                                                            ~
             $ /M'rM                     3  '8       3i78      3e78         F 78           3 '8          3 '8         3 '8     2 3 '8    2 ~ 160 F 78 2

3 '8 F 78 2 F 78 NNHYD C1 HYDRO RUN-OF RIVER PRFFERRED SUGPERIODI NONE ESCALATION RATESI CAPACITY COST 0 ~ 0 %/YR , 0 COHPANY 5 NO SPI!4NING RESERVE CREDIT ENERGY COST 0 ' AREAI 2 FORCED OUTAGE RATEI 0 YEAR JAN FEB HAR APR MAY JUN JUL AUG SEP OCT NOV DEC CAPACITY tI'>> 32 ~ 32 ' 32 ~ 32 ~ 32 ~ 32 ~ 32 ~ 32 ~ 3? 32 ' 32 ' a 6/fl'~ 0 ' 0~0 ' 0 ' QeO QeQ 0 ' 0.0 0 ' 0 '

                                                                                                                                                               ~

ENERGY GXH 280.3 23eBQB 21 ~ 504 23 F 808 23 '40 23e808 23 '40 23e808 23 F 808 '40 23 F 808 23 F 808 0/I &iH 3 '8 F 78 F 78 F 78 F 78 3 '8 F 78 3 '8 23 3 '8 3 '8 Z3 ~ 040 3 '8 F 78 l i 4 NHHYD E) HYDRO RUN OF~RIVER PREFERRED SUBPERIODI NONE ESCALATION RATESI CAPACITY COST 0 '  %/YR COHPAtlY 5 tl0 SPINNING RESERVE CREDIT ENERGY COST 0 ' AREA! 3 FORCED OUTAGE RATEI 0 ' YEAR JAN FEO HAR APR HAY JUN JUL AUG SEP OCT . NOV DEC CAPACITY t!'A 76e 76 ' 76 ' 76i 76. 75e 76 ' 76 ~ 76 ' T6 ~ 75 ~ Te. 0/'!H 0 ' ~ 0 ' 0~0 Q ~ 0 0 ' ~ 0 0 ' ' 0 ' 0>>Q QeQ ENERGY G~H 665eB se.s44 5) i072 56 '44 54 '20 56 '44 54 '20 se.s44 56e544 54e720 se.s44 '20 se.s44 S/H'gH 3 '8 3e78 3 '8 F 78 F 78 3 '8 F 78 3 '8 3 '8 3 '8 54 F 78 F 78 j ~

ftRC INTEPROGATORY ON NINE NILE POINT NUCI.EAR UNIT NO ~ 2 ENERGY t4AttAGEMEttT ASSOCIATESt INC PAGE 633 ITEM NO ~ E 320el (D) REPT 9 OPTION 3 SUBREPORT 1 05/13/83 oteoetoeooooo TRANSACT IOtlS It4PUT SUt<t4ARY FOR ]990 ee++O4YOooe>> NMHYD Fl ttYDRO RUkl OF~RIVER PREFERRED SUOPKRIODt NONE ESCALATION RATESI CAPACITY COST 0 ~ 0 %/YR COHPA"IY 5 NO SPIt4NING RESERVE CRED]T ENERGY COST 0 ' APEAt 4 FORCED OUTAGE RATEt 0 ' YEAR JAN FEB MAR APR MAY JUt4 JUL AUG SEP OCT NOV OEC CAPACITY 42o 42 ' 42i 42 ' 4P. ~ 42 ' 42e 42 ' 42 ~ 42 ' 42 ' 42 '

             $ /e'ltt                  Oe0          '        0 '             '              Oe0             '          0 '          '         0 '             '              '           '

ENERGY GeeH 367 ' 31 '48 28e224 31 ~ 248 304240 3]o248 30 '40 31 ~ 248 '48 30 '40 31 ~ 248 30 '40 31 ~ 248

           $ /te>H                   3 '8        F 78    . 3 '8          3 '8             3  '8          F 78        3 '8    31 3e78        3 '8          3 '8           3e78        3e78 NttHVO CZ              STORAGE      HYDRO                 PREFERRED       SUBPERIODt NONE                         ESCALATION RATESt CAPACITY COST                0 ~ 0 %/YR COMP.'ANY    5                     t<0   SPINNING RESERVF. CttEDIT                                                    ENERGY COST         0 '

AREAt 2 FORCED OUTAGE RATKt 0 ' YEAR JAN FEB MAR APR etAY JUN JUL AUG SEP OCT NOV DKC CAPACITY Hit 12e 12o 12e 12 12 ~ 12 ~ 12o 12 ~ 12 ~ 12 ~ 12 ~ 12 ~ 4 j/MA 0 ' 0 ' 0 ' '40 0 ' 0 ' 0 ' Oo0 0 ' 0 ' 0 ' 0 ' KNERGY G'AH

           $ /MKH 42 '       3 '71 0'

3 '26 0' 3e571 0 ' 3 '56 Oi0 3o571 0 ' 3 '56 Oe0 3 '71 0' 3 '7] 0 ' 3e456 Oe0 3oS71 0 ' 3 'S6 0 ' 3 ~ 571 0 ' NHttYO EZ STORAGE HYDRO PREFERRED SUBPERIODt NONE ESCALATION RATESt CAPACITY COST 0 '  %/YR COMPANY ttO SPINNING RESERVE CRED]T ENERGY COST 0 ' AREA] 2 FORCED OUTAGE RATEI Oi%

                                                                                                                           '23 YEAR            JAN        FEB        MAR           APR              t th Y        JUN          JUL        AUG         SKP           OCT            NOY         DEC CAPACITY                            223 ~       223 '     223 '         223   '          223 ~          223 ~       223              '     223 '         223 '          223 '       223   '

0 $ /etet 0 ' ' ' ' 0 ' 0 ' ' 0 ' ' ' ' ' ENERGY GtlH 78] ~ 4 66 '65 59e942 66 '65 64i2Z4 66o365 64 '24 66 '65 66 '65 64 'Z4 66 '65 64i224 66 '65

           $ /tl!0H                  0 '         Oe0       0 '           0 '              0  '           Oo0         0 '        0 '      . 0.0           0 '            0 '         0 '

NRC INTERROGATORY Ol'I NINE llILE POIt<T NUCLEAR UNIT NO. 2 KetEROY HAttAOEHEl'tT ASSOCIATES I INC PAGE 634 ITEM Noe E 320 ~ 1 IOI REPT 9 OPTION 3 SUBREPORT 1 05/13/63 I TRANSACTIONS INPUT SUHMAPY FOR 1990 o~+0+o~o4 NIIHYD F2 STORAGE IIYORO PREFERRED SUBPFRIODI I'toNE ESCALATION.RATKSI CAPACITY COST 0 ~ 0 %/YR CotlPatt Y 5 ttO SPIttNING RESERVE CREDIT ENERGY COST 0~0

                                                                             '3 ARKAI       2                              FORCED OUTAGE RATEI             0 ~%

YEAR JAN FEB MAR APR MAY JUN JUL AUG SFP OCT OEC CAPACITY 93e 93 ' 93 93 93 93 ~ 93 ' 93 93 ' 93 ' 93 ' 0 $ />>c 325 ' OeO

                                           '77        24 '98
                                                             ~ 0                        oeo'eo          'eo            'eO 0~0          ~ 0          'eo
                                                                                                                                                                      ~ 0           ~ 0         ~ 0 ENEflOY       O<H                      27                           27 77      26  '84      27 '77         26e764       27 '77     27e677     26 '84         27 '77        26 '84     27 '77 S/H'iH                          0~0           0~0            0~0           O.o         0+0            0 ~ 0        0 ~ 0      0~0        0 '            0~0           0~0        0 ~ 0 0

ORNBY HYDRO COMPAI'IY 5 IDUN~OF RIVER PREFERRED SUBPERIODI NONE; ESCALATION RATESI CAPACITY COST 0 '  %/YR NO SPIteNING RESEIIVE CREDIT ENERGY COST 0~0 AREA I 2 FORCED OUTAGE RATEI oi% YEAR JAN FEB ttAR APR HAY JUN JUL AUG SEP OCT NOV OEC CAPACITY MK 10e 10 ~ loe Ioa 10e loe 10 ~ 10 ~ 10 ~ 10e lo ~ 10 ' e $ /H<< oeo 0~0 oeo 0~0 oeo 0~0 0~0 0~0 0~0 Oen 0~0 ~ 0 ENERGY Gt';ll 35 ' 2 '76 2i 688 2 'T6 2 '80 '76 '80 '76 '76 2 '76 F 880 2,976 S/M w'lt 3 '8 3e78 F 78 3e78 2 3 '8 2 3 '8 2 3e78 2 3'8 F 880 3 '8 3 'B 3 '8 F 76 e UNION STORAGE HYDRO PREFERRED SUBPERIODI NONE ESCALATIOW ttATESI Cat ACITY COST O,O %/YR COMPANY 5 NO SPIWNINO RESERVE CREDIT EttEROY COST 0~0 ARKAI 3 FORCED OUTAGE RATEI oe% YEAR. JAN FEF. MAR APR etAY JUN JUL AUG SEP OCT NOV DEC CAPACITY 3~ 3~ 3~ 3~ 3~ 3~ 3~ 3~ 3~ 3~ 3~ 3~

            $                                0 ~ 0         0 ~ 0          0~0           0~0         0 ~ 0          oeo          0~0        0 ~ 0      0~0            0~0           0~0        OeO 8'/H
              /n'-'NERGY 10 '        0 ~ 930       0   840          '30             900         930        0 ~ 900          930        930      '00              930           900        930 S/MaH                           3 '8          ~
                                                        .3 ~ 78 0

3 '8 0 ~ 3i78 0 ~ 3 '8 3 '6 0 ~ 3eTB 0 ~ 3 '8 0 3 '8 0 ~ 3 '8 0 ~ 3 '8 0 ~ F 78

tlRC ltlTKRROGATORY ON NINE HILE POINT NUCLEAR UNIT NO ~ 2 EtlKRGY HANAOEHENT ASSOCIATESt INC PAGE 635 ITEN ND ~ E 320 ~ I IDI REPT 9 OPT IOtl 3 SUBREPORT 1 05/13/83 ss++t+0++est TRANSACTIONS INPUT SUHHARY FOR Ist90 TREtlT STORAGE HYDRO PREFERRED SUBPERIODI HONE ESCALATION RATESI CAPACITY COST 0 ~ 0 %/YR COt'PhtlY 5 NO SPINNIHO RESERVE CREDIT ENERGY COST 0 '

                                                                                   '0'0 AREAI        3                          FORCED OUTAGE RATEI          0 %

YEAR JAN FEB HAR APR llAY JUN JUL AUG SEP OCT NOV OEC CAPACITY  !<w 30 ' 30s 30 ~ 30 ' 30 ~ 30 ' 30 ' 30 ' 30 ' 30 ' S/sIK ' 0 ' 0~0 ~ 0 0~0 Os0 Os0 ' ' ' ~ 0 ' ENERGY Gs'H 168 ' 14 '85 12 '02 14 '85 13 '24 14 '85 13 '24 14 '85 14 '85 13 '24 14 '85 13 '24 14 '85 S/O'HH 3s78 3 '8 F 78 F 78 3 '8 F 78 F 78 3 '8 F 78 3 '8 3 '8 F 78 OLNPK HYDRO RUN~OF~RIVER PREFERRED SUBPERIODI NONE ESCALATION RATESI CAPACITY COST 0 ~ 0 %/YR COHPANY 5 NO SPINNINO RESERVE CREDIT ENERGY COST 0 ' AREAI 3 FORCED OUTAGE RATEI 0,% YEAR JAN FEB HAR APR HAY JUN JUL AUO SEP OCT NOV OEC CAPACITY HM 16e 16 i 16s 16e 16, 16s 16 ~ 16 ~ 16s 16 ~ 16 ~ 16 ' I /Htt 0 ' 0~0 0 ~ 0 0 ' Os0 Os0 0~0 0 ' 0 ' 0 ' 0~0 ' ENERGY Gl"H 105 ' 8 '95 8 ~ 124 8 '95 8 '0S 8 '95 8 '05 8 '95 8 '95 8 F 705 8 '95 8 '05 8 '95 S/Hi'tl F 78 3e78 3e78 3e78 3s78 3 '8 F 78 3 '8 3 '8 3 '8 3 '8 F 78 OSWGT IE HYDRO RUN 'OF~RIVER PREFERRED SUBPERIODI HONK ESCALATION RATESI CAPACITY COST 0 ~ 0 %/YR CPHPANY 5 NO SPINHINO RESERVE CREDIT ENERGY COST 0 ' ARKAI 3 FORCED OUTAGE RATEI 0 ' YEAR JAN FEB HAR APR HAY JUN JUL AUG SKP OCT NOV OEC CAPACITY tIII 0 ~ 0 ~ 0 ~ Qe 0 ~ Os 0 ~ 0 ~ Oi 0 ~ Oi 0 ~ I /Hw 0s0 0 ' 0 ' 0 ' 0 ' 0 ' 0 ' 0 ' Oe0 0 ' 0 ' 0 ' ENERGY 0!IH 3 ' 0 '74 0 '47 0 '74 0 '65 '74 0 '65 0 '74 '65 0 '74 0 '65 0 '74 S/Hs'H ETC '3 ~ 78 3s78 3 '8 0 3s78 3 '8 F 78 os 274 F 78 0 F 78 3 '8 3s78 F 78

NRC INTERROGATORY ON NINE HILE POINT t(UCLEAR UNIT WO ~ 2 ENERGY HANAGEHENT ASSOCIATESI INC pAGE 636 ITEH NQ ~ E 320 ~ 1 [V) REPT 9 OPTION 3 SUBREPORT I 05/i3/83

                                    <<<<4<<<<4<<<<<<<<     TRANSACTIONS INPUT SUNHARY FOR 1990 <<<<4<<<<<<<<<<4<<

HUOFLS STORAGE NYO'IO PREFERRED SUBPERIODI tPONE. ESCALATION RATESI CAPACITY COST 0 ~ 0 %/YR COIIPAttY NO SPINNING PESERVE CRFDIT KNERGY COST 0~0 AREA I 4 FORCED OUTAGE RATF-I Oe%. YEAR JAN FEB HAR APR JUN JUI. AUG SEP OCT NOV OEC CAPACITY ttw 2~ Z~ 2~ 2~ ~ 2~ 2~ 2~ 2~ 2~ 2~ 0 $ /Ng Oen Oen 0~0 Oen Oen 0~0 0~0 0~0 0 ~ 0 Oen 0~0 0 ~ 0 ENERGY G'cH 7 ' 0 '10 0 55] 0 '10 Oe590 0.610 '90 Oe610 610 '90 610 i 590 610

          $ /HvH                        3 '8         F F 78      F 78        3 '8           3 '8     '

0 3 '8 3i78 0 ~ F 78 0 3 '8 0 ~ 3 '8 0 3 '8 0 ~ 3 '8 HECHVL HYDRO RUM~OF~RIVER PREFERRED SUBPERIOOI NONE ESCALATION RATES I CAPACITY COST 0 ~ 0 %/YR COHPANY 5 ttO SPINNING RESEPVE CREDIT Et ERGY COST 0.0 AREAI 4 FORCED OUTAGE RATEI 0 % YKAR JAN FEB HAR APR HAY Jvtt JUL AUG SEP OCT NOV DEC i CAPACITY Het 3i 3~ 3~ 3~ 3 ~ j, 3~ 3~ 3~ 3~ 3~ 3~ 3~ CI 9 /O'et 0~0 0 ~ 0 0~0 0~0 0.0 I 0~0 Oen 0~0 0~0 0 ~ 0 0 ~ 0 0~0 ENERGY GwH 19 ' I ~ 683 I ~ 520 683 '29 '83 1ib29 I ~ 683 I ~ 683 I ~ 629 I ~ 683 '29 683 S/H'sH 3 '8 3 '8 1 ~ 3 '8 1 3 '8 1 3 '8; 3e78 3 '8 3 '8 3 '8 3 '8 1 3 '8 1 ~ 3e78 SUGAR STORAGE HYDRO 5 PREFERRED SUBPERIODI NONE ESCALATION RATKSI CAPACITY COST 0 '  %/YR COHPANY NO SPINNING RESERVE CREDIT ENERGY COST 0~0 AREAI 3 FORCED OUTAGE RATEI 0 ' YEAR JAN FEB HAR APR teAY, JUN JUL AUG SEP OCT NOV CAPACITY 4~ 4~ 4~ 4~ 4 4 ~ 4~ 4~ 4~ 4~ 4 ~ 4~ 6/&I'lf 0 ~ 0 Oen 0~0 0 ~ 0 Oin I 0~0 0~0 0 ~ 0 0 ~ 0 0~0 0 ~ 0 0~0 ENERGY GiH ZS ~ 4 2 ~ 156 1e947 2i156 F 087 Zi156 t 2,087 2e156 2 ~ 156 2 ~ 156 F 087 2,156 S/H'Net 3 ~ 78 3e78 F 78 3i78 3e78; 3 '8 3 '8 3 '8 F 087 3 '8 F 78 3 '8 3e78

                                                                                                                                                                                          '3

IIRC INTERROGATORY ON NINE t!ILE POltIT NUCLEAR UNIT tIOoz EtIEROY HA~IAGEHEtIT ASSOCIATESo INC PAGE 63( ITEM WQo E 320 ' IOt HEPT 9 OPTION 3 SUBREPORT 1 05/13/83 ooaoooaooo TRANSACTIONS INPUT SUHHARY FOR 19 0 oaooooaaoo SGLEWF H'YDRO RUN OF RIVER PREFERRED SUBPKRIOOI NO E ESCALATION RATESI CAPACITY COST 0 ~ 0 %/YR 6 COHPart Y 5 NO SPINNING RESERVE CREDIT ENERGY COST Oin

                                                                   '2 '2 ARKAI      4                      FORCED OUTAGE RATEI            Oe%

I I YEAR JAN FEB 1'IAR APR HAY JUN JUL AUG SEP OCT NOV OEC I I CAPACITY 12e 12o 12 ' 12 ~ 12 ~ lzo 12 ~ 12 ~ 12 ' 12 ' e - $ /Hlt 0 ' 0

                                                 '45
                                                     '           '          0
                                                                          '48
                                                                              '        0 '           0 6 '48
                                                                                                       '          0~0       0 '           0~0          0 '              '          '

ENERGY GoH 73.6 6.250 5 6o250 6 6o250 6 '50 6.zsn '48 '50 '48 6 '50

          $ /HIIH                      3 '8      3 '8       3 '8          3 '8       3 '8          F 78         3 '8      3 '8        6 F 78 6

3 '8 6 3 '8 3o78 HAOLEY HYDRO RUN OF RIVER PREFFRRKD SUBPERIODI NONE ESCALATION RATESI CAPACITY COST Oon %/YR COIIPANY AREAI 4 S NO SPINNIWO RESERVE CREDIT 0'5 ENERGY COST 0 ' FORCED OUTAGE RATEI YEAR JAN FEB MAR APR HAY JUW JUL AUG SEP OCT NUV OEC CAPACITY tlat 0~ 0 ~ 0 ~ 0 ~ 0 ~ Oo 0~ 0~ 0 ~ 0~ 0. 0 ~ e $ /t'II 0~0 0 ' 0 ' 0 ' 0 ' 0 ~ 0 llew 0~0 0~0 0 ~ 0 0~0 0~0 0~0 ENERGY GloH Oon 0. 0 ' ' F 0 ' ' O.n ' ' ' ' '8

         $ /MtlM 0 ~

3 '8 3 '8 0 3 78 3 '8 0 3 '8 0 F 78 F 78 0 3:78 0 F 78 0 3 '8 0 3 0~0 3 '8 FLTHLS HYDRO RUN"OF"RIVER PREFERRED SUBPERIODi NONE ESCALATIOtt RATFSI CAPACITY COST 0~0 II/Ytt COHPANY 5 NO SPINNING RESERVE CREDIT ENERGY COST 0 ' AREAI 3 FORCED OUTAGE RATEI 0 ' YEAR JAN FEB HAR APR HAY JUN JUL AUO SEP OCT NOV OEC 0 CAPACITY Hlt

            $ /lilt lli 0e0 lli F 0 ll 0~0
                                                                   ~        ll Oon
                                                                                ~      ll 0
                                                                                           ~

0 F 0 1 0 Ie ll non

                                                                                                                                ~         11 ~

0~0 1 1 e 0~0 ll' 0 o ll 0~0

                                                                                                                                                                                     ~

ENERGY G~H 75 ' F 428 5 '06 6 ~ 428 6o221

                                                                                         ~

6 ~ 428 6 '21 '28 6 '28 '21 '28 6i 221 6 '28

         $ /H<lt                       3 '8     '3 ~ 78     3 '8          3o78       F 78          3o78 6

F 78 3 '8 6 3o78 6 3 '8 3 '8 3 '8 0

tJRC INTERROGATORY ON NINE MLLE POINT NUCLEAR UNIT tIOe2 ENERGY MANAGEMENT ASSOCIATKSI INC PAGE, 638 ITEM NO ~ E 320 ~ I ID) REPT 9 OPTION 3 SUBREPORT i 05/13/83

                                  <<oaoooaaoo   TRANSACTIONS INPUT 

SUMMARY

FOR 19 90 aaaaooiaaa SHRMISI. STORAGE HYDRO PREFERRED SUBPKRIODI NONE ESCALATION RATESI CAPACITY COST 0~0 5/YR e COMPArtY 5 HO SPINNING RESERVE CREDIT ENERGY COST 0 ' AREAI 4 FORCED OUTAGE RATEI Oil YEAR JAN FEB MAR APR MAY JUH JUL AUG SEP OCT HOV OEC CAPACITY I'4 33 ~ 33 ' 33 ~ 33e 33e 33 ~ 33 ' 33 ' 33 ~ 33 ~ 33 ~ 33 '

            $ /tett                     0 0          '        0 '          0 '          Oe0              0 '          '          '        0 '          0~0           0 '           '

ENERGY GIIH 173 ~ 4 14 ~ 731 13e306 14 ~ 731 14 '56 14e731 14 i 256 14 '31 14 ~ 731 14 'S6 14 ~ 731 14 '56 14 ~ 731

          $ /HWH                      F 78       F 78       3 '8         3 '8         3 '8             3 '8        F 78      3 '8       F 78         3 '8          F 78        3 ~ 78 HIDAM                   STORAGE      HYDRO                 PREFERRED      SUBPERIODI HONE                       ESCALATION RATESI CAPACITY COST            Oi0 %/YR COMPAIIY     5                     NO    SPINNING RESERVE CREDIT                                                 ENERGY COST       0 '

AREAI 2 FORCED OUTAGE RATEI 0 ' YEAR JAH FEB HAR APR MAY JUN JUL AUG SEP OCT NOV DEC 1 CAPACITY fIH 9~ 9~ 9~ 9~ 9~ I~ 9~ 9e 9~ 9~ 9~ 9~ 9~ 0 $ /Mtt 0~0 0 ' 0~0 0 ' 0~0 e 0 ' 0~0 0 ' 0~0 0 ' 0 ' 0~0 ENERGY Gt!H 41e0 3 ~ 478 3 ~ 142 3 '78 3 '66 3 ~ 478 '66 3i478 3 '78 '66 '78 '66 '78

          $ /H'HH                     3 '8       3i78       3 '8         F 78         F 78 3

3i78 3i78 3 '8 3 3 '8 3 F 78 3 F 78 3 F 78 0 VARICK STORAGE HYDRO PREFERPED SUBPERIODI NONE ESCALATION RATKSI CAPACITY COST 0 ~ 0 %/YR COHPANY AREAI 5 NO SPINNING RESERVE CREDiT ENERGY COST 0 ' FORCED OUTAGE RATEI A % YKAR JAN FEB MAR APR MAY JUH JUL AUG SEP OCT DEC CAPACITY M'I 10 ~ 10 ~ 10 ~ 10 10 10 ~ 10 ~ 10 10 ' 10 ~ 10 ' 10 ~

            $ /Iles                     0 '     . Oe0         0 '              'i0         'e0 0 '        0 '        0~0
                                                                                                                                   ~
                                                                                                                                            '          0 '             '         0 '

ENERGY G4H 42 ' 3 '71 3e226 3i571 3j4S6 3e571 3e456 3e571 3 ~ 571 3 '56 3e571 3 'S6 3e57i

          $ /HKH                      3 F 78    '3 ~ 78     3 '8         F 78        3i78              3 ~ 7B     3i78       F 78       3e78         F 78          3 '8        3 '8

tlRC INTERROGATOttY ON NINE HILK POItlT NUCLEAR UNIT NO ~ 2 EtsERGY MANAGEt>KNT ASSOCIATESt ENC PAGE e3y ITEM NO ~ E 320 ~ 1 {Ot REPT 9 OPTIOtl 3 SUBREPORT 1 05/13/83 oooo+o+Ooo TRANSACTIONS INPUT

SUMMARY

FOR 199o NINET0 STORAGE HYDRO PREFERRED SUBPERIOOt NONE ESCALATION RATESt CAPACITY COST 0 ~ 0 %/YR COMPANY 5 NO SPINNING RESERVE CREDIT ENERGY COST 0~0 AREAt FORCED OUTAGE RATEt 0~% YEAR JAN FEB APR MAY JUN JUL AUG SEP OCT NOV DEC CAPACITY 9~ 9~ 9~ 9~ 9~ 9~ 9~ 9~ 9~ 9~ 9~ 9~ 0 ENERGY

           $ /'~ il G'<H     40sT        3 0~0
                                    '60 0

3e125

                                                  ~ 0     0~0 3o460      3 Ooo
                                                                   '48      3 Qoo
                                                                              '60       3 0
                                                                                          '48
                                                                                              ~ 0        0~0
                                                                                                       '60      3 0
                                                                                                                  '60
                                                                                                                      ~ 0     0 3g348
                                                                                                                                ~ 0         0
                                                                                                                                          '60
                                                                                                                                              ~ 0          Oeo
                                                                                                                                                         '48      3 0~0
                                                                                                                                                                    '60
         $ /MwH                     3 '8      F 78      3 '8       3 '8       3 '8        3o78 3

3 '8 3 '8 F 78 3 3e78 3 3o78 3 ~ 78 FULTON STORAGE HYDRO PREFERRED SUBPERIODt NONE ESCALATION RATES I CAPACITY COST 0~0  %/Ytt a COMPANY AREAt 2 5 ttO SPINNING RESERVE CREDIT FORCED OUTAGE RATEt 0 % ENERGY COST 0~0 YEAR JAN FEB HAR APR MAY JUN JUL AUG SEP OCT NOV OEC CAPACITY tilt I~ Io li le le 1 ~ 1 ~ le li Ie 1 ~ 1 ~ a $ /t1W 0

                                    '72 0~0
                                              '36 0~0
                                                        '72 0~0        Oio         0~0
                                                                                          '60 0~0        0 ~ 0     0~0
                                                                                                                            '60 0 ~ 0          0~0        0~0     Ega ENERGY      GwH        4                   0                        360    Oi372                    Oe372        '72                     '72          o.3eo          372
         $ /M'AH 0

3 '8 3 '8 0 3 '8 0 ~ 3 '8 F 78 0 F 78 3 '8 0 3178 0 3 '8 0 3 '8 3 '8 0 ~ 3e78 FKEOEP. STORAGE HYDRO PREFERRED SUBPKRIOOt NONE ESCALATION RATESt CAPACITY COST 0 '  %/YR COMPANY 5 NO SPINNING RESERVE CREDIT ENERGY COST 0~0 ARKAt 4 FORCED OUTAGE RATEt Oe% YEAR JAN FEB HAR APR MAY JUN JUL AUG SEP OCT NOV OEC CAPACITY Mw 5~ 5~ 5~ 5~ 5i 5~ 5~ 5i 5~ 5~ 5~ 5~ a $ /Htl 0 li711

                                        ~ 0     0~0       0~0        Qio        0 ~ 0       0~0 li656 0~0        0~0       0 ~ 0         0~0            0~0        0~0 ENKRGY      GNH      20 F 1                Io546         711    I ~ 656    le711                      i 711      eTII        656           711        l.ese        eTII
         $ /H'AH                    3 '8     '3 ~ 78 1 s 3 '8       F 78       3 '8        3 '8       1 3 ~ 78 1

3 ~ 78 1 ~ F 78 1 e F 78 3 '8 1 F 78 0

tlRC INTERROGATORY ON NINE MILE POItIT NUCLEAR UIIIT NO ~ 2 ENERGY MANAGEMENT ASSOCIATESt INC PAGE 640 ITEM NO ~ E 320 ~ 1 ID) REPT 9 OPTION 3 SUBREPORT 1 05/]3/"3

                                      <<oooaoaooa II TRANSACTIONS INPUT SUt1MARY FOR 1990 aoo<<oaoaoo 4

STORAGE HYDRO PREFERRED SUBPERIODI NO E ESCALATION RATESI CAPACITY COST 0 ~ 0 %/YR COMPAtjY 5 NO SPINNINO RESERVE CREDIT ENERGY COST 0 ' APEAI 4 FORCED OUTAGE RATEI 0 '4 I 4 YEAR JAN FEB MAR APR MAY i JUN JUL AUG SEP OCT NOV OEC lI CAPACITY MH 6~ 6, 6~ 6> 6~ bo e. e. 6~ 6~ e. eo 4 $ /M<I 0~0 0 ' 0 ' 0 ' 0~0 0 ' 0~0 0~0 0 ' 0~0 0~0 0~0 KNEROY GMH 24'] l 2 '46 li848 F 046 980 2 ~ 046 980 2e046 2 '46 980 2 '46 980 2 '46

             $ /INH                        3 '8        F 78      3 '8       1 ~

3e78 3e78 1 ~ F 78 F 78 3 '8 1 ~ 3 '8 3e78 1 ~ F 78 3 '8 I VERMONT SALE UNSCHEDULED PREFERRED SUBPERIODI NONE ESCALATION RATESI CAPACITY COST 0 ~ 0 %/YR COMPANY 8 RESERVE DEBITED ENERGY COST 0 ' ARKAI 20 FORCED OUTAGE RATKI Oo% YFAR JAN FEB MAR APR MAY JUN JUL AUO SEP OCT NOV DEC CAPACITY MH

               $ /M'l0
                                           ]SORY 0 '
                                                  . 150 0 ' ~    150i 0 '

150 ~ Oe0;t

                                                                                                        '50   0'
                                                                                                                  ~     ]50e 0 '
                                                                                                                                  ]50e 0 '

150 0 '

                                                                                                                                                  ~       150 0 '
                                                                                                                                                                ~        150 0 '
                                                                                                                                                                               ~     150 0~0
                                                                                                                                                                                           ~

ENERGY O~H

             $ /M'k'H 845 ~ 0     71 '67 4i0 64 '2]

0~0 7li767 0 ' 7]e767 . 69 '51 Oo0 i 0 ' 7] i 767 0~0 7] ~ 767 OeO 69 ~ 451 71 ~ 767 69 ~ 451 0~0 71 ~ 767 0 ' 0 0 4 I. I AMP-OHIO SALE UNSCHFDULED PREFERRED SUBPERIODI NONE KSCAI.ATION RATES I CAPACITY COST 0 ~ 0 %/YR COMPANY 8 RESERVE DEBITED ENERGY COST 0 ' AREAI 13 FORCED OUTAGE RATEI Oj% YEAR JAN FEB MAR APR MAY'UN JUL AUG SEP OCT NOV DEC CAPAC I T Y Mtt 23 I 23 ~ 23 ' 23 ~ 23e I 23 ' 23 ~ 23 ~ 23 ~ 23 ' 23 ~ 23 '

               $ /Htt                        0~0        0~0          '          0 '           0~0               '         0~0       0 '       0 '             '            0~0           '

ENERGY GXH 147 ~ 1 12 ~ 492 ]le 283 12 ~ 492 ]F 089 ]2e492 ]2o089 12 '92 ]2 '92 12 ~ 089 12 ~ 492 12 ~ 089 ]2 '92

             $ /MIH                        Oi0        .Oi0       Oi0          0 '           0 '             Oi0         0 '       0~0       Oe0           0 '            0 '         0 '

0

NRC INTERROGATORY ON NII<E NILE POINT NUCLEAR UNIT t>0 ~ 2 ENERGY HANAOKMENT ASSOCIATES> INC PAGE 641 ITEH t<0 ~ E 320e I ID) REPT 9 OPTION 3 SUBREPORT 1 05/13/83

                                   >>4>>>>>>>>>>>>>>>>      TRANSACTIONS It<PUT SUIIHARY FOR 1990 PASNY                     PURCHASE PEAK SHAVItte                   PREFERRED SUBPERIODI NONE                                       ESCALATIOtt RATESI CAPACITY COST                     0 ~ 0 %/YR COHPANY 8                                RESERVE CREDITED                                                                                 ENERGY COST         Oie AREAI                                    FORCED OUTAGE RATEI                   Oi%

YEAR JAN FEB HAR APR HAY JUN JUL Aue SEP OCT NOV OEC CAPACITY I'>w 0 ~ 0 ~ Oe Oi 0~ 0 ~ 0 ~ 0~ 0 ~ Oi 0 ~ 0 ~

             $ /MW                        0 '           0~0           0 '             Oie             oeo               Oee             Oee              0~0         0 '           0~0              0 '         0~0 ENERGY        O~H          0.0       0 '           0 '           0~0             0 '             Oeo               0 '             0 '              0 '         0 '           0 '              0 '         0 '
           $ /HWH                       0~0           0 '           0 '             0,0             Oee               0~0             0~0              0~0         0~0           0~0              Oee         0~0 INTERCHANGE ACCOUNTINO I PRICING OPTION               I                         COHP OWNERSHIP                  COMP OWNERSHIP                  Cot1P OWNERSHIP              CAMP OWNERSHIP        COHP OWNERSHIP DISPLACEMENT COST            I       0 '                 2          48  '    %               3           13  '             4           10 F 0          5        19eo            1      -     3 '

FIXED COST IttCREASE I 5 ' $ /HWH 6 3 ' 7 4 ' SAVINGS FIXED SPLIT I 0' PRIoRItY oRDER I 0 REPORTINO OPTIOtt ACCOUNTING OPTION I , AL.LHYDRl HYDRO COHPANY RUN OF~RIVER 4 PREFERRED SUBPERIODI NONE RESERVE CREDITED ESCAL,ATION RATESI CAPACITY COST FNERGY COST 0 0

                                                                                                                                                                                                  %/YP.

AREAI 7 FORCED OUTAeE RATEI Oe% YEAR JAN FEO HAR APR MAY ! JUN JUL Aue SEP OCT NOV OKC ~ CAPACITY HW Ioe loe loi 10 ' 10e lee 10 ' 10i 10 ~ 10 ' 10 ~ 10 ~

             $ /HW                        0 '           0~0           0 '               '             0 '               Oeo               '              0~0         0 '             '              0 '         0~0
                                                                                                                                                                                                              '44 ENERGY                    27.2       3e176         2 ~ 172       2 '03           4 ~ 122         2e837             0   817         0 '43            0 '36       I ~ 408       2 '43            3 '23       3 OWH
           $ /HWH                       6 '0          6e74          6i79            6 ~ 84          6eaa F
                                                                                                                        '3            6e97             7 '2        7 F 07        F 11             7 '6        Te21

~ ALLHYDR2 HYDRO COMPANY 4 RUN~OF~RIVER PREFERRED SUBPKRIODI NONE RESERVE CREUITEO ESCALATION RATESI CAPACITY COST ENEIIOY COST 0 0

                                                                                                                                                                                           ~

0 %/YR AREA 'I 19 FORCED OUTAGE RATEI 0 ' YEAR JAN FEa HAR APR HAY JUN JUL Aue SEP OCT NOV DEIL ~ CAPACITY >1W 19i 19 ~ 19 ~ 19i 19 ' 19e 19 ~ 19 ' 19e 19 ~ 19 '

             $ /O'W                       0 ~ 0         0.0           0 '             0 '             0 '                 '             0 '              0 '           '           0 '              0 '

9 '22 ENKRGY 01 e6 6 ~ 919 5 '28 8 '32 11 ~ 550 10 '84 Be396 5 ~ 051 6 ~ 138 8 ~ 341 9 '65 10 '34 OWH S/HWH 1 1 '3 le84 I ~ 86 1 e6'7 le88 1 ~ 89 1 e91 1 e92 1 ~ 93 1 ~ 94 1 e96 1 ~ 97

NRC INTERROGATORY DN NINE MILE POINT NUCLEAR UNIT NO 2 ENERGY t!AHAGEttENT ASSOCIATESt INC PAGE 642 ITEM NO ~ E 320 ~ 1 {D) REPT 9 OPTION 3 SUBREPORT 1 05/13/83 oaoaoooaoo TRANSACTIONS INPUf SUHt>ARY FOR ]990 aooaaoooao ALLHYOR3 HYDRO RUN OF~RIVER PREFERRED SUBPERIOD! NONE ESCAlATION ttATKSt CAPACITY COST 0 ~ 0 %/YR CotRPANY 4 RESERVE CREDITEO ENERGY COST 0 ' AREA I 19 FORCED OUTAGE RATE! 0~5 0 YEAR JAN MAR APR HAY, JUl AUG SEP OCT NOV OEC Q '/Hw CAPACiTY ENERGY Hat GWM 102 ~ 2 8 18i 0~0

                                         '60 18, 0 '

7 ~ 176

                                                                 ]Be 0

10i641

                                                                            ]Be 0

1]i843 18i 0 1]e745

                                                                                          '         8 18 ~

OiO

                                                                                                      '83      6 18i 0
                                                                                                                 '89 6

18 ~ 0~0

                                                                                                                            '39
                                                                                                                                        ]Be 0
                                                                                                                                      '82 18 ~

0 7.547 18 ~ 0 7 '78 8

                                                                                                                                                                                ]8 ~

0

                                                                                                                                                                              '58 0/Htt H                       3 '8        3o70      3 '2       3 '5        3 '7 I'UN !     3e80       3 '2       3 '5    6 F 88         3 '0           3 '3        3 '5 NEUT IL                 PURCHASE PEAK SHAVING               PREFERPED SUBPERIODt         NO E               ESCALATION RATES I CAPACITY COST            0~0    I/YR 0                         COMPANY 4 AREAI       8 RESKRVE CREDITED                                                         EttKRGY COST       9 '

FORCED OUTAGE RATEI 0 ~ ( ( YEAR JAN 'EB HAR APR MAY JUN JUl AUG SKP OCT NOV DEC CAPACITY HR 0 ~ Oo Oi Oi Oe 0 0 ~ 0 0 0 0 0 0,'52.0j

                                                                                                           ~                     ~          ~            ~              ~           ~

~ 0 $ /NW e7.6 67 ' 67 ~ 6 67 i 6 67oe 67 ' 67 ' 67 ' erie 67 F 6 eT.e e7,e ENERGY GvH

           $ /HIM 0~0       OoO        ,0 ~ 0
                                                  ]52!07 0 '        0 '         0 ~             OiO        0 '        0~0       0 '           0~0           0 '         OoO 152 F 07              152.07     ]52 F 07    152.07                     152 ~ 0'7  ]52i07    152 F 07      ]52o07        152 F 07    152  ~ 0'T

II@ If%'l~ NRC INTERROGATORY ON NINE

                                         ~        R ""    ~~~

MILE POINT NUCLEAR UNIT P~ Iy NO ~ 2 4 6 ICE~

                                                                                                    -   8 4I%     V A  P\      I'4 I ENERGY HANAGEHENT ASSOCIATESI A     b ~

INC

                                                                                                                                                       ...%Nt    8- l         Tbak~

PAGE

                                                                                                                                                                                     ~

cia ITEM NOI E 320ol IU) REPT 9 OPTION 3 SUBREPORT 1 05/13/83 4>>aaaaaaaa TRANSACTIONS INPUT SUHHARY FOR 1%9O >>44>>aaaaaa HIGHF ALL iIYGRO RUtI OF RIVER PREFERREO SUBPERIOPI t)ONE ESCALATION RATES I CAPACI TY COST 0~0 I/YR COMPANY 1 RESERVE CREOITEO ENERGY COST 0~0 AREA I 10 FORCED OUTAGE RAYEI 0 ' 1 YE4R FEB HAR APR HAY JUL AUG SEP OCT NOV OEC I CAPACl TY Htt 2~ 3~ 5~ 5~ 3~ 1 ~ Ie 0 ~ 1 ~ 1 ~ 2~ 3~ 5/HII 0~0 0 ~ 0 0~0 Oeo O.O 0 ~ 0 Oeo 0~0 0~0 0 ~ 0 0 ~ 0 0 ~ 0 EIIERGY GLH 13.2 l.eoo Oe800 2 ~ Too 3 '00 F 000 0 '00 0 ~ 300 O. 1OO 0 '00 0 F 100 0 ~ 300 1 ~ 600

           $ /R4H                  OeO       0~0         0 ~ 0      0 ~ 0         0 ~ 0         Oeo          0 '       0 ~ 0           0 ~ 0           0  ~ 0         0~0             0~0

I I

                                                                                                                                                                             'A>>~3+~~>>            'A'~i Cr NRC INTERROGATORY ON NINE             MILE POINT NUCLEAR UNIT            NO ~ 2                   ENERGY HANAGEHENT ASSOCIATESI          INC                             PAGE      64II ITEM NO ~ E 320   ~ 1   (OI                                                                      REoT     9 OPTION 3 SUBREPORT           1                              05/13/83 o>>>>e~ooooo4      TRANSACTIONS INPUT 

SUMMARY

FOR 1990 <<4>o+o+>>>>o

  )I TCHKLL            . PURCHASE      PEA!I SHAVING            PREFERRED SUBPERIOOI              >>lEKWOAY            ESCALATION RATESI CAPACITY COST               0 ~ 0 %/YR COMF A>>IY     3                        RESERVE CREOITEO                                                                ENERGY COST         0 ~ 0
                                                                                                  '2 ARES I     12                          FORCKO OUTAGE RATEI               0,%

YEAR JAN FEB MAR APR MAY JUM JUL AUG SKP OCT NOV OEC

 ~:APACITY                               32  '         32  ~      32           32 ~            32                         32  '      32 ~       32 ~          32 ~            3Z ~          32 ~

0 S/MIe 0 0 0 '>>0 0 0 0>>0 0 0~0 0>>0 0 ~ 0 0 ~ 0 0 ~

                                                                                  ~                                         ~
                                                                                                                                                                                          '51
                                                                                                                 '>>0
                                                         ~

ENERGY G~H 187 ' 15 '51

                                           ~

14 ~ 408 15>>951 15 '37 15 '51 15 '37 15>>951 15 '51 15 '3T 15 '51 15 F 437 15 S/H>>'~ 0 ~ Q 0 ~ 0 n.o 0>>0 0>>0 0>>0 0 ~ 0 0>>0 0>>0 0' 0~0 0 ~ 0 1ECHANI C HYORO HUN OF RIVER PRFFERRKO SUBPERIODI NONE ESCALATION RATESI CAPACITY COST 0 ~ 0 %/YR COMPANY 4 RESERVE CREOITKO ENERGY COST 0>>0 AREAI 21 FORCED OUTAGE RATK I Q ~%

                       'YEAR             JAN           FEB        MAR          APR             MAY           JUN          JUL        AUG        SEP           OCT             NOV           OEC JAPACITY                                lr.           lr  ~      lr  ~         17  ~          17            17 ~                    IT>>        lr.           lre             17            lre
                                           '                                   0lory                           '                                                                            oeo
                                                                                                                                                                                  'iO S/MW                       0             0~0        0~0             ~ 0
                                                                                                  '>>0 0            0   0      0   0      0 ~ 0         0~0 95>>3        9 ~ 010       8 '80     ll>>940       12 '00               810       6 '00
                                                                                                                            ~

5 F 000 4 '00

                                                                                                                                       ~

4 '00 5 '60 6 '50 9 '50

 "..NKRGY      GWH S/HWM                      1 ~ 82        1 ~ 83     1 ~ 84       1 ~ 85 11  ~

1 >> 87 1>>88 1 '5 1 ~ 76 1>>77 1 ~ 78 F 79 I ~ Bi l6R HYO1 MYORO RUN OF"RIVER PREFKRREO SUBPERIOOI NONE ESCAI.ATION RATESI CAPACITY COST 0 ~ 0 %/YR COMPANY 6 RESERVE CREOITKO ENERGY COST 0~0 I AREAI 11 FORCEO OUTAGE RATE! 0 ' YEAR FEB MAR APR HAY JUN JUL AUG SEP OCT NOV OEC IAPACITY MI>> 10>> 10 ' lo ~ 10>> 10 ' 10 ~ 10 ~ 10 ' loe 10 ' 10 ~ S/IW 0~0 0 0 ' 0 0 0~0 ~ 0 0 ~ 0 0>>0 ' 0!0 7 '00

                                                                                                                                                                                ~Q          0
                                                                                                                                                                                          '40
                                                                                                                                                                                              ~ 0
                                                         ~

7 '40 '00

                                                                                  ~
                                                                                             '40                        '40        '40      7 '00           '40                         7
NERGY GWH S/MWH 87 7 ~ 440 2 '0 F 720 Z ~ 90 2 '0 7 2 '0 7 2 '0 T ~ 200 2 '0 7 2 '0 7 2 '0 2 '0 7 2 '0 2 '0 2 '0

IIRC INTERROGATORY UN NINE MILE POINT NUCLEAR UNIT NO ~ 2 ENERGY MANAGEMENT ASSOCIATESe INC PAGE 649 ITEH NO ~ E 320 ~ 1 (0) REPT 9 OPTION 3 SUBREPORT 1 05/13/83

                                      ~++4eo4eoeee    TRANSACTIONS INPUT SUHHARY FOR              ]990   ~++Oeoee+

IF PSN 1 PURCHASE PEAK SHAVING PREFERRED SUBPERIOOI WEEKDAY ESCaLATION RATESI CAPACITY COST Oeo %/YR COMPANY 8 lory RESERVE CREDITED ENERGY COST Oeo AREAI 26 FORCED OUTAGE RATEI Oe%

                           'YEAN             JAN          FE8        MAR          APR        HAY             JUN         JUL        AUG         SEP           OCT            NOV         OEC IAPAC  IT  Y                                              10 ~       10 ~         10  ~      ]0 ~            10 ~        10  ~      ]oe         ]0 ~          10 ~           10 ~        10 ~
               $ /HW                         0~0    . 0~0        Ooo          0~0        0 ~  0          0 ~  0      0 ~ 0      0 '         0 ~ 0         0 ~ 0          0~0         0 ~ 0
,'NERGY          G<4H        58 ~ 7      4 '85        4 '02      4 '85        4 '24      4 '8'5          4 '24       4 '85      4 '85       4 '24         4 '85          4e824       4 ~ 985
             $ /HKH                        0~0          Oeo        0~0          Ooo        0 ~ C           0 '         0~0        0~0         0 ~ 0         0~0            0 ~ 0       0 ~ 0 IOL ID  WS T                 PURCHASE PEAK SHAVING                 PREFERRED SUBoERIODI WEEKDAY                      gscaLATIQN RATEsI cApAcITY cosT                0 '    %/YR COHPANY 2                             PESERVE CREDITED                                                             ENERGY COST         0~0 APEAI      25                         FORCED OUTAGE RATEI            0 '                  \

YEAR JAN FE8 MAR APR HAY JUN JUL AUG SEP OCT NOV OEC IAPAC I TY 50 ' 50 ' 50 50o 50e 50 ' Soe 50 ' 50 ' 50 ~ 50 ~ 50e

               $ /HW                            0             0          'oo 0~0             0               0      0 '            0,          0         0   0          0 ~ 0       0~0
                                                        ']2                                  0                                                    ~

ENERGY G'NH 293e5 24 '24

                                              ~

22

                                                            ~

24e924 24 ~ 120 24 'Z4

                                                                                               ~               ~

24 ~ 120 24 '24 24 '24

                                                                                                                                      ~

24 ~ 120 24 '24

                                                                                                                                                                ~

24 '20 24 '24

             $ /MAIM                       Oon          0 ~ 0      0 ~ 0        0 ~ 0      0 ~ 0           0 ~ 0       0 ~ 0      0 '         Ooo           0 '            Oeo         0 ~ 0 INONRPDS                      HYDRO         RUN OF~RIVER            PREFERRED SUBPFRIOPI           NONE               ESCALATIO"I RATESI CAPACITY COST               0 '    $ /YR COMPANY                               RESERVE CREDITED                                                             ENERGY COST         0~0 AREAI      19                         FORCED OUTAGE RATEI            0 ~ 5 YEaR              JAN          FEB        HAR          APR        HAY             JUN         JUL        aUG         SEP           OCT            NOV         OEC IAPACI TY                                     7~            7~         7~           7~         7~              7~          7~         7~          7 ~           7~             7~          7~
               $ /HW                         0~0          0~0        0   0        0~0        0    0          0~0         0~0        0 ~ 0       0~0           0 ~ 0          0~0         0 ~ 0
                                '          '74          '29        '56
                                                                       ~
                                                                                '88
                                                                                               ~
                                                                                                           '63                    '53           9]6         '76          2 '21       2.865
;NERGY           GWH
             $ /H'AH 34          2 3 '5       2 F 08 3

F 10 4 3 '2 4 268 3 AD ]4 2 3 AD ]6 2 ~ 341 3 ~ 18 2 3 '0 1 ~ 3 ~ 22 2 3 '4 3 ~ Ol 3 '3

NRC INTERROGATORY ON NINE NILE POINT NUCLEAR UNIT NO ~ 2 fNERGY HANAOEHENT ASSOCIATESt INC PAGF. 65tt ITEN NO ~ E 320e] IU] REPT 9 OPTION 3 SUBREPORT 1 05/]3/83 oooooooooo TRANsAGTlotks It4pUT sUHHAIIY FGR 1990 oooooooooo MF PSN 2 PURCHASE PEAK SHAY]ltG PREFERRED SUBPERIODI WEEKDAY ESCALATION RATESI CAPACITY COST 0~0 I/YR COMP AtiY ttfSERVE CREDITED ENERGY COST 0~0

                                                                      '0 APK>I     27                          FORCED OUTAGE RATEI               0~%
                                             '0e                                                            JUN         JUL        AUO             SKP           OCT               NOV          OEC YfaR            JoN         FEB          HAR        APR              HAY

':APACI TY 20 20 ' 20 20 ' 20 ' 20 ' 20 ' 20 ' 20e 20 '

           $ /H et                         '         0 ~ 0        0~0        0~0                  'eo
                                                                                                          '48
                                                                                                              ~  0
                                                                                                                      '70
                                                                                                                          ~ 0 9 '70
                                                                                                                                     ~ 0
                                                                                                                                                 '48
                                                                                                                                                     ~ 0
                                                                                                                                                               '70
                                                                                                                                                                   ~ 0             0 ~ 0
                                                                                                                                                                                              '70
                                                                                                                                                                                                  ~ 0
;NERGY       G/YR
']F PSN 3                 PVRChhSE PEAK SHAVIt~G                PREFERRED SUBPERIOD I etEEKDAY                      ESCALATION RATES I CAPACITY COST '                     ~ 0 COMPANY 8                             RESERVE CREDITEO                                                                   ENERGY COST             ~ 0 attfr I 26                            FORCED OUTAGE RATEI               0~%

JAN FEB HAR APR HAY JUN JUL AUO SEP OCT NOV OEC YEAR IAPACITY HW 4ne 40 40 ~ 40 ~ 40 ~ 40 ~ 40 ' 4g ~ 40 ~ 40 ' 40 ' 40 ' oeo oeo 0 0 0 0 0 0 0 0 ~ 0 ~ 0

           $ /Hte                                    0~0 'eo 0~0                              ~           ~          ~               ~             ~
',NERGY      GWH         234 '      19 ~ 939    18eo]0       19 ~ 939   19 ~ 296        19 ~ 939       19 ~ 296    ]9 ~ 939   19 ~ 939        19 ~ 296      19 ~ 939         19 ~ 296      19 ~ 939 S/HWH                        0~0    -    0 ~ 0        n.o        0 ~ 0            0~0           0 ~ 0       0 '        0 ~ 0           0 ~ 0         oeo               0 ~ 0        0 ~ 0 PURCHASE PEAK S~AVI~G                 PREFERRED SUBPERIODI WEEKDAY                        ESCALATION RATfSI CAPACITY COST                      0 ~ 0 %/YR IF PSN 4 COMPAttY 8                            RESERVE CREDITED                                                                   ENERGY COST           0 ~ 0 ARKAI     ]7                          FORCED OUTAGE RATEI               0 ~%
]APACITY I'NERGY S/HÃ HW GwH YfAR 234 '

JAN 40 0~0

                                    ]9 ~ 939
                                             '0,     FEB 0 ~

18 F 010 0 eIAR 40

                                                                    ~

19 ~ 939 0 APR 40 19 ~ 296

                                                                                 '.o MAY 40 ~

0~0 19 ~ 939 JUti 40 19 ~ 296

                                                                                                               ~

0 JUL 40 19 '39

                                                                                                                          ~

0 AUO 40 19e939

                                                                                                                                       'eo SEP 40 ~

0 ~

                                                                                                                                              ]9 ~ 296 0

OCT 40 ~ 0 ~ 19 ~ 939 0 0 NOV 40 19 ~ 296 0

                                                                                                                                                                                     ~

0 0

                                                                                                                                                                                         .      OKC 40
                                                                                                                                                                                                  ~

19 ~ 939 0 0 0 S/Hlt H 0~0 0 ~ 0 n.o 0~0 0 ~ 0 0 ~ 0 0 ~ 0 0 ~ 0 0 ~ 0 0 ~ ~ ~

r, .1991

r ~ +< <T' NRC INTERROGATORY ON h+ .~ o>>eT ~, r rrelar NINE NILE POINT NUCLEAR UNIT NO. 2 r ',+A~'vs40AH'8 j'0 Pro.,'

                                                                                   -   - ~      -      .  ~...'NERGY ~            -       =.

htsalw'rr

                                                                                                                                                   ~   +   ~ .  ~

Awi,.Ak>+ HANAGEHENT ASSOCIATES,

                                                                                                                                                                                  ~

INC. r-REPT 9 OPTION 3 SUBREPORT 2 ITEN NO. E 320.1 (D)

                                       *****INPUT         HYDRO ENERGY ALLOCATION FOR                      1991       *****

UNITS (GWH) - WLANTJIAHE UNIT f YEAR JAN FEB 'R '%PR HAY JUN, JUL AUG SEP OCT - NOV DEC NI AGF IRra rfIAGPEAK NI AGfrEPL 3443 3705e

                                             '37, 295
                                                                '4
                                                                 '73
                                                                '84
                                                                '24o
                                                                             '7
                                                                             '15 302    '7
                                                                                           '15e 287
                                                                                                             '6
                                                                                                             '04o 296e 37r 315 283 36e 304
                                                                                                                                             ~        279 315e
                                                                                                                                                            '7e 288e 37e 315e 278
                                                                                                                                                                                      '7
                                                                                                                                                                                      '93
                                                                                                                                                                                      '15e
                                                                                                                                                                                      '37
                                                                                                                                                                                                    '6
                                                                                                                                                                                                    '04 278   '6
                                                                                                                                                                                                                    '04 291 37
                                                                                                                                                                                                                              ~
                                                                                                                                                                                                                              '1S
                                                                                                                                                                                                                              ~

NI AGEXPrr

   >>I AGPSr<Y S T ~ Lair I>Ill 4188
                                            '645 410o 49lo 307o 468 '
                                                                             '37 137 4O7, 524r
                                                                                           ~             132e 182.

548,

                                                                                                                            '37
                                                                                                                           '29e 579 '
                                                                                                                                            '32
                                                                                                                                           '49
                                                                                                                                           '66, 137 ~

357 o 602 ' 137e 309

                                                                                                                                                                           '11
                                                                                                                                                                           ~

132

                                                                                                                                                                                      '67
                                                                                                                                                                                      '77          '83
                                                                                                                                                                                                   '81
                                                                                                                                                                                                   ~
                                                                                                                                                                                                                   '32
                                                                                                                                                                                                                   '68
                                                                                                                                                                                                                   '59 137 520e 539
                                                                                                                                                                                                                              ~

aSt<OKA>> 2~

                                            '5
                                            ~                   ~                       2~                 2~               ~            2~                ~             2~        2~            2  ~              ~          ~

KEr>s leo 22 2 ~ 2~ 2~ 2 ~ P ~ 2~ 2~ 2 ~ 2~ 2~ 2 ~ 2 ~ OELTA 'oe le le le 1 ~ 1 ~ lr le 1 ~ 1 ~ 1 ~ 1 ~ 1 ~ HIrrCKLEY 3) ~ 3 ~ 2~ 3~ 3~ 3~ 3~ 3~ 3~ 3~ 3e 3~ 3~ CRESCEreT 22 ~ 2~ 2~ 2~ 2r 2 ~ 2~ 2~ 2~ 2~ 2 ~ 2 ~ 2~ rr'ATErrFRO V ISCerER 16e 24 ~ le 1 ~ 1 ~ lo I ~ lr 1 ~ 1 ~ l. 1 e 2 1 ~ 1 ~ 2~ 2~ 2~ 2~ 2~ 2 ~ 2~ 2~ 2~ 2~ 2 ~ ~ Ih'POT U>>IT PARTICIPATION SALES PERCENTAGES SOLO FOR 1991 ee4er4+ PLar'7 reaHE U>>11 ~ da'r FEe e.aR aPR rlaY gUN JUL ave SEP OCT t<OV OEC OSerEGO 0~0 0 ~ 0 0 ~ 0 0 ~ 0 0 ~ 0 0 ~ 0 0 ~ 0 0~0 0 ~ 0 0~0 0 ~ 0 0 ~ 0 OS'MEGO 0.0 O.O Oeo 0 ~ 0 0 ~ 0 0 ~ 0 0 ~ 0 0~0 0 ~ 0 0~0 0 ~ 0 0 ~ 0

NRC IIITERROOATORY Orl WINE VIlE POIIIT ttl/CLEAR UNIT tl0.2 ENERGY HANAGEHFNT ASSOCIATES'tlC pAGE b93 ITEr< 80 ~ E 320 ~ l (0) REPT 9 OPTION 3 SUBREPORT I 05/13/B3 oo+!!Oo!!los TRANSACTIOtlS INPUT SUt!HARY FOR 1991 oo+o4+o4o" OHECONl PURCHASE PEAK SHAVIttn PREFERRED SUBPERIODI hnNK ESCALATION RATFSI CAPACITY COST 0 ~ 0 %/YR Cot<PArIY 0 OESERVF CREDITED ENERGY COST 0~0 AREA I I FORCED OUTAGE PATEI os% YEAtt JAN FEB ' HAR APR AUO SKP OCT tlOV DEC CAPACITY 0 ~ ~ 0 ~ no 0~ 0 ~ 0~ 0 ~ 0~ ne 0 ~ 0 ~

             $ /I!'4                        own            n.o           0 ~ 0     0~0          0~0        0 ~ 0          0~0       0 ~ 0        0~0       0~0           0 ~ 0       oed EI4EROY       GhH           0~0        an             0 ~ 0          0~0        0~0        0 ~ 0        nin          0~0        0+0         0~0         n,o         0~0         0 '
           $ /i<Wt!

t CCOUrlT ING n.o 0 ~ 0 0 ~ 0 0~0 0+0 0,0 0 ~ 0 0 ~ 0 0 ' 010 0~0 0 ~ 0 INTERCHANGE I PRICING OPTION I 8 coHp owNERsHIp cOHp otlt)ERsr!lp coHp ottNERsHIP cor p opt>ERsHIP coHp okftJERsHIP DISPLACE>>f NT COST I 50 ' FIXED COST ItlCREASE I ~lb' 3/tIWH SAVlllGS FIXED SPLIT I IOO.O ppIDRITY 0ROER I 7 REPORT ING OPTION I ACCOUNTINO OPTION I I OHKCON2 PURCHASE PEAK SHAVING PREFERRED SUBPERIODI NONE ESCALATION RATES I CAPACITY COST 0 ~ 0 %/YR Cnt!PANY 0 RESERVE CREDITED ENERGY COST 0~0 AREAI FORCED OUTAGE RATEI 0,% JAN FEB APR HAY JUN JUL AUG SEP OCT NOV OEC CAPACITY tlw 0~ 0~ 0~ 0~ 0~ 0 ~ 0 ~ 0 ~ 0 ~ 0~ 0~ 0~

             $ /Hw                          0~0            0~0           0~0       0~0          0~0        0~0            0 ~ 0     0.0          0~0       0~0           0~0         non ENERGY        GWI<          an         0 '            Oen            0~0        oeo        0~0          0~0          0 '        0~0         0 '         0~0         0 '         0 ~ 0 e           $ /HWH ItlTKPCHANOE ACCOUrlT ING I 0~0            nen           0~0        0~0         0~0         0~0           0 ~ 0     0~0          0~0        0~0          0~0         0~0 PRIG INO OPTION                I     B                      COHP OMt!ERSHIP        COHP Oh'NKRSIIIP       COHP OWt!ERSHIP      COHP OWt'ERSHIP     COHP OWNERSHIP OISPLACEI~EttT COST            I     50  '

FIlED COST II!CREASE I 19il $ /HWH SAVINGS FIXED SPI.IT I london PRIORI TY ORnER 6 REPORTINO OPTIOt~ I ACCOUrlTING OPTION t I e

t<t?C INTEPROGATORY ON NINE MILE POINT NUCLEAR UNIT flO ~ 2 ENEPGY MANAGEMENT ASSOCIATES't<C PAGE 694 ITEM ttOe E 320 ~ 1 (O) REPT 9 OPTION 3 SUBREPORT I 05/i3/83 a>>a>>a>>a>>aa TRANSACTIOflS INPUT SUkttARY FOR 1991 a>>a>>>>a>>>>aa NVRSK HY STOPAGE HYDRO PREFERRED SUBPFRIODI WEEKDAY ESCALATION HATESI CAPACITY COST 0 '  %/Yk 0 Cot'PAtlY I RESERVF. CRKDITED ENERGY COST OeQ AREAl 10 FORCED OUTAGE RATEI 0 ' YEAR JAN FER HAR APR MAY JUL AUG SEP OCT NOV DEC CAPACITY l lil 27 ' 27o 27e 27 ' 27 ~ 27 ~ 27 27 ~ 27 ' 27 ' 27 27 ~

             $ /HÃ                          oeo       0 '        0~0          '        0 ~ 0       DeO            'eO 0~Q         '           '               'oO 0~0
                                                                                                                                                                          '00 ENERGY        Gi'tft       60 F 7      3e400      3 '00     F 000      2 '00      4 '00       4 '00       F 000      Bo100     8.600       6.400          F 800        4
           $ /VWH                       15 F 00    15 F 00   15 F 00    15 F 00    15e00       15 F 00     15o00      15 F 00   15 F 00     15 ~ 00        15eOO        15 ~ 00 MISC-HY                    HYDRO         ftUN~OF~RIVKR        PREFERRED SUBPERIODI NONE                   KSCAI.ATIOll RATES l CAPACITY COST         0 ~ 0 %/YR 0                            COfiPANY      I                    RESERVE CREDITED                                                     ENERGY COST       0 '

iREAl 10 FORCED OUTAGE RATEl 0,% YKAR JAN FEB MAY JUN JUL AUG SEP OCT NOV OKC I CAPACITY ENERGY Hft

             $ /H>>

GwH 16 ' le500 4~ 0~0 le700 4~ 0~0 0~0 F 800

                                                                    ~

0 2 '00 4~ 1 3~ OeO F 800 Qe600 3~ 0~0 0 Oo400 3~

                                                                                                                ~ 0 0 F 3~

0,0 500 0 '00 3~ 0~0

                                                                                                                                            ~e800 3~

Oe0 1 '00 4~ 0~0 I ~ 4~ OeO 600

           $ /HVH                         0 ~ 0      0~0  i' 0 '        0'         O,l}        Qe0        0 '         Q ~ 0     n.Q         0 '            0 '          Oo0 STUt?GEON                  STORAGE       HYDRO                PREFERRED SUBPERIODl WEEKDAY                ESCALATION RATESl CAPACITY COST            OeO    %/YR CnHPANY       i                    PESERVE CREDITED                                                     ENERG'Y COST      0 '

AREAl 10 FORCED OUTAGE RA'TEl 0 % YEAR JAN HAR APR flAY JUN JUI. AUG SEP OCT NOV OEC CAPACITY et< 15e 15 ~ 15o 15e 15 ~ 15e 15o 15o 15 ~ 15 ' 15 ~ 15e 0 ENERGY

             $ /flet GWH          51 ~ 8 0,0 4e900 OoQ F 800 OeO 9 ~ 100    8 0
                                                                          '00
                                                                              '        0 5o300
                                                                                         '     1 F 0 '

800 0 le200

                                                                                                                ~  0      0,0 I o800 OiO le600       2 '00
                                                                                                                                                  '            DE 4.300 0        OeO 5e200
           $ /MÃH                         0~0        OeO       0 '        0 '        0;0         0 '        0 '         0~0       0 '         0 '            0 '          0 '

0

IIRC I'ITERROGATORY Ote NINE I,'ILE POItIT NUCLEAR Util T tlO ~ 2 ENERGY HAhAGENEtiT ASSOCIATESI It'C PAGE 695 ITKH NO ~ E 320 ~ 1 tD) REPT 9 OPTION 3 SUBRFPORT I 05/13/83

                                      <<aa" aaaa<<a          TRANSACT IOtlS INPUT SUH!IARY FOR            ]991 <<aaaaaaaaa OLR HYD2                    STORAGK HYDRO                              PPEFERRED SUBPERIODI HONK                          ESCALATIOt RATESI CAPACITY COST                  0 ~ 0 %/YR COHPANY 6                                  RESERVE CREDITED                                                             EtlERGY COST           0 '

AREA I 1 1 FORCED OUTAGE RATEI 0 A% YEAR APR HAY JUN JUL AUG SEP OCT NOV OEC CAPACITY >A 34 34 ' 34 ' 34 ' 34 ' 34 ' 34 ' 34 ' 34 ' 34 ' 34 ' 34 '

              $ /HI".                         0 ' 'I 100,5       13.7eo            l]I680                 10 ~ 900      ]0.0eo         8 F 400      5 '60         '60      1,800          7>>560            7 F 000      7 '60 Et(ERGY        G~H
            $ /H>>! H                        2>>90              2>>90 13 ~ 460 2 '0       2 '0          2 '0          2 '0         2 '0      2 2 '0      p ~ 90         2>>90              2 '0         2 '0 RGHYO RR                    HYDRO          RUN~OF RIVER                 PREFERRED SUBPERIODI NONE                         ESCALATIOtl RATKSI CAPACITY COST                 7~0     +/YR COtlPA>>IY      7                            RESERVE CREDITED ALL                                                         Et'ERGY COST          7 '

AREAl 9 FORCED OUTAGE RATEI 0 ' YEAR JAN I>>AY JUN JUL AUG SEP OCT OEC CAPACITY H4 15>> 5~ 20 ~ 20 10 ~ 5~ 3~ 3~ 5~ 10>> 20>> 10 ~ 0 $ />>e>>f 2050 ' 6811>>1 1538 ~ 0 ' '589 3075>>9 6357 ' 10253 ~ 2 10253 ~ 2 6357 ' 3075 ' ]589 ' 3075

                                                                                                                                                                                                 '40 0>:H         92 2       Il>>160             3  '60     14 ~ 880   14 ~ 400       7 '40         3 '00        2 '32       2 '32      3 '00          7 '40           14 ~ 400      7 ENERGY
            $ /HMH                          I ~ 88            1 ~ 88     I ~ 88     I ~ 88        1>>88          I ~ 88       1  '8       f>>88       1 ~ 88         1 ~ 88           1 ~ 88       1 ~ 88 RGHYD PS                    STORaGE        HYDRO                        PREFERRED SUBPERIODI NONE                         ESCALATION RATESI CAPACITY COST                  0~0     0/YR COHPANY                                     RESERVE CREDITED ALL                                                         ENERGY COST           7  '

AREAI 9 FORCED OUTAGE RATEI 0 A% YEAR FEB MAR APR HAY JUN JUL AUG SEP OCT OKC CAPAC IT Y fl>>t 20 45 ~ 30 ' 30 ' 4]e 30 ~ 30>> 22 ~ 45 ~ 40 30 ' 40 ' 0~0 '/Hl 0>>0 ~ 0 ' 0>>0 0 ~ 0 0~0 0~0 0 ' ~

                                                                                                                                                                         '0 0              '            '

9 ~ 8]7 15 ~ 930 12 ~ 333 '78 17 ~ 922 10 ~ 793 8 '97 4 '68 ]0 ~ 963 14 ~ 452 15 ~ 601 14 ~ 691 ENERGY G4>H

            $ /tlirt H 143 ~ 8 1 ~ 88            1 >>>>]8     ] F 88 8

1>>88 1>>88 1.88 1 ~ 88 1 ~ BB ] ~ 88 1 ~ 88 1 '8 1 ~ 88

NRC INTKRRoeAToRY ON NINE I'tILE POItiT NUCLEAR UNIT ho ~ 2 EttERGY MAt>AGKMENT ASSOCIATES ~ INC PAGE 696 ITEM NO ~ E 320 ' tU) REPT 9 OPTION 3'UBPEPORT 1 05/13/83

                                   <<<<<<<<<<4<<<<<<<<TRAMSACTIPttS INPUT SUttMAftY       FOR      1991 <<<<<<<<<<<<<<<<<<<<

NHHYD Al HYDRO KUtt OF RIVER PREFERRED SUt3PKRIODt NOME ESCALATION RATFSI CAPACITY COST 0 ~ 0 %/YH CoMr ANY s No SPIt<NIMG RESEPVE CREDIT Et'ERev cosT o.o AREC t 1 FORCED OUTAGE RATKt oti% FEO MAR APR MAY JUN JUL AUG SKP OCT NOV OKC 0 CAPACITY ENERGY

             $ /,"'8 G~H        26 '

0 2'232 3~

                                           ~ 0 2 '16 3~

o,n 3e 0,0 2i232 2eleo 3~ 0~0 0 2 ~ 232 34r

                                                                                        ~ 0   'oo 2

3~ 160 2 '32 3~ 0~0 2 '32 3~ 0~0 0 2rleo 3

                                                                                                                                       ~
                                                                                                                                         ~

0 3~ oio 2 ~ 232 2 3~ Ooo

                                                                                                                                                                ~ 160    2 '32 3~

0~0

           $ /M'ttl                    3 '8       F 78       3i78       3o78       3 '8       ;
                                                                                                   ~

3 '8 3 '8 3 '8 3o78 3r78 F 78 F 78 NHHYD Cl HYDRO KUtt OF RIVER PREFERRKn SUBPERIODt NONE ESCALATIoti HATESt CAPACITY COST 0~0  %/Yk COHPA<<Y 5 No SPItl4ING RESERVE CREDIT ENERGY COST 0~0 AREAt 2 FORCED OUTAGE RATEt 0)%

                                                                 '2i i

r YKAR FED HAR APR MAYj JUM JUL AUG SEP OCT NOV OEC CAPACITY Mtt 32 i 32 ~ 32 32 - 32 ' 32 ~ 32 ~ 32 ~ 32 ~ 32 ~ 32 Q $ /M'.0 oeo 0~0 ' oio 0 ~ 0' ~ 0 0~0 0~0 oeo 0 ~ 0 0~0 '.o ENEReY e>H 280 ' 23 F 808 21 ~ 504 23,808 23.O4O 23,808 23.O40 23e808 23 F 808 23 '40 23 F 808 23 '40 23 F 808

           $ /H'AH                     F 78       F 78       F 78       3 '8       F 78            3 '8        3 '8      3 '8      3.78          3 '8           3 '8       F 78 Q

NHHYO El HYDRO RUN OF RIVER PREFERRED SUBPKRIODt MOtlK ESCALATION RATKSt CAPACITY COST oeo %/YR COMPANY 5 No SPINNING RESERVE CREDIT ENERGY COST 0~0 AREAt 3 FORCED OUTAGE RATEt 0~% JAN FEB APR MA'Y JUN JUL aue SEP OCT NOV OEC 0 CAPACITY ENERGY Mtt

             $ /ttd GKH       665 '

76e oio 56 F 544 51 0

                                                  '72 7'AR Ter
                                                      ~ 0 56 76
                                                             '44
                                                                 'eo 54 76 ~

0

                                                                        '20
                                                                            ~ 0 76 56 '44
                                                                                        ~

0 54 76'

                                                                                                   '20
                                                                                                       ~ 0 56 Tee 0
                                                                                                               '44 56 Tee n.o
                                                                                                                         '44 76 54 '20
                                                                                                                                       ~

0 56 76

                                                                                                                                                 '44
                                                                                                                                                     ~

0 76

                                                                                                                                                                   ~

54 ~ 720 0 Te. 0 5eo544

                                                                                                                                                                               ~ 0
           $ /M'rttt                   F 78       3~         3e78       F 78       3 '8            3 '8        F 78      3 '8      3 '8          F 78           F 78       3 '8

tIRC INTERROGATORY QN NlttE <<ILK POINT NUCLEAR UNIT NO ~ 2 ENERGY tlAIIAOEt~ENT ASSOCIATESI INC PAGE 691 ITEN NO ~ E 320 ~ 1 IUI REPT 9 OPTION 3 SUBREPQRT I 05/13/83 titiitieitiiiitititlTRAitSACTIONS It)PUT SUHHAR'Y FOR ]991 ei+4tiitioaiiiiit NN<<YD F1 HYDRO KUN OF RIVER PREFERRED SUBPERIOOI NOttE ESCALATION RATESI CAPACITY COST 0 ~ 0 %/YR CPilPANY 6 eIO SPINttltIG RESERVE CPEDIT ENERGY COST 0~0 AREAI 4 FORCED OUTAGE RATKI 0 ~ % YEAR JAW FKA HAR APR HAY JUN JUL SKP OCT NOV OKC CAPACITY t~tt 42e 42 ~ , 42 ' 42 ~ 42 ~ 42 ~ 42 ~ 42e 42e 42 ~ 42 ~ 42 ' 0 $ /tt.! oeo 0~0 ~ 0 0~0 oeo 0 ~ 0 0~0 0~0 oeo 0~0 0 ~ 0 ~ 0 ENERGY G/tl 3e7.9 31.248 24 '24 31 ~ 248 30 '40 3le248 30 '40 31 ~ 248 31 ~ 248 30e240 31 '48 30 '40 3le248 S/cori<< 3 '8 3 '8 3 '8 3o78 F 78 3 '8 F 78 3 ~ 78 3I78 3e78 3e78 3 '8 NtlHYD C2 STOflAGE HYDRO CPHPAtlY 5

                                                 'REFERRED                   NO SUPPERIODI HONE SPINNING f)ESERVE CREDIT ESCALATIOI'I RATES I CAPACITY COST ENERGY COST 0~0 0~0 AREA I       2                               FORCED OUTAOK RATEI                0  ~%

YF.AR JAN FEB HAR APR HAY JUN JUL 'UO SEP OCT NOV OEC CAPACITY tlat

               $ /tlute 12              12e           12e            12 ~          12   '         12 ~        12  ~       12          12 ~         12e            12e         12 ~

Ci ',0 oeO 0 ~ 0 . 0~0 0 0~0 0~0 'eo 0 ~ 0 0 ~ 0 0~0 Oeo KNEf'GY Gl)tt 42 F 0 3 '71 3 '26 3 '71 3 '56 3e571

                                                                                                              ~

3 '56 3 '71 3 '71 3 '56 3e571 3 '56 3 ~ 571

             $ /Ho'H                           n,O             0~0           0 '            0 '            o.a           0~0         0~0         0~0          0~0         0 ~ 0           O.o        0~0 Ct Ntt)IYD K2                    STORAGE        tlYORO                        PREFKRRED SUBPERIOPI NO E                             ESCALATION RATES I CAPACITY COST               0 ~ 0 %/YK 0                                COHPAtIY 5 AREA I       2 NO    SPINtllNO RESERVE CREDlT FORCED OUTAGE RATE!                0 %

ENERGY COST 0 ~ 0 4'/t CAPACITY ENERGY . tlat G'tH

             $ /Ht tt lit YEAR 781,4       eee365 JAN 223 ~

0~0 0~0 59 FED 223

                                                               '42
                                                              '0 ~ 0
                                                                     '.O 66 HAR 223 ~

0~0

                                                                             '65 0 '

64 APR 2? 3 ~ 0~0

                                                                                            '24 0 ~ 0 66e365 HAY 223 oeo
                                                                                                                'S 0

64 JUN 223 ~ 0~0

                                                                                                                         '24 oeo JUL 223 66e365 0 '
                                                                                                                                         ~

0 66 AUG 223

                                                                                                                                                 '65 0~0
                                                                                                                                                     ~

0 64 SEP 223 ~ O.o

                                                                                                                                                              '24 oeo OCT 223 ee.3e5 0 '
                                                                                                                                                                              ~

0 64 NOV 223 '

                                                                                                                                                                                          '24 F 0 66 OEC 223 ~

0~0

                                                                                                                                                                                                     '66 0~0

NRC INTERRDGATOIIY Crl NINE MILE POINT NUCLEAR UNIT tIO ~ 2 ENEPGY MANAGEMENT ASSOCIATESI INC PAGE 696 ITEM hns E 32no1 ID) REPT 9 OPTION 3 SUBREPORT I 05/13/83 aa<<ao>>oa<<<< TRANSACTIONS INPUT

SUMMARY

FOR 1991 oooaoaaooo i NMHYD F2 STOR'GE HYDRO PREFERREn SUOPERIODt NOI'IE ESGALATION RATESt GAPAcITY cnsT 0 ~ 0 %/YR COMPANY 5 NO S~INIIIIIG RESERVE CREDIT ENERGY COST 0~0 ARFAI 2 FORCED OUTAGE RATEI Os% YK AII JAN FED MAR APR MAY JUN JUI. nUG SEP OCT NOV DEC CAPACITY Hn 93i 93e 93o 93 ' 93 ' 93 ' 93e 93e 93e 93 ~ 93 ' 93 6 S /el'.I 0~0 O.n 0 ' ~ 0 ~ 0 ' 0~0 0 ' 0 ~ 0 0~0 ~ 0 'en ENERGY GIIH 325o9 27 '77 24 '98 27 '77 26 F 784 27 ~ 677 26 '84 27e677 27 '77 26 '84 27 '77 26 '84 27 '77 I $ /MrlH 0 ~ 0 0~0 O.n 0 ~ 0 - 0 ~ 0 0~0 0~0 0 ' 0 ' 0~0 0~0 0~0 GRNBY HYDRO RUtk OF RIVER PREFERRED SuePERIODI NONE ESCALATION RATESI CaPACITY COST Oeo %/YR COMPA<IY 5 NO SPINNING RESERVE CREDIT ENERGY COST 0~0 AREA I 2 FORCED OUTAGE RATEI 0 ' YEAR JAN FE8 MAR APR MAY JUN JUL AUG SEP OCT NOV DEC CAPACITY 10e 10 ~ 10o 10 ~ lns 10 ~ lns lne 10 ~ lne 10 ~ 10 ~ 0  %/I it' 0 0 ~ 0 Oen 0~0 Oen CsC 0~0 o,n 0~0 nen 0 ~ 0 0 ~ 0 ENERGY G'otI 35 an 2 '76

                                      '8
                                        ~

2 '88 2 '76 2e680 2 '76 2i880 2 ~ 976 '76 2 '60 2s976 2 '80

                                                                                                                                                                    '6      2 '76 S/O'AH                   3            3 '8       3e78         3 '8         F 78            F 78        3e78 2

3 '8 3e78 F 78 3 F 78 Q UNION 570RAGE HYDRD PREFERPED SU8PERIODI tIONE ESCALATION RATES I CAPACITY COST 0~0 COMP atlY 5 NO SPIIINING PESERVE CRFDIT ENERGY COST 0~0 aPEAI 3 FORCED OUTAGE RATEI 0,% YEAR JAN FEP. MAR APR MAY JUN JUL AUG SEP OCT NOV DEC CAPACITY t ii 3~ 3~ 3~ 3~ 3~ 3~ 3~ 3~ 3~ 3~ 3~ 3~ 0 3/M4 0~0 0~0

                                                 '40 0~0           0 ~ 0        Oen             0 ~ 0       0~0       0 ~ 0      0 ~ 0        Oen           0~0
                                                                                                                                                                              '/0 ENERGY        GtH     10 '       0 '3en       0          Oe930          '00          '30           Oi900         '30        '30       '00         0 '30        0 ~ 900
           $ /H'<H                  3 '8        '3e78       3e78 0

F 78 0 3 '8 3 '8 0 3 '8 0 3 '8 0 F 78 3i78 3 '8 0 3s78

NRC INTERROGATORY ON NINE MILE POINT NUCLEAR UNIT tto ~ 2 ENERGY I~AtIAGKMEIIT ASSOCIATESI INC PAGE 69V ITEII Ieo ~ E 320 ~ 1 IU) REPT 9 OPTION 3 SUBREPORT 1 05/13/83

                               "<<oo<<<<ooo<<TRANSACTIONS INPUT SUIIMARY                FOR 1991         oooo<<<<oooo TRENT                   STORAGE      tIYORO                    PREFERRED      SUBPERIODI NONE                     ESCALATIOII RATESI CAPACITY COST            0 ~ 0 %/YR COIAPAtlY 5                            NO   SPINNINO RESERVE CRED17                                                 ENERGY COST       0~0 AREA I    3                            FORCED OUTAGE RATEI           0~%

YEAR JAN FEII APR MAY JUN JUL AUG SEP OCT NOV DEC CAPACITY ttet 30 30 ~ 30 30 ' 30 30e 30 ' 30 ' 30 ~ 30 ' 30 ' 30e Oeo '/Hit 0~0 ',0

                                                                               ~ 0          'eo 0 '          ~ 0         ~ 0      0~0           '             ~ 0       0
                                                                                                                                                                               '85
                                                                                                                                                                                   ~ 0 ENERGY        G"H      168 '     14 285           12 '02    14 '85       13 '24     14 '85           13 '24      14 '85     14 ~ 285   13 '24       14 '85        13 '24     14
         $ /MMM                     3  '8           F 78      3 '8         F 78       F 78             F 78        F 78       3e78       3 '8         3 '8          F 78       3 '8 OLNPK                   HYDRO        RUN OF       RIVER        PREFERRED      SUBPERIODI NONE                     ESCALATIOt" RATESI CAPACITY COST            0 '    %/YR COMPAIIY     5                         NO   SPINHItIG RESEPVE CREDIT                                                ENERGY COST       0 '

4REAI 3 FORCED OUTAGE RATEI oe% YEAR JAN MAR APR MAY JUN JUL AUG SEP OCT NOV OEC CAPACITY 16e 16 ~ 16e 16 ~ 16 ' 16. 16 ~ 16e 16 ~ 16e lbe 16 ~

           $ /Mlt                      Oeo            0~0       0~0          0 ~ 0      0 '              0~0         0~0
                                                                                                                   '95 0 ~ 0      0~0          0~0          Oeo
                                                                                                                                                                    '05 0~0
                                                                                                                                                                               '95 105 '      8 995            8 F 124   8 '95        Be705        '95            8 '05       8          Be995      8 '05        8 '95         8          8 ENERGY        GwH
         $ /HxH                     3  '8           F 78      3 '8         F 78 8

3 'S 3 '8 3e78

                                                                                                                          ~

3 '8 3 '8 3e78 F 78 3 '8 OSIIGT IE HYDRO RUN~OF RIVER PREFERRED SUBPERIODI NONE ESCALATION RATESI CAPACITY COST 0 ~ 0 %/YR COMPAIIY 5 NO SPIttNINO RESERVE CREDIT ENERGY COST 0~0 AREA I 3 FORCED OUTAGE RATEI Oe% YEAR JAN FEB MAR APR HAY JUN JUL AUG SEP OCT NOV OEC CAPACITY I<et 0 ~ n, 0 ~ Oe Oe Oe 0~ 0 ~ 0~ 0~ 0 ~ 0~

            $ /Hw                      0~0            Oeo       0~0          0~0        0.0 (I           0~0         0~0        o.n        0~0          0~0          0 ~ 0       0~0 OhH       3 '          '74          0 ~ 247   Oe274         O.265       '74            Oe265       Oe274      0 '74      O<<265        0 '74         0 '65           274 KNERGY
         $ /tIWH 0

3 ~ 78 '3e TB F 78 3 '8 0 3,78 / f I 3e78 3 '8 3eTB 3e78 3 '8 3e78 OS F 78

NRC INTERROGATORY ON NINE MILE POINT NUCLEAR UNIT NO ~ 2 ENKPOY MAtlAOEMENT ASSOCIATESt INC PAGE 700 ITEH NOe E 320 ~ 1 Io) REPT 9 OPTION 3 SIIBREPORT 1 05/13/B3 aaaaaaaaaa TRAI4SACTIONS INPUT SU>tMARY FOR 1991 aaaaaaaaaa HUDFLS STORAGE HYDRO PREFERRED SUBPKRIODI NONE ESCALATION RATESI CAPACITY COST 0 '  %/YR COMPAttY 5 NO SPltlNING RESERVE CftEDI7 ENERGY COST 0 ' ARFAI 4 FORCED OUTAGE RATEI 0 ' YEAR JAN MAR APR MAY 'UN JUL AUG SEP OCT NQV DEC 0 CAPACITY ENERGY H4

            $ /ltH GIIH     7 '     0 0

2~ 610 0 2~ 0~0 551 0 0

                                                         '10 2~

0 0

                                                                        '90 2~

0 0

                                                                                      '10~

2~ Oe590 2~ Oe0 0 2~ 0~0 610 0 '10 0 2~

                                                                                                                              '       0 0 '90 2~

0 0 2~ 610 0

                                                                                                                                                              '90 2~
                                                                                                                                                                  '         0 2~

0 ~ 610

          $ /MttH
                                  ~

3 '8 ~ 3e78 F 78 3 '8 3 '8 3e78

                                                                                                               ~

3 '8 F 78 F 78

                                                                                                                                               ~

3 '8 0 F 78 3e78 IIECHVL HYDRO Run-OF-RIVER PREFERRED SUBPERIODI N6NE Escat.ATION Ra TEs I cAPAclTY cos T 0. 0  %/YR COHPAtlY 5 NO SPINNING RESERVE CREDIT ENERGY COST oeo AREAI 4 FORCED OUTAGE RATEI 04% YEAR JAN FEB MAR APR MAY JUN JUL AUG SKP OCT NOV OEC CAPACITY Mtt 3~ 3~ 3~ 3~ 3~ 3~ 3~ 3~ 3~ 3 ~ 3e 3~ a $ /Mtt 0 ' 0 ' Oi0 0 ' 0 ' 0~0 0 ' 0~0 0~0 0 ' 0 ' ENERGY OteH 19 ~ 8 683 '20 1 ~ 683 629 683 le629 683 683 629 '83 629 683

          $ /MttH 1 ~

9e78 1 3 '8 3e78 1 ~ 3 '8 1 e 3 '8 3e78 1 ~ 3e78 1 ~ F 78 1 ~ 3e78 1 3 '8 1 ~ 3 '8 1 ~ 3e78 e SUGAR STORAGE COMPANY ttYORO 6 PREFKRRED SUBPERIODI NONE NO SPINNING RESERVE CREDIT

                                                                                               '%SCALATION RATESI                 CAPACITY COST ENERGY COST 0 ~ 0 %/YR 0 '

ARKAI 3 FORCED OUTAGK RATEI 0 YEAR JAN MAR APR MAY , JUN JUL AUO SKP OCT NOV DEC CAPACITY 4~ 4~ 4~ 4~ 4~ 4~ 4e 4~ 4~ 4 ~ 4e

            $ /I"tt                 0e0          0 '       oen            0~0           0 0
                                                                                                ~

0 0 0~0 0 ' 0 ' 0~0 0 ' 0~0 ENERGY OKH 25 ' 2 156 '47 2;156 2 '87 2 ~ 156 2e 087 F 156 2 ~ 156 F 087 2e 156 2 '87 2 ~ 156

          $ /MttH                 3 '8       1
                                              '3 '8      3 '8           3 '8          F 78         3 '8        F 78       F 78      3 '8       3 '8           F 78        3 '8

NRC INTERPOOATORY QN NINF. tIILF. PoltlT NUCLEAR Ut.IT NO.2 ENEPOY NAIIAOEr FNT ASSOCIATESI INC PAGE 701 ITEN NO ~ E 320e1 Ite) REPT 9 OPTION 3 SIIBPEPORT I 05/13/83

                                            >>>>>>4>>>>>>>>>>>> TRANSACTIOtlS INPUT SUIIIIARY              FOR     1991>>>>>>>>>>>>>>>>>>>>

rlYDRO HUrl-OF-Rl vER PREF'ERRED SUHPERIODI tlotlE ESCALATIOre RATESI CAPACITY COST 0 ~ 0  %/YR COHPAHY 5 t40 SPINNING RESEF VE CREDIT ENERGY COST 0~0

                                                                                                '2 '2 AREAI      4                             FORCFD OUTAGE RATEI           0~%

SGLENF'APACITY YEAR JAN FEB I~AR APR HAY JUN JUL AUG SEP OCT NOV OEC I Htl 12'eo 12o 12 ~ 12 ' 12 ' 12e 12 ~ 12 ~ 12 ~ 12 ~ 0 $ /tert

                                                '50           5 Q~
                                                                '45 0       0~0
                                                                             '50       6 '48
                                                                                              ~ 0     0
                                                                                                    '50
                                                                                                        ~ 0          0 ~

6 ~ 048 0

                                                                                                                               '50
                                                                                                                                  ~ 0 6

Qeo

                                                                                                                                          '50 Qeo 6 F 048 0 ~ 0 6

0~0

                                                                                                                                                                                 '48 0~0 6 'SQ ENERGY             Gt H S/rI'g H T3 F 6     6 3e78            F 78 6

3 '8 3 '8 6 3 '8 F 78 6 F 78 3 '8 F 78 F 250 3 '8 F 78 F 78 HADLEY HYDR" RUtl OF RIVER PREFERRED SUBPERIODI NONE ESCALATION RATESI CAPACITY COST 0~0  %/Y" COHP INY 5 NO SPItlNING PESERVE CREDIT ENERGY COST OeO APEAI 4 FORCED OUTAGE RATEI Qe% YEAR JAN FEB HAR APR NAY JUN JUL AUG SEP OCT rrOV DEC i CAPACITY 0 ~ 0 ~ 0~ 0~ 0~ 0~ 0 ~ 0 ~ 0~ 0~ 0~ 0 ~ s/rw 0~0 Qoo 0~0 ~ 0 0llew 0~0  ! Qio llew Qeo neo 0~0 0~0 0~0 0~0 ENERGY 0~0 0 0~0 o.n 0~0 0~0 0~P Oeo 0~0 0 ' 0~0 OIIH

                 $ /re<H 0 ~ 0 3 '8          0 ~

3 '8 3 '8 3 '8 0~0 3e78 3o78 3 '8 F 78 3 '8 3 '8 3 'B F 78 le I I I FLTHLS HYDRO RUN OFiRIVER PREFERRED SUBPERIODI tlONE ESCALATION RATESI CAPACITY COST 0 ~ 0 %/YR 0 COHPArtY APEAI 3 5 NO SPINNING RESERVE CREDIT FORCED OUTAGE RATE! Qoi% ENERGY COST 0~0 YEAR JAN HAR APR NAY ~ JUN JUL AUO SEP OCT NOV OEC CAPACITY Irlo

                    $ /I!lI 11              1  le        II ~                   ll  e                      ll ~       1 le      ll ~         ll  ~           11  ~       11 ~

0 '28

                                                      'eo 0~0         Qio 6 '28 n.o
                                                                                         '21 Qeo            Qeo         0~0
                                                                                                                               '28 Qeo
                                                                                                                                          '28 0~0          0~0
                                                                                                                                                                 '28 0 ~ 0       0~0 ENERGY             G4H          75  '      6               F 806                    6          6e428          6 ~ 221     6          6         6 ~ 221      6               6 ~ 221     ee428
                  $ /H'r,'H                     3 '8            3 ~ 7 II    F 78         F 78       3 '8           3e78        3e78       F 78      3i78         3 '8            3 '8        3 '8 0

NRC INTERROGATORY QN NINE NILE POINT NUCLEAR UtIIT NO ~ 2 ENERGY ttAIIAGEt<EttT ASSOCIATESi INC PAGE ITEM NO ~ E 320 ~ 1 (0) REPT 9 OPTION 3 SUBREPORT 1 70'5/13/83

                             <<aoaoaoao<<TRAIISACTIONS            INPUT 

SUMMARY

FOR ]3 oaooaaooao SHRHI SL STORAGE IIYORO PRES ERRFD SUBPERIODI ESCALATION RATES I CAPACITY COST 0 ~ 0 %/YR 0 COtlPAttY 5 NP SPINNING RESERVE CREDIT ENERGY COST 0 ' AREA 4 FOPCED OUTAGE RATEI 0 ' YEAR JAN FEB MAR APR MAY JUtk JUL AUG SEP OCT NOV DEC

                                                                                                '3 CAPACITY     tIW                   33 ~         33  ~      33  '         33 '               ~          33  '       33 ~        33 ~      33 ~         33 '          33 ~       33  '

0 S/tttt OeO 0~0 ' ' Oe0 ' 0 ' 0 ' ' -0 ' Oe0 ~ 0 ENERGY GtiH 173e4 ]4 73] ]3 '06 14 ~ 731 14 ~ 256 14 ~ 731 ]4.256 14 ~ 731 14 ~ 73] 14 ~ 256 14e73] 14 ~ 256 14 ~ 731 S/Mt'H

                                  ~

3 '8 3 '8 F 78 3e78 3e78 3e78 F 78 F 78 F 78 3 '8 3 '8 F 78 HIDAM STORAGE HYDRO PREFERRED SUBPERIODI NONE ESCALATION RATESI CAPACITY COST 0 ~ 0 %/YR COMPANY 5 NO SPINNING RESERVE CREDIT ENERGY COST 0 ' AREAI 2 FORCED OUTAGE RATEI 0.% YEAR FEB HAR APR MAY JUN JUL AUG SEP OCT NOV OEC CAPACITY 9e 9~ 9~ 9~ 9~ 9~ 9~ 9~ 9~ 9~ 9~ 9~ 0 S/Mtt OeO 0~0 0 ' 0~0 0 ' 0 ' 0 ' 0 ' 0 ' Oe0 0 ' 0~0 ENERGY GetH 41 ~ 0 3 '78 3 ~ 142 3 '78 3 '66 3 '78 3 '66 'TB 3 '78 3 '66 3 '78 3 '66 3 '78 S/MVH 3 '8 3e78 F 78 F 78 3 '8 3 '8 3 3 '8 3 '8 F 78 3 '8 3 '8 3 '8 VARICK STORAGE HYDRO PREFERRED SUBPERIODI NONE ESCALATION RATESI CAPACITY COST 0 ' 5/YR COMPANY NO SPIttNING RESERVE CREDIT Et>ERGY COST 0 ' AREA! 2 FORCED OUTAGE RATEI 0 'l YEAR JAN HAR APR MAY JUN JUL AUG SEP OCT NOV OEC CAPACITY I!'If 10 ~ 10, 10e 10 ~ ]0> ]Oe 10e 10 ~ 10 ~ 10e 10 ~ ]0 ~ S/l)et 0 ' 0 ~ 0 0 ' 0 ' 0 ' 0 ' OIO 0 ' 0~0 Oe0 0 ' 0 ' ENERGY GUH 42 ' 3 '71 3 '26 3 ~ 571 3.456 3 '71 3 '56 3 '71 57] '56 3e571 3 '56 3 ~ 571 S/MUH 3 '8 'F 78 3e78 3 '8 3 '8 3 '8 3 '8 F 3 '8 3 3 '8 3 '8 F 78 3e78 0 0

tlRC INTERROGATORY ON thINK HILE POINT NUCLEAR UNIT 110 ~ 2 ENERGY HAotAGEHENT ASSOCIATESr INC PAGE 70> ITKI< NO ~ K 320il AU) REPT 9 OPTION 3 SUBREPORT 1 05/13/83

                            <<<<<<<<<<<<<<<<<<>>  TRANSACTIONS INPUT S1IHHARY FOR 1991                  <<<<>>>>>><<<<<<<<<<

8 HINETO STORAGE 11YDRO PREFERRED SUBPERIOPt NONE ESCALATION RATFSt CAPACITY COST 0 ~ 0 %/YH 0 COHPANV APEAI 2 5 f40 SPINNING RESERVE CREDIT FORCED OUTAGE RATEt Oo> ENERGY COST 0 ' YEAR JAN HAR APR HAY JUN JUL AUO SEP OCT NOV OEC CAPACITY He' 9~ 9e 9~ 9~ 9~ 9~ 9~ 9~ 9~ 9~ 9~ 9e

           $ /tt W                0 '       0.0       0 '           Oo0            0   0    i     0 '         0 '       Oeo      0~0           0.0            0.0         0 '
                         '    3 '60                 '60
                                                                                     ~
                                                                                                '48                            '48                          '48         '60
                                                                                          ~

ENERGY Ot'H 40 3e125 3 3o348 3 '60 3 3o460 3.460 3 3o460 3 3

         $ /tt V H              3 '8      3 ~ 18    3 '8          3 '8           3 '8           3 '8        F 78      F 78     3 '8          3 '8           3eTB        3 'B 0                                                                                          0 FULTON               STORAGE   HYDRO               PREFERRED       SUBPKRIOOi NONE                       ESCALATION RATESt CAPACITY COST            Oo0 %/YH 0                      COHPANY   5                   NO    SPINNING RESERVE CREDIT                                                EttEROY COST        0 '

APKAt 2 FORCED OUTAGE RA7E t 0 ~% YEAR JAN FEB HAR APR HAY JUN JUI. AUG SKP. OCT NOV DEC CAPACITY HN 1 ~ 1 ~ 1 ~ 1 ~ 1 ~ 1 ~ 1 ~ lo 1 ~ 1 ~ 1 ~ 1 ~ 0 $ /Htt 0o0 0 ' Oo0 Oe0 0o0 0 ' 0 ' 0 ' Oo0 0 ' 0 ' 0~0 ENERGY Go1H 4i4 0 '72 0 '36 0 '72 0i360 0 '72 I 0 '60 0 '72 0 '72 '60 0 '72 0 '60 0 '72

         $ /O'HH                3 '8      F 78      F 78          3e78           3o78           3 '8        F 78      F 78 0

3 '8 3 'B 3 '8 F 78 a I I FEEDER STORAGE HYDRO PREFERRED SUBPERIODt HONK ESCALATION RATESI CAPACITY COST 0 ~ 0 %/YR COHPANY 5 ttO SPINNING RESEPVE CREDIT ENERGY COST 0 ' AREA! 4 FORCED OUTAGE RATEt Oo% YEAR JAN FEU HAR APR ttAY JUN JUL AUO SEP OCT NOV OEC CAPACITY Hit 5~ 5~ 5i 5i 5e 5~ 5o 5~ 5~ 5e 5e 5~ e $ /ooQ 0 ' Oop Oe0 0~0 Oo0 0~0 0~0 0 ' 0~0 0~0 0 ' oeO ENERGY OHH 20il T1 1 lo546 711 656 lo711 " 656 e711 o711 l,ese i711 '56 711

         $ /HitH 1 e F   78.  '3 ~ TB 1 ~

3 '8 1 ~ 3e78 3o78 1 ~ 3e78 1 3 ~ 78 1 3 ~ 78 F 78 1 3 '8 1 3 '8 1 ~ 3oTB 0 0 0

NRC INTERROGATORY QN N]NE NILE POINT NUCLEAR UIIIT NO ~ 2 'NERGY t<attAGEHEtlT ASSOCIATESI INC PAGE 704 ITEN NO ~ E 320 ' ]D] REPT 9 OPTION 3 SUBREPORT 1 05/13/t]3 I. aaaaaaaaaa TRANSACTIONS INPUT SUHHAPY FOR =1991 <<a<<a<<a<<a<<a OSWF STORAGE tIYORO PREFERPED SUBPKRIODI NONE'. ESCALATION RATESI CAPACITY COST 0 ~ 0 %/YR COHPattY 5 NO SPIttNING RESERVE CREDIT ENERGY COST 0~0 AREAI 4 FORCED OUTAGE RATEI 0~% YEAR JAN FED HAR APR HAY JUN JUI. AUG SEP OCT NOV DEC CAPACI TY HM 6~ 6o 6~ 6~ 6~ 6~ 6~ 6~ 6~ 6~ 6~ 6~ 0 $ /t'1 oio ENERGY Gt"H '4 ' 2 0

                                     '46 ~ 0      0~0 848    2 0~0
                                                           '46 0~0
                                                                        ]e980 0~0 Zo046               980 0~0 Zo046       2 ooo
                                                                                                                               '46 0~0 980 0~0 F 046 0~0 980 0

Ze046

                                                                                                                                                                                      ~ 0
           $ /HKH                    3 '8     1 ~

F 78 3 '8 3o78 3 '8 1 ~ 3 '8 3 '8 3 '8 1 ~ 3 '8 3 '8 1 ~ F 78 3 F 78 VERHONT SALK UNSCHEDULED PREFERRED SUBPERIODI NONE EscaLATloN RaTEst capaclTY cnsT ooo $ /YR COHPANY 8 RESERVE DEBITED ENERGY COST 0~0 ARKAI Zo FQRGED 0UTAGE RATKI 0 ~ 5 YEAR JAN FEB HAR APR HAY JUN JUL SEP OCT NOV DEC CAPACITY 1ttt 150' 150 ' 150 ~ 150 ~ ]50 ~ 150 ~ 150 ~ 150 ~ ]50 150 ~ ]50 ~ ]50 ~

             $ /Htt                    oeo          '        0   0         oio            0 '             0~0        0~0         0   0         'so 0~0           0~0         0~0 ENERGY        GIRTH
           $ /H'KH 845 '     71  '67 0~0 64 '21 0~0 71 '67
                                                               ~

0 69

                                                                      ]ZAN
                                                                          '5]

0~0 71 ~ 767 69 '5] ooo 71 ~ 767 0~0

                                                                                                                                   ~

71 ~ 767 69 '51 71 ~ 767 69 '51 0~0 71 ~ 767 0 0 0 ~ 0~0 0~0 0~0 0~0 ~ AHP~OHIO SALK UNSCHEDULED PREFERRED SUBPERIODI NONE KscALATIGN RATEsI cApacITY cosT 0 ~ 0 %/YR COttpaNY RESERVE DEBITED ENERGY COST ooo AREAl 13 FORCED OUTAGE RATEI 0~5 YEAR JAN FEB HAR aPR JUN JUL AUG OCT NOV DEC CAPACITY Ntt 23 ~ 23 ~ 23 ~ 23 ' 23 ' 23 ' 23 ~ 23 ~ 23 ~ 23 ~ 23 ~ Z3 ~

             $ /H ti                   0~0        0~0        0 ~ 0           ~ 0            '              '         0 ~ 0       0~0        0~0           0~0           0 ~ 0       0 ~ 0 ENERGY        04H     ]47+]     ]F    492   1] i 283   ]Zo492             089      ]Ze492           ]F   089   12 ~ 492    ]2 ~ 492   12 ~ 089      12 ~ 492      12 ~ 089    ]F   492
          $ /MVH                     0~0       '0 ~ 0      0 ~ 0         0~0            0 '             ooo        n.o         0 '        0~0           ooo           0~0         0~0

ttRC INTERROGATORY Oht t(lt<E tiILE POINT NUCLEAR Ut'IT NO 2 ENERGY HANAGEHENT ASSOCIATKSj INC PAGE ITEN NOe E 320 ~ I IUl REI)T 9 OPTION 3 SUBREPORT I 70'5/13/83

                                     >>>>>>>>I)>>>>>>>>>> TRANSACTIONS INPUT                          SUHHARY FOR 1991               >>>>>>>>>>>>>>>>>>>>

PASNY PURCHASE PEAK SHAY/tIG PRFFERRKD SUBPEPIODI NONE FSCALATION RATESI CAP~CITY COST oeo %/YR 8 COHPAttY 0 RESERVE CREDITED ENERGY COST 0 ' ARKAI 1 FORCED OUTAGE RATEI Oe% YEAR JAN FEB HAR APR HAY JUN JUL AUG SEP OCT NOV DEC CAPAC I TY t"et 0 ~ 0e 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ S/HW 0~0 0 ' 0 ' Oi0 Oe0 0 ' 0 ' 0 ' 0 ' 0 ' 0 ' 0 ' ENERGY Ge H 0,0 0~0 0 0 ' Oi0 Oj0 0 ' Oe0 0 ' 0 ' 0~0 Oe0 0 '

            $ /HMH                        0      '             0             0 '              0,0          0 '                0,0            Oe0            0 '         0,0            0 '            0 '         0 '

INTERCHANGE ACCOUNTItlO I PRIG lt'tO OPT IOht I COHP OWNERSHIP COHP OWNERSHIP COHP OWNERSHIP COHP OWNERSHIP COHP OWNERSHIP D I SPLACEhtE(IT COST I 0 '  % 2 48 ~ 0 % 3 13 ' 4 10 ' 5 19 ' 1 3 ' FIXED COST INCREASE I 5 ' $ /HWH 6 3 ' 7 4 ' SAVINGS FIXED SPLIT I 0'  % PRIORITY ORDER I 0 REPORTING OPTION ACCOUNTIttG OPTION I ALLHYDR1 HYDRO RUtl OF~RIVER PREFERRED SUBPERIODI NONE ESCALATION RATESI CAPACITY COST 0 '  %/YR COHPANY 4 RESERVE CREDITED ENERGY COST 0 ' AREAI 7 FORCED OUTAGE RATEI 0 ' YEAR JAil FEB HAR APR HAY JUN JUL AUO SEP OCT NOV DEC ~ CAPACITY HW 10e 10

                                                                     ~         10
                                                                                   ~            10
                                                                                                    ~        10 ~               10e            10
                                                                                                                                                   ~          10e 10 ~           10e            10e 10e
              $ /O'W
                               '        3 ~ 176 0               0 2 ~ 172 0

2i703 Iles 0 4 ~ 122 0 ' 2 ~ 837 0 Oe817

                                                                                                                                  '            0
                                                                                                                                             '43 0

0 '36 Oe0 408 0

                                                                                                                                                                                       '43
                                                                                                                                                                                           '            0
                                                                                                                                                                                                      '23       3 0
                                                                                                                                                                                                                  '44 ENERGY         GWH         27                                                                                                                                                       2              3
            $ /HWH                        F 70                 6e74          6 ~ 79           6 '4         6 '8               6 '3         0 6,97           F 02 1 ~

7 '7 7 ~ 11 7 '6 7e21 ALLHYDR2 HYDRO RUN OF RIVER PREFERRED SUBPERIODI NONE ESCALATION RATESI CAPACITY COST 0 ~ 0 %/YR COMPANY RESERVE CREDITED EttERGY COST 0 ' 19 4'REA! FORCED OUTAGE RATEI 0 ' YEAR JAN FEB HAR APR HAY JUN JUL AUG SKP 'CT NOV DEC Q CAPACITY t<it 19 19 ' 19e 19 ~ 19 ~ I t 19 ~ 19 ' 19e 19 ' 19i 19 ~ 19 '

              $ /Net                                 'i0
                                                                   '           0~0              0 '          Oe0     (.         0 '              '            0 '           '            0 '            Oe0           '

ENERGY O>'H 101 ' 6 ~ 919 5 '28 Bj532 550 10 ~ 884 j 8 '96 5 ~ 051 6 ~ 138 8 ~ 341 9 '65 10 '34 9 '22 0 $ /HÃH 1 '3 1 ~ 84 1 ~ 86 1 e87 1 ~ 88 I tr I e89 1 ~ 91 1 ~ 92 I ~ 93 1 '4 I ~ 96 1 ~ 97 0

      'RC INTERROGATORY ON NINE MILE POINT NUCLEAR UNIT ND ~ 2                              ENERGY ttAttAGEttKNT ASSOCIATES)      INC                         PAGE     70tt ITKM      NO ~  E  320 ~ 1  (O)                                                            REPT    9 OPTION 3 SUBREPORT           1                          05/13/83 aaaaaaatta>>    TRANSACTIONS It<PUT SUteMARY FOR 1991         aaaaaaaaaa ALLHYDR3                   HYDRO         ttUt< OF RIVER        PREFERRED SU8PERIOOI       NONE              ESCALATION ttATESI CAPACITY COST            0 ~ 0 %/YR COMPANY       4                     RESERVE CREDITKO                                                       Et~KPGY COST      0~0 AREAl      19                       FORCED OUTAGE RATEI        0 ~ 5 YEAR             JAN        FER       HAR          APR      HAY            JUN        JUL          AUG      SEP          OCT            NOV         OEC CAPACITY.      ttrl                        18 ~       18 ~      18 ~  ,     18 ~     18 ~           18e        18           18 ~     18  '        18 ~           18 ~        18 0            $ /9p                           Oen        0~0       0 ~ 0        Oin      0   0          0~0           'en 0,0        '          0~0            0 ~ 0          'en ENERGY       GttH         102  '       8 F 460     7i176    10 '41       11 '43   11 '45~

8 '83 6 '89 6 '39 6 '82 7e547 7 '78 8 '58

          $ /Htt H                        3 '8       3e7n       3e72         3.75     3,77          3.80       3 '2          F 85     F 88        3 '0           3 '3        3 '5 NEUT Il.                   PURCHASE PEAK SHAVING               PREFERRED SUBPERIODt NONE                    KSCAI ATION RATKSI CAPACITY COST            0 ~ 0   I/YR COMPANY                             RESERVE CREDITED                                                       ENERGY COST       9 '

AREAt 8 FORCED OUTAGE RATEI 0 ' YEAR JAN FEB MAR APR NAY JUN JUL AUG SEP OCT NOV OEC CAPACITY Oi 0 ~ 0~ Oi 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0, 0~ 0 $ /ttlt 67 ~ 6 67 ' 67ee e7.e 67 ' 67,e 67eb 67e6 67i6 67 ~ 6 67 ' e7,e ENERGY Gtt H 0 i0 0~0 Oin OiO '

          $ /MttH                      166i82      166 ~ 82  166 '2        0~0 166 '2    Oen 166 '2         0 166  '2     0~0 Iee ~ 82
                                                                                                                        . 0~0 166i82 0~0 166 '2        0~0 166i82 0~0 166   '2      0~0 166 ~ 82 rQ

H NRC INTERROGATORY ON NINE NILE POINT NUCLEAR UNIT NOg2 ENERGY HANAGKHENT ASSOCIATESt INC PAGE TIU ITEN ttC ~ E 320o I ID) REPT 9 OPTION 3 SUBREPORT 1 05/13/B3 oooooooooo TRANSACTIONS ItlPUT SUHI1APY FOR 1991 ooooooooao HYDRO RUN OF R I YKR PREFERRED SUBPERIODt ttONK ESCALATION RATFSI CAPACITY COST 0 ~ 0 %/YR HIGHF ALL CO>>P~ttY 1 RESERVE CREDITED ENERGY COST 0~0 ARK< t 10 FORCED OUTAGE RATE! 0 ' YEAH JAN FEB WAR 'PR t1AY JUt~ JUL AUG SEP OCT NOV OEC I CAPACITY 2~ 3~ 5~ Se 30 1 ~ I~ 0 ~ 1 ~ I~ 2~ 3 ~ 0 0~0

           $ /t I<                   0.0        O.n     0~0        0 ~ 0    0  ~ 0         OIO        Ooo        0 ~ 0         0
                                                                                                                             '00
                                                                                                                                 ~ 0         0~0          0
                                                                                                                                                        '00
                                                                                                                                                            ~

ENEPGY G"t1 13 2 1 ~ eoo O ~ SOO F 700 3 '00 F 000 0 '00 0 '00 0 ~ 100 0 0 ~ 100 0 I.eOO 5/t4'i tt 0~9 0~0 0 ' 0 ' 0 ~ 0 0 ~ 0 Ooo 0 ~ 0 0 ~ 0 0~0 0 ~ 0 0 ~ 0

                                                  ~ c                                 Dl                                                ~   ~
            >>>>RC      INTERROGATORY ON NINE MILE POINT NUCLEAR UNIT NO ~ Z                                     EIIERGY MANAGEMENT ASSOCIATES ~           INC                           PAGE       TIC IIE!I NG ~     E 320 ~ 1 {D1                                                                      I>>EPT    9>>IPT ION 3 SUBREPORT             1                            05/$ 3/83 oaaaaoaaaa         TRANSACTIONS INP{IT SUMIIAPY FOR 1991             ooaaoaoaoa I>>URC>>IASE PEA!{ SHAVING                PREFEP>KD SU((PERIOD I e>>EE<OAY                   ESCALATION RATESI CAPACITY COST                  0 ~ 0 %/YR MITCHELL CC>>>>PANY    3                           RESEPVE CREOITKO                                                               ENERGY COST         0~0 AREAI    12                             FOPCEU OUTAGE f?ATE{ A %

JAN I'EB HAR APR MAY JUN JUL AUG SEP OCT NOV OEC CAPACITY 32 ~ 32 ~ 32 ~ 32 ~ 32 ~ 32 ~ 32 ' 32 ~ 32 ~ 32 ~ 32 ~ 0 32

                                                                                                                                                                                                  'eo I'/'{>>>>                       0~0              0~0        o,o        Oeo         0   0           0>>0              0      0~0           0 ~ 0         0   0           0 ~

ENERGY G~H 187>>8 lb>>951 14 ~ 408 15e951 15>>437

                                                                                               ~

15 ~ 951 15 '37 15 '51

                                                                                                                            ~

15 ~ 951 15 '37 15 '51

                                                                                                                                                                   ~

15 '37 15 ~ 951 s/t>>':h Oen neo O.n o,n 0 ~ 0 0 ~ 0 0 ~ 0 0 ~ 0 0~0 0 ~ 0 0 ~ 0 0~0 I>>ECH>>>>NI C HYGRO RUN-OF R I Vf.R PREFERRED SUBPEI{IODI NONE ESCALATION RATESI CAPACITY COST 0 '  %/YR CO'ePANY 4 RESERVE CREDITED KNERGY COST 0 ~ 0 aPEAI 21 FORCED OUTAGE RATEI 0~5 JAN HAR APR JUN JUL AUG SEP OCT NOV OEC YEAR FEB CAPACITY 17 17 ~ 17e 17 ~ 17 ~ 17 ' 17e ITe 17 ' 17>> 17 ~ 17 ~ 0 0 0~0 0 0 0 1/. 0 0~0 0~0 0~0 0 0 0 0~0 ~ ~ ~ I>>>> 0

                                                                                                                                                                               '50
                                              'eo
                                                                                                               ~            ~

Gl>>H 95 ' F 010 8.280

                                                             ~

11e940 12 '00 11 ~ 810 6 '00 F 000 4 '00 4 ~ 50{1 5 '60 6 9 ~ 250 ENERGY 0/Mt>>H I ~ 82 1 '3 I ~ 84 1 ~ 85 1 ~ 87 1 ~ 88 1 ~ 75 1 ~ 76 1 ~ 77 1 ~ 78 1>>79 1 ~ 81 OLR<<MYDI e>>YDRO IIVII OF RIVER PREFERRED SUBPERIODI NONE ESCALATION RATESI CAPACITY. COST 0 '  %/YR COMPANY 6 RESERVE CREDITEO ENERGY COST 0 ~ 0 hREAI 11 FORCED OUTAGE RATEI 0 ~ If YEAP JAN FEB MAR APR MAY JUN JU{. AUG SEP OCT NOV DEC CAPACI TY "h 10 ~ 10 ~ loe 10 ~ 10 ~ 10 ~ 10 ' 10 ~ 10 ' loe 10 ' 10 ~ 9/>>{I>> 0 0 0~0 0 0~0 0 0 0 ' 0 ~ 0 ~ 0 0

                                                                                                                                                                                            '40
                                                                                                                                                                                                ~  0 0
                                        '4Q
                                            ~                ~ 0      0
                                                                    '40
                                                                        ~ 0                  0 ~

7 '40

                                                                                                                            ~
                                                                                                                                   '40
                                                                                                                                       ~
                                                                                                                                                 '00           '40             '00        7 ENERGY         {>>>>H
           %/>>e~f>>

e7.6 7 2 9O F 720 2 '0 7 2 '0 7 ~ 200 2 '0 7 F 440 2 '0 7 ~ ZQQ 2 '0 2 '0 7 2 '0 7 2 '0 7 2 '0 7 2 '0 2 '0

t>RC INTERRf)GATORY otf NINE Hll.E polNT tfUCLEAR UNIT tfO ~ 2 ENERG'Y tfANAGEMENT ASSOCIATESt INC PAGE 71 J ITEH ftG E 320e1 fU) REPT 9 OPTION 3 SlfBREPORT 1 05/13/83 et>oet4oetet"o TRANSACTIONS INPtJT SUHHARY FOR 1991 ttoo04Doooo RF PSti 1 +QRCtiASE t'EAK SteAVING PREFERRED SUBPERIODf ftEEKDAY ESCALATION RATESf CAPACITY COST 0 ~ 0 %/YR COtiPhtfY 8 RESERVE CREUITED Et<EPGY COST 0~0 ppehf 26 FORCED OUTAGE RATEf 0~% YEhR JAN FEB teAP APR HAY JUtf JUL AUG sep OCT NUV OEC CAPACITY 10 ~ 10 ~ 10 ~ 10 ~ 10 ~ loe loe 10 ' 10 ~ 10 ~ 10 ~ 10 '

             $ /feet                       0   0        0   0      0~0          0    0        0~0            0   0        0~0              0          0 ~ 0          0~0              0~0          ~ 0 EtfERGY         G',ftf      58 '        4 '85
                                             ~

4 '02

                                                          ~

4 '85 4 '24

                                                                                   ~

4 '85 4 '24

                                                                                                               ~

4 '85 4 '85

                                                                                                                                         ~

4 '24 4 '85 4 '24 4 '85

           $ /Hi;tf                      0~0          oeo        nen          o.n           Oeo             0~0         0~0          0 ~ 0          0 ~ 0          0 ~ 0            0~0        oeo SOLID~ST                    PURCt>>ASE     PEAK StfAVING           PREFERRED SUBPERIODf             WEEKDAY             ESCALATION RATES f CAPACITY COST                     0~0      ff/Yff COHPANY                               RESERVE CREDITED                                                                     ENERGY COST          ff ~ 0 aREAI      25                         FORCEff OUTAGE RATEf             0 ~ ft YEAR                          FEB        HAR                        HAY            JUN          JUL          AUG            SEP            OCT              NOV        OEC
CAPACITY, 5/tf et 50
                                               'eo 50
                                                            '      50
                                                                       ',0 50
                                                                                     'eo 50e 0~0 50e o,e 50
                                                                                                                              '.n 5'  0 50
                                                                                                                                                          'eo 50  '

0 50

                                                                                                                                                                                       ~

0 50

                                                                                                                                                                                                   ~

0 24 '24

                                                                                                                                         ~                             ~

FNERGY G~tf 293 ' 24 '24 22 ~ 512 24 '24 24 ~ 120 24 '24 24 '20 24 '24 24 '24 24 ~ 120 24 '24 24 ~ 120 0>>C o.n 0 ~ 0 0~0 0 ~ 0 oen 0 ~ 0 0~0 0 ~ 0 0 ' 0~0 0 ' ItfptfftPDS HYDRO RUtf OF RIVER PRFFERRED SUBPERIODf NONE ESCALATION RATESf CAPACITY COST 0 ~ 0 %/YR CQtePAtf Y RESERVE CREDITED ENERGY COST 0 ~ 0 hoch f 19 FORCED OUTftGE RATEf 0 ~% YEAR JAtt tfAR APR MAY JUN JUL AUG SEP OCT NOV DEC CAPACITY 7e 7~ 7~ 7~ 7~ 7e 7~ 7e 7~ 7 ~ 7~ 7~

             $ /thee                       n.o          0~0        Oeo          0'e 0         oeo            n.o          0 ~ 0        oeo            0 ~ 0          0~0              0~0        0 ~ 0 Gttt           '          '74          '29        '56          '68           '68             '63       2 ~ 341        '53              916          '76            2 ~ 621    2 '6b ENERGY 5/ ">>.>> V.

34 2 3 '5 2 3 ~ OF. 3 3 ~ 10 4 3 '2 4 3 ~ 14 2 3>>16 F 18 2 3 '0 1 ~ 3 ~ 22 2 3e24 F 01 3 '3

NRC INTKRROGATORY ON NIIVE MILE POINT NUCLEAR UNIT t(Oo2 ENERGY MANAGEMENT ASSOCIATESs INC PAGE 71<< ITEM NO. E 320.1 IO} RE.PT 9 OPTION 3 SUBREPORT 1 05/13/83 4444444444 TRANSACTIONS INPUT

SUMMARY

FOR 1991 4444444444 RF PSN 2 PURCHASE PEAK SMAVI"G PREFERRED SUBPERIOOI HEEI'OAY ESCALATION RATESI CAPACITY COST 0 '  %/YR COMPANY 8 PESERVE CREOITEO Et'ERGY COST 0 ' AREAI 27 FORCEO OUTAGE RA?El 0,% YEAH JAN FEB HAR APR . HAY JUN JUL AUG SEP OCT NOV OEC CAPACITY I"X 20 ~ 20 ' 20 ' 20 ~ 20 20o 20 ' 20 ' 20 ' 20 ' 20 ~ 20 '

           $ /HH                          0~0           0         '        OeO            'o0 0 '            '              0        '             '            0 '             '

Et>ERGY G4H 117r4 9 '70 9e005

                                                      ~

9 '?0 9 '48 9 '70 9 '<<8 9o9?0 9 '70

                                                                                                                                 ~

9 '48 9 '70 9 '48 9 '70

                                                                           '          '                         0 '          0 '        OoO           OeO            0 '           0'
         $ /Mal                         0 ~ 0     QoO         0 ~ 0      0          0              OoQ RF  PSN 3                    PURCHASE PEAK SHAVING             PREFERRED SUBPERIOOI        HKEKOAY             ESCALATION RATES I CAPACITY COST                0 ~ 0 %/YR COHPAIIY                          RESERVE CREOITEO                                                            ENERGY COST         0 '

AREAI 26 FORCKO OUTAGE RATEI 0 ' YEAR JAN FEB HAR APR MAY JUN JUL AUG SEP OCT NOV OEC CAPACITY 40 ~ <<0, 40o 40 ' 40 ~ 40e 40 hge 40 ~ 40. 40 40 '

           $                              0~0       0 '           '          '                       OoO              'eO 0   0      0 '           OeO            0 ~

0 ' 19 '39 OeO

             /Hr.'NERGY GHM           234 '     )9 '39    18e010 0

e'939 19 '96 19 '39 19 ~ 296 19 '39 19 '39

                                                                                                                                 ~

19 '96 19 '39 19 '96

         $ /IeI'H                       0 ~ 0     0 '

19 0 ' 0 ' 0 ~ 0 0.0 0 ' 0 ~ 0 0 ' 0 ' 0 ~ 0 0 ' RF PSN 4 PURCHASE PEAK SIIAVING PREFERREO SUBPERIOOI HEEKOAY ESCALATION RATESI CAPACITY COST 0 ~ 0 %/YR CO<<PAilY 8 RESERVE CREOITEO ENERGY COST 0 ' AREA> 1? FORCED OUTAGE RATE! 0 ' YEAR JAN FEB APR JUN JUL AUG SEP OCT NOV OEC CAPACITY 40e 40 ' 40 ' 40 ~ 40 ~ 40 ' 40 ' 40 40 ' 40 ~ 40 ~ 40 '

                                            '       0             '        0 '        Oe0              '              0        0 '
                                                                                                                                   ~
                                                                                                                                            '           0 '            0 '             '

19 '39

                                                      ~ 0                                                           ~

ENERGY GHIo 234 ' 19 '39 18 F 010 19 e 939 19 '96 19 '39 19 '96 19 '39 19 '39 19 '96 19 '39 19 ~ 296

         $ /Nate                        0 ~ 0     0 ~ 0       0~0        OeO        0 '            0 '          0'           0 ~ 0      OeO           0'             0 ~ 0         0'

II.D External System Transaction Summary

EXTERNAL SYSTEM TRANSACTION

SUMMARY

There are five types of external system transactions. These are firm purchases from HQ, economy purchases from HQ, prescheduled purchases from HQ, short-term firm purchases from OH and economy purchases from OH. The first four categories are modeled as fixed energy transactions. The schedules for these fixed energy transactions are provided in this section. The firm transaction is divided between Con Ed (HQ FRMCE) and RGGE (HQ FRMRG). The short term firm purchase from OH is referred to (OH-FIRM).and is owned by NMPC. The HQ Economy is referred to as (HQ ECONP) and HQ prescheduled is referred to as, (CEDARS). The economy purchase from OH is referred to as (OHECONl) and,(OHECON2). A chart is attached showing the annual energy for each of these transactions. HQ ECONP is priced at 50 percent of the NYPP displaced cost plus a fixed adder. The mid-year (July) adders for. HQ ECONP are detailed below: July Adder for HQ ECONP Year Mills KWH

                -1986                                       11.3 1987                                       11.0 1988                                        11.7 1989                                     ~ 12. 4 1990                                        13 ..1 1991                                        13.9 The Economy purchase       from OH.is priced at 50 percent of the NYPP di"placed cost plus a fixed adder. The mid year (July) adders for each component are detailed below:

OHECONl OHECON2 Year Mi 1 1 s/KWH Year Mi 1 1 s/KWH 1986 12. 3 1986 13. 2 1987. 12.0 1987 14.0 1988 12.7 1988 14.8 1989 13.4 1989 15. 6 1990 14.1 1990 16. 5 1991 14.9 1991 17. 4

The OH Economy is treated as two (2) dispatchable transactions. The characteristics of these units are as follows: OHECON1 OHECON2 Mid-Year Mi d- Year Max Cap.-MW Fuel Cost Max Cap.-MW Fuel Cost Avail Avail Summer Winter $ /MBTU Years Summer Winter. $ /MBTU 1000 700 100 2.73 1986 500 800 100 2. 94 1000 900 100 2.66 87 900 800 100 3.11 1000 900 100 2.81 88 900 800 100 3.28 1000 900 100 2.97 89 900 800 100 3.47 1000 900 100 3.14 90 900 800 100 3.66 1000 1000 100 3.31 91 900 900 100 3.87 Note: Each unit is considered as having a 9000 BTU/KWH flat heatrate. After the hourly dispatch is determined, treating OH as a unit, the model does the external accounting for OH.

L~~. r t'-'e e P P

                                                                                                                                      ~

NRC INTERROGATORY Ott NINE MILK POIIIT NUCLEAR UNIT NO ~ 2 . ENERGY MANAGEMENT ASSOCIATESt INC PAGE 124 ITEM t<O ~ E 320 F 1 (0) REPT 9 OPTION 1 SUBREPORT I 05/13/83

                                <<aoaaooooaGENFRATING              UNITS CHARACTEPISTICS a<<a<<a<<oooo aooaa  OH  FIRM       G   aooao                        CAPACITY        RELll 8 ILITY    >>IIEAf RATE          rrrrrrrrre rr>>FUEL>>rrrrrrrrrrrrr rrr rrr>>CPS'frrrrrrrr>>

M le BTV/KIIH TYPE MIN% TGT%  %/YH COMPAtIY 5 PRE JAee 1 1985 MIN 400 FoR M o ~ 0 IvR FAC 0 ~ 0 HANDLING Qeo 6en COI'AN 1965 I ' STPT>>UP 100 ' LEASING 0~0 AREA VIIIT TYPE RESERVE I'AT S . RET JA I OEC 1 1 1 1995 2020 MAX EHERG CAP 1 4QQ 4QQ 0 FOR I"OH AVL 1 0 0 0 ~ 0 0 AHR 1 ACCTG IHR I 0 0 0 SUPP FUEL 1

                                                                                                                        ~ ~ ~ ~ ~ ~ ~ ~
                                                                                                                        ~ ~ ~ ~ ~ ~ ~ ~
                                                                                                                        ~ ~ ~ ~ ~ ~ ~ ~     ~ ~ ~ ~

0' 0' 0 0100 0

                                                                                                                                                        ~     ~

VAR 0eH 21 ~ 5 FIXED OeM799027 0 6~0 6~0 100.0 4 M JAI, 1 2020 CAP 2 400 AVL 2100 ~ 0 IHR 2 0 FUEL 2 ~ ~ ~ ~ ~ e ~ ~ ~ ~ ~ 0' 0' SALE ADO 0 0~0 CAl 3 0 AVL 3 0 ~ 0 IHR 3 0 FUEL 3 ~ ~ ~ ~ ~ e ~ e ~ ~ ~ ~ 0 ~ 0 0 ~ 0 MA INT 0 PRIORITY CYCLE CAF' 0 AVL 4 0 ' IHR 4 FUEL 4 ~ ~ ~ e ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0 ~ 0 OVERHAUI. 0 PENALTY an POSIT IOIt CAP 5 0 AVL 5 an IMP 5 0 HEAT HATE FACTOR 1.00 SPN MNT 0 MATURING 0 ~ 0 F REOIIEI'IC Y CAP 6 0 AVL 6 0' II;R 6 STFT>>UP 0 fvtITU MUST RU I DEVIATION CAP 7 0 AVL 7 0~0 IHR 7 0 84t>II IItG 0 MBTIj/Iv PRE CVMM GEN 0~0 MAX SCHO E Rkfh.O 400 MIN DOIvN TIME 0 I'D' 7 e TRANS ~ LOSS  % 0 ~ 0 I MULTIPLE OWNERSHIP r COt'P ANY COMPAtv Y COMPANY % C04'.PANY  %>> COMPAfiY COMPANY 5 100e0 0 0 ' 0 Qeo 0 0.0 0 0 ' 0 0 ' 0 0 ' 0 0~0 0 0~0 0 0 ' oooo<< OHECON1 ] <<aoaa CAPACITY RELIABILITY >>HEA'f RATE rrr>>rrrrrrrr>>FUEL>>rrrrrrrrrrrrr COST reit BTU/gwH TYPE <<IN% TOT%  %/YH COMPANY 1 PRE JAN 1 1985 MIN 700 FOR M 0~0 HR FAC I ~ 00 HANDLING Qeo 6e0 AREA 1 COI'- JAN I 1985 HAX 70n FOR I 0 ' AHR 1 9000 STRT UP OH FUEI. 100 ~ 0 I.EASING 0 0~0 UNIT TYPE C M4T JA!v 1985 EMERG 700 MOR 0' ACCTG SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0 ' VAR OvM 0 ' 6 RESERVE N RET JAN 1 2010 CAP 1 700 AVL 1 0 ' IHR 1 9000 FUEL 1 OH FUEL UNLM 0 ~ 0100 ~ 0 FIXED 0+M 0 6 ' 100 ' 4 M JAI4 1 1984 C4P Z 700 AVL 2100 0~ IMR 2 9000 FVFL 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ' an SALE AOD 0 0 ~ 0 CAP 3 0 AVL 3 0' IHR 3 0 FUEL 3 e ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0~0 MAINT 0 PRIORITY 0 CYCLE CAP 4 n AVL 4 0 ~ 0 IHR 4 FUEL 4 ~ ~ ~ ~ ~ e ~ ~ ~ ~ ~ ~ 0~0 0~0 OVERHAUL 0 PKN4LTY le00 POSITIOtv CAP 5 0 AVL 5 0 ~ 0 IHR 5 0 HEAT RATE FACTOR I ~ 00 SPN MNT 0 MATURING 0 ~ o FREOUEI'CY CAP e 8 AVL 6 Q,O ItR6 0 S'fRT UP 0 H8TU PRE>>COMM GFN Qe0 MUST RUN E DEV14T 10tt CAP 7 AVL 7 CD 0 IMR 7 0 BANKING 0 MBTU/H MAX SCHD E RATED 7QQ MIN DOWN TIME 0 I~0~ ¹ 8 TRANS'OSS  % Qen

NRC INTERROGATORY ON NINE MILE POINT NUCLEAR UNIT NO ~ 2 ENERGY MANAGEMENT ASSOCIATES) INC PAGE ITEM rip ~ E 3ZQ ~ 1 (Ol REPT 9 OPTION 1 SUHREPORT I 12'5/13/83 aaaaaaaaaaGENERATItvO UNITS CHARACTERISTICS aaaa>>aaaa aaaaa OMFCON2 aaaaa CAPACITY RELIABILITY HEAT RATE a<<<<aa FUELa<<aaaaa<<a aa a<<<<<<aCPS Taa<<aaa<<aa, MV BTU/K~M TYPE MIN% TGT%  %/YR COMr ANY 1 PRE ~>AY 1985 HIN 800 FOR M 0~0 HR FAC I ~ 00 MANDLI NO 0~0 e.o AREA 1 COM <<AY 1 1985 MAX 8QO FOP I 0 ~ 0 AHR 1 900Q STRT UP PH FUEL 1 00 ~ o LEASING 0 0 ' UNIT TYPE C MAT MAY 1985 EMERG 800 MOR 0~0 ACCTG 0 SUPP ~ ~ ~ ~ ~ ~ ~ ~ 0~0 0~0 VAR O+M 0~0 6 ' RESERVE RET JA> 1 2100 CAP 1 800 AVL 1 0~0 IHR ] 9000 FUEL I OH FUEL UNLH 0 0100 ' FIXED 04M 0 e.o 100 ' MAY 1 1984 CAP 2 800 AVL 2100 ~ 0 IHR 2 9000 Z ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ' 0~0 SALE ADO MAINT 0 0~0 CAP 3 0 AVL 3 0~0 IHR 3 FUEL 3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 0~0 0 PRIORI TY 0 CYCLE CAP 4 0 AVL 4 0 ' IHR 4 0 FUEL 4 ~ ~ ~ ~ e ~ ~ ~ ~ ~ ~ ~ 0',0 Q.O OVERHAUL 0 PENALTY 1.00 PPSI t IPM CAP 5 r AVL 5 0~0 IRR 5 0 MEAT RATE FACTOR Ieoo SPN MNT 0 HATURING 0 ~ o FREOUENCY CAP e 0 AVL 6 Q.e I~R e 0 S'TRT<<UP Q MGTU MUST RUN E CEV I AT IPN CAP 7 0 AVL 7 0~v IHR 7 0 94r.KING 0 MBTU/H PRE COMM GEN 0~0 HAX SCMU E RATED 800 MIN DOWN TIME 0 I~O ~ 4 9 TRANS'OSS 0 ~ 1

HOURLY SCHEDULES FOR FIXED ENERGY TRANSACTIONS The following pages illustrate the hourly schedule for fixed energy external transactions. The hour is listed first followed by the hourly transaction energy (capacity). The energy level for the transaction stays the same for all succeeding hours until a change is indicated. Hence, for 1987 for the Hg ECONP schedule in January, from hour 1 to 8 the energy per hour is 380 MW, from hour 9 to 22 it is 1700 MW and from hour 23 to 33 it is 380 MW, and so on. The attached chart indicates how the hours of the typical week are defined in sequence from 1 to 168. Monthly maximum capacity, energy and cost are also illustrated in this section. When hourly schedules do not change from year to year, they are not repeated.

SEQUENTIAL HOUR DEFINITION PROMOD III TYPICAL WEEK Hour Ending Monday Tuesday Wednesday Thursday Friday Saturday Sunday 1 a.m. 25 49 73 97 121 145 2 a.m. 26 50 74 98 122 146 3 asm ~ 27 51 75 99 123 147 4 a.m. 28 52 76 100 124 148 5 a.m. 29 53 77 101 125 149 6 a.m. 30 54 78 102 126 150 7am, 31 55 79 103 127 151 8 a.m. 8 32 56 80 104 128 152 9 a.m. 9 33 57 81 105 129 153 10 a.m. 10 34 58 82 106 130 154 11 a.m. 11 35 59 83 107 131 155 ~12 noon 12 36 60 84 . 108 132 156 1 porno 13 37 61 85 109 133 157 2 porn, 14 38 62 86 110 134 158 3 p.m ~ 15 39 63 87 111 135 159 4 p.m. 16 40 64 88 112 136 160 5 porno 17 41 65 89 113 137 161 6 p.m. 18 42 66 90 114 138 162 7 p m. 19 43 67 91 115 139 163 8 p.m. 20 44 68 92 116 140 164 9 porno 21 45 69 93 117 141 165 10 p.m. 22 46 70- 94 118 142 166 11 p.m. 23 47 71 95 119 143 167 12 midnight 24 48 72 96 120 144 168

4 ANNUAL ENERGY

SUMMARY

FOR FIXED ENERGY TRANSACTIONS HQ FRMCE + HQ OH Hg FRNRG ECONP Cedars Firm

           - ---------------(GWH)-

1986 3000 3586 1687 3206 1987 3000 2682 1656 0 1988 3000 2769 1627 0 1989 3000 2702 1584 0 1990 3000 2659 1549 0 1991 3000 2643 1515 0

NRC INTERROGATORY ON NINE MILE POINT NUCLEAR UNIT NO ~ 2 ENERGY MANAGEMENT ASSOCIATESr INC PAGE 384 ITEM NO ~ E 324 ~ 1 (D) REPT 9 OPTIOH 3 SUBREPORT 1 05/13/83

                                    +ee~+0+++4 TRANSACTIONS INPUT SUHMARY FOR 1986 ++~+~+oo4 HQ FReICE               pURc~as       E   PEAg SHAVING        PREFERRED  SUBPERIOOI HONE,                ESCaLATION RATKSI CAPACITY COST       0 ~ 0 %/YR COMPANY           2                   NO SPINNING RESERVE CREDIT                                     ENKROY COST       0 ~ 0 AREAI           1                     FORCEO OUTAGE RATEI     0~%

APR HR 1 CAP ~ 275 275 '5 tIR Cap ~ 145 780e 789 ~ HR 23 Cap, 275 275 ~

                                                 '19 33 129 CAP ~

784 78'43 HR 47 CAP ~ 27> ~ 275 '53 HR 5T CAP ~ 789 78'67 HR 71 CAP ~ 275

                                                                                                    '75 HR 81 0

78'AX CAP 0

                                                                                                                  ~
                                                                                                                  ~

CAP ENERGY

                                                                                                                               ~      78'W 410 ~ 1098'WH 1542 0
                                                                                                                                                          '0$ /MW
                                                                                                                                                          ' S/MWH HR    CAP ~           HR  CAP ~

78'7 CAP ~ HR CAP ~ HR 78'1 CAP ~ HR HR CAP ~

              'R CAP ~                                        HR
                                                                                                    'AP 1542 '0$ /MW
                                                                                                    ~

Bl 78' 784 'W MAY 1 275

              '5 9

780 78'05 23 275 275 '19 33 129 78'43 275 '53 27> ~ 57 78'67 275

                                                                                                    '75 0~                423 '70OWH           0  ~ 0  S/HWH 78'7         27'7         78'1 27'R Cap                                                          CAP ~               HR              HR  CAP ~
                                                 'R CAP ~               CAP ~       CAP ~   HR                CAP ~
                                'R HR                     HR
                                                                                                                                                          '0$ /HW
                                                                                                    'AP
               ~                                                                                    ~

78'W 1542 JUN 1 275 275e '5 789

                                '05 23  275 275 ~
                                                 '19 33 129 78'43        275 '53      78'67      275
                                                                                                    '75 81 0

78Q 0~

                                                                                                                  ~    HAX CAP ~

ENERGY 410 ~ 100GWH 0 ' $ /HWH 78'AX 78'R HR CAP ~ CAP ~ HR CAP ~ HR CAPe HR CAP ~ HR CAP ~ HR 'AP

                                                                                                    ~     HR  CAP ~

Bl 780 ~ MW 1542 ~ 5QS/HW JUL 1 275 275 '5 9 78'05 23 275 275 '19 31 129 789 '43 '53 780 ~ 47 27> ~ 275 57 780 780

                                                                                       ~
                                                                                       ~

71 167 275

                                                                                                    'T5
                                                                                                    ~      0    0~

CAP ~ EHEROY 423 '70GWH 0 ' S/HWH 78'R 78'1 78'AX 78'P. HR CAP ~ HR CAP ~

                                                 'R CAP ~           CAP ~               CAP ~    HR CAP ~   HR   CAP ~  HR    CAP ~
               'R 3j                                                                                            1542.50$ /Hw AUO    I  275 275   '5 9

780 78'05 23 275 275 e 129 780e 780e 47 143 275 '53 ZTP ~ 57 78'67 27'75 81 0 0~ CAP ~ ENERGY 780 AM'W 423.770GWH 4 ~ 0 S/HWH

                                                                                                                  'AX
                                                 '19 CAP ~
               'R CAP ~
                                'R HR  CAP ~    HR CAP ~   HR   CAP ~  HR    CAP ~  HR              HR  CAP ~ ~
                                                                                                                                                          '0$ /H'M
                                                                                                    'AP
                                                                                                    ~

1542 78'43 276.'53 SEP 1 275 9 780e 23 275 33 780. 47 ST TBQ, 71 275e 81 784 CAP ~ 780eMW 275 '5 145 275 '19 129 275 780 ~ 167 275 0 0~ ENERGY 410 ~ 100OWH 0 ~ 4 $ /HWH 78'1 78'AX 78'R CAP ~

               'R CAP ~
                                                 'R CAP ~    HR CAP ~   HR   CAP ~  HR    CAP ~  HR              HR  CAP~
                                                                                                                                                          '0$ /Hw
                                                                                                    'AP
                                                                                                    ~

275 9 TBQ ~ 23 275 33 TBQ ~ 47 ZTP ~ 57 275e 81 CAP ~ 78'W 1542 OCT 1 275e '5 105 275 ~

                                                 '19 129 780 ~  143   ZT5 ~ 153    78'67      275e         0    0~     ENERGY     423.770GWH            0 ~ 0 S/HWH

NRC INTERROGATORY ON NINK HILK POINT NUCLEAR UNIT NO ~ 2 ENERGY MANAGEMENT ASSOCIATESy INC pAGK 38$ ITEM NO ~ E 320 ~ 1 IU) REPT 9 OPTION 3 SUGREPORT 1 05/13/83

                            <<aaa>>aa<<        TPANSACTIONS INPUT 

SUMMARY

FOR ]986 aaoaaaaoaa

                                                                                      'l HO FRMRG             PURCHASE PEA H SHAVING               PREFERRED   SUBPERIOOI NONE                  ESCALATION RATESI CAPACITY COST       0 ~ 0 5/YR COMPANY 7                            NO  SPINN]NG RESERVE CREDIT                                      ENERGY COST       0 '

APR Ha

      ]

CAPe 7~ HR 9 AREAI 20 '3 CAP ~

                          '19
                              ]4 HR   CAP ~

7 ~ HR 33 CAP ~ 20 '7 fORCED OUTAGE RATKI 0 HR CAP ~ 7

                                                                    'f ~

HR 57 20

                                                                                 ,CAP ~  HR   CAPe 7 ~

HR 8] CAP ~ 2Q ~ MAX CAP ~ 20 'W 1542 ~ 505/MW HAY 95 HR 1 7~* CAP ~

         '7 ~

105 HR 9 20 20 '3 CAP ~

                          ']9 HR 7~

CAP. 7~ 129 HR 33 20 CAP ~ 20

                                                         ~
                                                         ~
                                                         '43 143 HR 47 CAP ~

7~

                                                                       ~  153 HR 57 20 ~

CAP ~ 20 ~ 167 HR 71 7~ CAP ~ 7~ 0 HP 81 0 20

                                                                                                                ~

CAP ~ ENERGY HAX CAP ~ 10 ~ 500GWH 20eHW 0 ' 5/MWH 1542 ~ 505/MW JUN 95 HR 1 7~ CAPe Te 105 MP 20 20 '3 CAP ~ HR 7~ CAP ~ 7e 129 HR 33

                                                  'AP 20 20
                                                         ~
                                                         ~

HR 47 7~ CAP ~ 7 ~ 153 HR 57

                                                                         '53 20e CAP ~

20 ~ 167 HR 71 7~ CAP ~ 7~ HP 81 0 CApe 20

                                                                                                                ~

ENERGY MAX CAP. 10 ~ 850GWH 20 'W 0 5/HWH 1542 ~ 505/HW 95 7~ 105 20e

                          '3   119      7~    ]29    20  e   143     7 ~
                                                                                      '1 20 ~ 167     7 ~           0~     ENERGY       10 '00GWH          0      5/HWH
                                                                                      ']

HR CAP ~ HR CAP ~ ?IR CAP ~ HR CAPe HR CAP ~ HR CAP ~ HR CAP ~ HR CAP ~

                                                                                                                '                      20 'W      1542 ~ S0$ /MW JUL    1   7~           20              ~7 ~    33    20e      47,    7 ~   57      20
                                                                                      '67       7 ~     81   20      HAX CAP ~

AUG 95

    ?IR
      ]

T~ CAP ~ 7~ 105 HR 9 '3 20 ~ CAP ~ 20 119 MR 7~ CAP ~ 7~ 129 HR 33 ZO ~ CAP ~ 20 '7

                                                         '43 143 MR 7

CAP ~ 7~

                                                                       ~  153 HR 57 20 CAP ~

20

                                                                                      '67 HR 7~

CAP ~ 7 ~ HR 81 0~ CAP ~ 20 ~ ENERGY HAX CAP ~ 10 ~ 850GWH 20 'W 0 5/MWH 1542 ~ 505/MW SEP 95 HR I 7~ CAP ~ 7~ 105

               ?IR 9
                      .ZOi CAP ~

ZOe

                          'i9 li9
                              '3 HR 7~

CAP ~ Te 129 HR 20 CAPe 20 '7 HR fe CAP ~ 7~ 153 HR 57 20

                                                                                      '1 CAP ~

20

                                                                                      '67 7~

CAP ~ 7 ~ ~ 0 HR 81 0 20

                                                                                                                ~

CAP ~

                                                                                                                  ~

ENERGY HAX CAP ~ 10 ~ 850GWH 20eHW 0 5/HWH 1542 ~ 505/HW OCT 95 HR 95

      ]

7~ CAP ~ 7 7~

            ~

105 HR 105 9 20 20 '3 CAP ~ 20 ~ HR

                               ]19 7~

CAPe 7~ 7~ 129 HP 33 1Z9 20e CAP ~ 20 20

                                                         '7
                                                         '43 143 HR fe CAP ~

7~ 7~ 153 HR 57 153 20 CAPe 20 20

                                                                                      '1
                                                                                      '67 HR 7~

CAP ~ 7~ 7~ HR 81 0~ CAP~ 20 0

                                                                                                                ~

ENERGY HAX CAP ~ ENERGY 10 ~ SOQGWH 20eHW 10 ~ 850GWH 0 0 ' 5/HWH 1542 ~ 505/MW 5/HWH

NRC INTKRROOATORY ON NINE MILE POINT NUCLEAR UNIT NO ~ 2 ENERGY HANAOEHENT ASSOCIATESe INC pAGK ITEH Noe E 320 ~ 1 tO) REPT 9 OPTION 3 SUBRKPORT I 38'5/13/S3

                                       +o~oooo~+o TRANSACTIONS INPUT                   

SUMMARY

fOR ]986 o4Do+ooo4 HQ ECONP PURCHAS E PEAK SHA VINO PR EO SUB NONE ESCALATION RATESI CAPACITY COST 0~0 5/YR COMPANY 0 NO SPIN NING R ESERVE CREOIT ENERGY COST 0 ~ 0 AREAl ]4 FO RCED OUTAGE RATEI A % HR CAP ~ HR CAP ~ HR CAP ~ HR CAP ~ HR CAP ~ HR CAP ~ HR CAP ~ CAP ~ 380 9 1700 23 360 33 ]T00 ~ 47 380 sr lroo. 7] 380 81 1700e MAX CAP ~ 1700 ~ MW F 0 5/MW 380 '5 105 1700

                               ~
                               ~                 380  '19
                                                      ~        129 1700 ~      143        'ERIODt
                                                                                          '80 153 1700    ~    167       '80 0    0 ~    ENERGY     855 ~ 600OWH             0 '   5/M'WH CAP.
              'R HR    CAP ~            HR    CAP ~          HR  CAP ~       HR        'AP
                                                                                          ~         HR    CAP ~     HR        'APe HR  CAP ~

FEB 360. 9 1700 23 380 33 1700 4r 380 57 1700 71 380 81 1700 ' HAX CAP ~ 1700 ~ HW 0' 5/HW 95 360 ]05 1700

                               ~
                               ~                 360  '19
                                                       ~       129 1700  'FERR
                                                                         ~
                                                                         ~     ]43        '80 153 1700
                                                                                                              ~
                                                                                                              ~    167       '80 0      ~    ENERGY     772 ~ 800GWH             0 5/MWH CAP ~
              'R HR    CAP ~            HR    CAP ~          HR  CAP ~       HR        'AP
                                                                                          ~         HR    CAP ~     HR       'AP
                                                                                                                             ~         HR  CAP ~

HAR ] 360 9 2200 23 360 33 2200 47 380 57 2200 71 380 81 2200 ' HAX CAP ~ 2200eH'W 0 ~ 0 5/HW 380 '5 2200 '05 380 '19

                                                       ~       129       '200 143        '80 2200  '53 167        '80 0      ~    ENERGY     o++oo+oOWH               0 '   5/MWH CAP ~
               'R CAP ~
                               'R HR    CAP.           HR       'AP HR        'AP
                                                                                          ~               CAP ~
                                                                                                              'P.

HR 'AP

                                                                                                                             ~         HR  CAP~

APR ] 98 ~ 9 1400 ~ 23 98 33 1400

                                                                         ~

4T 96 57 1400o 7] 98 81 1400 ~ HAX CAP ~ 1400 ~ O' 0 ' 5/M'W 95 98 105 1400 ~ 98 ~'19 129 1400

                                                                         ~
                                                                         ~     ]43        '8
                                                                                           ~      153 1400 ~       167        '8e 0    0 ~    ENERGY     617 '00GWH               0 '   5/MWH CAPe
               'R HR    CAP ~            hR    CAP ~          HR  CAP ~       HR   CAP ~          HR    CAP ~     HR  CAP ~          HR  CAP ~

HAY I 96e

               'AN 1400  ~           23      98           33 ]400 ~       47     98 ~         57 1400         71   98            81 1400 ~    MAX CAP ~      1400 ~ O'W         ~ 0 ~ 0 5/HW 95   -98       105 1400    ~                   98 ~'19;.

129 1400 ~ 143 - 98 153 1400 ~

                                                                                                               ~

167 i

                                                                                                                              '8 0    0 ~    ENERGY     63T ~ 980GWH             0 '   5/HWH CAP ~
               'R HR    CAP ~            HR    CAP ~          HR  CAP ~       HR        'APe HR    CAP ~     HR  CAP ~          HR  CApe JUN 4UL   1 98 98 CAP ~

98

               '5
               'R 9 1400 ~

105 ]400 9 CAP ~

                         ]400e
                               'R 23 I]9 HR 23 98 ~
                                                 "98e CAP ~

98 ~ 33 1400 129 HR CAP ~ 33 1400

                                                                         '400e
                                                                         ~

4r ..98 ~ 143 HR 98

                                                                                          'AP
                                                                                          ~

96 ~ 57 1400 153 1400 HR CAP ~ 57 1400 ~

                                                                                                               ~
                                                                                                               ~

71 167 HR 71 98 98

                                                                                                                             'R
                                                                                                                             '98
                                                                                                                             'AP
                                                                                                                              ~

61 1400 0 HR 0 CAP~ 81 1400

                                                                                                                                               ~
                                                                                                                                               ~
                                                                                                                                               ~

MAX CAP ~ KNKROY HAX CAPe 1400 6]7.400GwH

                                                                                                                                                                         ~ Mw 1400 ~ MW
                                                                                                                                                                                    - ~ 0 ~ 0 5/HW 0

0'

                                                                                                                                                                                          '   5/HWH 5/MW 96   '5 105 1400e              ))9      98          129 1400  ~     ]43     98         153 1400    ~    ]67   98 ~           0    0 ~    ENERGY     63T ~ 980GWH             0 ~ 0 5/HWH CAP ~
               'R HR    CAP ~                  CAP ~
                                                      'R HR  CAP ~       HR        'AP
                                                                                          ~         HR    CAP ~     HR  CAP ~          HR  CAP ~

AUG 96 9 1400 23 98 ~ 33 1400 47 98 ~ 57 1400 71 98 81 1400 ~ MAX CAP ~ 1400oMW 0 ' 5/HW 96 '5 105 1400

                               ~

119 98 ~ 129 1400

                                                                         ~
                                                                         ~     143     98         153 1400
                                                                                                              ~
                                                                                                              ~    16T
                                                                                                                              '8 0    0 ~    ENERGY     637 '80OWH               0 '   5/HWH CAP ~
               'R CAP ~
                               'R RR    CAP ~          HR  CAP ~       HR        'AP
                                                                                          ~         HR    CAPe      HR       ~.
                                                                                                                             'AP HR  CAP ~

SEP ] 96 1400 ~ 23 96 ~ 33 1400 ~ 4r 98 ~ 57 1400 ~ rl 98 Bl 1400 ~ MAX CAP ~ 1400 ~ MW 617.40OOWH 0 ~ 0 5/HW

                                                                                                                                                                                          '   5/MWH 96 ~ '5
                   ]05   1400  ~          119      98          129 1400  ~     ]43     98 ~       153 1400         167       '8 0    0 ~    ENERGY                              0 CAPo       HR    CAPe                   CAP ~
                                                      'R HR  CAP ~       HR   CAP ~                CAP ~
                                                                                                              'R HR                 HR  CAP ~

HR

                                                                                                                             'AP
                                                                                                                             ~

OCT 96 9 1400 ~ 23 98 33 1400 47 96 ~ 57 1400 71 98 81 1400 ~ MAX CAP~ 1400 AM'W 0 5/MW 9'R

               '5 105 1400   ~                    98 ~
                                                      '19
                                                               ]29 1400
                                                                        ~
                                                                         ~     143     98         153 1400
                                                                                                              ~
                                                                                                              ~    167       '8 0    0~     ENERGY     637  '980GWH             0 '   5/HWH CAPo       HR    CAPe             HR    CAP ~          HR  CAP ~       HR        'AP HR    CAP ~     HR       'AP
                                                                                                                             ~         HR  CAP ~

0'

                                                                                          ~

NOV 360 2200 23 380 33 2200 47 380 57 2200 71 380 81 2200 ' HAX CAPe 2200 oo4oaooGWH

                                                                                                                                                                         'W 0'

5/MW

                                                                                                                                                                                              $ /HWH 380   '5 2200 '05 380  ']9 129      '200 143        '80 2200 '53 167      '80 0      ~    KNEROY CAP ~
              'R CAP ~
                              'R CAP ~
                                                      'R HR      'AP
                                                                         ~      HR        'AP
                                                                                          ~               CAPe
                                                                                                              'R HR       'AP
                                                                                                                             ~         HR  CAP~

OEC ] 380 9 1700 ~ 23 380 33 1700 47 380 57 1700 ~ 71 380o 81 1700 ~ HAX CAP ~ 1700 ~ HW 0 ~ 0 5/MW 360 '5 105 1700 380 '19

                                                      ~        129 1700
                                                                        ~
                                                                               ]43        '80 153 1700    ~    167  380             0    0 ~    ENERGY     855 ~ 600OWH             0 '   5/HWH INTERCHANGE..ACC.                t
                              'UNTING.

PRICING OPTION I 8 COMP OWNERSHIP .COHP OWNERSHIP COHP OWNERSHIP CORP OWNERSHIP COMP OWNERSHIP OISPLACEMENT COST t 50 F 0 FIXED COST INCPEASE t ~)) ~ 6 5/HWH SAVINGS FIXEO SPLIT t ]00 ~ 0  % PRIORITY OROER t 2 REPORTINO OPTION I ACCOUNTINO OPTION t I

v rr v =a w 'otv 6">>v <<r ~ea 't" ( NRC INTERROGATORY OH NINE=-HILK-..POINT HUCLEAR UNIT-'-NO ~ 2 .ENERGY HANAGEMENT ASSOCIATKSI, INC PAOK,'..-.:388=. -.: ..;. ITEM HO ~ E. 320 ~ 1 (0} REPT 9 OPTION 3 SUBRKPORT 1 05/L3/83.

                                                ~+4t~++~++ TRANSACTIONS INPUT                           SUMHARY FOR        1986 400000D01%

I CEOARS PURCoIAS CHEOULED pRFFERRED SUBPERIOOI NONE ESCALATION RATKSI CAPACITY COST 0 ~ 0 %/YR COMPANY 5 RESERVE CREOITED ENERGY COST 0 ' AREAI 14 FORCED OUTAGE RATEI 0~ HR CAP ~ HR CAPe MR CAPo HR CAP ~ HR CAP ~ HR CAP ~ HR CAP ~ HR CAP ~ JAN 1 21Z ~ 9 162 ~ 23 212 33 162 ~ 47 212 ~ 57 -162 ~ 71 212 ~ 81. 162e MAX CAP ~ 212oMW 0 ' $ /MW 95 21Z ~ 105 1'6R ~ 119 '12o 0 0~ 0 . 0~ 0 0~ 0 0 ~ 0 0~ ENERGY 14'280WH 21 ~ 92$ /HWH HR CAPe HR CAPe HR CAP ~ HR CAP ~ HR CAP ~ HR CAP ~ HR CAP ~ HR CAP ~ FEB ZLZ ~ - 9 162 ~ 23 R12 ~ 33 162 ~ 47 212 ~ 57 162 212 ~ Bl .162 ~ MAX CAP ~ . 212eHW 0 ' $ /MW

                                                                                                                             ~
                                                                                                                                                                                                           '3$ /MWH HAR 95 HR 95 1

212 ~ CAP ~ 212 ~ 21R ~ 105 HR 105 9 162 ~ CAP ~ 162 162

                                              ~
                                              ~

119 HR 23 119 212 ~ CAP ~ 212 ~ 212 ~ 0 HR 33 0 162 0 CAP ~ Oo

                                                                                    '7 '7
                                                                                    ~       0 HR 0

CAPe 212 Oe Oo HR 0 0 162 0~ CAP ~ 0

                                                                                                                             ~
                                                                                                                             ~

0 HR Tl 0 0~ CAIs ~ RLZ ~ 0 ~ 0 HR 81 0 Oe CAP ~ 162 ~ 0~ ENERGY MAX CAP ~ ENERGY 128 '640WH 212 ~ HW 142 '28GWH 22 0' 22 '4$ /MWH S/MW APR HR 1 CAP ~ 212 ' HR 9 CAP ~ 162 162

                                            'HS        HR 23 119 CApo Z12 ~

HR 33 CAP ~ 162, HR 47 0 CAP ~ 212, 0~ HR ST CAP ~ 162 ' HR 71 CAP ~ 212 ' HR . Bl 0 CAP ~ 162 ~ MAX CAP. ENERGY gLZoMW 137e6400WH-F 0 SIHW 22o25$ /HWH-105 0 0 0

                                             '5 ZLZZ                                         21'AP 0      ~                              0         ~                 ~                  ~

CAP ~ HR CAP ~

                                             'R HR             ~     HR CAPe        HR       CAP ~        HR     CAP ~       HR    CAP ~    HR       CApo HAY               21,1 ~        ='9 173              -:23. 211 ~         33 L73i        47     '211o'-        57     173 ~      'Tl Rile        81 - 173            HAX.=CAPe        ZfleHW           0~0 1                                   ~
                                                                                                   -'0                                                                                                     '8$ /HWH ..
                                                                                                                                                                                                              -S/HW'0
      .95       '211  ~
                        . 105          L73i- 119 -R1 1 ~                     0    0~    -   0               ~
                                                                                                              -    0-    - Oe    -  -0      -0 ~                0~
                                                                                                                                                                  '0 ENERGY     145 '04GWH
      'HR        CAP~          HR     'CAPs            HR     CAPo          HR CAPe        HR       CAPe         HR     CAP ~       HR    CAPo              CApe 57 . '173 e                            .                               Rll eMW          0'           S/HW JUN     -  l. Rile        .   =: 9-',173.e              23     211           33 173 ~      -47       21    1~-                       71    211  ~   81 0'

173 ~ MAX CAP ~ 20 '9$ /HWH'- Zl 1 ~ 105'73 CAP ~

                                              ~
                                                 '5 119
                                                      -HR     CAP i
                                                                      'LL 0    0 CAP ~
                                                                                    ~       'tI HR CAP ~
                                                                                                         '0 ~

HR 0 ' CAP ~

                                                                                                                             ~       0 HR
                                                                                                                                           . 0 CAP ~
                                                                                                                                               ~

HR" CAP ~

                                                                                                                                                                  ~    KNEROY     140 '200WH HR        CAP ~         HR 0'
                                                                      ~

JUL 1 211 ' 9 173 23 Rile 33 173 ~ 4T 211 ~ - 5T 173 ~ Tl 211 ~ 81 173 ~ MAX CAP ~ 211 eMW 22 '8$ /HWH S/MW ZLL ~ 105 173 Lii *RID 0~

                                                                                    '7 '7   0             be'-.   '0       0         0       0      0          0~      ENERGY     145,2040WH
                                            '5 0                     .                         ~                 ~

CAP~ HR CAPi 'R HR CAPe HR CAP ~ HR, CAP ~ HR CAP ~ HR CAP ~ HR CAPe AUO 1 211 ~ 9 173 ~ ?3 211 ~ 33 173 211 L73 ~ Tl 211 ~ 81 173 ~ MAX CAP ~ 211, HW 0 0 $ /HW

                                                                                    'T, '7 95        211         105 173 ~               119      Rll ~          0    0~        0   ...0            .0 :     0         0       0~     0     -    0~      ENERGY     145 '040WH           RO ~ 80$ /MWH HR        CAP ~
                      ~  .

HR--CAP i HR. CAPo HR CAP ~ HR: CAPa.

                                                                                                            ~

HR . CAP ~

                                                                                                                             ~
                                                                                                                               . HR    CAP ~

HR CApe SEP 1 211 ~ 9 173e R3 211 ~ 33 173 211 173 ' 71 211 BL 173 HAX CAPe 211 ~ HW 0

                                                                                                                                                                                                           '0$ /MWH S/HW OCT 95 HR 95 1

211 CAP ~ 211 211 s

                      ~
                      ~

105 173 ~ HR 105 9 CAP ~ 173e 1T3 ~ 119 t1R 23 119 Rile CAPe Rll Zll

                                                                     ~
                                                                     ~

0 HR 33 0 CAP ~ 173 0

                                                                                    '7
                                                                                    ~
                                                                                    ~

5 HR 0 CAPe Zll' 0 0~

                                                                                                            ~

HR 57 0 0 0 CAP ~ 173 ~ 0~

                                                                                                                             ~       0 HR Tl 0

CAP ~ 2LL ~ 0

                                                                                                                                               ~
                                                                                                                                               ~

HR 81 0 0 CAP ~ 173 ~ 0~

                                                                                                                                                                  ~    ENERGY MAX CAP ~

ENERGY 140 '20GWH 211 ~ HW 145 '04GWH 20 Oeb S/MW 21 ~ 00$ /MWH NOV HR 1 CAP ~ 209 ' HR CAP ~ 157 IIR 23 CAPe 209 HR 33 15'7 CAP ~ HR CAPe R09 ~ HR 57 CAP ~ 157 ~ HR Tl CAP ~ 209 ' HR 81 CApe 157 ~ MAX CAP ~ " 209 'W 0 ' S/HW

                                                                                                                                                                                                           '4$ /HWH 209e
                      '9     105       157e          LL9                                    0             0~               0         0              0          0       ENERGY     134 '800WH           23
                                            '5
                                                                     '09 0    0~                               0         ~                 ~                  ~

OEC HR CAP~ 209 209 '05 HR CAP ~ 157 157 '5 MR 23 119 209

                                                                     'AP
                                                                     ~
                                                                    '09
                                                                     ~

HR 33 0 CAP ~ 157 0

                                                                                    '47-0
                                                                                    ~

HR CAPo 209i

                                                                                                     .'0    ~

HR 57 0 CAP ~ 157 '

                                                                                                                             ~

HR 71 0 CAP ~ R09 ~ 0 ~ HR Bl ~ CAP. 157 0

                                                                                                                                                                  ~

MAX Capo ENERGY 209oH'W 139 '760WH 0' 23 ~ 15$ /HWH

                                                                                                                                                                                                                      $ /MW

NRC INTERROGATCRY ON NINK MILE POINT NUCLEAR UNIT NO ~ 2 ENERGY MANAGEMENT ASSOCIATES'NC PAGE 449 ITEH NO ~ E 320 ~ 1 tO) REPT 9 OPTION 3 SUBREPORT 1 OS/13/83 4oo+o+o4o+ TRANSRCTIONS INPUT SUHMARY FOR 198T ooo44++oo> HQ FRHCE PEA~ SHAVING PREFERRED SUBPERIODl NONE RATES'APACITY COST 0 ~ 0 %/YR COMPANY 2 NO SPINNING RESERVE CREDIT ENERGY COST 0 ~ 0 APR HR 1 CAPe Z75

            'URCHAS
              ~

HR AREA! CAP, rsog 1 nR 23 CAP ~ 275 HR 33 780 '7 FORCED OUTAGE RATE) CAP ~ HR CAPe 27> ~ HR S7 0 ' CAP ~ 780 '1 HR 275

                                                                                                              'SCALATION CAP ~      HR 81 CAP ~

760 ' HAX CAP ~ 780 'W 1542 '0$ /MW 95 275 105 780 275 129

                                                                    '7 143   275. 153    Tso;
                                                                                                  '1 ler  275,             0        ENERGY    410 ~ 100GWH        0 ~ 0 S/HWH
                                                       '19
                                                       ~                                                       'so.
                                                                                                                             ~

27'7

                                   'R CAP ~            HR  CAP ~        HR          HR   CAP ~                    HR  CAP ~      HR  CAP ~
              'R CAP ~                                                   CAP ~                  HR    CAP ~

rso. 780 'W 1542 '0$ /M'W HAY 1 275 780 23 Z75. 33 780

                                                                    '43                      780
                                                                                                  '167 275        61             HAX CAP.

275 Tsoe 119 275 129

                                                                    '7       27S      153    780
                                                                                                  '1      275         0             ENERGY    423 ~ TTOGWH        0 ~ 0 $ /HWH
              '5
                                   '05
                                                       ~                          ~
                                                                                                               '80 0~

CAP~

              'R HR     CAP ~            MR  CAP ~        HR          HR   CAP ~     HR    CAP ~    HR  CAP ~'AP HR  CAP ~
                                                                    ~

sl Tso. 'W 1542 '0$ JUN 1 ZTS ~ 23 275 33 760

                                                                    '43      27> ~
                                                                                  '53  57    780
                                                                                                  '67     275                       HAX CAP ~     780                     /MW
                                                                    '7                            '1                                          41o. OoewH       0 ~ 0 f/MWH 780'05 95  275e              Tsoe                 275 ~       129  780          275             780          2751        0    0        ENERGY          1
                                                                                                  'l
                                                       '19
                                                                                                                             ~

HR CAP ~ MR CAP ~ ~R CAp HR CAP ~ HR CAP ~ HR CApy HR CAP ~ HR CAP ~ 780. 780 ~ HW 1542 '0$ /HW JUL 1 275e z3 275 33 780 27'PE

                                                                                  '53  57    780          275        81  780 ~      MAX CAP ~

95 275e 105 780 Z75 ~ 129

                                                                    '7 143   275             780     167  275         0    0        ENERGY    423 '70GWH          0 ~ 0 $ /MWH
                                                      '19                                                      '80
                                                                                                                             ~

HR CAP ~ CAP ~

                                  'R
                                           <R  CAPe         HR          HR   CAP ~     HR    CAP ~    HR  CAP ~'AP HR  CAP ~
                                                                    ~

Sl ' 780 'W 1542 '0$ /HW AUG I 275e 9 Tsoe 23 275 33 780 27> ~ 27'5357 780

                                                                                                  '67     275            780        HAX CAP ~

95 Z75 ~ 105 780 275 ~ 129

                                                                    '7 143                   780          2T5 ~            0~       ENERGY    423g770GWH          0     $ /HWH
                                                      '19
                                                                                                               'SO, HR  CAP ~             CAP ~
                                  'R HR  CAP~         HR  CAP ~   HR   CAP ~     HR    CAP ~    HR  CAPe       HR  CAP ~

27> ~ ' 780 ~ HW 1542s50$ /MW SEP 1 275 9 760 23 275 3.j 780

                                                                    '43           '53 Tsoi'67 57             71  275        81  780        HAX CAP ~

275 780 129

                                                                    '7       275             780
                                                                                                  '1      275                       ENERGY    410 ~ 100GWH        0 ~ 0 $ /HWH
             '5 0
                                 '05                 '19                                                      '80
                                 ~             275'R
                                                                                                                             ~

CAP ~ CAP ~ HR CAP ~ CAP ~

            'R CAP ~      HR     CAP ~                             HR          HR             HR    CAPo                    HR
                                                                                                                                                                    '0$ /MW
                                                                                                              'AP
                                                                                    ~
                                                                    ~
                                                                                                                                                       'W      1542 OCT   I  275 275
            '5 780 780    '
                                 '05 23  275 275 ~  '19 3q 129 780
                                                                    '43      ZTP 275  '53 '67 57    780 780 275 275 '80 81 0

780 0

                                                                                                                             ~
                                                                                                                             ~

HAX CAP ~ ENERGY 780 423iTTOGWH 0 ~ 0 S/MWH

                                                                                                                             'e ENERGY HANAGEHENT ASSOCIATESe    INC                        pAGE    450 NRC   INTERROGATORY. ON NINE HILE POINT NUCLEAR UNIT NO ~ 2 ITEN   NO ~  E 320 ~ 1  (Ol                                                  REPT     9 OPTION 3 SUBREPORT     1                         05/i3/83 ooaoaaaooo    TRANSACTIONS INPUT SUHHARY FOR 1987 oaaooaoaao
                                                                               'l PURCHASE PEA H SHAVING           PREFERRED  SUBPERIOD) NONE             ESCALATION RATESI CAPACITY COST         0 ' %/YR HO FRHRG COHPANY      7                   NO SPINNING RESERVE CREDIT                                 ENERGY COST         0 '

APR HP 1 CAPe 7 ~ HR AREA! 20 '3 CAP ~ 14 HR CAP ~ 7~ HR 3q 20 'T FORCED OUTAGE RATEt CAP ~

                                                       '43 HR  CAP ~

7~ HR 57 Qe% CAP ~ 20

                                                                               '67 HR  CAP ~

7~ HR Bl CAP. 20 ~ HAX CAP ~ 2Q ~ Hw 1542 F 505/HW

                                                       '7 105     20e     I i9    7~   129   20            7~   153  20           7~      0     0 ~   ENERGY       10 '00GWH           QeQ   5/HWH 95     Te
        .CAP ~     HR   CAP ~      HR CAP ~    HR  CAP ~    HR  CAP ~   HR CAP ~   HR  CAP ~    HR  CAP ~

HR 20 'W 1542 '05/HW HAY I 7~ 20e 23 7~ 33 20

                                                       '43        7     57  20
                                                                               '67Tl     7~     81   20  ~   HAX CAP ~
                            '3                         '7 119          129   20            7~   153  20           7~      0     0     ENERGY       10 '50GWH           0     5/HwH 95     7~    105     20 e            7~                                                              ~

HR CAP ~ HR CA~ ~ eR CAP ~ HR CAP ~ HR CAP ~ HR CAP ~ CAP~ HR CAP. 20 33 20 T~ ST 20e 71 Te 81 20e HAX CAP ~ ZQ ~ HW 1542 ~ S0$ /HW JUN 1 Te

                            '3                         '7 105    20e     ll9     7~   129   20     143    7~   153  20    16T    7e      0     0     ENERGY       10  '00GWH          Qe0 5/HWH
                                                                               'l'1
                                                                                                         ~

95 7~ CAP ~ HR CAP ~ HR CAP ~ HR CAP ~ HR CAP ~ HR CAP ~ HR CAP ~ HP. CAP ~ HR

                                                                                                         '                      20        1'542 '05/HW JUL    1     T~           20              7~    33   20
                                                       '43        7~    57  20e
                                                                               '67 71     7 ~   81    20     HAX CAP ~             ~ HW
                            '3                         '7
                                                                                                                              '50GWH                5/H'WH 95     7~     105    ZG ~    ll9     7~   129   20            Te   1S3  20           7e            0 ~   ENERGY       10                  0 CAP ~     HR   CAP ~      HR Car. HR  CAP ~    HR  CAP ~   HR CAP ~   HR  CAP ~    HR  CAP ~

HR

                                                                                                         '   >AX CAP ~          20 'W     1542  '05/MW AUG    I    7~            20              7~    33   20
                                                       '43        T~    57  20
                                                                               '67        7~    81    20
                                                       '7                                                                 10 '50G'WH 20            7~           0     ENERGY                           0     5/MWH 95     7~     105    20e     119     7~   129   20            7~   153                               ~

CAP ~ HR CAP ~ HR CAP ~ HR CAPe HR CAP ~ HR CAP ~ HR CAP ~ HR CAP, HR 20 'W 1542.50S/Hw SEP I 7 ~ ZQe 23 7~ 33 20

                                                       '43
                                                                  'T
                                                                     ~  57  20
                                                                               '67        7~    81    20 ~   HAX CAP ~
                            '3                                                                               ENERGY       10 ~ SQQGWH         0     $ /HHH 95     7~     105    20 ~    1 19    7~   129   20            7~   153  20            7~      0    Qe CAP ~      CAP ~   HR  CAP ~    HR  CApe.

HR CAP ~ HR CAP ~ HR CApe HR CAP ~ HR HR 20e 20 'H 1542 '05/HK OCT 95 1 7~ 7~ 105 20 20 ~ 119 7~ 7~ 33 129 20 '43 20 ~ 47 7~ 7~ 57 153 20 '67 20 ~ 71 7e Te 81 0 0 ~ HAX CAP ~ ENERGY 10 ~ BSQGHH 0 ' 5/HHH

%A

                                                                       <<l <<>> t>> <<jV'>>M<<>> VM<<>>>><<>>V                                                     ~ >>>>    ~>>o a>> h 't.- <<'<<o5 i        >>>>'Ij>>    ','      . . -~ C.

NRC INTERROGATORY ON NINE HILE POINT NUCLEAR UNIT NO ~ 2 ENERGY HANAGEtlENT ASSOCIATESI INC pAGK 45] ITEH NO ~ E 320ol IVI REPT 9 OPTION 3 SUBREPORT 1 05/13/83 0044404000 TRAtISACTIONS ltlPUT

SUMMARY

FOR 1987 0404400440 HO ECONP PURCHASE PEAK SHA VINO PREFERRED SUB NONE ESCALATION RATESI CAPACITY COST 0 ~ 0 %/YR COHPANY P NO SPINNINO R ESERVE CREDIT ENERGY COST 0 ~ 0 AREA I 14 FORCED, OUTAGE RATEI 0 ' HR CAP ~ HR CAP ~ olR CAP ~ HR CAP ~ HR CAP ~ HR CAP ~ CAP ~ CAP ~ 47 380 8] 1700 OeO S/MW JAN 380 380 '5 9 ]TOQUE 1700o

                                    ]700 ~

CAP ~ 23 380 119 IIR 380 '05

                                                              'R 33 1700 ~

129

                                                                     'HR
                                                                               ~   '43     380 'ERIOOI CAP ~
                                                                                                   '700 57 1700 ~

153 1700 ~ 71

                                                                                                                        ]6T HR 380
                                                                                                                                  '80 0

HR 170Q 0 CAP ~

                                                                                                                                                    ~
                                                                                                                                                    ~

MAX CAP ~ ENERGY

                                                                                                                                                                              ~

BSS.6OOGWH HW 0 ~ 0 S/MWH CAP ~ CAP ~ HR HR CAP ~

                'R
                                                                                                   'AP                            'AP
                                                                                 ~                                                ~

FEB 380 ]700 ~ 23 380 1700 ~ 47 380 57 1700 ~ 71 380 Bl 1700 ~ MAX CAP~ 1700 ~ MW 0~0 $ /HW 380 '5 1 19 380 '05 129 ~ 143 380 '700 153 ]700 ~ 167 '80 0 0 ~ ENERGY 772 ~ 8000WH 0~0 S/MWH CAP ~

                'R CAP ~       llR   CAP ~
                                                              'R HR         ~    HR   CAP ~   'AP HR    CAPe     HR       'AP
                                                                                                                                  ~        HR  CAP ~

Tl ' ' $ /MW HAR HR 380 3IIQ ~ CAP ~

                '5 9 ?200o 2200 '

CAP ~ Z3 19

                                              ~ lIR 380 380 CAP ~
                                                             '05
                                                             'R 33 ZZOQ ~

129 HR

                                                                                 '43  47 HR 380 380 CAP ~
                                                                                                   '200
                                                                                                   'APe 57 2200 2200 '53 CAP ~
                                                                                                                     'R 167 HR 380
                                                                                                                                  '80
                                                                                                                                  'AP
                                                                                                                                  ~

81 2200 0 HR CAP~

                                                                                                                                                    ~

MAX CAP ~ ENERGY 2200 AM'W o4000040WH 0 0 ' $ /tlwH APR 98 9 1400o <23 98e 33 1400 ~ 47 98 57 1400 ~ 71 98 81 1400 ~ MAX CAP ~ 1400oMW Q~Q $ /MW 98 '5 105 1400 ~ ]19 98 129 ~ ]43 98 '400 153 1400e 167 '8 0 0~ ENERGY 6]T ~ 400GWH 0 ~ 0 $ /MWH CAP ~

                'R CAP ~       HR    CAP ~
                                                             'R HR              HR   CAP ~          HR    CAP ~    HR                HR  CAP ~
                                                                                                   'AP                            'AP
                                                                                 ~                                               ~

HAY 1 98 1400 ~ 23 98 33 1400 47 98 57 1400 71 98 81 140O. MAX CAP ~ 1400eHW 0 $ /MW

                                                                                 ~                                  ~
         -98 ~                      1400
                                         '3    119       98         129              ]43     98         153 1400        167                               ENERGY     637 '80GWH               0       S/MWH
                                                                                                                                 '8 0~
                '5
                                                             '05
                                         ~                                                                          ~
                                                                                                   '400
                                                                                 ~

HR CAP ~ CAP ~ HR CAP ~

                                                             'R HR              HR   CAPe    'AP HR    CAP ~    HR       'AP HR  CAP ~

0'

                                                                                 ~                                               ~

JUN JUL 1 98 98 CAP ~ 98

                '5
                'R 9 1400 9

1400 '19

                                         '3 CAP ~
                                    ]400 HR 98 98 CAP ~

98

                                                             '05
                                                             'R 33 1400 129 HR 33 1400
                                                                                 ~
                                                                                 ~

47 143 HR 47 98 98 CAPe

                                                                                            -98
                                                                                                  '400e
                                                                                                  'AP 57 1400 153 1400 CAPe 57 ]4QQ ~
                                                                                                                    'R 'R
                                                                                                                    ~
                                                                                                                    'R 71 167 HR 71 98 ~

98 ~ CAP ~ 98 81 1400 0 HR 0~ CAP ~ 81 140Q

                                                                                                                                                    ~
                                                                                                                                                    ~

MAX CAP ~ ENERGY MAX CAP ~ 1400 1400 AM'W 617 ~ 4000 WH AH'W 0 ~ S/Hw 0 ~ 0 S/MWH 0 $ /HW 1 98 '5 1400 ~ 119 98 '05 129

                                                                                 ~
                                                                                 ~   143     98   '400 153 1400 ~      167
                                                                                                                                  '8 0     0~      ENERGY     637 '800WH               0  '    $ /MWH CAPe
                'R CAP         IoR   CAP ~
                                                             'R HR              HR   CAPo   'AP HR    CAPe     HR      'AP
                                                                                                                                 ~         HR  CAPi 0'
                                                                                 ~

AUG 98 1400 ~ 23 98 33 1400e 47 98 57 14000 71 98 81 140Q ~ MAX CAP ~ 1400 ~ HW S/HW 98 '5 1400 ~ l]9 98 '05 129 ~ 143 98 '400 153 1400 ~ 167

                                                                                                                                  '8 0     0~      ENERGY     637 '80GWH               0~0     S/MWH CAPo                        CAP ~       RR    CAPe
                                                            'R HR              HR   CAP ~  'AP HR    CAP ~    HR      'AP
                                                                                                                                 ~         HR  CAP~
               'HR
                                                                                 ~

SEP 98 9 1400 23sory 98 33 1400 47 98e 57 1400 71 98 81 1400 ~ MAX CAP ~ 1400 ~ Mw 0 S/MW

                                         ~                                       ~                                  ~

9'R

               '5
                                    )4oo ~     ))9       98.'05 129 1400     ~

1'43 98 153 1400 ~ 167 '8 0 0~ KNKROY 617 ~ 4000WH . 0 $ /MWH CAP ~ HR CAPe HR CAP ~ HR ~ HR CAP ~ 'AP HR CAP ~ HR 'AP

                                                                                                                                 ~         HR  CAP ~

OCT 98e 9 1400 23 98 33 1400 47 98' 5T 1400 71 98 81 14OOe MAX CAP ~ 1400 ~ MW 0~0 $ /MW 1 ~ ~ ~ 95 ]400 ~ ))9 98 129 1400

                                                                                 '7  143     98         153 1400        167                       0~      ENERGY     637 '800WH               0       $ /MWH
                                                                                                                                  '8 98e                                                '05
                                                                                 ~                                  ~             ~         0 HR   CAP ~                       CAP ~       HR    CAP ~
                                                            'R HR         ~    HR   CAPe   'AP HR    CAP ~    MR  CAP ~         HR  CAP ~

81 2200 ' 2200 'W 0 ~ 0 S/HW NOV 1 380 380 CAP ~

               '5
               'R 9   2200i 2200 '19 CAP ~

23 HR 380 380 CAP ~

                                                            '05
                                                            'lR 33 2200 129 MR
                                                                                 '43  HR 380 380 CAP ~
                                                                                                  '200
                                                                                                  'AP 57 2200 2200 '53 CAP ~
                                                                                                                    'R 71 167 HR 380
                                                                                                                                  '80
                                                                                                                                 'AP
                                                                                                                                 ~

0 HR CAP ~

                                                                                                                                                    ~

MAX CAP ~ ENKRIIY O>>o044GWH 0 ' $ /MWH 0'

                                                                                 ~

OKC 380e 9 1700 23 380 33 1700 47 380 57 1700 71 38o ~ 81 1700 ~ MAX CAPe 1700 ~ HW S/HW 0' 1 ~ ~ ~ 95 380 17On. ]i9 380. 'OS 129 ~ 143 380 '700 153 1700 167 380 0 0 ~ KNERGY 855e6000WH S/HWH ACC OUNTINO I

              'NTERCHANGE, PRICING OPTION                          I      8                        COMP OtoNERSHIP              .COHP OWNERSHIP      COMP OWNKRSHIP          COMP OWNERSHIP     COHP OWNERSHIP DISPLACEMENT COST                       I          0 FIXED COST INCREASE I                        <<]2 ~ 3  S/MWH SAYINGS FIXED SPLIT I                        100.0    %

PRIORITY ORDER I 2 REPORTING OPTIOtl I ACCOUNT INO OPTION I I

NRC INTERROGATORY ON NINE HILE POINT NUCLEAR UNIT NO ~ 2 ENERGY HANAGEHENT ASSOCIATES> INC PAGE 453 ITEM NO ~ E 320 ~ 1 tO) REPT 9 OPTION 3 SUBREPORT 1 05/13/83 (, aooooaoooo TRANSACTIONS INPUT

SUMMARY

FOR 1987 aoooooaooa CEDARS PURCHA SE CHEDULED PREFERR EO SUBPERIO Ol NONE ESCALATION RATES! CAPACITY COST 0 ~ 0 %/YR COVPAN Y 5 RESERVE CREDITEO ENERGY CQST 0 ' JAN HR 95 HR 1 CAP ~ 209

                  '09 HR 105 HR 4REAI CAP ~

157 157 CAP ~

                                    ~

e 14 HR 23 119 HR CAP ~ 209

                                                       '09
                                                       'AP 33 0

HR 157 0~

                                                                      '7 FORCED OUTAGE RATE CAP ~

CAP ~ HR 0 HR CAP ~ 209o 0 ~ CAP ~ HR 5T HR 0 157 0~ CAP ~ CAP ~

                                                                                                     ~

HR 71 0 HR CAP ~ 209 CAP ~

                                                                                                                ~

HR 81 0 HR CApo 157e 0~ CAP~ MAX CAP ~ ENERGY 209jHK 139 '76GWH 23 0 ~ 0 $ /MW

                                                                                                                                                                    '6$ /MWH
                                                                                                                                                    'w
                  'AP
                  ~                                    ~

FEB 1 209 157 ?3 209 33 157e 47 ROgo 57 15( ~ Tl R09 ~ 81 157 'e HAX CAP ~ 209 0 ~ 0 $ /HW 95 '09 15To'05 119 '09 0 0~ 0 Oe

                                                                                   '7       0      0 ~  0    0  ~    0           ENERGY     125 ~ BBBGWH       23 ~ 38$ /MWH
                  'NS HR              HR   CAP ~         e(R       'AP HR  CAP ~    HR  CAP ~      HR    CAP ~  HR  CAP ~    HR  CApe
                                                       ~
                                                                                                                                                                    ' $ /Hw
                  'AP
                  ~

MAR 209 157 23 Z09 ~ 33 157 47 209 157 ' Tl 209 ' 81 157 ' HAX CAP ~ 209 ~ Mw 0 95 1

                   '09 157  '05 119    209          0    0~

o 0 0 ~ 0 ~ 0 ~ 0 ~ ENERGY 139 '76GWH 23 '0$ /MWH HR

                   'AP CAP ~
                                    'R HR        'AP HR  CAP ~    HR  CAP)       HR    CAP ~  HR  CAP ~    HR  CApo 0'
                   ~                                   ~

APR 209 9 157 e ?3 209 33 157 ~ 47 209 ~, 57 157. ~ 71 209 ' 81 157 ' MAX CAP ~ 209 ~ Mw S/HW MAY 95 HR 95 209 CAP ~

                   '09
                   'AP
                    ~
                   '09e 105 HR 105 9

HR 15T ~ CAP ~ 169 ~ 169 ~ CAP ~ 119 HR 23 119 HR R09 ~ 209

                                                       '09
                                                       'AP
                                                       ~
                                                      'AP 0

HR 33 0 HR 0~ CAP ~ 169 0~

                                                                      ~

CAP ~ 0 HR 47 0 HR 0 209 0~

                                                                                   '7
                                                                                   ~

CAP ~ CAP ~ ( w HR 0 0 HR-169 0~ CAP ~ CAP ~

                                                                                                     ~

0 HR 71 0 HR CAP ~ 209 CAP ~

                                                                                                                ~
                                                                                                                ~

0 HR 81 0 HR CApe 169

                                                                                                                            ~
                                                                                                                            ~

CAP ~ KNERGY MAX CAP ~ ENERGY 134 ~ BBQGWH 209eHW 143 '96GWH 23 ~ 61 $ /MWH 0 ~ 0 $ /MW R 1 ~ 75$ /MWH

                                                       ~
                                                      'R                   47                                   '       169 ~                   209eMW            0      $ /Mw
   'R'UN 209          9   169 e         23   209         33  169 ~        209 ~      57    169  e 71  209      81           MAX CAP ~

Iig 95 105 169 ~ 0 0~ 0 0~

                                                                                   'T       0      0    0            0    0      ENERGY     138 '80GWH          21 ~ 86$ /MWH
                                                       '09
                   '09
                                                                                                     ~          ~           ~

HR CAP ~ HR HR CAP ~ HR CAP ~ HR CAP ~ HR CAP ~ HR CAP ~ HR

                                                      'AP
                                                      ~
                   'AP
                   ~

JUL 1 209 169 ~ ?3 Z09 ~ 33 leg. 47 209 169 ~ 71 209 ' 81 leg. MAX CAP ~ 209eMW 0 $ /MW

                                                                                                                                                               -21.97$ /MwH 95       '09 105    169 ~       119    209          0    0 ~     0    0 ~        0      0~   0       ~    0    0~     ENERGY     143.09eGwH       .

HR . HR CAP ~ HR 'AP HR CAP ~ HR CAP ~ HR CAP ~ HR CAP ~ HR CApe

                                                                                                                                                                    ' $ /MW
                  'AP
                  ~                                   ~

AUG 209 169 ~ 23 209 33 169e 4T R09 ~ 57 169 Tl 209 ' 81 169 ' MAX CAP ~ 209 'W 0 1 e

                                                                                                                                                                    '7$ /MWH SEP 95 HR 209
                  '09
                  'APe.

105 HR. 169 ~ CAP ~ 169 ~ 119 HR 23 209

                                                      '09
                                                      'AP
                                                      ~

0 HR 33 Q~ 169 '7 CAP ~ 0 HR 0 R09

                                                                                   ~

CAP ~

                                                                                   ~

HR 57 0 169 0~ CAP ~

                                                                                                     ~

0 HR Tl CAP ~ 209

                                                                                                                ~

0 HR 81 CApe 169

                                                                                                                            ~

ENKRGY MAX CAP ~ 143 '96G'WH 209 'W 22 Q ~ 0 $ /MW 95 105 169 1 1 9 0 Oo

                                                                      '7 '7 0    0 ~        0      0    0      '     0      ~    ENERGY     138 '80GKH          22 ~ 18%/MWH
                   '09                                '09 o                                                                ~

HR HR CAP ~ HR HR CAP ~ HR CAP ~ HR CAP ~ HR CAP ~ HR CAp>>

                   'AP                                'AP
                   ~                                  ~

OCT 1 209 9 169 e 23 209o 33 169 209 169 ' 71 209 ' 81 169 ~ MAX CAP ~ 209 'W 0 $ /HW 95 '09 105 169 ~ 119 209 0 Qe 0 0 ~ 0 ~ 0 ~ 0 0 ~ ENERGY 143 '96GKH 22 ~ 30$ /HWH NOV HR 95 1 205e 205

                   'APe HR   CAP ~

151 151 '05

                                   ~

AIR

                                             ?3 119    205
                                                      'AP
                                                      ~

Z05 ~ HR 33 0 CAP ~ 151 0

                                                                      ~
                                                                      ~

HR 47 0 20'7 CAP ~ 0 ~ HR 0 CAP ~ 151 0~

                                                                                                     ~

HR 71 0 CAP ~ 20> ~ 0 ~ HR 81 0 CAp>> 151 e 0 ~ MAX CAP ~ ENERGY 205eMW 131 ~ 4008 WH 24 0 ~ 0 $ /HW

                                                                                                                                                                    '4$ /MWH HR      ~
                  'AP HR   CAP ~         HR       'AP
                                                      ~       HR  CAP ~    HR  CAP ~      HR    CAP ~  HR  CAP ~    HR  CApe OEC        '1  205i             151 ~         23   205e        33  151 ~    47  ZOPF       57    151  ~ 71  20> ~    81  151 ~    MAX CAP ~      205 'W            0 ~ 0  S/Hw 95  205       105    151 ~       119    205          0    0 ~     0    0 ~        0      0 ~  0    0  ~    0    0~     ENERGY     135 ~ TBQGWH        24 ~ 56$ /HWH

NRC INTERROGATORY ON NINE HLLE'OINT NUCLEAR UNIT NO ~ 2 ENERGY HANAGEHENT ASSOCIATES'NC PAGE SLZ ITEH NO ~ E 320el {0) REPT 9 OPTION 3 SUBREPORT 1 05/i3/83 oooaoooooa TRANSACTIONS INPUT SUMHARY FOR 1988 aooooioooo HQ FRHCE PEAK SHAVING PREFERRED SUBPERIODl NONE ESCALATION RATESl CAPACITY COST 0 ~ 0 %/YR COHPANY 2 NO SPINNINO RESERVE CREDIT ENERGY COST 0 ' APR HR 1 275

            'URCHASE CAP ~     HR AREAl CAP 780
                               ~

1 HR 23 CAP ~ 27S ~ HR 33 780 '7 FORCED OUTAGE RATE) CAP ~

                                                                '43 HR   CAP ~

27/ ~ HR 57 0 780 '1 CAP ~

                                                                                           '67 HR  CAP ~

275 Bl CAP ~ 780 ~ HAX CAP ~ 780 'W 1542 '05/MW

                                               '29 '7
                                               '3 275
            '5 780t '05 1 19  Z75     129      780          275    153    780               '75 0    0 ~    ENERGY     410e100GWH           0     5/HWH
            'R CAP ~     HR     CAP ~         HR  CAP ~    HR      CAP ~   HR   CAP ~   HR    CAP ~   HR        'AP
                                                                                                         ~     HR  CAP ~

1542 '05/HW HAY 1 275 9 780 23 275 780

                                                                '43      27> ~
                                                                              '5357    780
                                                                                           '67     Z75 ~       81  780 ~    HAX CAP ~      780 ~ HW 275              780   '           275
                                               '3 '7        780          275           780
                                                                                           '1      275e         0    0      ENERGY     423 '70GWH           0     5/HWH
            '5                                                                             '9
                              '05
                                                                                                                       ~
            'R CAP ~     HR     CAP ~         HR  CAP ~    HR      CAP ~   HR   CAPt    HR    CAP ~   HR  CAP ~       HR  CAP ~

JUN 275 9 780 23 275 780 ZTP ~ 57 780 275e 81 780 ~ llAX CAP ~ 780 'W 1542 ~ 50$ /HW 1

                                               '29 '7
                                               '3                                          '1 780e          19  275.             780. 143   275. 153    780. 167  Z75 ~                               410 ~ 100GWH         0     5/HWH
                                                                                           '67 'R Z75e
            '5
                               '05 1             129                                                          0    0 ~    ENERGY HR  CAP ~     HR     CAP ~         HR  CAP ~    Hg . CAP ~   HR   CAP ~   HR    CAP ~   HR  CAP ~       HR  CAP ~

780 'W 1542 '05/HW JUL 1 275 9 780 23 275 780

                                                                '43      27) ~
                                                                              '5357    780         275         81  7)0 ~    HAX CAP ~

275 780e 19 275

                                               '3 '7        780          275           780
                                                                                           '1                   0           ENERGY     423 '70GWH           0     5/HWH
                                                                                           'l 0~
            '5
                               '05                                                                       '75 1

CAP ~

             'R HR     CAP ~         HR  CAP ~    HR      CAP ~   HR   CAP ~   HR    CAP ~   HR        'AP
                                                                                                         ~     HR  CAP ~

1542 '05/HW AUG 1 275 9 780e 23 275

                                               '29       . 780
                                                                '43      27'PE
                                                                              '5357    780
                                                                                           '67     ZTS ~       81  780 ~    HAX CAP ~      780eHW
                                                        '80 '7 275  '5 105     780 ~       1 19  275         ---780            275           780         Z75 ~        0    0 ~    ENERGY     423 '70GWH           0 ~ 0 5/HWH
            'R CAP ~     HR     CAP ~         HR  CAP      Hg.,CAP         HR  CAP ~    HR    CAP     HR  CAP ~       HR  CAP ~ ~

27> ~ 275t 780 ' 780 'W 1542 '05/HW SEP 1 275 780 23 275 33

                                                                '43           '5357    780                     81           HAX CAP ~

275 780e 19

                                               '3 '7 Z75 ~   129      780         275            780
                                                                                           '1 167  275               0      ENERGY     410 ~ 100GWH         0     5/HWH
            '5
                              '05 1                                                                                 ~
            'R CAP ~     HR     CAPe          HR  CAPt     HR      CAP ~   HR  CAP ~    HR    CAP ~   HR       'AP
                                                                                                        ~      HR- CAP ~

Bl 780 1542 '05/HW OCT 1 9S Z75 ~ 275 9 780 780 '

                             '05 23 i9 275 275e    129 780
                                                           .780 '43     ZTPe 275e 57 153 780 780e 275
                                                                                                       '75 0

780e 0~ HAX CAP ~ ENERGY e HW 423 '70GWH 0 ~ 0 5/HWH

NRC INTERROGATORY oN NINE M]lE POINT NUCLEAR UNIT Noo2 ENERGY MANAGEMENT ASSOCIATES'NC PAGE 5]d ITEH NO ~ E 320 ~ I tO) REPT 9 OPTION 3 SUBREPORT I 05/13/83 aaaaaaaaaa TRANSACTIONS INPUT

SUMMARY

FOR ]988 aaaaaaaaaa PURCHASE PEA K SHAVING PREFERRED SUBPKRIODf NONE ESCA].AT]ON RATESf CAPACITY COST 0~0 5/YR HQ FRMRG COMPANY 7 NO SPINNING RESERVE CREDIT ENERGY COST 0 '

                         '3 AREA] 14
                                                     '7 FORCEO OUTAGE RATE]   0 '
                                                                             ']

CAP ~ CAP ~ HR CAP ~ CApe HR CAP ~ HR CAP ~ HR CAP ~ HR CAP ~ HR HR MR

                                                                                                      '                     20 'w     1542 ~ 505/MW APR        7~     9    20
                         '19          7 ~    33   20
                                                     '43        Te   57   20,    71    7~    81    20      MAX CAP ~
                         '3 1
                                                     '7                         167                        ENERGY      10 ~ 500GWH       0      5/MWH 95    7~   ]05    20              7~    129   20            7~  153   20 ~         7~           0~

CAP ~ AIR CAP ~ HR CAP ~ MR CAP ~ HR CAP ~ HR CAP ~ HR CAP ~

                         'i9 HR  CAP ~   HR Bl                             20        1542 ~ 505/MW HAY        7~     9    20              7~     33   20
                                                     '43        7~   57   20
                                                                             '67       7~          20 ~    MAX CAP ~           ~ MW
                         '3                          '7 1

105 20 7~ 129 20 7~ 153 20 7~ 0 Oe ENKRGY 10 ~ 850GWH 0 5/MlfH 95 7~

                                                                             ']

HR CAP ~ HR CAP ~ HR CAPe HR CAP ~ HR CAP ~ HR CAP ~ HR CAP ~ HR CAPe

                                                                                                      '    MAX CAP.         20 'W     ]542 ~ 505/MW JUN   ]    7~     9    20              7~     3~   20
                                                     '43        7 ~  57   20>>
                                                                             '67 71     7~   81    20
                         '3 95    7e   ]05    20e     1]9     Te    129   20            7~  153   20            7~          0 ~    ENERGY      lo.sooGwH          0     5/HWH HR  CAP ~   HR   CAP ~     AIR  CAPo     HR  CAP ~    HR  CAPe   HR  CAP ~   HR  CAP ~   HR   CAP ~

20 20 HW 1542 ~ 505/MW JUL 7~ 9 20 7~ 33 20e

                                                     '43  47    7 ~  57   20            7~   81       ~    MAX CAP ~           ~
                                                     '7 1                                                                                                                                   '0
                         '3                                                     167                        ENERGY      ]O,BSOGWH                5/HWH 95    7~   ]05    Zo ~    119     7e    129   20            7~  153   20 ~          T~    0     0 ~

HR CAP ~ HR CAP ~ MR CAP ~ HR CAP ~ HR CAP ~ HR CAP, HR CAP ~ HR CAP ~ Bl 20 ZoeHW 1542 ~ 505/HW AUG 9 20

                         '19          7~     33   20
                                                     '43        7~   57   20 ~   71                   ~    MAX CAP ~
                                                     '7 1       ~
                         '3 7,

20 129 20 To 153 20 ~ 167 7~ 0 0 ENERGY ]Q ~ 850GWH 0 5/HWH 95 7~ 105 7o ~ CAP ~ HR CAP ~ HR CAPo HR CAP ~ HR CAP~ HR CAP ~ HR CAP ~ HR CAP ~

                         'i9 HR 7~     9    20              7      3i   20            7~   57   20 ~   71     7~   Bl    20 ~    HAX CAP ~        20oMW     1542 ~ 505/MW SEP   1                                  ~
                         '3 20                    129   Zoe    143    fe  153         167     7~    0     0~     ENERGY      10,500GWH          Q~  0 $ /MWH 95    T~   105                    7~                                  Zoo HR   CAP ~     HR   CAPe     HR  CAP ~    HR  CAP ~  HR  CAP ~   HR  CAP ~   HR   CAP ~

CAP ~ ZO'47

                         'i9 HR
7. Zoe 2QoHW 1542 ~ 505/Hlf OCT ]

95 7o 7~ 9 105 20 20 7~ 7~ 33 129 20 '43 7~ 57 153 20, 20, 71 167 7~ 7o 81 0 0 ~ MAX CAP ~ ENERGY ]Oe850GWH 0 ~ 0 5/HWH

                                                         't; NRC INTERROGATORY GN                   NINE MILE POINT NUCLEAR UNIT             HO ~ 2                  EHERGY MANAGEHENT ASSOCIATESe             INC                          pAGE. Sla ITEM NO ~ E 320 ~ 1 (0)                                                                                 REPT            9 OPTION 3 SUBREPORT       1                           05/13/83 a<<aaaaaaaa            TRANSACTIONS INPUT 

SUMMARY

FOR 1988 aaaaaaaaia HO ECONP PURCVAS E PEA K SHAVING PREFERREO SUBPKRIODI NO FSCALATIOH RATESI CAPACITY COST 0~0 5/YR

                          ]TOOER CofePANY           0                           HO SPINNING RESERVE CRE OIT                                                   ENERGY COST       0~0 HR   CAP ~

380 HR 9 AREAI CAP ~ 14 leR

                                            ?3 CAP ~

380 HR CAP ~ 3~ 1700 ~ HR 47 CAP ~ 380 '7 FORCKO OUTAGE RATEI

                                                                                       '53 HR 0~

CAP ~ 1TOO ~ HR 7] CAP ~ 380 81 CAP 1700o

                                                                                                                                            ~

HAX CAP ~ 1700 ~ HW 0 ' 5/HW

                                                                                       '7 l]9                  ]29 1700     ]43  380            1700         ]67                   0             ENERGY     855 ~ 6000WH          0      5/HWH 380         105 ]700e                                                                                                           0
                                                                                                                        '80
              '5
                                                       '80o
                                                                        ~                            ~                                      ~

CAP ~

              'R HR    CAP ~           HR    CAP ~         HR  CAP ~    HR  CAP ~    HR     CAP ~        HR       'AP
                                                                                                                        ~         HR   CAP~

1700 ~ HW 0 ' 5/HM FEB 380 1700 ~ 23 380 33 1700 ~ 47 380

                                                                                       '53      1700          71   380            81 1700   ~    MAX CAPe
                                                                        '43 '7
                                                                        '7
                                            ]9                 129          143  380            1700         167                   0      0      ENERGY     800 ~ 4000'MH         0      5/MWH 380         105 1700                                                                                                               ~
                                                                                                                        '80
              '5
                                                                                                     ~
                                                      '80
                                ~         1                                                          '700e CAP ~
              'R HR    CAP ~           HR        'AP
                                                       ~        HR  CAP ~    HR  CAP ~    HR     CAP ~        HR       ~
                                                                                                                        'AP HR   CAP ~

81 2200 ' MAX CAP ~ 2200 'lt 0 ~ 0 5/MW MAR 380 2200 ?3 380 2200 380

                                                                                       '53      2200          71   380
                                                                                       '7 380            2200         167                   0             ENERGY     aaaaaaaGWH            0      5/MWH 380   '5 2200  '05 119          '80 129                                   '200
                                                                                                                        '80
                                                                                                                                            ~

CAP ~

               'R CAP ~
                                 'R HR                  HR           HR  CAP ~    HR     CAP ~
                                                                                                     'AP HR        'AP
                                                                                                                        ~         HR   CAP ~
                                                       'AP
                                                       ~                ~

98 9 1400 23 98 33 1400 ~ 47 98 ]400 ~ 71 98 81 1400 ~ MAX CAP ~ 1400 ~ HW 0 5/MM APR 1 ~

                                                                                       '7 98
                '5 105 ]400             119
                                                       '8 129 lhoo. 143     98. 153    lhoo.        167
                                                                                                                        '8 0      0 ~    ENERGY     617 '000WH            0      5/HlfH CAP ~           HR                      CAP ~    HR  CAP ~    HR     CAP ~        HR                  HR   CAP ~

HR

                'R               'R                                                                                     'APo CAP ~
                                                       'AP
                                                        ~

81 1400 1400 ~ HM 0 5/Hlf 33 1400 47 98

                                                                                       '53      1400          71    98                           MAX CAP ~
                 'AN HAY   ]     98          9 14QO               23     98                                                                                       ~
                                 ~                                      ~                             ~
                                                                                       '7 98   '5 105 lhooe            119          '98
                                                       ~       129 1400 ~   143  -  98          1400  ~      167        ~
                                                                                                                         '.98 0      0 ~    ENKRGY     637 ~ 9800lfH         0      5/HlfH CAPe
                'R HR    CAP ~           HR    CAP ~         HR  CAP~     HR  CAP ~    HR     CAP ~        HR   CAP ~          HR   CAP ~
                                                                                                                           'R                                  1400oHW          " 0~0    5/HW
                                                                                   -98                                            81 1400 JUN       ,-98 ~        9 ]400o              23     98           33 ]hooe     47
                                                                                       '53      1400  ~       71    98                      ~    HAX CAP ~
                                          ))9                               143     98
                                                                                       '7       ]400 ~       167                   0             ENERGY     617o4000MH            Oeo 5/MMH
                                                                                                                         '8 95     98        105 1400    ~
                                                       '8e 129 1400 ~        .                                                        0~

CAP ~

                'R HR    CAP ~           HR    CAP ~         HR  CAP ~    HR  CAPe     HR     CAP ~        HR         'AP
                                                                                                                         ~        HR   CAP ~

98 47 =98 1400o Tl 98 Bl 1400 ~ MAX CAP ~ 1400 ~ MM 0 ~ 0 5/HW JUL 98 1400 ~ ?3 33 14QO ~ 98 '5 105 1400 ~ 119 '8 129 lhooo ]43 -98e 153 1400 ~ 167 '8e 0 0~ KNERGY 637 '80GWH 0 ~ 0 5/HWH CAP ~

                'R HR    CAP ~           HR         ~
                                                        'AP HR  CAP ~    HR   CAP ~   HR     CAP ~        HR   CAP ~          HR   CAP ~

47 Tl Bl 1400 ~ MAX CAPo 1400 ~ MW 0 ~ 0 $ /HW AUG ] 98 ~ 1400 ~ ?3 98o 33 1400e 98e

                                                                                       '5357 1400      ~            98 98
                                                                                       '7       1400         167                                 ENERGY     637 '800WH            0 ~ 0 5/HWH
                                                                                                                         '8 95     98        105 1400    ~        119      98 ~        129 1400 ~   143                        ~                            0     0 ~

CAP ~ CAP ~ CAP ~ HR CAP ~ HR CAP ~ HR HR CAP~ HR

                                                                                                                          'AP CAP ~        HR                                        HR
                'R
                                                                                                                          ~

8] 1400 1400 HM 0 5/Mlf SEP 98 9 ]400 ~ ?3 98 33 1400 ~ 47 98

                                                                                       '53      1100   ~      71    98                      ~    MAX CAPo            ~
                          ]400                                                      98
                                                                                       '7       1400         167                                 ENERGY     6]7 '00GWH            0      5/MWH
                                                                                                                          '8 98    '5 105                  119
                                                        '8 129 1400 ~   143                        ~                            0     0~

CAP ~

                 'R CAP ~
                                  'R HR                  HR  CAP ~    HR   CAP ~   HR     CAPe         HR          'AP
                                                                                                                          ~       HR   CAP ~
                                                        'AP
                                                         ~

7] 1400 HAX CAP ~ 1400 ~ HW 0 5/MW OCT 98 9 ]4QO ~ 23 98 33 1400 ~ 47 98

                                                                                       '53      1400                98e           81        ~
                                                                        '?             '7                                                                   637 '800WH 98                       167    98                           ENERGY                           0       5/MWH 98        105 ]400             119                  129          143                 1400                                0     0~
                                                        '8
                 '5
                                                                                                       ~
                                                                                                       '400
                                                                        ~

CAP ~

                 'R CAP ~
                                  'R eIR         'AP HR  CAP ~    HR   CAPe    HR     CAPe         HR          'AP
                                                                                                                          ~       HR   CAP ~
                                                         ~

81 2200 ' 2200 'W 0 0 5/MM NOV 1 380 380 CAVe

                 '5
                 'R 9 2200 2200 CAPe
                                   '05
                                  'R 23 119 HR 380
                                                        ~
                                                         '80
                                                         'AP 33 2200 129 HR
                                                                        '43 '53
                                                                        ~    HR 380 380 CAP ~   HR 2200 2200 CAP ~
                                                                                                        '200
                                                                                                        'AP 71 167 HR 380
                                                                                                                           '80
                                                                                                                           'AP
                                                                                                                           ~      HR 0

CAP ~

                                                                                                                                            ~

MAX CAP ~ ENERGY <<aefaaaaGMH . 0

                                                                                                                                                                                     ~
                                                                                                                                                                                     ~ 0 5/HWH 38o.                             380            81 1700        HAX CAP ~     ]7QQoMM            0 ~ 0 5/MW OEC   1   380              1700 ~            23    360           33 ]Too. 47           57 17oo.            71                            ~

380 '5 105 1700 ~ ]19 '80 129 1700 ~ 143 380 ~ 153 1700 ~ 167 '80 0 0 ~ ENERGY 855 '00GlfH 0 ~ 0 5/HWH INTERCHANGE ACC OUNT ING ..I I 8 COMP OWNERSHIP COMP O'WNERSHIP COMP OefNERSHIP COMP O'MNERSHIP COMP OWNERSHIP PRICING OPTION olspLAcKHKNT cosT - I so.o 5 FIXED COST INCREASE I ~]3 ' 5/ SAVINGS FIXEO SPLIT I 100 ~ 0 % PRIORITY ORDER I 2 R EPORTING OPTION I ACCOUNTING OPTION I I

rr',v rrrrrr rr ass ~ r rO

          <Rc Il']TERROGATORY ON NINE MlLE POINT NUCLEAR UNIT                            NO ~ 2                ENERGY MANAGEMENT ASSOCIATESl        INC                         PAGK   5]o ITEM NO ~ E 320 ~ 1 (O)                                                                              REPT       9 OPTION     3 SUBREPORT   I                          05/13/83            l o oaoaaaoaaa           TRANSACTIONS INPUT SUhHARY FOR           ]9ee oaaaooaaaa CEOARS                     PURCM4          VI 45 Co!KUULED               PR EFERP ED SUB PER ]0 Q t NOtiK                 ESCALATION RATFsl cAPACITY cosT         0 ~ 0 5/YR CO>toAN Y       5                             RK SERVE CREOI TEO                                                     ENERGY COST       0 '

AltEA t 14 FO P.CEO Ot!TAGK RATE 0.$

     ~ oP CoPo               CAP,         olR    CAP ~        IR   CAP ~      MR   CAP ~  MR     CA+ ~     HR    CAP ~     et 8 CAP~

JAN 1 205 151 e ?3 Z05 ~ 33 15]o 47 20> ~ 57 15' 71 205o 8] 151 e MAX CAP ~ 205 'oW 135.7808>>H 0~0 5/Hw 24 '85/HWH IMPAR 95 'O5

              ~      105     151  ~     ))9      205            0    0~         0    0~     0         ~      0       0~       0   0~      ENERGY HR   CAP ~       HR     CAP ~        toR        'AP
                                                     ~        HP. CAP ~      tiR  CAP ~  HR    CAP ~      HP    CAP ~     HR   CAP ~

FEB 1 205 9 15]e ?3 205 33 15]e 47 20> ~ 57 151 o 71 208 ' 81 151 ~ HAX CAP ~ 205 ~ HW 0,0 5/Hw 24 '05/H'WH 95 '05e 105 15]o ]19 '05 Oe 0 n. 0 0~ 0 ~ 0 0~ ENERGY 127 ~ OZOGWH

     'IP  CAPe        toR    CAPe         hR                  o!R  CAP ~      titt CAP~   hR     CAP ~     HR    CAP ~     HR   CAP ~
                                                     'AP
                                                     ~

23 33 47 20> ~ 57 151 71 81 151 HAX CAP ~ 205 MW 0 S/HW 205e 151 ~ 205 151 ~ ~ ~ ~ 1 205e 105 151 119 0 0~ C ~ 0 0 no 0 0 ~ ENERGY 135 ~ TBVGwh 24 '35/HWH 95

                                                     '05
                                  ~                                                                   ~

rlR CAP ~ 205o hR CAP ~ 151 hR 23 205

                                                     'AP
                                                     ~        HR   CAPe 3j 15]e HR 47 CAP ~

20> ~ HR 57 CAP ~ 15le tlR CAP ~ 71', 205e HP 81 CAP ~ 151 ~ MAX CAP ~ 205 'lf 0 ' S/Mw APR 95 1 205 105 151

                                  ~
                                  ~     ]19           '05 0    0  ~       0    0~     0      0~        0,      0,            0 ~    ENERGY     131 ~ 400Gwd         25 '45/HWH 207 'lt CAP ~      HR   CAPe   HR     CAP ~     tiR C4P         htt  CAP ~

o!R HR CAP ~ HR HR ~

               'AP                                    'AP
               ~                                      ~

HAY 1 207e 9 lbs. ?3 207o 33 ]bb, 47 207 ' 57 ]65 ~ 71 207 ' 81 165 ~ MAX CAP ~ 0 5/Hw 23 '85/MWH 95 207 105 165e 119 ZOT ~ 0 0 ~ . 0 ~ 0 0 ~ 0 ~ 0 0 ~ ENERGY 140 9888>>H

                                                                                                                                                          ~

HR CAP ~ i'R CAP ~ CAP ~ HR Chp MR CAN HR CAP ~ HR CAP ~ HR

                'AP
                ~                                             HP,.

v 207 165e 47 2CT ~ 57 ]65 ~ 7] 207, 81 165 ~ HAX CAP ~ 207 ~ Hw 0 5/MW JUN 1 207 165 ?3 3~ 105 119 0 0 0 0~ 0 0 0~ ENERGY 136,440GWH 23 '05/HwH 95 '07 '65

                                  ~
                                                      '07 0    Oe                ~                               ~

Hp HR CAPe HR CAP ~ CAP ~ HR CAP ~ HR CAP ~ CAP ~ HR HR

                'AP                                    'AP MR                                               ~

JUL 1 207

                 ~

165 ~ 23 207 33 165. 4( 207 ' 57 165 ~ 71 207o Bl 165 ~ MAX CAP ~ 207 'W 0 5/HW 23 '15/HwH 95 '07 105 165 ~ 119 '07 0 Oe 0 ~ 0 0 ~ 0 0 ~ 0 0 ~ ENKRGY 140 ~ 988GWH hR CAP ~ ttR MR CAP ~ HR CAP ~ HR CAP. HR CAP ~ HP CAP ~

                                                       'AP HR         'AP
                ~                                      ~

AUG I 207e ]65 ~ 23 20T ~ 33 ]6> ~ 47 207 ' 57 165 ~ Tl 207 ' 81 ]65 ~ HAX CAP ~ 207 ~ Hw 0 5/HW 23 '25/HWH 95 207 105 165 ~ 119 ZOT ~ 0 0~ 0 ~ 0 Oo 0 ~ 0 0 ~ ENERGY 140 ~ 988GwH hR CAP. tlR CAP ~ CAP ~ HP CAP ~ HR CAP ~ HR CAP ~ HR CAP~ SEP MR 207

                'APe 165 ~        23     207o HR 33   165,       47   ZOT ~  57     165e      71    207   '   81   165 ~     HAX CAP ~      207   'w          0  '  5/HW 95 1
                '07 105     165e        119     2VTo           0     0 ~       0    0 ~    0       0~       0         ~      0    0~     ENERGY     136 4408wH           2'45/H>>H HQ               HQ     CAP ~        hR     CAPe              CAP ~      HR   CAP ~  HR     CAP ~     HR    CAP ~     MR   CAP ~
                 'AP
                 ~

207 165 ~ 23 2V7 ~ 33 165o 47 20( ~ 57 165, 71 207o 81 165 ~ MAX CAP ~ 207 stew 0 5/Hw OCT ] 95 '07 105 165e ))9 207. 0 0 ~ 0 0~ 0 Oe 0 0 ~ 0 0 ~ ENERGY ]40.988Gwh 23 '65/HwH hR CAP ~ HR CAP ~ MR CAP ~ HR CAP ~ MR CAP~ HR CAP ~ HR CApe ooQ

                                                                   ]4'                                                                                                        '
                 'AP
                 ~

r'tOV ] ZO] ~ 145 ~ 23 201 ~ 33 47 201 ' 57 ]45o Tl 20]o 81 145 ~ MAX CAP ~ 20]ot W 0 5/Mw 25 '35/HltH 95 201 ~ 105 ]45 ~ 119 ZO] ~ 0 ~ 0 0 Oo 0 0 ~ 0 0 ~ ENERGY ]Z7 ~ 920Gwh hR CAP ~ hR CAP ~ CAP ~ hR CAP ~ HP CAP ~ HR CAP ~ HR CApe OEC HR 1 CAP ~ 201 ~ 145e 23 201 ~ MR 33 ]4be 47 20] ~ 57 145o 71 201 ' 8] 145 ~ MAX CAPe 201 ~ MW 0 ' 5/HW ZO] ~ 105 145e ]19 201 0 0 0~ 0 0 0 0 ~ ENERGY 132 ~ 184GWH 26 '55/MWH 95 ~ 0 ~ 0 ~ ~

NRC INTERROGATORY Ph NINE HILE POINT NUCLEAR UNIT NO ~ 2 ENEPGY HANAGENENT ASSOCIATES) INC PAGE 579 ITEH Nae E 320 ~ 1 lt)) REPT 9 OPTION 3 SUBREPORT 1 OSii3/83 4ooo4oo>>o TRANSACTIONS INPUT SUMHARY FOR 1989 <<oeof ooo4 Ha FRNRO PURCHASE PEAK SHAVING PREFERRED SUBPERIODf NONE ESCALATION RATESl CAPACITY COST 0 ~ 0 %/YR CONPANY 7 NO SPINNINO RESERVE CREDIT ENERGY COST 0 ~ 0 APR HR 1 CAP ~ 7~ HR 9 AREA f CAP ~ 20o 14 HR 23'- CAP ~ 7~ HR 33 20, FORCED OUTAGE RATEI CAP ~

                                                         '43 hR 47 CAP ~

7 ~ HR 57 20 '1 0 ~5 CAP ~

                                                                                    '67 HR  CAP ~

7~ r. HR 81 CAP ~ 20 ~ MAX CAP ~ 2O ~ HW 1542 ~ 50$ /NW 95 7~ )05 20 ~ - .)iP .",. 7 ~ 129 20

                                                         '7         7~  153
                                                                                '0 '1 20                 0           ENERGY        10 ~ SOOGWH          0 ~ 0 $ /MifH
                                                                                    'l 0 ~

CAP ~ HR CAP ~ -'HR 'iCAP ~ HR CAP ~ HR CAP ~ HR CAN HR CAP ~ HR CAPo

                         'i9 HR HAY    1   7~    9    20 ~ =..'.23 .."'     ~     3 j  20
                                                         '43        7~   57      20
                                                                                    '67      7~    81   20 '    HAX CAP ~          20 'W        1542 ~ 50$ /HW JUN 95 ofR 1

7~ CAP ~ 7~ 105 HR 9 20 CAP ~ 20 '3

                         '19 RR'AP 7~

7~

                                           ~

129 HR 33 20 20 'T CAP ~

                                                         '43 HR 7~

CAP ~ 7~ 153 HR 57 CAP ~ 20

                                                                                    '67 HR 7~

CAPe 7~ HR 81 O. CAP ~ 20 ' ENERGY lfAX CAP ~ 10 ~ 850GWH 20 eHlf 0 $ /HWH 1542 ~ 50$ /HW JUL 95 HR 1 7 ~ CAP ~ to 105 HR 9 20 CAP ~ 20e

                         'l9 ffR.

23 7~ CAP ~ 7~ 129 HR 33 20

                                                         '7 CAP ~

20

                                                         '43 HR 7~

CAP ~ 7~ 153

                                                                         +

5g 20 20 '1 CAP ~

                                                                                    '67 HR 7~

CAP ~ 7~ HR 81 0~ CAPs Zo ~ ENERGY HAX CAP ~ lo SooowH 20eNW 0 ~ 0 $ /NMH 1542 ~ 50$ /Hlf AUG 95 HR 1 7~ CAP ~ 7~ 105 HR 9 20 CAP ~ 20 '3 HR T~ CAP ~ 7~ 129 HR 33 20 CAP~ 20 '7

                                                         '43 HR 7~

CAP ~ T~ 153, HR 57

                                                                              ~

20 2'1 CAP ~ 2'67 HR 7~ CAP ~ 7~ 0 HR 81 0 CAP~ 20

                                                                                                           ~

ENERGY HAX CAP ~ 10 ~ 850GWH 20 ~ HW 0 ~ 0 $ /NWH 154R ~ 50$ /HW 95 7e 105 20

                         '3 i --i f9 .    -7 ~    129   20
                                                         '7         To  153
                                                                                    '1       7~          0      ENERGY        10 ~ 850OWH          oio   S/NWH
                                                                                    'l
                                              -                                                            ~

CAPe HR 'CAP ~ fIR .CAP ~ HR CAP ~ HR CAP ~ HR CAP~ HR CAP ~ HR CAP~ HR 20 'W 1542 '0$ /NW SEP 1 7e 9 20

                         'i9,            To      33   20
                                                         '43        7~   57 2'67 20          7~    81   20 ~    HAX CAP ~
                                                                                                                                                     ' S/NWH OCT 95 HR 95 1

7~ CAP ~ 7~ 7e 105 HR 9 105 20 CAPi Ro ~ 20i RR'AP 23., ' 7 li9 7~

                                           ~
                                           ~
                                           ~

129 HR 33 1Z9 20 20 Ro

                                                         '7 CAP ~
                                                         ~

HR

                                                            )43 7e CAP ~

Te 7~ 153 HR 57 153 CAP ~ 2'67 20 HR 7o CAPo 7~ 7~ 0 HR 81 0 0 CAP. 0

                                                                                                           ~

20 ~

                                                                                                           ~

ENERGY NAX CAP ~ ENERGY 10 ~ 500GWH 20 ~ H'W loe8500lfH 0 1542e50$ /HW 0 ' $ /H'WH

NRC INTERROGATORY ON NINE MILE POINT NUCLEAR UNIT NO.2 EffERGY MANAGEMENT ASSOCIATKSI INC PA 4 E 58 ff ITEM NO ~ K 320 ~ 1 {V) REPT 9 OPTION ~ 3 SUBREPORT 1 05/ 1 3/83 TRANSACTIONS INPUT

SUMMARY

FOR 1989>>>>>>>>>>>>>>aa HO ECONP PURCHAS E PEAK SHAY PR SUBPERIODI NONE ESCALATION RATESI CAPACITY COST 0 ~ 0 %/YR COHPAffY NO SPlNNING RESERVE CREDIT ENERGY COST 0~0 JAN HR I CAP ~ 380 HR 9 AREAI 14 CAP ~ HR 23 CAP ~ HR 33 1700 CAP ~ HR 47 CAP ~ 380 '7 FO RCED OUTAGE RATEI HR 1700 A % CAP ~

                                                                                                                               ~

HR 71 CAP ~ 380e HR 81 CAP ~ 1700 ' MAX CAP ~ 170'W 0 ~ 0 $ /Hlf 143

                                                                                                                  '7 170'l 153 1700        16T  380                                     855 '00GWH            0      $ /HWH 170'05                    38'19 1700                                              129                         38Q ~                                              Qe     ENERGY
                                                                                                                               'l'l
                    '5
                                                                                                   ~                           ~
                                                                                                   '700 38'R 38'R CAP ~                        CAPe
                                           'R CAP ~                    HR       CAP ~         HR  CAPe    HR   CAP ~      HR           ~
                                                                                                                                                   'AP HR   CApe FKB                        9 1700                 23     384                       33                     47  380                                         81 1700  ~    MAX CAP ~    1700 ~ HW          0'     $ /Hlf 38'5 380                   1700       '05 3SQ              '19
                                                                          ~      129 170'700e 143  380  ~ 153 1700   ~    167  38'8'AP          0     Qe     ENERGY    772 ~ BQQGWH          0 '    $ /HWH CAP.

38'7 HR CAP ~

                                          'R CAP ~
                     'R CAP ~      RR                               HR       CAP ~         HR  CAP ~   HR   CAP ~                    ~

2200. 0 ~ Q $ /HW HAR I 380e 9 23 380 33 47

                                                                                                                  '53 '67 2200             380e            81            MAX CAP ~    220Q ~ MW
                                                                                                                  '7 220'200                                                                                     aaa>>aaaOWH 384                                                 380                         380                                                           0 ~ 0 $ /MWH 224'05 95   380                  2200         ~
                                                                          '19 129                    143             2200                              0     0 ~    ENERGY CAP ~             CAP ~                              CAP ~             CAP ~                   HR                  HR   CAP~
                                                                        'NG33                            HR               CAP ~
                                                                                                   'R CAP ~           HR                                                                                          HR
                     'R                                                    'fR                                                                    'AP
                                                                                                                                                  ~

1400oMlf $ /Mlf APR 98 9 1400 ~ 23 98 1400 ~ 4T 98

                                                                                                                  '53   1400                98           81  1400 ~    HAX CAP ~                       0 ~ Q 98      105 1400                               98 ~              129 1400               143   98
                                                                                                                  '7    1400        167                   0            ENERGY    617 '00GWH            0      $ /MWH
                                                                                                                                                  '8
                     '5                                                    '19
                                                                                                   ~                           ~                                0 ~

CAP ~ CAP ~ HR 170'FERRKD CAPe CAI' HR HR CAP ~

                                                                                                                  '53 140'1 HR
                                           'R CAP ~
                     'R HR          HR   CAP ~                   ~
                                                                                                                                                   'AP
81. 1400 0' $ /MW HAY 1 98 9 1400 23 98 33 1400 ~ 47 98
                                                                                                                               '67          9B ~                  ~    MAX CAP ~    1400 ~ MW 0'
           ;98o                                         ~98 o                    129 1440 ~ 143               98
                                                                                                                  '7    1400                98            0     0      KNEROY    637 '80OWH                   $ /HWH
                    '5                                                    '19
                                          '05
                                                                                                                                                                  ~

H" 140'R HR CAP ~ CAPe FIR CAP ~ HR CAPo HR CAP ~ HR CAP ~ 'AP

                                                                                                                                                  ~      HR   CApe
                                                        -98 ~                                                                        Ti                      140'                   1400 'W          ..0 '    $ /MW JUN   1   =9S ~            9 1400                 23                               33 1400         ~      47   98
                                                                                                                  '53 '67 1400   ~            9B ~         81            MAX CAPo 0'

JUL 95 CAP ~ 98 98e

                   'R 140'R 9 1400
                                          '05 CAP ~
                                          ~

1 $ HR 23 9 CAPe 9B ~ 98 129 140'R 33 1400 CAP ~

                                                                                                  ~

143 HR 4T 98 CAl' 98 '7 HR 1400 ~ CAPe 1400 ~ HR 71 98 98

                                                                                                                                                 'AP
                                                                                                                                                 ~       HR 81 1400 Oe CAP ~
                                                                                                                                                                  ~

ENERGY MAX CAP ~ 617 ~ 400OWH 1400 ~ MW 0'

                                                                                                                                                                                                              $ /M'WH
                                                                                                                                                                                                              $ /MW
               '98 ~    105 1400                               98e               129 1400               143   98    153 1400
                                                                                                                               '1   167                                ENERGY    637 '80OWH            0 ~ 0 $ /HWH
                                                                                                                                                 '8 95                                                                                                                                                    0     0~

9'7

                                                                         '19
                                          ~                                                                                    ~

HR CApe HR CAP ~ I:R CAP ~ HR 'AP

                                                                                                 ~       HR  CAP ~   HR   CAP ~      HR          'AP
                                                                                                                                                 ~       HR   CAPe 1400 ~ HW              4 $ /HW AUG              98e       9 1400 ~               23            98                 33                     47
                                                                                                                  '53 140'67 1400                98           81 1400  ~    MAX CAPe                        0 ~

98 105 1400e 98 143 98

                                                                                                                  '7 '67                                               ENERGY    637 '804wH            0 ~ 0 $ /HWH
                                                                                                                                                 '8 140'29,1400 95                                                                   '19 0     0~

CAP ~ 'HR HR CAPo CApe, 'R. CAP ~ 'R HR CAI' HR CAP ~ = HR 'AP

                                                                                                                                                 ~       HR   CAP ~

SEP 1 98 9 23 98 33 1400. 47 95 1400 ~ 71 98 81 1400 ~ HAX CAPe 1400 'W 0 ~ 0 $ /HW 98 '5 140'05 98 ~ 129 1400 143 9S 153 1400

                                                                                                                                                 '8 0     0      ENERGY    617 '00GWH            0   0 $ /HWH 9'7 140'1
                                                                         '19
                                                                                                                  ~                                               ~                                      ~

CAP ~

                   'R 140'fR CAP ~      ffR    CApe                      HR             ~
                                                                                                  'AP HR  CAl"    HR  CAP.        HR          'AP
                                                                                                                                                 ~       HR   C4Pe I          98        9 1400          ~      23            98                 33 140'400 47                                 98           Sl lhooe      MAX CAP ~    1400 ~ MW          0 ~ 0 $ /MW 98 '5 105                                    98 ~     '19 129             ~      143   9S  ~ 153 1400   ~    167
                                                                                                                                                 '8 0     0~     ENERGY    637 '80GWH            0~0    $ /HWH 38'7 140'R CAP ~
                   'R CAP ~     HR     CAP ~                      HR       CAPe          HR  CAPo    HR  CAP ~       HR          'AP
                                                                                                                                                 ~       HR   CAP ~

Tl 220' 0 ~ 0 $ /Mlf NOV 1 9 2200 ~ 23 38Q ~ 33 2200 ~ 47

                                                                                                                  '53   2PQQ ~

220'67 380 81 HAX CAP ~ ZPQQ ~ MW

                                                                                                                  '7                                                             aaa>>a>>aGwH                   f/MWH 38'5 380            105                    1)9     380              ~        129 2200               143  380                                 '80 0~     ENERGY                          0 i

38'CT 220'R HR HR CApe CAP ~ HR CAP HR CAP 170'1 CAP

                   'R CAP ~                                                                    HR                                 HR
                                                                                                                                                 'AP
                                                                                                 'AP
                                                                                                                  ~                              ~

0'

                                                                                                 ~                             ~

9 1TQQe 23 33 1700 47 380 380 81 170' MAX CAP. 1TQQoHW $ /HW DEC 1 38'5 105 1700 INTERCHANGE. A CCOUNTING I

                                          ~            380 38'19 129
                                                                                                 ~

143 38'53 170'67 'SQ

                                                                                                                                                 ~              0~     ENERGY    855 '00GWH            0'     $ /MWH PRICINO OPTION                            I 8                                          COMP OWNERSHIP           ~OMP OWNERSHIP         COMP OWNERSHIP           COMP OWNERSHIP   COMp OWNERSHlp DISPI.ACEMENT COST                        I 50   '

FIXED COST INCREASE I 13 ' 5/MlfH SAVINGS FIXED SPLIT I 100 ~ 0 TY ORDER I 2 I'RIORI REPORTING OPTION I ACCOUNTINO OPTION

NRC INTERROGATORY ON NINE. MILE POINT NUCLEAR UNIT NO ~ 2. ENERGY HANAOEHENT ASSOCIATES> INC PAGK" SBR ITEH NO ~ E 320ol (Dt REPT 9 OPTION 3 SUBREPORT 1 05/i3/83 aaoaaaaaoo. TRANSACTIONS INPUT

SUMMARY

FOR 1989 aoaaoaaooa CEDARS PURCHASE UN SCHEDULED PR EFERRED SUBPKRIO Dl NONE ESCALATION ttATKS I CAPACITY COST 0~0 5/YR COMPANY 5 RE SERVE CREDITED ENERGY COST 4~0 AREA I ]4 FO RCED OUTAGE RATE l A % HR CAP0 HR CAP ~ HR CAP ~ HR CAP ~ HP. CAP ~ HR CAPe HR CAP ~ HR CAP ~ JAN 1 20] ~ ]45 ~ 23 201 ~ 33 145e 47 201 ~ 57 145 ~ 71 201 ' 81 145 ~ HAX CAP ~ 20]eHIf 0~0 5/Hlf 95 201 ~ 105 145 ~ ]19 201 ~ 0 0~ 0 0 ~ 0 0~ 0 ~ 0 0 ~ ENERGY 132 ~ 1846WH Z6 ~ ]85/MefH HR CAP ~ HR CAP ~ HR CAP ~ HR CAP ~ HR CAP ~ HR CAP ~ HR CAP ~ HR CAP ~ FKB 1 201 145 ~ 23 201 33 ]45 ~ 47 20]o 57 14So Tl 201 ~ 81 145 ~, HAX CAP ~ 20]oHW 4 ' 5/HW 95 '01 105 145 o 119 '01 0 0 ~ 0 0~ 0 0 ~ 0 0 ~ 0 0~ ENERGY 119 ~ 392GWH R6 ~ 305/MWH HR HR CAP>> HR HR CAP ~ HR CAP ~ HR CAP ~ HR CAP ~ HR CApe

                 ~
                                                                                                                                                                                                  ' 5/MW
                 'AP                                          'AP~

HAR 201 ~ 9 ]45 o 23 Z01 ~ 3i 145 47 241. 57 145e 71 Z01 ~ 81 145 ~ MAX CAP ~ Z4]oMW 0 1 ~

                                                                                                                                                                                                  '4$ /MWH APR 95 1

201 CAP ~ 201 20]e

                  ~
                  ~

105 HR 9 145 ~ CAPe

                                  ]45  '3     119 HR
                                                      $ 0] ~
                                                     .]AP ~

li9 Zal, HR 33 0 0 ~ CAP ~ 145o HR 4T 0 CAP ~ 201 0 ~

                                                                                                     ~

HR 57 0 0~ CAP ~ 145o HR 71 0 201 0~ CAP ~

                                                                                                                                     ~

0 HR 81 0 CAP ~ 145 ~

                                                                                                                                                     ~       ENERGY MAX CAPo 132 ~   ]846WH 201 eMW 127.92OOWH 26 0'     5/HW Z6 ~ 575/MlfH 105        145 ~
                                                                                                     7 95                                                                 0    0~        0         0 ~        0      0 ~     0     0~             0  ~       ENERGY HAY
     .HR    CAP ~

204i HR

                        -==-9 CAP ~
                                  ] 60 e i     HR 23 CAgo 204 ~

HR CAP ~ 33 160 ~ HR CAP ~ 47 "204 HR CAPe 164 ~ HR

                                                                                                                         -71 CAP ~

204 ' HR Sl CAP ~ 160 ~ HAX CAP ~ 204eHW -0 ~ 0 5/Hlf 160 i

                                                                                                     '7                                          .Oi         ENERGY'38 '366WH                 24 '95/HWH.

45- 204 ~ .' 105 = 1 9 Rote 0- ~ ~ 0 0 ~ 0 0~ 0 tIR -MR CAP ~ HR CAP ~ HR CAP ~ HR CAI ~ HR CAP~

                                           '23        CAPe                   CAP ~     HR                   HR     CAP ~

Tl 204 ' ~, 'P04oMlf -0 ~ 4 5/Mlf JUN 204o 95 -'204 ~ i05 9 160 ~ 160e 1]9

                                                    =ROte 204'e 33 0

160 0~

                                                                                 ~     47 0

204

                                                                                              -    0~
                                                                                                       =

0 160 0~

                                                                                                                       ~

0 ~ 81 0" 160

                                                                                                                                                '"Oi"     , HAX  CAP ~

KNERGY '33 ~ 6806WH R446]$ /MWH MR CAI ~ HR CAP ~ HR CAP ~ HR CAP ~ HR CAP ~ HR CAP ~ HR CAP ~ HR CAP ~ JUL . ] 204 9 160 ~ 23 R04 ~ ~ 33 160 ~ 47 204o 57 160 ~ Tl 204 ' 81 160 ~ MAX CAP ~ 204eHW 0 ' 5/Mlf AUO 95 HR 1 CAP ~

           -204e
                 '04e 105 HR 160 CAP ~

160

                                       ~
                                       ~

li9 HR 23 204 204 ~

                                                            ~
                                                             'AP HR 33 0    0~

CAP ~ 160 ~ HR 47 0 CAP ~ 204 0

                                                                                                     '7
                                                                                                     ~

HR 0 0 ~ CAP ~ 160 ~

                                                                                                                           =

HR 0 CAP ~ Tl 204o

                                                                                                                                     ~      0 HR 81 0

CAPe 160 ~

                                                                                                                                                     ~       ENERGY HAX CAP ~

138.1366WH 204 'W 24 '35/HWH 0 ' 5/MW SKP P95 204 ~

     -HR =-CAPe 95 HR R04 ~

204

                ~
                'AP 105
                      =

105 HR MR 160 CAP ~ 160 160 CAP ~

                                       ~

e

                                       ~
                                             ;-119, 204 ~

HR 23

                                              ]i9 HR CAP ~

204 204

                                                           ~
                                                            '3
                                                            'AP
                                                                   ":HR HR 0

0 CAP ~

                                                                             ]60i 0~

CAPe

                                                                                       ,'0; -
                                                                                      ,HR 47 HR 0

CAP ~ 204 CAP ~ 0~ 0

                                                                                                     '7
                                                                                                     ~
                                                                                                             .0 =... Os, 9R HR 0

CAPe 160 0

                                                                                                                       ~
                                                                                                                       ~

CAP ~

                                                                                                                          .MR 71 HR 0

0

                                                                                                                                 . 0~

CAPe 204 CAP ~

                                                                                                                                     ~

HR 0 HR 0 ~= CAP 0 CAPe e'l

                                                                                                                                                ]60 ~
                                                                                                                                                    ~
                                                                                                                                                           . ENEROY.-.

MAX CAP ~ ENERGY 138 ~ 1366ifH 204eHW 133 ~ 6806WH R4 ~ 865/HWH 0 ' 5/HW R4 ~ 975/tIWH OCT 1 20he 160 ~ 23 244 ~ 33 160 ~ 47 204 ~ 57 160 ~ 71 204 ' 8] 160 ~ MAX CAP ~ 204eHW 0~0 5/Hlf R5 ~ 10$ /MWH 95 20he 105 160 119 204 0~ 0 0~ 0 0 0 ENERGY 138 ~ 1366 WH

                                                            'R
                                       ~                                  0                                   0      0 ~             ~              ~

HR CAP ~ HR CAP ~ HR ~

                                                           'AP CAP ~     HR     CAP ~         HR     CAP ~   HR   CAP ~      HR   CAP ~

NOV 197 ~ 9 138 ~ 23 197 33 138 ~ 47 197 ~ 57 13" e 71 197 ' 81 138 ~ HAX CAPe 197 ~ MW 0 ' 5/Hlf 95 19T ~ 105 138 ~ 119 '97 0 0~ 0 0~ 0 0 ~ 0 ~ 0 0~ ENERGY 124 ~ 1406 WH 27 '95/MWH HR CAP HR CAP ~ CAP ~ HR CAP ~ HR CAP ~ HR CAP ~ HR CAP ~ DEC HR I CAP ~ 197 ~ '9'38 ~

                                       ~        23    197.

MR 33'38e 47 197 ~ ~ 57 138 ~ :7] 197 ~ .- 81 I ]38 ~

                                                                                                                                           '0
                                                                                                                                                        . MAX CAP ~  ~   .=;197oHW         -0  '    5/HW 95   197 ~     ]05         138  ~      ]i9     19T ~              ,0    0~        0         0~         0      0 ~     0     0 ~            Oi         ENERGY     -.]RB.RTBGWH          RT ~ 635/HWH

a NRC INTERRnOATORY ON NINE HILE POINT NUCLEAR UNIT NO,2 ENERGY HANAOEHENT ASSOCIATESt INC PAGE 57tt fiO ~ E 320 ~ 1 (0 I REPT 9 OPTION 3 SUGREPORT 1 05/13/83

                                        <<<<<<<<<<<<<<<<<<<<            TRANSACTIONS INPUT SVr NARY FOR 1989            "<<<<<<4<<<<<<<<<<

HQ FR~aCE PE '.K St'.4VING PRE SUPPEP.IOOt'.'ONC ESCALATlotr HATES( CAPACITY COST 0~0 >/Yf< Caai<pait f t!O SPINNIt!G RESEteVE CREOI T ENERGY COST Qeo

               'aJRCta:aSE
                                                       '3                FOR CEO OUTAGE RATEI          0 '
                                                                                                         'l aREA t        1 t'R CAP ~                         Can APR      1 CAPe 275 Z75 ~
                '5

e 143 275e HP. 5T 153 CAP ~ 780e 780 '6T Tl 275>> 275e ~R 81 0 CAP. TROe 0~ HAX CAP ~ ENERGY 78Q ~ HW 410 ~ 100GWH 1542.SQS/HW 0 ' S/HWH CAP CAP, CAP ~ HR CAP ~ HR CAP ~ r R CAP ~ HR CAP ~ HR CAP. 27> ~ 780 ' 780 1542 '0$ /HW HAY 1 275 la!5 9 TRQ, 23 119 ZT5 ~ 275 '29 3g 760 47 143 275 ST 153 780 780 167 275e ZT5e 81 HAX CAP ~ ENERGY ~ 423<<77OGWH HW 0 ' $ /HWH 'l 275 '5 TSO ~ '8n, 0 ~ CAP ~ nR CraaP ~ reR CaPo ttR CAP ~ HR CAP ~ HP. CAP tR CAP ~ KR Cnp. '0$ /H'W '(R 23 275e 4T 27~ Tl 275. 61 780. HAX CAP ~ 780 'W 1542 JUa4 1 275 ~ 7 8 at ~ '2at33 780 ~ 57 780 ~ JVL 9'5 t."al 1 275 ~ CAP 275 ~ 105 raR T80 C XP ~ 780e 119 RR 23 275 CAP ~ 275 '3 rtR '&os CAP ~ 780 I re 3 47 275 CAP ~ 27> ~ ~ 153 '53 HR 57 780 CAP ~ 780 o '67 1*7 t'R ZTS ~ ClaP 275 ~ HR 81 5 0 CAP~ Teo. ~ ENERGY t!AX CAP ~ 410 ~ IOQGWte 78Q ~ HW 0~0 $ /HWH 1542.50$ /Hw 275 105 780, 119 Z75 ~ '3 129 143 275 780 0 0 ~ ENERGY ~23 ~ 770GWH 0 ~ 0 S/MWH '5 'TS '80 ~ CAP ~ 'R eaR CAPe r'R CAP ~ HP Cape Hp CAP, HR CAD ~ reR CAPe '0$ /Hw 'AP ~ 1542 AUO I 275 9 TBQ ~ 23 275 '29 780 ~ 47 27'PE 57 780 '67 275e 81 780e HAX CAP ~ 78Q AH>> ' S/HWH Z75 ~ 105 780 ' 19 275 '3 780 275 153 780 275e 0 0 ~ ENERGY 423 '7QOWH 0 '5 '43 HR CAP ~ HR C>pe raR CAP ~ 'AP ~ HR CAP ~ HP CAP ~ >R CAP ~ Cap, dl 780.Hw 1542.5OS/HW SEP 1 275 780. 23 275 780 47 27> ~ '53S7 78(a ~ '67Tl 275 78o. MAX CAP ~ 275 105 780 l9 275 'e 143 275 780 '1 0 0 ENERGY 41o, looGWH Qeo $ /HWH '5 '75 1 'Hoe ~ HR CAP ~ CAP ~ HR HR CAP~ CAP. trR CAP ~ HR 'rr '2'APe CAP ~ 'R 'AP a.R ~ 780 1542 '0$ /H'w OCT 1 275 275 '5 105 780e 780 '19 23 275 275 '29 TRQ ~ 780 47 143 27~ ~ 275e 57 153 780 780 '67 ZTbe 275e 81 n 780 0, ~ HAX CAPo ENERGY 423 '70GKH 0 ' S/HWH t<RC ]NTE!t>>OQATORY Ot NINE MILE Poli!T NUCLEAR U>>IT t!Oo2 ENERGY HANAGEHET!T ASSOCIATESt INC PAGE 643 ITEH rio ~ E 32oel (v) PEPT 9 OPTION 3 SU8REPORT 1 05/]3/83 oteeoeeteeOee44'ot TetaotSACTIONS INPUT SUHMAR'Y FOR ]990 eeet4eootoeeeeoeteo hatt HQ F'f<'cCt SE PEA IC Sl!AVlNG PREFER>EO SVRPER]oot NONE EscaLATIO't RhTEst cAPAc]TY cosT ooo tt/Ytt CO'!Pa>>T tlO SP].'oti]rto RESERVE CREOlT ENEPGY COST 0 ~ 0 '29 '7 apEA I FOPCEO OU'/AGE RATti 0 ' '7l 1 HR CAP ~'ut!CH4 toR CAP ~ CAP ~ HR CAP ~ ttR CAP ~ HR Chp ~ o' CaPo 8] Capo 1542 ~ 50$ /HW APR ] 275 9 780 ~ 23 275o 33 780 '53 27> ~ 57 780 '67 275 78Q ~ CAP ~ 780.oMW 0' 275 ]eiS 780. ]19 275 '3 >80 ~ 143 275 780 '1 0 n. ENERGY 4]o.]0 0 8>>H $ /MttH '5 '75e ?SORY ttP CAP ~ 'R CAPe oeR CAP ~ HR CAP ~ MR CAP ~ CAP ~ HR Cap ~ KR Cap ~ MAY 1 275 9 780 23 275 '?80e 47 27> ~ 57 780 275 e]1 780 ' HAX CAP ~ 780 'W 1542 ~ 50$ /MW 275 ])9 275 e 129 780 '7 143 275 ~ 153 110 167 ENERGY 423 '70GWM 0 ~ 0 $ /HwH '5 THOL 'OS ?GORY~ ~ '75o ~ JU! ] 275 ~ 'APe HR Y CAP ~ ?Gory 780 ~R 23 CAP ~ 2T5 ~ toP. 3~ CAP. 780 t'R 27'7 CAP. '53 HP CAP. TFto ~ t R Tl CaP 2?So ~ RR 8] Cap 780 ~ ~ t<AX CAP ~ Tt)0 'et 1542 '0$ /HW 95 275 ))9 2TS ~ )29 780 '7 143 275 780 '1167 '67 'R 275 n o. ENERGY 410,]OOG>>H 0 ~ 0 $ /HttH 'n5 CAPe 'P HP CAPe Hit CAP eR CAP ~ Met CAP ~ otP CAP ~ toR 'an Cap. 78o, 77> ~ 780 '78Q ~ MW 1542 ~ 505/Htt JUL 1 275 23 275o 3z 780 '53 57 780 27S ~ 81 e MAX CAP ~ '29 '7 '1 27be ]05 78o, 119 2?bo 129 143 275 780 275 0 ENERGY 423e770GWH 0 0 $ /HWH 0.'AX 'l 0 '5 ~ ~ MR CAPo 'ip CAP ~ Cape oop CAP ~ IR CAP ~ ttp CApo teR 'ap ~ rlR Cap ~ ' 1542 ~ 50$ /HW AUG 1 27S ~ 9 23 275e 33 780 '43 27> ~ '53 57 780 275o 81 780 HAX CAP ~ 78Q AH'k SEP 95 ] 275 CAP ~ 275 '<R 105 780 CAP 780 'P, 119 HR 23 275 CAP ~ 275 '3 '43 HR 780 CAP ~ 780 ~ VR 47 275 CAP ~ 27> ~ '53 HP 57 780 CAP ~ 780 167 '67 <t) 275 275 'AP ~ HP 81 0 Cap 780 ~ ~ ~ ~ ENERGY "!AX CAP ~ 423 770G>>H 780 'W 0 $ /HWH 1542 F 50%/Mtt 275 T80 ~ 119 275 ~ ]29 780 275 780 '1 0 0~ ENERGY 410 ~ 100GWH 0 $ /M'kH '5 '05 '75o CAP ~ 'R CAP ~ CAP ~ oep CAP HR CAP ~ otP Cap ttR Ca> ~ HR CAP ~ ' 1542 ~ 50$ /Mw OCT 95 1 275e 275 780 780 '0< 23 )19 2>5 ~ 275 '29 33 780 '43 27> '53 It]G ~ 47 275 ~ ST 780 780 ~ 167 275 '75 81 780 ttAX CAP ~ ENERGY 78Q ~ HW 423 '70GRH 0 ' $ /HWH WAHc4 NRC INTERROGATORY ON NINE. NILE POINT NUCLEAR UNIT NO ~ 2 ENERGY HANAGEHENT ASSOCIATESe INC PAGE: 644 ITEH NO ~ E 320 ~ 1 (O1 REPT 9 OPTION 3 SUBREPORT I 05/l3/<3 ++4~44~~~~ TRANSACTIONS INPUT SUHHARY FOR 1990 +"~>+>~0+ HQ FRHRG PURCHASE PEA SHAVING PREFERRED SUBPERIODI NONE ESCALATION RATES'APACITY COST 0 ' $ /YR COtePANY NO SPINNING RESERVE CREPIT ENERGY COST 0 ' AREAI '3 14 FORCED OUTAGE- RATEl 0 ' 'l'1 CAP ~ HR CAPe HR CAP ~ HR CAP ~ HR CAP ~ HR CAP ~ HR CAP ~ HR CAP ~ HR

r. 20 ~ HW 1542 '0$ /Hw APR 1 9 20
'19 7~ 33 20 '43 47 T~ 57 20 '67 71 7~ 81 ZOe HAY 95 HP Te CAPe 105 HR 9 20 CAP ~ 20e. HR 23 7~ CAP ~ Te 129 HR 33 20 20 '7 CAP ~ '43 HR 7~ CAP ~ 7~ 153 HR 5T 20 CAP ~ 20 '67 HR 7~ CAP ~ 7~ HR 81 0 Oe Cap, 20e HAX CAP ~ 10 '00GWH 20 eH'W 0 1542e50$ /Hw $ /HWH ' $ /HWH JUN 95 HR 7 CAP ~ 7~ 105 HR 9 20 CAP ~ 20 '3 ~ 119 HR 7~ CAP ~ 7e 129 HR 33 20 '7 CAP ~ 20 HR 7~ CAP ~ 7~ 153 HR 57 20 CAP ~ 20 HR 7~ CAP ~ T~ HR 81 0 0 CAP ~ 20 ~ ~ ENERGY HAX CAP ~ 10 '50GWH 20 ~ Hw 0 1542 '0$ /Hw 0' '3 ~,153 '1 95 Te 105 20e 119 7~ 129 20 ~ 143' 20 ~ 167 7~ 0 Oe ENERGY 10 F 5000'WH $ /HWH HR CAP ~ HR CAP ~ HR CAP ~ HR CAP ~ HR CAP ~ HR CAP ~ HR CAP ~ HR CAP ~ 1542 '0$ /HW JU4 1 7~ 20 '19 7~ 33 20e '43 47 Te 57 20 '67 7~ 81 20 ~ 20eHW 0' '3 10 '50GWH 105 20 7~ 129 20 7~ 153 20 7~ 0 0~ $ /HWH 95 7~ 'AX CAP ~ CAP ~ dR CAP ~ HR CAP ~ HR CAP ~ HR CAP ~ CAP ~ HR CAP ~ 1542 '0$ /HW LHR HR
r. 9 20 Te 33 20 ~ 47 7~ 57 20 ~ 71 7~ 81 20 CAP ~ 20 'W AUG
,Ti'29 -'0 ' 95 fe 105 20i -119 '7 20 ~ 143' 153 20 ~ 16T 7~ 0 Oi ENERGY ,10 '50GWH $ /HWH 'l 'AX e SEP HR CAP ~ 7~ HR CAP ~ 20e '19 HR 23 CAP ~ 7~ HR 33 20 '43'fe'- CAP ~ HR CAP ~ 7 HR 57 CAPe 20 'Tl HR CAP ~ T~ HR 81 CAP ~ 20 ~ CAP ~ 20 ~ HW 154'0$ '-0 ' /H'W OCT 95 HR I 95 7~ CAP ~ ,7e 7~ 105 HR 105 20 CAP ~ 20 20e '3 HR 119 Te CAPe Te Te "129 HR 33 129 20 20 20e '? ~ HR 143 CAPe 7~ 7~ 153 HR 57 153 20 CAP ~ 20 20e 'AP HR 7~ CAP ~ 7~ 7~ HR 81 0 . 0 0. CAP ~ 20 0 ' 'AX ENKRGY CAP ~ ENERGY 10 '00GWH 20 'W 10 F 8508'WH 1542 0 $ /HWH '0$ /H'W ' $ /HWH ~r<<r<<wAr rt ~~y Sw< '. % ~ aweawgpr<<rw r ra a- '<<was << le4t <<g = a v ~ <<a NRC'NTERROGATORY ON NINE: HILE POINT NUCLEAR UNIT NO ~ 2 HANAGEHENT ASSOCIATES I INC PAGE <<'NERGY 645 ITEM NOs K 320 ~ 1 REPT 9 OPTION 3 SUBREPORT 1 05/]3/83 aoaoaaaoaa TRANSACTIONS INPUT

SUMMARY

FOR 1990 <<ao<<iaaaao. 80 ECONP PURClIASE PEA K SHAVING pR EFERREO SUBPERIOOI NO NE ESCALATION RATESI CAPACITY COST 0 ~ 0 COMPAN Y 0 NO SPINNING RESERVE CRE OI T ENERGY COST 0 ' JAN HR 95 HR CAP ~ 380 380 CAP ~

                 '05 HR HR AREAI CAP ~

1700 1700 CAP ~

                                 ~
                                 ~

14 AIR 23

                                       ))9 IIR CAP ~

380

                                                      '80 33 1700 129 1700 HR FO RCEO OUTAGE RATEI CAP ~

CAP ~

                                                                        ~
                                                                        ~

HR 47

                                                                                  ]43 HR CAP ~

380 380 CAP ~

                                                                                               '7
                                                                                               '53 HR HR 0~

CAP ~ 1700 1700s CAP ~ HR 71 167 HR CAP ~ 380

                                                                                                                               '80 0

HR CAP ~ 81 1700 0

                                                                                                                                                 ~
                                                                                                                                                 ~

CAP ~ MAX CAPs ENERGY 1700 ~ MM 855 '00G'WH 0 0 5/MW 5/HWH

                                                      'AP                                                                      'AP
                                                      ~                                                                        ~
                 '                                                                                                                               '                                                            5/HW FKB   1    380
                 '05    1700      ~      23     380            33 1700 ~            47    380.
                                                                                               '53   57 1700.        Tl  380            81 1700           HAX CAP ~      170Q          ~ MW          0 95    380           1700           1]9                    129 1TQQ ~          143     380
                                                                                               '7         1700 ~    167                        0          ENERGY      772   BQQGWH                   0        5/MWH
                                                      '80                                                                      '80
                                  ~                                                                                                              ~                        ~

HR CAP ~ HR CAP ~ HR 'AP

                                                      ~        HR  CAP ~            HR    CAP ~      HR    CAP ~     HR        'AP
                                                                                                                               ~        HR   CAP ~
                                                                                                                                                 '                                     'W                     5/MW MAR        380s
                 '05 9 2200              23     380            33 2200              47    380
                                                                                               '53        2200       71  380            81 2200           MAX CAP ~      2200                        QeQ
                 '9                                                                            '7 380           2200      '5 119             '80~

129 ~

                                                                        '200 380             2200  '43 167        '80 0~         ENERGY     -aaaa<<aaGWII                    0        5/HWH HR                        CAP ~                  CAP ~            CAP ~     HR                 HR   CAP ~
                                                                                                                'R CAP ~           CAP~                                 HR                                    HR
                                  'R HR                          CAP~
                                                                                                                               'AP 0'
                                                                                                                               ~

1400 ~ MW S/HM APR 1 95 98 98 '05 1400i 1400 ~ 23

                                       ]19 98i, 98  '

33 1400 129 1400

                                                                        ~           47 143
                                                                                          . 98 98 '53        1400 ~

1400e 71 167 98 '8 81 1400 0 Qs

                                                                                                                                                 ~        MAX CAP ~

ENERGY 617 '00GWH 0' 5/MWH HAY HR

95.

CAP ~ 98

            '96s-HR    CAP ~

1400 105 1400i

                                  ~

IIR

                                        =?3.

l]9 CAP ~ < HR 98

                                                     ~
                                                      '98 33 1400
                                                             .129'40Q
                                                                        'APe
                                                                        ~
                                                                        ~

47:CAP HR 143 98 "98

                                                                                               ~
                                                                                               ~

HR CAP ~ 57 1400 ~ 153 1400e HR Tl 167 98

                                                                                                                               'APe
                                                                                                                               '8 HR 0

CAP ~ Bl 1400 ~ 0 ~ MAX CAP, ENERGY

                                                                                                                                                                   ~     1400 ~ HW 637 '80OMH
                                                                                                                                                                                                  ~ <<0 ':

Qs0 5/HWH 5/MW HR CAP ~ HR CAP~ IIR CAP ~ HR- CAP ~ HR CAP~ HR . CAPe HR 'AP

                                                                                                                               ~        HR   CAP ~

JUN JUL 95 HR

          ~:98 ~ -
          ."08 ~

CAP ~

             '98 '

9 HR 1400i 105 1400 CAPe

                        ]400
                                 ~

23 119 HR 23 98 98e

                                                     'R
-98 ~
                                                     'AP
                                                     ~

33 1400 ~ 129 1400e HR CAP~ 33 1400 47

                                                                                  ]43 HR 47.
                                                                                          '98i
                                                                                           .98 CAP ~
                                                                                           ;98
                                                                                               '53
                                                                                               '7 57 1400e HR 1400 ~

CAP ~ 1400 ~ 71 167 HR Tl

                                                                                                                         .98 ~
                                                                                                                         .98 ~

CAP ~ 98

                                                                                                                              'R        81-1400 HR "0 ~ .

CAP ~ 81 1400 ~ HAX CAPe KNEROY MAX CAP ~ 1400 ~ HW 617 ~ 400GMH

                                                                                                                                                                         ]400 'W
==0 ~ 0 5/HW 0

0 5/HMH 5/MW

                                                "-98 ~
                                                                                               'T 98s   105 1400e     '5
                                       ]19                    129      '400i 143     ='98 ~   153 1400    e    167        '8 0     0~         ENERGY      637 ~                          QeQ      5/MWH 980OMH'400 CAP ~           CAP ~          HR     CAP ~          HR  CAP ~            HR    CAPe       HR    CAP ~     HR                 HR  CAP ~

HR HR

                                                                                                                              'AP
                                                                                                                              ~
                 '                                             33 ]400 ~                                             Tl                 Bl 1400 ~                                                             5/MW AUO   1       98
                 '05    1400    ~        23       98                                47      98
                                                                                               '53        1400 ~           98                             MAX CAP ~                    ~ HW          0 98         1400           119                    129 1400e           ]43       98
                                                                                               '7         1400      167                                   ENERGY      637 '80OMH                     0        5/HWH
                                                                                                                              '8 95
                                                     '8
                                ~                                                                              ~                         0     0~

HR .CAPs HR CAP ~ HR HR CAPe HR CAP ~ HR CAP ~ HR HR CAP ~

                                                     'APe                                                                     'APs
                 '                                                                                                                      81 1400  '                       1400 ~ HW                   0        5/HW SEP           98
                 '05    1400    ~        23       98           33 1400 ~            47      98 98s'53 1400e      71    98                             HAX CAP ~

98 1400 129 1400 143

                                                                                               '7         1400 ~    167                                   ENERGY      617 '00OWH                     0.0      5/HWH
                                                                                                                              '8 95                                                                                                                                         0~
                                                     '8
                                ~                                      ~

KR CAPe HR CAP ~ lIR HR CAP ~ HR CAP ~ HR CAP ~ HR HR CAP ~

                                                     'AP                                                                      'APe
                                                     ~

Tl 8] 1400 ~ 1400 ~ HW 5/HW OCT 1 98e

                 '05 9 1400e             23       98           33 1400 ~            47      98
                                                                                               '53        1400 ~           98                             MAX CAP ~                                  0 1400           ]19                    129 1400            143       98
                                                                                               '7         1400      167                                   ENERGY      637 '80GWH                     0        5/HWH
                                                                                                                              '8 95       98                                                                                                                          0     0~
                                                     '8
                                ~                                      ~                                       ~              ~

HR CAP ~ HR CAP ~ HR 'AP HR CAP ~ HR CAP ~ HR CAPe HR CAP ~ HR CAP ~

                                                     ~

Tl 380 81 2200 ' 2200 'W 0 ' 5/HW NOV 1 380 380 CAP ~

                 '05HR 2200 2200 CAP ~
                                 '5
                                'R 23 119 HR 380
                                                     '80 33 2200 2200 CAP ~
                                                                        '29
                                                                       'R AT    380 380s CAP ~      HR 2200 153 2200    '43 CAP ~
                                                                                                               'R 167 HR
                                                                                                                               '80 HR 0

CAP~

                                                                                                                                                 ~

HAX CAP ~ ENERGY <<aaa<<a<<OWH 0 ' 5/MWH

                                                     'AP                                                                       'AP
                                                     ~                                                                        ~
                 '                                                                                                   Tl 380                                              1700 ~ HW                   0        5/HW OEC   ]

95 380 380 '05 INTERCHANGE ACCOUNTING I

                        ]700 ~
                        ]700 ~

23 119 380

                                                     '80 33 1700 129 1700
                                                                       ~
                                                                       ~

47 143 380e 380 '153 57 1700 1700

                                                                                                               ~
                                                                                                               ~    167       '80 81 1700 0     0
                                                                                                                                                 ~
                                                                                                                                                 ~   .

MAX CAP ~

                                                                                                                                                         .ENERGY      855 ~ 600GWH                   0 '      5/HWH PRICINO OPTION                    I 8                          COMP OWNERSHIP                    COHP OWNERSHIP        COMP OWNERSHIP              COMP OWNERSHIP     COMP OWNERSHIP DISPLACEMENT COST                 I 50    '    %

FIXEP COST INCREASE I r]4 ' 5/H'WH SAVINGS FIXEO SPLIT I 100 ~ 0% PRIORITY OROER I 2 REPORT]NO OPTION I ACCOUNTINO OPTION I I

               .NRC-INTERROGATORY -ON NINE MILE: POINT NUCLEAR UNIT.:NDe2.                                                                  ENERGY 'HANAGEHENT.ASSOCIATKSI"INC                             ;.%'        .~-           .'PAGKt'-.647'"-"-=',-'-.

ITEH NO ~ E320 j 1 (D) REPT 9 OPTION 3 SUBREPORT 1 -.

                                                                                                                                                                                                                           ='5/]3/83
                                           <<aa<<oooo<<a              TRANSACTIONS INPUT 

SUMMARY

FOR ]990 aoaaoaooo<< PURCHASE UNSCHEDULED PREFERRED SUBPERIODI NONE ESCAL ATION RATESI CAPACITY COST 0~0 S/YR

                                                                                                                                                                                                                       'EDARS COMPANY 5                                              RESERVE CREDITED                                                                          ENERGY 'COST               4 ~ 0=

JAN HR 95 HR 1 CAP ~ 197 197 CAP ~

                            )QS HR 9

HR AREA I

                                     )38 138
                                         '3 CAP ~

CAP ~ 14 MR l]9

                                                   'MR CAP ~

197 ~ 197 ~ CAP ~ HR 33 HR

                                                                             .0 CAP ~

138 CAPe 0 FORCED OUTAGE RATEI

                                                                                         ~
                                                                                            =   HR 47 HR 0

CAP ~ 197 ~

                                                                                                          .4 ~

CAP ~ HR 57 HR 0 138 0~% CAP ~ CAP ~

                                                                                                                                ~

MR 71 0 HR CAP ~ 19T ~ 0 CAP ~

                                                                                                                                                   ~

HR Bl HR 0 CAP ~ 138 0~ CAP ~

                                                                                                                                                                  ~           MAX CAP ~

ENERGY

                                                                                                                                                                                                  - 19'TeHW =
                                                                                                                                                                                              =128 ~ 2780Wgi
                                                                                                                                                                                                                   -.0
                                                                                                                                                                                                                    .         27
                                                                                                                                                                                                                                   ~ 0 $ /HW
                                                                                                                                                                                                                                   '6$    /HWH'AX oEB          1 ,197~            9    ]38 e          23     197 ~           33      138   ~      47    197tlat ~ ...- 57    138  ~      Tl    197 ~      81   138  ~               CAP ~,,             197eHW -==";               0 ~ 0 S/HW SAR
         '95 HR 95 HR 1

197 ~ CAP ~ 197 ~ 197 ~ CAP ~

                            )05 105 MR 9

HR

                                    .138 138 138
                                         '3
                                         ~

CAP ~

                                         ~

CAP ~ 1)9 MR

                                                  ])9 )90 IIR 197 ~

CAP ~ 197 CAP ~ HR 33 HR 0 0 138 0 CAP ~ 0 CAP ~

                                                                                         ~
                                                                                         ~
                                                                                         ~

MR 4? MR 0 0 CAPe 197

                                                                                                     .CAP ~

0

                                                                                                              '7
                                                                                                              ~

lI ~ HR HR Q 0 CAPe 0~ CAP ~ 138 0 0 HR 71 0 HR 197 0~ CAP ~ 0~ CAP ~

                                                                                                                                                   '1   HR MR 0

0 0 CAP ~ 138 0~ CAP ~

                                                                                                                                                                  ~
                                                                                                                                                                  ~
                                                                                                                                                                            'ENERGY MAX CAP ~

ENERGY 115 ~ 8640WH~25 ~ 59$ /HWH: 197eHW 128e278GWH

                                                                                                                                                                                                                              .- 0 28
                                                                                                                                                                                                                                   '    $ /HW
                                                                                                                                                                                                                                   '3$ /NWH

'4PR 1 197 9 138 ~ 23 '197 ~ 33. 138 ~ 47-- 197 ~ 57 138 ~ - 71 197 81 )38. MAX CAP ~ = 197 ~ HW: ~ 0 ~ 0 $ /HW 95 197 ~ 105 138 ~ l)9 ]97 ~ 0 0 ~ 0 0 0~ 0 0~ 0 0 ~ ENERGY- - )R4 ~ 140GWH' <<28 ~ 17$ /MWH. CAP ~ HR CAP ~ MR CAP ~ HR CAP ~ MR ;CAP ~ MR CAP ~ HR ..CAPe MR CApe << HR <AY

          '1=- 202e 95 . 20Ri-'-'105 -156 ~ =-)19='202
       -HR- 'CAP ~ 'HR: 'CAP~

9 .:-156. '-."23'-.-'202e ,.=33.". 156 ~

                                                                            . 0:     ..Qs -=,~'4 47:-202i- .5T '-156e" Tl.

HR.-'CApi.=.=='"HR =CAPe .-'HR'CAP ~ HR'--CAP ~

                                                                                                       -. 0 ~       :  0     0~ -

RORY 0- .-'0 "= . 0 HR. CAP ~

                                                                                                                                                  ~

81 HR 156e;= 0 ~, CApe

                                                                                                                                                                             .MAX CAP ~   '-  -    ,'RQReMW~~.OS ENERGY'136i0280Kli~,.=aRS ~ 98$ /MWH:

0 $ /MW=-, JUN="- -1: '202 9..-156  :- R3>>:.R02 '..33 156 =-:47 202'= '7...

                                                                                                                     ..'0156 ~       Tl 202 ' Bl          '56    F-         HAX-CAP~ ., ';:202'eHWm"- <<'0 ~ 0"$ /NW
                      '05
                                          ~
                                                                                                                                                               '0             ENERGY'.]3<<1 6400WH~~Rdi 1 ) 5/HWH'. 
        -,95 '202                  '156           )]9 'RQR
                                                                '3         - 0 .                -'0    .-4 ",,                          0
                                                                                                                                                   '1
                                                                                                                                             . 0~

Os ~ HR CA'p ~ HR CAP ~ MR 'CApe 'HR CAP ~ HR CAPi'R CAP ~ HR CAP ~ HR 'Ape JUl..-,l ' 9 '56e .. 23 = 202 156 ~ 47 156 ~ Tl 202 156 ~ HAX CAP ~ 202tH&'".'>~<<0 ~ 4 f/HK

       .95 202 202     -
                            ]05      156 RORY 119 .202 . '." 4" . 0                           0   0 ' 57 242 ~ .

0 0~ .0 0 ~ ENERGY- 136 ~ ORBGWH,",'". '26 '3$ /HWH

        'R      CAPe HR    CAP ~

MR CAP ~ -HR *CAP ~ HR'APi'R '7 ~,".0CAP ~ HR CAP ~ MR CApe

                                                                                                                                                                                                    'ZQRiHW:".-~<c~'. 0 '             $ /HW.

LUG 202 ~ 9 156e 23 202 ~ ~33 ]56 ~ 47 202 ~ 156 ~ 71 202 ~ 81 156e HAX CAPe 1

                                                                                                                                       -'0, 3EP
  ,,.95
  .- HR 1
              -,202 CAP ~

202 '

                      ~     105-.

HR.-CAP ~ - 156 ~,-..])9 e242y

                                     ]56'i AR---CAP ~
                                                  -23   >>  202  '3     . HR
                                                                           -.0~;,=;0 ~

CAP ~

                                                                                 .-156 ~
                                                                                              .-~0~<<. 0 ~,"

47 .202

                                                                                                        ~

HR.. CAP ~

                                                                                                              '57
                                                                                                                       .0 HR .
                                                                                                                                ~;..
                                                                                                                           )56e'1 CAP ~   . AR
                                                                                                                                              . 0~

CAP ~ 202 '1~ HR 0 CApe 156 ~

                                                                                                                                                                           .KNERGY:., ..136 0280~WH"'- jVV26 36$ /NWH MAX CAP ~                   f
                                                                                                                                                                                                     '20 t MW ~~, t 'Q e 4 $ /HW
)CT 95 HR 95 HR 1

202 ~ CAP ~ 20R ~ 202i CAPe 105 105 HH 9 HR 156 ~ CAPe 156 ~ 156 ~ CAP ~ l]9

                                                   'HR 119 23 8R 202 CAPe 202 CAP ~
                                                                '3
                                                                    =

HR HR

                                                                             '0-Qi CAP ~

156 ~ 0 CAP ~

                                                                                         ~
                                                                                              'R HR 47 0

0' CAPe

                                                                                                     .202 ~

CAP ~ 0~

                                                                                                              ~

HR 57 HR 0 0 CAPe 0 156 ~ 0~ CAP ~

                                                                                                                                ~       0 HR- CAP ~
7) RQZ ~
                                                                                                                                      . 0 MR 0~

0~ CAP ~

                                                                                                                                                        "R 81 MR 0

0 0~ CApe 156 ~ 0~ CApe ENERGY CAPe ENERGY 131 6400WH'~@26 49$ 136 ~ RORY MW ',~f 0 ' $ /HW OZBGWQ'-:-.s~26 6RS/MWH ~

                                                                                                                                                                                                                                            /HWH'AX

<OV 1. 193 ~ 9 132 ~ R3 193 ~ .-33 132 ~ 47 193 ~ 57 13R ~ 71 193 ~ 81 132 ~ MAX CAP ~ )93eHW -'.;R998 ~ 44$ /HW 95 193 ~ 105 132 ~ 119 193 ' 0 0~ 0 0~ 0 0~ 0 0~ 0 0 ~ ENERGY 120 ~ 6600WH :."-.R9 ~ 155/HWH )EC' MR CAP!

              '193i' 95 - 193t'.105, HR 9'32iCAP ~          MR 132e. 1]9. 193 ~ ',:4 CAPt . HR CAPe
                                                '=23 <<']93 j>-'-,.g33" ']32 ~
                                                                  '                 =-0 ~ -

HR CAP ~

                                                                                                 '0'.Os,.
                                                                                                                =
47. -193 ~ -~57 HR CAP ~
                                                                                                                           ]32 ~

0,.0 ~ . HR. CAP

                                                                                                                                   71'=
                                                                                                                                     . 0',

193

                                                                                                                                               .0
                                                                                                                                                   ~
                                                                                                                                                   ~
                                                                                                                                                   ~

HR 81 CApe 132 ~ 0~ .

                                                                                                                                                                           'AX 'CAP ENERGY
                                                                                                                                                                                      ~ ~.: ->>'93iNW lR4edBZOW~H'~
                                                                                                                                                                                                                   <<+~2998 ~ 04$ /HW
                                                                                                                                                                                                                    "+29           ~ 29f/N'WH       -.

NRC INTKRROGATORY ON NINE HILK POINT NUCLEAR UNIT NO ~ 2 ENERGY MANAGEMENT ASSOCIATKSe INC PAGE- 707 ITEM NO ~ K 320sl IO) RKPT 9 OPTION 3 SUBREPORT 1 05/)3/83 (-

                               +444oo~e+         TRANSACTIONS INPUT 

SUMMARY

FOR 1991 +<<4iiaiioe HQ FRMCK PURCHASE PKA K SHAV PREFERRED SUBPKRIODl NONE ESCALATION RATES'APACITY COST Oe0 %/YR COMPANY 2 NO SPINNING RESERVE CREDIT ENERGY COST 0 ' APR HR 1 CAP ~ 275 HR 9 AREA I CAP ~ 780 '3

                             '19 1

HR CAP ~ 275 HR 33 780 '7 FORCED OUTAGE RATE! CAP ~

                                                             '43 HR   CAP ~

27> ~ HR 57 780 0' CAP ~

                                                                                           '1  HR  CAP ~

275 Bl CAP ~ 780 ~ MAX CAP ~ 780 'W 154'05/HW

                                                             '7 95       '75 105   780                 '75 780          RTS ~   153     TBO ~   167  275t'129 0    0 ~    ENERGY     410 ~ 100GWH       0     5/HWH HR      'AP
            ~      HR   CAP ~      HR      'AP
                                           ~        HR   CAP ~   HR   CAP ~     HR    CAP ~    HR  CAPt        HR  CAP ~
                                                                                                                       '                   780 'W      1542 '05/MW HAY   1 95 275
             '75e 9

105 780e 780 CAP ~

                             '19   23 kR 275
                                           'NG
                                            '75 33 129 HR 780 780 '43 CAP ~   HR 27> ~

27~t CAP ~ 57 153 HR 780 780 CAP ~

                                                                                           '67Tl HR R75 2T5 ~

CAPs Bl HR 780 0 ~ CAP ~ HAX CAP ~ ENERGY 423 '70GWH 0 ' 5/MWH CAP ~ HR

                                                                                                                                                            '0$ /MW
                                            'AP HR                                     ~

3i 780tMW 1542 JUN 1 275 9 TBD ~

                             '19   23  Z75 ~             780
                                                             '43 47   27> ~
                                                                            '53 57    780
                                                                                           '67 71  275         81  TBO ~    MAX CAP ~
                                                                                                                                                            ' 5/MWH 780
                             '3        275         129   780
                                                             '7       275             780
                                                                                           '1 'R   ZT5 ~        0    0~     ENKRGY     410 ~ 100GWH       0
                                                                                           'l'l 95       '75 105 JUL HR 275
             'AP
             ~     HR   CAP ~

780 HR 275

                                            'AP
                                            ~       HR 3g CAP ~

780

                                                             '43 HR 27'7 CAP ~
                                                                            '53 HR    CAP ~

780 HR CAP ~ 275 HR 81 CAP~ 780' Hax cap. 780 'W 1542 '05/HW 95 105 780

                             '3'R119                     780
                                                             '7       275             TBO ~   167  275               Oeg    ENERGY     423 '70GWH         0     5/HWH
                                            '75                                                        '29
             '75
                             ~

HR 'AP

             ~     kR   CAP ~      RR       'AP
                                            ~            CAP ~   HR   CAP ~     HR    CAP ~    HR  CAP ~
                                                                                                       'R HR  CAP ~

cap. 1542 '05/HW AUG 1 95 HR 275

              '75 9

105 HR 780 780 CAPe

                             ')9-      275 CAPe
                                            '75s 33   780 780e CAP ~
                                                                )<3 HR 27>e 275 CAP ~
                                                                            '153 57 HR 780
                                                                                     -780 CAP ~
                                                                                           '67 HR 275 275 CAP ~
                                                                                                        '29
                                                                                                       'R-81 0

HR 780 0

                                                                                                                       ~
                                                                                                                       ~

CAP ~ ~ Max ENERGY 780 AM'W 423 ~ TTOG'WH 0 ' 5/HWH

                             'i9
             'APs
                                                             '                                     275t        Bl      '                   780eHW      1542 '05/HW SEP   )  275         9   780e       23  275e        '33   780
                                                             '43  47  27> ~

57 '780

                                                                                           '67                     780      HAX CAP ~

OCT 95 HR 95 275

            ~
             '75
             'CAP
             'T5
             ~

105 HR 105 780 CAP ~ 780 780

                             '3
                             '19 HR 275 275s 275
                                            'AP
                                            ~

1P9 780

                                                       'CAP ~

33 780 780

                                                             '7
                                                             '43 HR 275 Capi 27> ~

275e 153 780 HR 57

                                                                               )S3 CAPe 780e 780 HR
                                                                                           '67Tl 275 CAPe 275 275
                                                                                                       'R
                                                                                                        '29.

HR Bl 0 780 0~

                                                                                                                       ~

CAP ~ ENERGY MAX CAP ~ ENERGY 410 ~ 100GWH-780sHW 423e770GWH 0 5/HWH 1542 '05/MW 0 ' 5/HWH}}