Text
a U. S.
NUCLEAR REGULATORY COtlt4ISSION DOCKET NO. 50-410 NINE tlILE POItlT tlUCLEAR STATION, UNIT 2 NIAGARA HOHANK POtlER CORPORATION CEttTRAL HUDSON GAS
& ELECTRIC CORPORATION NEW YORK STATE ELECTRIC & GAS CORPORATION LONG ISLAtlD LIGHTING COMPANY ROCHESTER GAS
& ELECTRIC CORPORATION ORDER EXTENDING CONSTRUCTION COtlPLETIOH DATE I.7590-01]
Niagara tlohawk Power Corporation, Central Hudson Gas
& Electric Corporation, tlew York State Electric
& Gas Corporation, Long Island Lighting Company and
.Roch'ester Gas and Electric Corporation are the co-holders of Construction Permit tlo. CPPR-112 issued by the Atomic Energy Commission" to Niagara mohawk Power Corporation on June 24, 1974 for construction of the Nine tlile Point Nuclear Station, Unit 2 to.be located in Oswego County, flew York, on the south shore of Lake Ontario in the town of Scriba, seven miles east of the city of Oswego, New York.
The Construction Permit t)o. CPPR-112 was amended on October 27, 1978 to approve the transfer of ownership interests to the above noted companies.
By letter dated February 27, 1978, Niagara mohawk Power Corporation filed a request for extension of the latest construction completion date for the Nine Nile Point tluclear Station, Unit 2. It was requested that Construction Permit Ho.
CPPR 112,be extended from July 31, 1978 to December 31, 1984.
By letter dated June 26, 1981, tliagara tlohawk Power Corporation identified additional factors which have resulted in further delay an4 requested the latest completion date be extended an additional three years to December 31, 1987.
NAC FORWPS~i0=80) NRCM 0240.
USGPO: 1881-88&880 1
I
<<Fic~tw.-Regulatory.
omissioo..il d..PAKy$4~..(tt. ffect; op fh t day were c ntinued unde the authority f the Nuclea Regulatory mmission.,
~
~
~
~ ~
~ ~ ~
~
~
~
-"'<" 8303i600i8 830228 PDR ADQCK 050004i0
~"'A.-
PDR"
~,
"" OFFICIAL RECORD COPY,
4'
<<+i8
r
+ ~
0
~
t759O-Oll This action involves no significant hazards consideration, good cause has been shown for the delays and the requested extension is for a reasonable period, the basis for which are set forth in the staff's safety evaluation for this extension.
The Commission has determined that this action will not result in any signifi-cant environmental impact and, pursuant to 10 CFR 51.5( d)(4), an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with this action.
The NPC staff evaluation of the request for extension of the construction permit is available for public inspection at the Commission's Public Document
- Room, 1717 H Street, NH, tIashington, D. C. 20555 and at the Denfield Library, State University College at Oswego,
- Oswego, New York 13126.
IT IS HEREBY ORDERED that the latest completion date for Construction Permit No. CPPR-112 is extended from July 31, 1978 to December 31,, 1987.
FOR THE NUCLEAR REGULATORY COMfIISSION Date of Issuance:
~EB ~ 8
~983 Robert A. Purple, Deputy Director Division of Licensing Office of Nuclear Reactor Regulation OFFICEI SURNAMEP DATEP DL:LB¹2/ M
~ ~ ~ ~ ~ 0 ~ ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ ~ 0 MHa uahev :pt
~ ~ ~ ~ 0 0 0 0tl0 0 0 0A0 0A0 ~ 0 ~
/
~ ~ 00/eo jo/00800000 ~ 0 ~
DL:LB¹ /LA
~ ~ ~ ~ 0 0MO ~ ~ 0
~ 0 ~ 0 ~ ~ 0 ~ 0 EH@
n
~ ~
~ ~ ~ 0 ~ ~ ~
~ ~ ~ 0 ~ 00 ~ 0 ~ ~ ~
~ 0
~
~ ~
~ ~ ~
~ ~ ~ 0 ~ 0 ~ ~ ~ ~
pcj I ISP OELD
..R&SAE~k.
I//j/83
~ 0 ~ 0J ~ 0 ~ 00 ~ ~ 0 ~ ~ ~ 0 ~ ~ ~ ~ ~
DL.
2/BC
~ ~ ~
~ 0
~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
ASc encer
~ ~ ~ ~ ~ ~
~ ~ ~ 0 ~ ~ 0 ~ ~ ~ ~ ~ ~ 0 ~ ~
2-/
I,.
83
\\ ~ ~ ~ ~ 0 ~ 00
~ ~ ~ ~ ~ ~ 0 ~ ~ ~ ~ ~
DL
~ ~ ~ ~ ~
~
TN
/
3'L R
D 'nhut Q/gS/83 NRC FORM 318 (10-80] NRCM 0240 OFFICIAL R EGO R 0 COPY USGPO: 1SS1~w960
~f lh
~
~
, ~
4 4
l
t.7590-013 The reasons given for the requested extension to December 31, 1984 were:
1.
Reduction in the demand for electric power in the Niagara Mohawk Power Corporation's service area; 2.
Difficulty in obtaining funds at a reasonable 'rate thereby delaying construction; 3.
Additional construction time required to implement design changes such as relocation of the safety/relief valve piping to mitigate Mark II containment dynamic loads and changing from once-through to closed loop circulating water cooling; 4.
Additional time required to study geological features and phenomena; 5.
Extended construction period caused by labor problems and work stoppages in 1976 and 1977 and shortages of qualified welders, material procurement delays and shortages of qualified vendor s; and 6.
Delay in granting the original Construction Permit.
The reasons given for the additional three year s of extension to December 31, 1987 were:
l.
Additional time required to implement design chanqes and improve-ments to meet NRC requirements, some of which resulted from the Three Nile Island incident; 2.
Additional time required to evaluate geological features and phenomena; and 3.
Additional time consumed by an extensive audit of the project as ordered and directed by t'e New York State Public Service Comnission.