Text
FEB
~
19@
DISTRIBUTION:
See attached page Docket No.:
50-41 0
/'UBJECT:
MEMORANDUM FOR:
A. Schwencer, Chief Licensing Branch t(o.(-2, DL FROM:
M.
F. Haughey, Project tHanager Licensing Branch t(o. 2, DL CASELCAD FORECAST PANEL VISIT TO NINE HILE POINT, UtlIT 2 DATE 5 TIftE:
LOCATION:
PURPOSE:
AGENDA:
February 22, 1983 9:00 am - 4:00 pm Febr uary 23, 1983 9:00 am - 4:00 pm February 24, 1983 9:00 am,'-,'0l'2,:66. noon Nin'ei Mile Point, Unit 2 Scr'iba, New York To r'eview construction progress and obtain information for ass'ess-ing projected fuel load date..
See attached Meeting Agenda for details.
Februar 22 1983
- Meeting:
Discuss recent construction prog'r,ess and present status of the project.
Februar 23 1983
- Site Tour:
Tour the project and observe construction activities.
(Februar 24 1983
- Meeting:
Discussion to resolve questions remaining after tour.
PARTICIPAt/TS:
NRC; M. Lovelace R. Shul.tz M. Haughey NMPC H. Rademacher S.
t1anno R. Pinney, et.al 8302i40209 83020i PDR ADOCK 050004i0 A
Attachment:
As stated M. F. Haughey, Project Hanager Licensing Branch No.
2 Division of Licensing cc:
See next page OFFICE/
SURNAME/
DATE$
DL LBk'
~ ~ ~ 1 ~ ~ ~I
~i~ oo/oP@H0 ~ ~
MHaughey:pt
~ ~ ~ii~i ~ ~i~i ~i ~i~ o ~ o ~ o ~
2/7/83
~ ~ ~i&o~ oooo ~i~i~ ~i~i~ ~ ~
DL 2/BC
~ ~ ~ ~ ~ o ~i~ ~ oo ~ ~ oAo ~ o ~ ~ ~ ~
ASc hwencer
~\\ ~ o ~ o ~ ~ ~ ~ ~i~ ~ o ~ o ~ o ~ o ~ o ~
2/
~ oo/oo o joo0oRoooOooo
~
~ ~ ~ ~ ~i~ ~ ~ ~i~i~i~ ~ ~
~
~
o i
~
~ ~
i~ ~
~ ~
~
~ ~i~ ~
~i~ i~
~ ii~
~ ~ ~ ~ ~ ~ ~ ~ 1 ~ ~ I ~ ~ ~ ~ ~ ~ ~
~ ~i~
NRG FDRM 318 u0-80) NRCM 0240 0 FFI CIA L R ECOR D COPY IE USGPO: 199t~o960
r f
I 1
Nine Mile Point 2 Mr. Gerald K. Rhode Vice President, System Project Management Niagara Mohawk Power Corporation 300 Erie Boulevard West
- Syracuse, New York 13202 CC:
Mr. Troy B. Conner, Jr.,
Esq.
Conner 8 Wetterhahn Suite 1050 1747 Pennsylvania
- Avenue, N.W.
Washington, D.'C.
20006 Mr. Richard Goldsmith Syracuse University College of Law E. I. White Hall Campus
- Syracuse, Hew York 13210 T. K. DeBoer, Director Technological Development Programs Hew York State Energy Office Agency Building 2 Empire State Plaza
- Albany, Hew York 12223 Ezra I. Bialik Assistant Attorney General Environmental Protection Bureau New York State Department of Law 2 World Trade Center New York, Hew York 10047 Resident Inspector Nine Mile Point Nuclear Power Station P. 0. Box 126
- Lycoming, New York 13093 Mr. John W. Keib, Esq.
Niagara Mohawk Power Corporation 300 Erie Boulevard West
- Syracuse, New York 13202---
~'
ELOAO FORECAST PANEL SITE YIS T MEETING AGENDA 2.
3.
Overview of project construction schedule including progress and major milestones completed, current probl'ems and any anticipated problem areas that may impact the current projected fuel load date.
Detailed review and current-status of design and engineering effort {by major dipcipl inc) including" any potential problems that may arise from necessary rework.
Detailed review and current. status of procurement activities including valves, pipe, instruments,
- cable, major components, etc.
4.
Actual and proposed craft work force (by. major craft), craft
'vailability, productivity, potential labor negotiations and problems..
Detailed review and current status of all large and small bore pipe hangers, restraints,
- snubbers, etc., including design,
~.
rework, procurement, fabrication, delivery and installation.
.6.
Detailed review of project schedule identifying critical path items,'near critical items, amount of float for various activities, the current critical path to fuel loading, methods of implementation of corrective action for any activities with ne'gative fIoat, and provisions for continoencies.
The estimated project percent complete as of,>>nuarY 3I, 1983.
7; Detailed review and current status of bu1k quantitses including
~
, current estimated quantities, quantities insta'Iled to
- ate, quantities scheduled to date, current percent complete for
~
- each, actual versus forecast installation rates, in cubic yards/mo.,
~
linear feet/m., or number/mo.,
and basis for figures.
(a)
Concrete (CY)
(b)
Process Pipe'LF)
Large Bore Pipe {2 1/2" and larger)
Small Bore Pipe {2" and smaller)
(c) 'ard Pipe (LF)
(d)
Large Bore Pipe Hangers, Restraints, Snubbers (ea)
~"
~ 4
j 1
I
~ '\\
4
~..
(e)
Small Bore Pipe Hangers, Restraints '(ea)
(f} Cable Tray (LF) '..
(g)
Total Conduit (LF)
~
~
{h} Total Exposed Hetal". Conduit (LF}:.
(i)
Cable (LF)
Power Control Security':Instr umentation Pl a(it-.Lighti ng
'e
,(j)..Terminations -(ea},'
Power Control Security
-, Instrumentation Plant Lighting (k)
Electrical Circuits (ea)
Power Control Security (1)
Instrumentation (ea]
~
~
~
~
/
~
~ ~
~
~
~
~
Dethiled'eview and current status of preparation of preop and acceptance test procedures, integration of preop and acceptance test activities with construction schedule, system turnover schedule, preop and acceptance tests schedule, current and proposed preop and acceptance tests program manpower.
~
(a) 'otal number of procedures required for fuel load.
(b)
Number of draft procedures not started.
(c)
Number of draft procedures being written.
(d}
Number of procedures approved.
.(e Number of procedures in review.
{f) Total number of preop and acceptance tests required for fuel load.
g Number of preop and acceptance tests completed.
(h Number of preop and acceptance tests currently
. in progress.
{i) Number of systems, turned over to start-up..
0
c r
~ ~
~ 4 9.
1'0.
12.
~
~
~
Detailed discussion of potential schedular. influence due to changes attributed to NUREG-0737 and other recent licensing requirements.
. Discussion of schedular impact, if any, regarding potential
~.
deficiencies reported in accordance with 10 CFR 50.55(e).
Overview of current construction'and"startup management organization showing interfaces between t'e two.
Site tour and observation'of construction activities.
0
~
~
~
~
~
Qy 4
MEETING NOTICE DISTRIBUTI'ON:
Date:
FEB 4
1983 Document Control (50- 41OI NRC PDR L
PDR NSIC PRC LB02 Reading E. Hylton Project Manager M. F.
Hau H. Dentonj'E.
Case D. Eisenhut/R.
Purple T. M. Novak*
B. Youngblood A. Scliwencer G. Knighton E. Adensam G. Lainas F. Miraglia J.
P. Kniglit W. Jofinston D. Muller T. Speis
- R. Houston L. Rubenstein
'F. Schroeder M. Ernst J.
Kramer NRR Division Directors" 0
A I'.
L. Jordan, DEQA:IE J.
M. Taylor, DRP:I'E Phillips Euil ding Receptio ACRS
(.16$
Region Resident I:nspecton nlst**
NRC PARTICIPANTS:
W. Love ace.
=
R. Shultz M. Haughey cc:
Service Ltst
+Only if participant in meeting
- Onlyif meeting held i'n Bethesda
I 0
qg ~
i x'