ML17053D124
| ML17053D124 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 04/20/1982 |
| From: | Polk P Office of Nuclear Reactor Regulation |
| To: | Vassallo D Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8204290409 | |
| Download: ML17053D124 (6) | |
Text
~pg Rfoy 0
Cy 0
D$
'+n +a*<<+
Docket No. 50-220 UNITED STATES
'~AR REGULATORY COMMISSION WASHINGTON, D. C. 20555 April 20, 1982 MEMORANDUM FOR:
FROM:
SUBJECT:
DATE'OCATION'omenic B. Vassallo, Chief Operating Reactors Branch ¹2, DL Philip J. Polk, Project Manager Operating Reactors Branch ¹2, DL Forthcoming Meeting with Niagara,Mohawk Power Corporation Thursday, April 22, 1982 9:00 a.m.
Bethesda Holiday Inn, Wisconsin Avenue Versailles 2
PURPOSE:
- Requested Attendance:
The licensee is to present the current status of Nine Mile Point (Unit 1) plant as well as their plans and schedules for changeout of recirculation system sensitized safe-ends; (Agenda attached)
NRC'.
Eisenhut T. Novak T. Ippolito K. Wichman Q W. Hazelton i J. Collins J. Halapatz P. Polk P. Matthews P. O'onnor D. Collins F.
Shopec T. Johnson H. Kister, ISE H. Gray, I8E S.
- Hudson, I8E Conrad J.
Wing Nia ara Mohawk Power Cor oration:
G. Gresock C.
Mangan T. Perkins T.
Roman S. Wilczek W. Schmidt (MPR)
R.
Hemmings (London Nuclear)
G. Gordon (GE)
C. Schmidt (NES)
- N.Y. State Public Service Commission Representative Philip J. Polk, Senior Project Manager Operating Reactors Branch ¹2, DL
a
AGENDA NIAGARA MOHAWK POWER CORPORATION April 22, 1982
.0 III.
IV.
V.
VI.
INTRODUCTION
SUMMARY
OF PRQBLEM-.
t PLANS FOR REPLACEMENT ISI CRACK GROWTH ANALYSIS DECONTAMINATION VII.
I
MEETING NOTICE DISTRIBUTION et File ",
~, --
- D. Yassallo Project Manager T.. Novak-B. Grimes OELD IE (1)
Receptionist
'CRS (10)
Ippolito, ORAB - MS 545 H. Denton NRC Participants Resident Inspector
. Regional Administrator M. Schaaf
P g
~ 4