ML17053C966
| ML17053C966 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 11/18/1981 |
| From: | Lempges T NIAGARA MOHAWK POWER CORP. |
| To: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML17053C968 | List: |
| References | |
| NMP-3864, NUDOCS 8112140353 | |
| Download: ML17053C966 (4) | |
Text
NAP-3864 NIAGARAMOHAWKPOWER CORPORATION NIAGARA 'I MOMAWK
.I)))~
300 ERIE BOULEVARD, WEST SYRACUSE. N. Y. 13202 November 18, 1981 kk.
Ekdon J. Rmnnm, Ctu.e,t'I Paojmte Branch
<1 0~ed S~ee MuckeaII. Regula'os CommQbkon Region I 631 Pads Avenue.
G.ng o$ P~am, PA 19406 RE:
Dock& No.
50-220 Iespe~n RepoM Mo. 50-220/81-24 TM ce.$~ Co Ae, eocene,,
aa$ c+L supe~on conducted by A.. S. Huron o( Ck4 o(g.ce, on September 1-30, 1981, at Nne. NXe, Point Unit <1, Seru.ba, Neg Yo&, o( a~au aut1Ioru.zed by MRC Lice,me. No. 'OPR-63.
ITEII A Technical Specification 6.11 states:
"Procedures for personnel radiation protection shall be prepared consistent with the require-ments of 10 CFR 20 and shall be approved, maintained and adhered to for all operations involving personnel radiation exposure."
Radiation Protection Procedure RP-1, "Access and Radiological Control," Revision 2, Section 8.6, dated March 30, 1981, states in part:
"Items Negating Use of Extended flitP... b. Contamina-tion levels in excess of 25,000 dpm/100 cm."
Contrary to the above, from September 24 to 28, 1981, multiple
- entries, using Extended Radiation Work Permit (RNP)
II2G issued May 5,
- 1981, were made into the Reactor Building northeast
- corner, elevation 198 ft. where measured contamination levels up to 43,000 dpm/100 cm existed.
RESPONSE
TkQ vL o~on o$ Roon Ptcoke~on Pnocn4n.e, RP-1 "Acmw and R~okogk cak Co~okR occ~ed wake, a~on auxiXiarcy opercatom
- merce, compk~ng Che aeq~em~
o( aCation SWncKng Orcder.
<29 RV~ Mea Sexy P~okR.
Thee oem cab ~sued Co name.
Xhe, ~eggy o$
( 8fi2140353 8~~~0~'DR ADOCK 05000220, 8
l(g Page 2
81-24
RESPONSE
(Continued) a~on safety equipment and m pm$o~ed on each aalu.$ C.
RP-1 a~u Chat "An gaea <n emma o$ ~ Level (25,000 dpm/100 cm~)
may be, entmedL ( ceqaur.erne~
(oe e~y have, been evaLuated and pocked by Rad. Paoke~n."
The, gaea had been awcveyed and evaLuated on 9/24/81 (amvey
<59405) ancLu&ng an ~ aampLe ut4.ch ~sulcated 12'PC.
- However, Che ae-q~eme~
foe seZ(-moment'oa eettcy ence not posted, ao e~y ahouLd noC have, been made on. Che eMended RNP.
Upon noWgeafion o$ Ae van by Che NRC ~mpeMoe, Ae gaea ediateLy amveyed and Che au~ pated.
An RMP um Lagued Co Ae op~os, and Che gaea uxor suk equentLy decontaminated a.
Lev& o( 6000 dpm/100 cm~, ehich w eeLL ~hin seL(-monitorung Kin~
The op~re who.had entmed Che gaea ewe feei.m~Med on Che seL(-mo~omng L~ and Wo mme ehoLe body counted on a. sampling bw~ on. 10/6'/81, and Che am~
aru4'.cated Lua Chan 15 MPBB Co" and Lua Chan, 0.15 QPBB Ce"".
Ra%~on Pmkmtion Tech'.eius rue hei m~Med on, Che aeq~eme~
$oa posing meu whee contami~n LeveLe exceed 25,000 dpm/100 cm~
and on Che advmab L&ty o( decon~nating (frequented, uceu be(owe
<each'hat Level.
SLecneLy
~1~
Thorn@5 E.
Lempg86 Vi.ce Pan ident.
NucL~ Generation TEL/RR/jm
'I
\\
l 59 2 Ah F2 M81 l9i X NOI038 au~ sn.