ML17053C766

From kanterella
Jump to navigation Jump to search
Notification of 810806 Meeting W/Util & London Nuclear Svcs, Inc in Bethesda,Md to Discuss London Nuclear Decontamination Procedures.Agenda Encl
ML17053C766
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 07/28/1981
From: Polk P
Office of Nuclear Reactor Regulation
To: Ippolito T
Office of Nuclear Reactor Regulation
References
NUDOCS 8108100385
Download: ML17053C766 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555

++*++

July 28, 1981 MEMORANDUM FOR:

Thomas A. Ippolito, Chief Operating Reactors Branch 82, DL FROM:

SUBJECT:

DATE:

PLACE:

PURPOSE:

Participants:

Philip J.

Polk, Project Manager Operating Reactors Branch 82, DL FORTHCOMING MEETING WITH NIAGARA MOHAWK POWER CORPORATION/

LONDON NUCLEAR SERVICES, INC.

Thursday, August 6, 1981 10:00 a.m.

Maryland National Bank Building, Room 6110 To discuss London'ucl.ear decontamination procedures (Agenda attached)

Nia ara Mohawk Power Cor oration L. McNeer S. Wilczek London Nuclear Services, Inc.

T.

Beaman NRC P.

J. Witt P.

R. Matthews C.

E.

McCracken H.

F.

Conrad B. Turovlin P.

W. O'onnor W. Bammill F.

Congel Attachment cc:

See next page Philip J. Polk, Project Manager Operating Reactors Branch 82 Division of Licensing 8108100385 810728 PDR ADQCK 05000220 P

/DR

AGENDA:

NINE NILE POI'NT - UNIT 1

DECONTAMINATION OF RECIRCULATION PUMP 1.

Description of Decontamination Process a.

b.

C.

equipment and piping affected (system diagram) decontamination solutions. used - composition, concentration, quantity, etc.

process steps 2.

Corrosion data on RCS components in contact with decontamination solutions a.

test data on each. material in system taking into consideration:

1.

crevice corrosion 2.

galvanic corrosion 3.

general corrosion 4.

material condition (sensitized,. cold worked, surface condition, etc.)

5.

consequences of long term exposure b.

fracture mechanics tests on pre-cracked specimens to determine KI sec 3.

Radiation measurements a.

decontamination factors b.

man-rem savings c.

recontamination data 4.

Description of waste handling and control a.

solidification process b.

quantity of waste (volume and curies) 5.

Description of any unplanned occurrences, corrective action taken 6.

Planned future decontaminations.

Cg

MEETING NOTICE DISTRIBUTION cket File HRC PDR Local PDR TERA HSIC ORB Reading T. Ippolito Project Manager T. Novak J. Heltemes, AEOD OELD IE(E (3)

Receptionist ACRS (10)

J. Olshinski H. Hughes, DL 5RC Participants Resident Inspector P,Ua05198t~

n, usS ~~~gg gsgQZM 1p

l.a, 1'

4 g

y i

I' II