ML17053C763

From kanterella
Jump to navigation Jump to search
Notification of Cancellation of 810806 Meeting W/Util & London Nuclear Svcs,Inc in Bethesda,Md to Discuss London Nuclear Decontamination Procedures.Agenda Encl
ML17053C763
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 07/28/1981
From: Polk P
Office of Nuclear Reactor Regulation
To: Ippolito T
Office of Nuclear Reactor Regulation
References
NUDOCS 8108100160
Download: ML17053C763 (6)


Text

UNITED STATES NUCLEAR REGULATORY COf/iMISSION Qyy/g -Or Q IVASHIMGTOM,D. C. 20555 July 28, 1981

!'iEt"iORAHDUM FOR:

FROM:

SUBJECT:

DP,,TE:

PLACE:

PURPOSE:

Parti ci pants:

Thomas A. Ippolito, Chief Operating Reactors Branch 82, DL Philip J.

Polk, Project Manager Operating Reactors Branch

>'2, DL FORTHCOYiIHG MiEETING WITH NIAGARA YiOHAWK POWER CORPORATION/

LONDON NUCLEAR SERVICES, INC.

Thursday, August 6, 1981 10:00 a.m.

Yiaryland National Bank Building, Room 6110 To discuss London Nuclear decontamination procedures (Agenda attached)

Hia ara Mohawk Power Cor oration

- L. McNeer S. Wilczek London Nuclear Services, Inc.

T.

Beaman HRC P.

J. Witt P.

R. Matthews C.

E.

McCracken H.

F.

Conrad B. Turovl in P.

hi. O'onnor

'W.

Gammi 1 1.

F.

Congel

~<KÃh auG o 5 198'.~

Atta chm.ent cc:

See next page Philip J.

Polk, Project Manager Operating Reactors Branch

=;,'2 Division of Licensing t'108100<

0>pppggO 0 8g07281 PDR PDQCK pDR~

I

1,

p1 i~lEETING NOTICE DISTRIBUTION L

Docket File NRC PDR Local PDR

~ TERA NSIC ORB Reading T..Ippol ito

.. Project hanager T, Novak J.

Heltemes, AEOD OELD ISE (3)

Receptionist

~

ACRS (10)

J. Olshinski N. Hughes, DL 9RC Participants

- Resident Inspector

AGENDA:

NINE hiILE POI'NT - UNIT 1

DECONTAMINATION OF RECIRCULATION PUtlP 1.

Descri ption of Decontamination Process a.

equipment and piping affected (system diagram) b.

decontamination solutions used - composition, concentration, quantity, etc.

.c.

process steps 2.

Corrosion data on RCS components in contact with decontamination solutions a.

test data on each material in 'system taking into consideration:

1.

crevice corrosion 2.

galvanic corrosion 3.

general corrosion 4.

material condition (sensitized, cold worked, surface condition, etc.)

5.

consequences of long term exposure b.

fracture mechanics tests on pre-cracked specimens to determine KI sec 3.

Radiation measurements a.

decontamination factors b;

man-rem savings c.

recontamination data 4.

Description of waste handling and control a.

solidification process b.

quantity of waste (volume and curies) 5.

Description of any unplanned occurrences, corrective action taken 6.

Planned future decontaminations

I J