REGULATORY ~ ORNATION DISTRIBUTION SYN (RIBS)
ACCESSION NBR t 8102100368 DOC ~ DATE! 81/01/16 NOTARIZED!'O DOCKET FACIL':50 220 NineI Mi)e Point Nuclear StationE Unit iE Niagara Powe 05000220 AUTH BYNAME AUTHOR AFFILIATION LEMPGES~ T ~ E ~
Ni agara Mohawk< Power Cor p, RECIP ~ NAME RECIPIENT AFFILIATION Commissioners
SUBJECT:
Forwards list ot mods installed or completed during 1980>>
DISTRIBUTION CODE:
ADOSS COPIES RECEIVED:LTR Q ENCL ~ SIZE"
'ITLE'.
Annual p
Semi Annual L Monthl y Oper ating Repor ts (OL Stage)
NOTES:
RECIPIENT ID CODE/NAME'CTION:
IPPOLITOE T ~
00 INTERNAL: D/DIRg HUM FAC07 ILK 06 NRC PDR 02*
OR ASSESS BR 10 COPIES LTTR ENCL 7
1 1
2 2
1 1
1 RECIPIENT ID CODE/NAME DIRzDIV OF LIC MPA 13 BR09 REG FILE 01 COPIES LTTR ENCL 1
1 2
2 1
1 1
1.
EXTERNAL>> ACRS LPDR 11 03~
1 1
1 1
1 FEB >4 >98>
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 21 ENCL 21
r V I IP I
~
t
~, >3),"<
D
~'I') )
I I
IP 841 4 IICl v
)'. >>,b, g
hi
, ~
n>>,~'>Ni f
I f
I l
I i
K
~
~
AY{P-2899 NIAGARAMOHAWKPOW-R CORPORATION/300 -"Rl~ BOULEVAPO WEST. SYRACLISF. N.Y. 13202/TiI.BPHONE (315) 474-1511 Janucvug 16, 1981 Dme&o/I,, 0(g.ce o) lfanageme&
In)o/1m~on and Paogruun Cobol, U~ed Slates Muelea/I. Reg~ony Comnkwion Naskmgton, D.
C.
20555 RE:
Doc>a& Mo. 50-220 DPR - 63 Ge~eme,n:
Attached m a, copy o( the ~C o( mocKpc~o~z which we/Ie ~nedalZed o< complied duru.ng 1980.
T~ ~C wm cnadv~enKy omened when Che RepoM of Opmatu1g SC~Wcs and Shou.'down Exp'.ence
)o/I. Dec,-
embe/I.,
- 1980, um sub~ed.
In Ae
$Mu/I.e CM <epos eiXC be. made, a, i'eg~ p~ o) Che moI<kQJ'p~ng
<epos.
Vmy Wut'.y yo~,
C Thomas E.
Lempg65 V~ce P/I.es~deI<
MucZeart. Gen~on TEL:jZ
~achmeet xc:
Dme&o/I., 0(g.ce o$ ISE (10 cop~es j
The following modifications were installed and completed during 1980 and are safety-rel'ated.
79.12 Anticipated Transient Without Scram cwork Package fr'1 Reactor Recirc.
Pump Trip on High Reactor Pressure and Low-Low Reactor Level 80.07 Vent 6 Purge Valve Mechanical Stops Limit opening on containment MOV 6 AOV isolation valves to 40% stroke 80 F 11 Reroute Cable Power Board 101 to Power Board 103 Provide separation on cable route of normal supply to P.B.
103 (E.D.G.)
80.43 Torus Saddles Provide additional support to torus shell
- 80. 50 Torus Room Vent Penetrations Provide penetrations to torus containment room above flooding level to allow ventilation for 80.43 work 80.64 Separate Fuel Oil Lines to Diesel Generators Eliminate inner tie on diesel generator fuel supply lines
- 80. 70 APRM LPRM Selection Provide additional LPRM selections for APRM's to eliminate failed LPRM chambers from APRM assignment 78.34 Fire Protection Phase 1 and 2 Structural modifications safety and non-safety related to provide stair towers and area separation for fire protection A safety analysis was performed for each safety-related modification.
For each modification, the probability of occurrance or the possibility a different type of an accident or malfunction than those evaluated in the safety analysis report did not change or were enhanced.
Also the margin of safety as defined in the basis of the Technical Specifications did not change.
Based on the above, these modifications did not constitute any unreviewed safety questions.