ML17053B991

From kanterella
Jump to navigation Jump to search
Forwards LER 80-020/03L-0
Date released: 06/30/2017 Download: ML17053B991


LER 80-020/03L-0:on 800830,while Experiencing Electrical Storm During Normal Operation,Loss of Meteorological Data Transmission to Control Room Instruments Occurred.Caused by Transceiver Failure.Transceiver Repaired & Returned to Svc
ML18037A291
Person / Time
Site: Nine Mile Point 
Issue date: 09/29/1980
From: Harrison P
NIAGARA MOHAWK POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML18037A291 (2)
Forwards LER 80-020/03L-0
ML17053B990
Person / Time
Site: Nine Mile Point 
Issue date: 09/29/1980
From: Bartlett J
NIAGARA MOHAWK POWER CORP.
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML17053B990 (2)