IE Insp Rept 50-220/79-26 on 791210,11 & 13.No Noncompliance Noted.Major Areas Inspected:Licensee Response to IE Bulletin 79-19,documents,procedures,training,audits,facility Tours & Records
ML17053B536
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 02/15/1980
From: Knapp P, Thomas L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML17053B535 List:
References
50-220-79-26, IEB-79-19, NUDOCS 8004100173
Download: ML17053B536 (26)


See also: IR 05000220/1979026

Text

'

U.S.

NUCLEAR REGULATORY COMMISSION

OFFICE

OF INSPECTION

AND ENFORCEMENT

Region I

Report No.

50-220/79-26

Docket No.

50-220

License

No.

DPR-63

Priority

Category

Licensee:

Nia ara

Mohawk Power

C r

300 Erie Boulevard West

Syracuse,

New York

13202

Faci 1 ity Name

Nine Mi1 e Point Nuclear Station

Inspection at:

Scriba,

New York

Inspection conducted:

December

10, 11,

and 13,

1979

Inspectors:

Lee, H. Thonus, Radiation Specialist

date signed

date signed

Approved by:

P. J.

Knapp, Chief, Radiation

upport

Section,

FFENS Branch

date signed

g r~

ate signed

Ins ection

Summar

Ins ection on December

10,

11

and 13,

1979 (Report

No. 50-220/79-26) "

A~Id:

Sp

i

1

p

y

g

p

licensees

response

to IE Bulletin 79-19 including licensee

action

on IE Circulars,

documents,

procedures,

training, audits, facility tours,

and records.

The inspection

involved 19 inspector-hours

onsite

by one

NRC regional

based inspector.

Results:

No items of noncompliance

or deviations

were identified.

.Region I Form 12

(Rev.

April 77)

800410~> <

DETAILS

Persons 'Contacted

Mr.

  • Mr.

Mr.

  • Mr.
  • Mr.

Mr.

  • Mr.

J. Aldrich, Supervisor,

Training

J. Duell, Assistant

Chemistry

and Radiation Protection Supervisor

C. Gerber,

Radwaste

Coordinator

E. Leach,

Chemistry

and Radiation Protection Supervisor

G. Leskiw, guality Control Auditor

D. Palmer, Supervisor,

guality Control-Operations

T. Perkins, Station Superintendent

  • Denotes those present at the exit interview on December

13,

1979.

The inspector interviewed several

other licensee

employees

including

auxiliary operators,

radiation protection technicians

and records

clerks.

Licensee Action on IE Circul'ars

.

79-15

The licensee does'ot

use the respiratory protection equipment

described

in the circular.

The inspector

had

no further questions.

Re ul ator

Documents

The licensee's

response

to IE Bulletin 79-19 indicated that current

copies of NRC and

DOT (Department of Transportation)

regulations

were

maintained in the station 'library and that current copies of the

burial site license. were maintained

by the radwaste

operations

coordinator

and the radiation protection department

supervisor.

The inspector

examined

the

NRC regulations

(10 CFR 71) and

DOT regulations

(49

CFR

170-179) in the library.

These

copies

were page

change

copies which

are periodically updated

as

changes

in the regulations: occur.

The

copy of the burial site license

issued

by the State of South Carolina

for the Barnwell facility which is maintained

by the radiation protection

department

head

was examined

and found to be

up to date.

No items of noncompliance

or deviations

were observed.

Procedures

The licensee's

response

to IE Bulletin 79-19 indicated that revised

procedures

covering the transfer,

packaging,

and transport of waste

would be developed

by January

1, 1980.

At the time of the inspection

the procedures

had not been developed,

reviewed

and implemented; this

area will be further examined at a date after the licensee's

scheduled

date for the completion of the procedures.

(50-220/79-26-01).

A

letter from the general

superintendent,

nuclear

generation-to

the

station superintendent

dated

September

21,

1979 designated

the radwaste

c'oordinator

and the radiation protection manager

as the individuals

responsible for the safe transfer,

packaging

and transport of low

level radioactive material.

No items of noncompliance

or deviations

were identified.

'Tnaini.n

J

The licensee

implemented

changes

in the basic "radiation worker"

.training and retraining

on October

5,

1979.

These

changes

emphasized

minimizing the creation of low-level waste.

Courses for operators

and members of the radiation protection departments

were under development

by'

contractor.

This area will be further examined at

a subsequent

inspection

when the

new training programs

are implemented

(50-220/79-

26-02).

No items of noncompliance

or deviations

were identified.

Audits

The inspector reviewed the licensee's

audit program of activities

associated

with the transfer,

packaging,

and transport of low level

radioactive wastes.

The licensee's

audits

by guality Assura'nce-

Operations

are performed in accordance

with guality Assurance

Procedure

1640 which calls for an audit report within 30 days,

a response

to

nonconformance

items within 22 days for acceptance

or rejection of

plant responses

to nonconformance

items.

The. procedure

also contains

provisions for verification of the response

and provisions for escalation

of disputed

items.

The inspector

examined

the results of several

licensee

audits in the

area of radioactive material transportation

and transfer.

Audit SR-

79-026A was conducted

September

4-13,

1979

and covered shipping,

.

handling,

and receiving of radioactive material,

procedures,

compliance

with 10 CFR 71, compliance with 49

CFR 173,

IE Bulletin 79-19 response

and conformance

to burial site requirements.

Audit SR-79-026B

conducted

in the

same time period covered

compliance with 10 CFR 71 requirements.

Audit SR-79-026C

was conducted

from September

10-12,

1979

and dealt

with compliance with 49

CFR requirements.

The licensee's

normal audit

program covers radioactive material transportation

on

a more frequent

than annual basis, typically twice per year.

No items of noncompliance

or deviations

were identified.

t

~Fillt l

The inspector

toured the licensee's

radwaste

area;

no containers

of

solidified or dewatered

waste were onsite.

These

are typically shipped

offsite in casks within a day of. being. prepared.

The inspector observed

a cask being filled with resin.

At the completion of the inspection

the filling/dewatering process.had

not been

completed.

The inspector

reviewed the licensee's

method of dewatering which included repeated

'ump downs of the resin using

a well point laid horizontally on the

bottom of the cask liner.

The holes in the upper half of the well

point had been filled with a rubber compound

such that water and air

could only enter through the bottom.

While in the radwaste

area

the

inspector

examined

area posting

and high radiation area control.

No items of noncompliance

or deviations

were observed.

0

8.

Shi ment Records

Technical Specification

(T.S'.) 6. 10. 1 requires

in part that "records

shall

be retained for at least five years" including "Records of

radioactive shipments".

The inspector

examined

records of approximately

15 shipments

made during 1979.

Certificates of compliance

and supporting

documents f'r two cask types

used

by the licensee

were examined to

verify that the licensee fulfilled the requirements

for a general

license to ship radioactive materials

under

10 CFR 71.12.

No items of noncompliance of deviations

were identified.

9.

Exit Interview

The inspector

met with licensee

representatives

(denoted in paragraph

1) at the conclusion of the inspection

on December

13,

1979.

The

inspector

summarized

the purpose

and scope of the inspection,

and the

findings as presented

in this report.

r PR RECy(

Wp

Q,

0

0

++*+~

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I

631 PARK AVENUE

KING OF PRUSSIA, PENNSYLVANIA19406

2

NOV IS>9

Docket No. 50-220

Niagara

Mohawk Power Corporation

ATTN:

Mr. R.

R. Schneider

Vice President

Electric Operations

300 Erie Boulevard West

Syracuse,

New York

13202

Gentlemen:

Subject:

Inspection

50-220/79-24

This refers to the inspection

conducted

by Mr. E. T. Shaub of this office

on September

14,

1979 and September

26-27,

1979, at Nine Mile Point Nuclear

Station Unit

1 of activities authorized

by"NRC License

No.

DPR-63

and to

the discussions

of our findings held by Mr. Shaub with Mr. T. Perkins of

your staff at the conclusion of the inspection..

Areas

examined during this inspection are described

in the Office of

Inspection

and Enforcement Inspection

Report which is enclosed with this

letter.

Within these areas,

the inspection consisted of selective

examinations

of procedures

and representative

records,

interviews with personnel,

and

observations

by the inspector.

Within the scope of this inspection,

no items of noncompliance

were observed.

In accordance

with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and the enclosed

inspection report will be placed in the

NRC s Public Document

Room. If

this report contains

any information that you (or your contractor)

believe

to be proprietary, it is necessary

that you make

a written application

within 20 days to this office to withhold such information from public

disclosure.

Any such application must be accompanied

by an affidavit

executed

by the owner of the information, which identifies the document or

part sought to be withheld, and which contains

a statement of reasons

which

addresses

with specificity the items. which will be considered

by the Commission

as listed in subparagraph

(b)(4) of Section 2.790.

The information sought

to be withheld shall

be incorporated

as far as possible into a separate

part of the affidavit. If we do not hear from you in this regard within

the specified. period, the report will be placed in the Public Document

Room.

  • ~

Niagara

Mohawk Power Corporation

g

HOV >979

No reply to this letter is required;

however,

should you have any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

'alter

G. Martin, Chief

Safeguards

Branch

Enclosure:

Office of Inspection

and Enforcement

Inspection

Report

Number

50-220/79-24

(Contains

2.790 Information)

U.

S.

NUCLEAR REGULATORY COMMISSION

OFFICE

OF INSPECTION

AND ENFORCEMENT

REGION I

Report

No.

50-220/79-24

Docket No.

50-220

License

No.

DPR-63

Licensee:

Nia ara

Mohawk Power Cor oration

Safeguards

Group~

300 Erie Boulevard i<est

Syracuse,

New York

13202

Facility Name:

Nine Mile Point I

Inspection At:

Oswego,

New York

Inspection

Conducted:

September

14, 1979,

Se tember 26-27,

1979

Date of Last Material Control

and Accounting Inspection

Type of Inspection:

Unannounced

Material Control

8 Accountin

Inspectors:

E. T. Shaub,

Safeguards

Technician

<I'c'. /

P"..H. Bissett,

Safe

ua

s

A itor

/o p2.

7

date

date

date

Approved by:

.

H.

oyne

,

ie

, Nuclear Material Control

date

port Section,

Safeguards

Branch

Ins ection

Summar

~dl

td:

P ttty g;

t

d

p

t

t

d

shipping

and receiving, storage

and internal control inventory, record

and reports,

and, management

of nuclear material control system.

The inspection

involved 26

inspector-hours

on site

by two

NRC inspectors

and was started

on the regular shift.

Results:

The licensee

was found to be in compliance with NRC requirements

in all

areas

examined during the inspection.

Region I Form 166

(August 1979)

DETAILS

l.

Persons

Contacted

"T. Perkins,

Superintendent

of Nuclear Generation

~M. Drews, Reactor Analysist Supervisor

"G. Leskin, Acting Supervisor gC-Operation

~P. Harrison,

gC Engineer

"R. Tessler,

Technician

D Reactor'Physics

B.

Eastman,

Technician

D Reactor

Physics

" denotes

those present at the exit interview.

2.

Licensee Action on Previous

Ins ection Findin s

(Closed)

Noncompliance

(77-21-01) Failure to maintain

on a current

basis Material Control Procedure

No. AP-37.

(Closed)

Noncompliance

(77-21-02) Failure to conduct

a physical

inventory

within a twelve month interval

as required

by 10 CFR 70.51(d)

~

(Closed)

Noncompliance

(77-21-03) Failure to accumulate

and include

plutonium decay

on Form NRC-742 reports

as required to

CFR 70.53.

Licensee actions

on these

three

items were reviewed

and closed during

inspection

78-06.

3.

Exit Interview

The inspectors

met with the licensee's

representatives

(denoted in

paragraph

1) at the conclusion of the inspection

on September

27,

1979.

The inspectors

summarized

the scope

and findings of the inspec-

tion.

4.

Unresolved

Items

There were

no unresolved

items.

5.

Inde endent Ins ection Effort

No items of noncompliance

were noted.

I

The inspectors

walked through various areas of the plant to observe

plant operations.

6.

MC 85102B - Material Control

and. Accountin

No items of noncompliance

were noted.

Facilit

Or anization

and

0 eration - The inspector verified, through

review, that the licensee

has prepared,

maintained

and utilized on a

current basis,

adequate written procedures

for nuclear material control

and accounting

and that written statements

of responsibility

and

authority have

been established

for those positions with responsibility

for SNM.

Shi

in

and Receivin

- Inspection results

were attained

through

review of each of the prepared

Form NRC-741, Material Transaction

Reports,

against criteria for preparing/completing

the forms, timeliness

in issuance

and completion, correctness

of the coding information/quanti-

tative data,

and authorized signature.

Measurement

and Control - The inspectors

reviewed procedures,

ledgers

and process

computer printouts to ascertain that the licensee

has

established,

maintained

and utilized a method of computation for the

determination of the total element

and isotope composition of nuclear

materials

The licensee

uses

a General Electric supplied computer

program,

OD-12; to determine

element

and isotopic composition

and

exposure history for each fuel assembly in the reactor core.

The

licensee's

backup

method for determining thermal

power output of the

core is a calorimetric determination.

The inspector's

independent

determination of the uranium and uranium-

235 fission and transmutation

and plutonium production agrees

with the

licensee's

reported figures

as

shown

on the

Forms

NRC-742, Nuclear

Material Status

Reports,

submitted for the period July 1,

1976 through

March 31,

1979.

Stora

e and Internal Control - The licensee

has established

a system

of storage

and internal control of SNM which provides for knowledge of

the quantity and location of all

SNM within the facility.

The inspectors

reviewed

SNM accountability system

documents

maintained

by the licensee,

including Fuel

Element History Cards,

Fuel

Movement Sheets

(Internal

Transfer Forms),

and Reactor

Core and Spent

Fuel

Pool tagboards.

Ph sical Inventor

- The inspectors verified the licensee's

latest

physical inventory by an item count of the irradiated fuel elements

in

the spent fuel pool and by verification of a random sample of approxi-

mately 25K of the fuel elements

in the spent fuel pool to tagboards

and grid maps.

The core inventory was verified by selecting

a random

sample of 25K of the fuel elements

and comparing the location of each

fuel assembly selected

to the fuel element history cards,

reactor core

tagboards

and Fuel

Loading Procedure

for Cycle 6, Fuel

Loading.

The inspector's verification confirmed the facility SNM inventory to

be as follows:

Location

Fuel Assemblies

Reactor

Core

532

Spent

Fuel

Pool

844

Total

1,376

Records

and

Re orts - A 100K audit of Material Status

Reports

(Form

NRC-742

and Material Transaction

Reports

(Form NRC-741) filed by the

licensee for the period April 1,

1977 through March 31,

1979 was

performed to verify compliance with 10 CFR 70.53

and

10 CFR 70.54,

respectively.

Through this review it was noted that the licensee

was

including both natural

and enriched

uranium on on line 30 (receipts)

of the enriched

u'ranium Material Status

Report.

To avoid any future

confusion,

since all future shipments

of fuel assemblies will contain

both natural

and enriched

uranium, the licensee

agreed to open

a

separate

account for all natural

uranium received

and, for reporting

purposes,

transfer the appropriate

amount of natural

uranium from the

normal

uranium Material Status

Report to line 22 of the enriched

uranium Material Status

Report.

It was also noted during the review,

that both the uranium and plutonium Material Status

Reports for the

period October

1,

1978 to March 31,

1979 were dated

and actually

reported for October

1,

1978 to March 1,

1979.

The licensee

agreed to

submit corrected

copies of both the uranium and plutonium Material

Status

Report.

Material Balance

Summaries for the, period covered

by the inspection

are

shown in Exhibits I, II, and III.

Mana ement of Material Control

S stem - The inspection results

were

obtained through review of the equality Control procedures.

The last

gC audit of the special

nuclear material accountability procedures

was

completed in July,

.1978.

Also,

gC checks

are performed continuously

when reactor fuel is received,

moved or shipped at the site.

~

~

EXHIBIT I

PERIOD:

4/1/77 - 3/31/79

MATERIAL BALANCE SUMMARY

ENRICHED URANIUM

RIS:

YGX

= Beginning Inventory

8 '4/1/77

Receipts

Material to Account For

Removal s:

Shipments

Burn-Up

Total Removals

Ending Inventory 8

3/31/79

Material Accounted for

Grams

Element

221595201

31588828

0

1256373

1@HZ(

251937656

Z5318$

}ZR

~Iso to

e

3010673

893259

M3932

0

549384

3254548

p

~

EXHIBIT II

PERIOD:

4/1/77 - 3/31/79

MATERIAL BALANCE SUMMARY

PLUTONIUM

RIS: YGX

Grams

Element

~lento

e

Beginning Inventory I 4/1/77

Receipts

Production

Material to Account For

Removals:

Shipments

Decay

Total

Removals

Ending Inventory 8

3/31/79

Material Accounted For

1143800

0

279703

1423~5

0

12245

12245

1411258

868149

0

189607

M1UZK

0

12245

12245

1045511

1(~57 5j

s

~

~

EXHIBIT III

PERIOD:

4/1/77 " 3/31/79

MATERIAL BALANCE SUMMARY

NATURAL URANIUM

RIS:YGX

Grams

EIement

~Isoto

e

Beginning Inventory 8 4/1/77

Receipts

YLG-YGX 27-33

Material to Account For

Removals:

Shipments

Burn-Up

Total

Removals

Ending Inventory 8

3/31/79

Material Accounted For

0

958721

0

0

0

958721

0

8095

~85

0

0

0

8095

5999

Natural

uranium will be transferred to the enriched

uranium account in the

next Form NRC-742 reporting period (4/1/79 - 9/30/79), for simplication of

accounting

and reporting requirements.

(See paragraph

6 for details).

J

~

~