ML17053B062

From kanterella
Jump to navigation Jump to search
Forwards LER 79-013/03L-1
Date released: 06/30/2017 Download: ML17053B062


LER 79-013/03L-1:on 790525,during Refuelling Outage,Three Instrument Surveillance Procedures Were Implemented Before Required Temporary procedure-change Signatures Were Obtained.Cause Not Stated
ML18037A203
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 09/19/1979
From: Duda E
NIAGARA MOHAWK POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML18037A203 (2)
Forwards LER 79-013/03L-1
ML17053B061
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 09/27/1979
From: Schneider R
NIAGARA MOHAWK POWER CORP.
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML17053B061 (2)