ML17053A457
| ML17053A457 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 01/12/1979 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML17053A452 | List: |
| References | |
| 50-220-78-21, NUDOCS 7903070112 | |
| Download: ML17053A457 (2) | |
Text
'APPENDIX A
'NOTICE OF 'IOL'ATION Niagara Mohawk Power, Corporation Docket No. 50-220 Based on the results of an NRC inspection conducted on December 11-14, 1978, it appears that one of your activities was not conducted in full compliance with the conditions of your NRC Facility License No.
DPR 63 as indicated below.
This-item is a deficiency.
Technical Specification 6.8.1 states in part:
"Written procedures and administrative policies shall be established, implemented and maintained..."
- and, Technical Specification 6.8.2 states in part:
"Each procedure...
of 6;8.1 above,...shall be reviewed by the SORC and approved by the General Superintendent Nuclear Generation prior, to implementation..."
Contrary to the above, on November 9-10,
- 1978, a Station Shift Supervisor Instruction established and implemented a procedure to cross-connect the fire protection systems of Nine Mile Point Unit 1 with Nine Mile Point Unit'2.
This procedure was not reviewed by the SORC and approved by the General Superintendent Nuclear Genera-tion prior to implementation.
080 2'0
ii ~
"-