ML17053A315

From kanterella
Jump to navigation Jump to search
Forwards Supplemental Reload Licensing Submittal for Reload 7,Reanalysis Suppl
ML17053A315
Person / Time
Site: Nine Mile Point 
Issue date: 01/02/1979
From: Dise D
NIAGARA MOHAWK POWER CORP.
To: Ippolito T
Office of Nuclear Reactor Regulation
Shared Package
ML17053A316 List:
References
NUDOCS 7901040121
Download: ML17053A315 (4)


Text

DOCKET

'5000220 NOTES-REGULATOR+ NFORMATION DISTRIBUTION SQTEN (RIDS)

ACCESSION NBR:7901040121 DOC.DATE: 79/O.l/02 NOTARIZED-NO FACIL~50-220 NINE MILE POINT gl, 1'JIAGAflA MOHAWK.POWER CORP.

AUTH.NAME AUTHOR AFFILIATION DISE,D.P. '.IAGARA MOHAWK PWR "RECI P. NAME REC IP IENT AFF ILIATION I PPOLITO T-A ~

+**OPERATING REACTORS BRANCH 3 0

SUBJECT-Forwards Reanalysis Suppl to supplemental Reload Licensing Submi ttal (NEDO-24155-1) reload 7.

E DISTRIBUTION CODE<

AOO IS COPIES PECEI VED-'LTR 4 ENCL +~

SIZE: J~~/

TITLE-GENERAL DISTRIBUTION F()R AFTER ISSUANCE OF OPERATING LIC RECIPIENT ID CODE/NAME ACTION:

05 BC dgB &B INTERNALS EG FILE 15 CORE PERF BR 17 ENGR BR 19 PLANT,SYS BR 21 EFLT TRT SYS EXTERNAL: 03 LPDR 23 ACRS COPIES LTTR ENCL 7

'7 1

1 1>>1 1,1l,l 1

1 16 16 DECI PI ENT ID CODE/NAME NRC PDR 14 HANAUER 16 AD SYS/PROJ 18 REAC SFTY BR 20 EEB 22 BRINKMAN 04 NSIC COP I ES LTTR ENCL

.1 1

1 1

1 1

1 I

1 1

I I

I TOTAL NUMBFR OF COPIES REQUIRED-LTTR 38 ENCL 38

0

~

'I A

~

III n

, ~

fI 0

7 NIAGARA 4 MQHAWK NIAGARAMOHAWKPOWER CORPORATION/300 ERIE BOULEVARDWEST, SYRACUSE, N.Y. 13202/TELEPHONE (315) 474-1511 January 2,

1979 Division of,Opeiating Reactors Attn:

Mr. Thomas A. Ippolito, Chief Operating Reactors/Branch t3 U.

S. Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Ippolito:

Re:

Nine Mile Point Unit 1 Docket No. 50-220 DPR-63 As stated in Attachment B of the Application for Amendment to Operating License dated November 20, 1978, additional analysis is provided.

This supports a revised end-of-cycle power level profile and verifies applicability of the revised Load Line Limit Analysis.

Attached are forty (40) copies of NED0-24155-1, Supplement 1, which supplements our previous licensing submittal for Reload 7 and contains the results of the aforementioned analyses.

The results of these analyses show that no Technical Specification changes other than those contained in the November 20, 1978 submittal are required.

However, these analyses show rated power operation is allowed beyond the previously analyzed point at EOC6-2000 MWD/ST to EOC6-1500 MWD/ST.

Very truly yours, NIAGARA MOHAWK POWER CORPORATION Donald P. Disc Vice President-Engineering SWW/szd Attachments (40)

e l Q$ ) k j)~q~c