LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Tables 8.3-1 Through 8.3-6

From kanterella
(Redirected from ML17046A453)
Jump to navigation Jump to search
Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Tables 8.3-1 Through 8.3-6
ML17046A453
Person / Time
Site: Salem  PSEG icon.png
Issue date: 01/30/2017
From:
Public Service Enterprise Group
To:
Office of Nuclear Reactor Regulation
Shared Package
ML17046A230 List: ... further results
References
LR-N17-0034
Download: ML17046A453 (7)


Text

  • *
  • DIFFERENT FEEDS TO THE VITAL INSTRUMENT RUSES No. lA Vital Bus No. lB Vital Bus No. lC Vital Bus No. lD Vital Sus SGS-UFSAR Battery Feed 230V CC Feed 230V CC Feed To Power Supply To Power Supply <Emerg. Feed) A c B 1 of 1 A c A c B Revision 11 July 22, 1991 STEP NO. LOAD DESCRIPTION 0 230 V 460 V Vital Buses 1 Safety lnj Chrg Pmp 2 Safety Injection Pmp 3 Residual Heat Removal Pmp 4 Containment Spray Pmp 5 Service Water Pump 5 AltSfWtrPmp, iffail 6 CFCUs (Low Speed) 7 Aux Feedwaler Pmp B Control Rm A/C (Chillers) 9 Emergency Control Air Camp 10 Aux Building Exh and Sup Fans 11 Switchgear Rm Supply Fans STEP NO. LOAD DESCRIPTION 0 230 V 460 V Vital Buses 1 Safety lnj Chrg Pmp 2 Safety Injection Pmp 3 Residual Heat Removal Pmp 4 Containment Spray Pmp 5 Service Water Pump 5 All SfWir Pmp, if fail 6 CFCUs (Low Speed) 7 Aux Feedwater Pmp 8 Control Rm A/C (Chillers) 9 Emergency Control Air Camp 10 Aux Building Exh and Sup Fans 11 Switchgear Rm Supply Fans TABLE8.3-2 DIESEL GENERATOR LOADING SEQUENCE FOR LOSS OF OFFSITE POWER WITH ACCIDENT UNIT N0.1 TIME nME DIESEL 1A SEC DIESEL 18 SEC 00 00 01 01 05 05 09-10;30(1) 13 09 18 14 22 18 26 22 30 26 30 26 30 26 UNIT N0.2 TIME TIME DIESEL 2A SEC DIESEL2B SEC 00 00 01 01 05 05 09-10;30(1) 13 09 18 14 22 18 26 22 30 26 30 26 30 26 TIME DIESEL 1C SEC DIESEL2C 00 01 05 09-10;26(1) 13 18 22 26 26 26 26 TIME SEC 00 01 05 09-10;26(1) 13 18 22 26 26 26 26 The component ooo!ing pumps are manually energized during the recirculation phase only after prior reduction of the diesel load by manual shutdown of equipment not required for the recirculation phase. Prior to closing the vital bus breaker supplying the pressurizer backup heaters, the operator shall verify that the additional load will not exceed the 2000 hour0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> rating (2750 kw) of the diesel generator. (1} A one (1) second containment spray pump start permissive is established followed by an end of sequence permissive. 1 of 1 SGS-UFSAR Revision 23 October 17, 2007 STEP NO. 0 1 2 3 4 4 5 6 7 8 9 10 STEP NO. 0 1 2 3 4 4 5 6 7 8 9 10 TABLE 8.3-3 DIESEL GENERATOR LOADING SEQUENCE FOR LOSS OF OFFSITE POWER UNIT NO.1 TIME TIME TIME PIESEL lC 230 V 460 V Vital Buses 00 00 00 Safety lnj Chrg Pmp Ol 01 Component Cooling Pmp 01 05 05 Auxiliary Feedwater Pmp 05 09 Service Water Pmp 09 13 09 Alt S/Wtr Pmp, If fail 14 18 14 Emergency Control Air Camp 18 Control Rm A/C (Chillers) 20 20 20 Aux Building Supply/Exh Fans 20 20 20 Switchgr Supply Fans 20 20 20 R/X Shield Vent Fans 20 20 R/X Nozzle Support Vent Fans 20 20 20 UNIT N0.2 TIME TIME TIME LOAD DIESEL 2A SEC DIESEL 2B SEC D!E;St;;L 2C 230 V 460 V Vital Buses 00 00 00 Safety lnj Chrg Pmp 01 01 Component Cooling Pmp 01 05 05 Auxiliary Feedwater Pmp 05 09 Service Water Pump 09 13 09 Alt S/Wtr Pmp, if fail 14 18 14 Emergency Control Air Camp 18 Control Rm A/C (Chillers} 20 20 20 Aux Building Supply /Exh Fans 20 20 20 Switchgr Supply Fans 20 20 20 R/X Shield Vent Fans 20 20 R/X Nozzle Support Vent Fans 20 20 20 The reciprocating charging pump, containment fan cooler units and other equipment will be manually energized as required only after prior reduction of diesel load by manual shutdown of equipment not required for long-term operation. Prior to closing the vital bus breaker supplying the pressurizer backup heaters, the operator shall verify that the additional load will not exceed the 2000 hour0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> rating (2750 kW) of the diesel generator. l of 1 SGS-UFSAR Revision 22 May 5, 2006
  • *
  • SGS-UFSAR TABLE 8.3-4A CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES -UNIT 1 This Table Deleted. (See Section 8.3.3) 1 of 1 Revision 14 December 29, 1995
  • *
  • SGS-UFSAR TABLE 8.3-4B CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES -UNIT 2 This Table Deleted. (See section 8.3.3) 1 of 1 Revision 14 December 29, 1995 Time Interval 0 -1 1 -30 30 -60 60 -120 28-VDC Time Interval 0 -1 1 30 30 60 60 -120 SGS-UF'SAR TABLE 8.3-5 28-VDC Battery Load Profile SGS -Unit No. 1 Total Load Cycle {Amperes) Battery 1BTRY1ADE 150.3 136.5 133.3 127.9 Battery Load Profile Total Load Cycle Battery 2BTRY2ADE No. 2A 160.6 129.6 126.6 124.7 1 of 1 Battery lBTRYlBDE 166.0 172.8 155.8 120.7 (Amperes} Battery 2BTRY2BDE No. 28 166.0 171.5 166.3 125.1 Revision 19 November 19, 2001 Time Interval (Minutes) 0 -1 1 -30 30 -60 60 120 Time Interval {Minutes) 0 -1 l -30 30 -60 60 -120 SGS-UFSAR TABLE 8.3-6 125-VDC Battery Load Profile SGS -Unit No. 1 Total Load Cycle (Amperes) Battery Battery lBTRYlADC lBTRYlBDC No. lA No. lB 565.27 667.38 237.17 299.46 238.22 300.91 238.22 300.91 125-VDC Battery Load Profile SGS -Unit No. 2 Total Load Cycle (Amperes) Battery 2BTRY2ADC No. 2A 561.34 249.10 250.15 250.15 Battery 2BTRY2BDC No. 2B 659.02 297.02 298.47 298.47 1 of 1 Battery lBTRYlCDC No. lC 579.24 381.74 381.61 381.61 Battery 2BTRY2CDC No. 2C 539.25 340.85 340.78 340.83 Revision 18 April 26, 2000