ML17037C559
| ML17037C559 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 01/03/1973 |
| From: | Brosnan T Niagara Mohawk Power Corp |
| To: | Anthony Giambusso US Atomic Energy Commission (AEC) |
| References | |
| Download: ML17037C559 (4) | |
Text
AEC DI IBUTION FOR PART 0 DOCKET MA L
~.TEMPORARY FORMA CONTROL NO:
141'X FROM: Niagara Mo a Power Gorpo
.'yracuse, N.Y.
13202 Thomas J. Brosnan DATE OF DOC:
1-3-73 DATE REC 'D LTR lZMiO RPT OTHER 1-5<<73 TO o Mr. A. Giambusso CLASSY PROP riiFQ ORIG
&iiTAZC PDR Sr".WZ LOCAL PDR DOCiKT NO:
50-220 DESCRIPTION:
Ltr re our 11-20>>72 ltr. ~.. ~
furnishing.addi info re fuel densification for Nine Mile Pt. Unit I Plant.
~. ~.
ENCLOSURES:
PLANT NAhSS:
Nine Mile Pt. Unit I.
FOR ACTION INFORMATION BUD+(z,)
scHWENCER(L)
W/
Copies W/
Copies CLARK(Z,)
STOLZ(Z,)
W/
Copies W/
Copies oozzzn(L)
VASSALID(z)
'/
Copies W/
Copies
'NXEr,(z,)
H. DEIGN W/
Copies W/
Copies scHEmu,(L) 1/
Copies xEMAmm(z,)
W/Sjcopies CZfmKID(FM)
W/
Copies
. DICKER(E)
W/
Copies KNXGRTON(E)
W/
Copies YOUNGBIDOD(E) '
W/
Copies
'EGAN(E) j W/
Copies W/, 'Copies XWVQIALDISTRIBUTION FX 4hC-Oocp ROOM P-506A MUNTZING/STAFF CASE GIAMBUSSO deYD-L(BWR)
DEYoUNG-L(pwR)
SKOVHOLT-L Po COLIZNS REG OPR itFLLE k. REGIOE (2)
MORRXS STELLE SCHROEDER MACCARY LANGE(2)
PAVZZCKI SHAO NRNUTH Trzzo YDORE HOUSTON TEDESCO IDNG LAINAS HMQ<OYA VOLLMER DENTON GRIMES GAMELL KASTNER BALLARD SPANGLER EEVZRO MULLER DICKER KNXGHTON YOUNGBIDOD PROJ ZZAMR HAIUPZS FSM Sl SLEE NUSSBAKKR rzc AssT.
MASON L
WILSON L
MAXGRET L
SbiETH L
GEARXN L
HIGGS L
TEETS L
'LEE L
WADE E
SHAFER 8o M BROWN E
G. VILIZAMS E E o GOULBOURNE L
AT IND SALTZMAN PLANS MCDONALD f4, MACKAY
- DUBE, WARGA 44UBENSTEZN INFO C
MILES 4 IDCAL PDR Oswe
-DTXE(mWNATHY)
-NSXC(BUCHAtMN) 1-ASLB-YORE/SAYRE WOODWARD/H.'T.
E 16-CES ACRE.iSCSEGI o
N.Y EXTERNAL DISTRIBUTION SENT TO -LZC ~ ASST.
R. DIGGs 0N 1>>5-73 (1)(5)(9)-NATxoNALLAB GT-B227 1 R.
CATLIN~ E-256-GT 1 CONSULANT'S NEWMARK/BUZZ/AGABXAN 1 PDR-SAN/LA/NY 1>>G1RG3 LELIDUCHE BROOKHAVEN NAT. LAB 1-AGMED(WALTER KOESTER Rm C-427,F OT) 1-RDo ~ o MULL'ERo ~ oF-)09GT
~J' r
a 4
1 4
~
'i4
<<PJ vq C.
a ~
~
4
~ a
~N, I
I
. 4
)
jP g
@~1,'l >... ',.m'l gll
'.2 'J K
~~t
>~
4
- asia, lQ
~. i a..~
~
~
~
1
. ~
I i
~
~
~
I kI
~ u~
y NIAGARA MOHAWK POWER CORPORATION f
C'IAGARA~
MOHAWK 300 ERIE 80ULEVARD WEST SYRACUSE, N.Y. ISEOE January 3, 1973 Regulatory f Flf@ Cy" Mr. A. Giambusso Deputy Director for Reactor Projects Directorate of Licensing U. S. Atomic Energy Commission Washington, D. C.
20545
Dear Mr. Giambusso,
Re:
Nine Mile Point Unit 1
Docket No." 50-'220 8
4og~
~Kg~P o+(<e>
4p C~4 gg Your letter of November 20, 1972, requested analyses and additional information relative to the possible fuel densification
, at Nine Mile Point Unit 1.
The requested information has been submitted to the Commission in a comprehensive generic report, NEDM-10735, "Densification Considerations, in BWR Fuel Design
'and
-Performance,"
dated
- December, 1972.
We have reviewed this report and find that the fuel design and operating parameters for both the initial core and reload fuel at Unit 1 are within the range of parameters analyzed.
- Further, visual inspection of fuel discharged from Unit 1
has shown no tendency for the fuel rods to experience the collapse mechanism noted in, the Commission,'s report on fuel densification.
From the analyses and data presented in this report, we conclude that no changes in design or operating conditions are necessary to maintain required margins for Unit 1.
Sincerely, TJB/vk Thomas Brosnan Vice President and Chief Engineer