ML17037C547
| ML17037C547 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 08/27/1973 |
| From: | Raymond P Niagara Mohawk Power Corp |
| To: | Anthony Giambusso US Atomic Energy Commission (AEC) |
| References | |
| Download: ML17037C547 (4) | |
Text
AEC DIS UTION FOR PART 50 DOCKET MATE (TEMPORARY FORM)
CONTROL NO: 6605 FILE:
FROM:
Niagara Mohawk Power Corporation
- Syracuse, New York 13202 Philip D. Raymond DATE OF DOC 8-27-73 DATE REC'D 8-29-73 LTR MEMO RPT OTHER TO:
A. Giambusso ORIG 1 signed CC OTHER SENT LOCAL PDR X
CLASS UNCLASS PROP INFO INPUT NO C S REC'D DOCKET NO:
50-220 DESCRIPTION:
Ltr advising Tech Specs have been modified in accordance with Order of Modification dtd 8-24-73 by adoption of Change No, 9
ENCLOSURES:
'ACKNOWLEDGKD DQNQT H,ZMOVZ Nine Mile Point Unit t.
1 FOR ACTION/INFORMATION 8-30 BUTLER(L)
W/
Copies CLARK(L)
W/
Copies GOLLER(L)
W/
Copies KNEEL(L)
W/
Copies SCHWENCER(L)
W/
Copies STOLZ (L)
W/
Copies VASSALLO(L)
W/
Copies SCHEMEL(L)
W/,
Copies NIEMANN (L)
W/4 Copies DICKER(E)
W/
Copies KNIGHTON(E) "
W/
Copies YOUNGBLOOD(E)
W/
Copies INTERNAL DISTRIBUTION REGAN(E)
W/
Copies W/
Copies W/
Copies W/
Copies G PILE C
DR OGCP RSM P-506A MJNTZING/STAPF CASE
~EAMBUSSO
~OYD MOORE (L) (BWR)
DEYOUNG (L) (PWR)
~KOVHOLT (L)
P.
COLLINS REG OPR
~ILE & REGION(3)
MORRIS STEELE TECH REVIEW HENDRIE SCHROEDER MACCARY KNIGHT PAWLICKI SHAO
~TELLO HOUSTON
~OVAK
~OSS IPPOLITO TEDESCO LONG LAINAS BENAROYA VOLIMER DENTON GRIMES GAMMILL KASTNER BALLARD SPANGLER ENUIRO MULLER DICKER KNIGHTON YOUNGBLOOD REGAN PROJECT LDR HARLESS LIC ASST
~EGGS (L)
GEARIN (L)
GOULBOURNE (L)
LEE (L)
MAIGRET (L)
SERVICE (L)
SHEPPARD (E)
SMITH (L)
TEETS (L)
WADE (E)
WILLIAMS (E)
WILSON (L)
~AT IND BRAE%MAN SALTZMAN PLANS MCDONALD DUBE INFO
~. MILES
~VARGA
~L, RUBENSTEIN
~GC(Engelhardt)
~J, F. O'EARY EXTERNAL DISTRIBUTION
~ - LOCAL PDR Oswe o
,~1 - DTIE(ABERNATHY)
(1)(2)(10)-NATIONALLAB'S
~1 - NSEC(BUCHANAN) 1-R.Schoonmaker,OC,GT,D-323 1 - ASLB(YORE/SAYRE/
~ 1-R.
CATLIN) E-256-GT WOODARD/"H" ST.
1-CONSULTANT'S
~16 - CYS ACRS gggggQ Sent 8-30 73 to NEWMARK/BLUME/AGBABIAN R. Diggs 'for Dist.
1-GERALD ULREKSON...OML 1<<PDR-SAN/LA/NY 1-GERALD LELLOUC BROOKHAVEN NAT. LAB 1-AG?KD(WALTER KOESTER HM-C-427-GT 1"RD..MULLER..F-309 GT
I'tgh
~ ltfl lt 0
~ jl
/III ihj) ij Pjt Ii II II, I
I Il I ~ I i=
)I ttgf Ih ggg
'ill r.tijl 1j I
j I j>q, th) gli,"
P
-hj Ie
~ I tgji I
~
\\
~
~ I
NIAGARA MOHAWK POWER CORPORATION NIAGARA~
MOHAWK
~)I5h Regu1atorjj Fiie Cy.
300 ERIE BOULEVARDWEST SYRACUSE, N, Y. I3202 August 27, 1973 c3 CO~/fig Q f/'8~g~iQg III/g~O g/
0>
Mr. A. Giambusso Deputy Director for Reactor Projects Directorate of Licensing United States Atomic Energy Commission Washington, D.
C.
20545
Dear Mr. Giambusso:
Re:
Nine Mile Point Unit 1
Docket No. 50-220 The Technical Specifications for Nine Mile Point Unit 1
have been modified in accordance with the Commission's Order for Modification dated August 24,
- 1973, by adoption of Change No.
9 attached to the Order.
The maximum reactor power level that can be attained-consistent with the Order is variable depending primarily on the operating power distribution at any given time.
The present operating power distribution enables attainment of 1665 thermal megawatts.
Very truly yours, Philip D.
Raymon Vice President"Engineering GKR/vk Qu~~~c us~~
ua29'" )
'EGu+gECgQ sEcW" I5'ugyS
0
+~-
1